General Presentation 1 General presentation Design, Engineering, Manufacture, Assembly and maintenance of Flare system EIFFAGE CONSTRUCTION METALLIQUE 481 rue du faubourg d’Esquerchin 59553 CUINCY Téléphone + 33 327 95 75 00 - Fax + 33 327 95 75 02 GSM + 33 603 36 03 63 Email [email protected]
36

Design, Engineering, Manufacture, Assembly and maintenance ...

Apr 01, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Design, Engineering, Manufacture, Assembly and maintenance ...

General Presentation

1 General presentation

Design, Engineering, Manufacture,

Assembly and maintenance of

Flare system

EIFFAGE CONSTRUCTION METALLIQUE

481 rue du faubourg d’Esquerchin 59553 CUINCY

Téléphone + 33 327 95 75 00 - Fax + 33 327 95 75 02

GSM + 33 603 36 03 63 Email [email protected]

Page 2: Design, Engineering, Manufacture, Assembly and maintenance ...

General presentation2

GIATEC Services

Turnkey Solutions

1) Design

2) P.I.D.(piping and instruments diagram)

3) Engineering

4) Manufacture

5) Revamping

6) Survey

7) Maintenance

8) Assembly

9) Commissioning

10)Piping

Page 3: Design, Engineering, Manufacture, Assembly and maintenance ...

3

References

NOVAPEX / TRANSUGIL PROPYLENE

General presentation

Page 4: Design, Engineering, Manufacture, Assembly and maintenance ...

4

Quality system iso 9001- Engineering

- Supply

- Welding process

- Qualified welders

- Non destructive controls

- Documentation

General presentation

Page 5: Design, Engineering, Manufacture, Assembly and maintenance ...

5

Flare design

FLARESIM software :

gas properties

combustion (stœchiométry)

design

radiations

emissions

General presentation

Page 6: Design, Engineering, Manufacture, Assembly and maintenance ...

6

P.I.D.Burn pit 10 and 20’’

SONATRACH

Hassi R’Mel & Ghardaia

Algeria

General presentation

Page 7: Design, Engineering, Manufacture, Assembly and maintenance ...

7

Engineering

10’’and 20’’ Burn Pit

SONATRACH / Algeria

General presentation

Page 8: Design, Engineering, Manufacture, Assembly and maintenance ...

8

P.I.D.Ground Flare

Ground Enclosed Flare

Degassing railways Tanks

Special burner

Multi products

SDH Ferroviaire

Orléans / France

General presentation

Page 9: Design, Engineering, Manufacture, Assembly and maintenance ...

Titre de la présentation9

P.I.D.

20’’ Biomass Flare

Page 10: Design, Engineering, Manufacture, Assembly and maintenance ...

10

Engineering

General presentation

20’’ Biomass Flare

Page 11: Design, Engineering, Manufacture, Assembly and maintenance ...

11

Engineering

Front flame generator

General presentation

Page 12: Design, Engineering, Manufacture, Assembly and maintenance ...

12

Engineering

Airrestore

- Purge reducing device

- Designed to minimize air

infiltration into the flare tip

with significant purge gas

saving

General presentation

Page 13: Design, Engineering, Manufacture, Assembly and maintenance ...

13

Engineering

Molecular seal

-Designed to minimize air

infiltration into the flare system

- Even when the purge gas is

interrupted, the molecular seal

provides protection for a period of

time

- The protection from Airrestore

and similar devices is immediatly

lost if the purge gas flow is

interrupted.

General presentation

Page 14: Design, Engineering, Manufacture, Assembly and maintenance ...

14

Engineering

Knock Out Drum

- Separates liquid from gas

- Increases flare tip life

- Prevents or reduces smoke because of

reduced liquid in the flame

- Prevents liquids from being discharged to

atmosphere (fire)

General presentation

Page 15: Design, Engineering, Manufacture, Assembly and maintenance ...

15

Engineering

Liquid seal

- Commonly incorporated into the flare stack base,

the liquid seal is used to provide positive pressure

on the flare gas relief header and to be a positive

flame arrestor in the event a flashback occurs in

the flare stack.

-The internals are specially designed to ensure a

stready flow of gases to the tip thus increasing the

maximum smokeless capacity of the flare without

supplemental energy.

-The liquid seal internals also decrease the noise

caused by combustion at the flare.

General presentation

Page 16: Design, Engineering, Manufacture, Assembly and maintenance ...

16

Engineering

Flare Stack

Guyed support stack Fixed derrick structure Self supported structure

General presentation

Page 17: Design, Engineering, Manufacture, Assembly and maintenance ...

17

Manufacture

General presentation

Page 18: Design, Engineering, Manufacture, Assembly and maintenance ...

18

Manufacture

Enclosed Ground FlareSpecial burner

Multi products

General presentation

Page 19: Design, Engineering, Manufacture, Assembly and maintenance ...

19

Manufacture

Welding process (TIG, arc, flux cored wire)

SS 310S, 316L, 304L, CS…

Non destructive controls (Xrays, penetration test, PMI…)

documentation

General presentation

Page 20: Design, Engineering, Manufacture, Assembly and maintenance ...

20

Revamping

24’’tip

Penetration test

Sand blasting

Sound insulation

High energy igniter

General presentation

Page 21: Design, Engineering, Manufacture, Assembly and maintenance ...

21

Revamping

Short radius bending

(Steam injection)

General presentation

Page 22: Design, Engineering, Manufacture, Assembly and maintenance ...

22

Revamping

Reconstruction of 2 Tips 36 and 30’’

Steam injection, new pilots

New internal refractory

General presentation

Page 23: Design, Engineering, Manufacture, Assembly and maintenance ...

23

Survey

Flare 90m High

Stack + Tip, Platform

Temperature control

Front flame generator

Cables tension + lubrication

Verticality

General presentation

Page 24: Design, Engineering, Manufacture, Assembly and maintenance ...

24

Maintenance

Most major maintenance has to occur during a Shutdown

Consideration for inspection, repair or replacement

- Tip

- Pilots

- Thermocouples

- Clean/ check fuel and FFG piping for leaks and pluggage

- Critical instrumentation

- Stack (feeder, Platform and ladders)

- Guy wire connections at stack (cables tension, lubrication and

Verticality)

- Molecular seal

- Water seal

- KO Drum

- Aviation lights

General presentation

Page 25: Design, Engineering, Manufacture, Assembly and maintenance ...

25

Maintenance

Works in hight (140m) Cables lubrication

General presentation

Page 26: Design, Engineering, Manufacture, Assembly and maintenance ...

26

Maintenance

Handling of Tips (45m)

General presentation

Page 27: Design, Engineering, Manufacture, Assembly and maintenance ...

27

Maintenance

Installation of new pilots Piping 1’’(front flame + pilot gas)

General presentation

Page 28: Design, Engineering, Manufacture, Assembly and maintenance ...

28

Maintenance

Temperature control

(thermocouples, ATEX Junction box)Pilot gas lines

General presentation

Page 29: Design, Engineering, Manufacture, Assembly and maintenance ...

29

Refractory

Concrete and ceramic fiber repairs

General presentation

Page 30: Design, Engineering, Manufacture, Assembly and maintenance ...

30

Assembly

Ground Enclosed flare Handling

Front flame generator

General presentation

Page 31: Design, Engineering, Manufacture, Assembly and maintenance ...

31

Commissioning

Control cabinet

Pressure, flow

Temperature,

Ignition2500 Nm3/h biogas burner

General presentation

Page 32: Design, Engineering, Manufacture, Assembly and maintenance ...

32

Piping

ANGUILLE project / TOTAL Gabon

54000 welded inches by ETCM

Structures 1200t by ECM

General presentation

Page 33: Design, Engineering, Manufacture, Assembly and maintenance ...

33

Piping

ANGUILLE project / TOTAL Gabon

ECM yard in Fos sur Mer France

EIFFAGE CONSTRUCTIONS METALLIQUES

General presentation

Page 34: Design, Engineering, Manufacture, Assembly and maintenance ...

34

Installation 3 new ground enclosed flare 2500 Nm3h Biogas + maintenance 5

flares + delivery and installation 1 tip 10’’

Shutdown 1 flare 45m + installation 2 new tips + 600m piping 1’’

Maintenance 12 flares, 4 different site, maintenance 1 burner 40’’

Delivery 1 tip 24’’ steam assisted + 1 front flame generator

NOVAPEX / TRANSUGIL PROPYLENE Maintenance 1 flare 16m 8’’

Installation 1 new ground enclosed flare

Delivery 2 burn pits 10 and 20’’ + 2 front flame generators

+ 2 purge gas skids (Algeria)

General presentation

Survey 2 flares 90 and 45m, fabrication 8 pilot burners Revamping 2 tips

30 and 36’’ + maintenance flare24m 8’(TOTAL E&P)

Installation 1 flare 20’’ + front flame generator

Installation 1 flare 15 Nm3h + front flame generator

Maintenance 2 flares MABRUCK offshore site AL JURF (Libya)

Page 35: Design, Engineering, Manufacture, Assembly and maintenance ...

35

Thank you for your attention

General presentation

Page 36: Design, Engineering, Manufacture, Assembly and maintenance ...

36 General presentation