Page 1
General Presentation
1 General presentation
Design, Engineering, Manufacture,
Assembly and maintenance of
Flare system
EIFFAGE CONSTRUCTION METALLIQUE
481 rue du faubourg d’Esquerchin 59553 CUINCY
Téléphone + 33 327 95 75 00 - Fax + 33 327 95 75 02
GSM + 33 603 36 03 63 Email [email protected]
Page 2
General presentation2
GIATEC Services
Turnkey Solutions
1) Design
2) P.I.D.(piping and instruments diagram)
3) Engineering
4) Manufacture
5) Revamping
6) Survey
7) Maintenance
8) Assembly
9) Commissioning
10)Piping
Page 3
3
References
NOVAPEX / TRANSUGIL PROPYLENE
General presentation
Page 4
4
Quality system iso 9001- Engineering
- Supply
- Welding process
- Qualified welders
- Non destructive controls
- Documentation
General presentation
Page 5
5
Flare design
FLARESIM software :
gas properties
combustion (stœchiométry)
design
radiations
emissions
General presentation
Page 6
6
P.I.D.Burn pit 10 and 20’’
SONATRACH
Hassi R’Mel & Ghardaia
Algeria
General presentation
Page 7
7
Engineering
10’’and 20’’ Burn Pit
SONATRACH / Algeria
General presentation
Page 8
8
P.I.D.Ground Flare
Ground Enclosed Flare
Degassing railways Tanks
Special burner
Multi products
SDH Ferroviaire
Orléans / France
General presentation
Page 9
Titre de la présentation9
P.I.D.
20’’ Biomass Flare
Page 10
10
Engineering
General presentation
20’’ Biomass Flare
Page 11
11
Engineering
Front flame generator
General presentation
Page 12
12
Engineering
Airrestore
- Purge reducing device
- Designed to minimize air
infiltration into the flare tip
with significant purge gas
saving
General presentation
Page 13
13
Engineering
Molecular seal
-Designed to minimize air
infiltration into the flare system
- Even when the purge gas is
interrupted, the molecular seal
provides protection for a period of
time
- The protection from Airrestore
and similar devices is immediatly
lost if the purge gas flow is
interrupted.
General presentation
Page 14
14
Engineering
Knock Out Drum
- Separates liquid from gas
- Increases flare tip life
- Prevents or reduces smoke because of
reduced liquid in the flame
- Prevents liquids from being discharged to
atmosphere (fire)
General presentation
Page 15
15
Engineering
Liquid seal
- Commonly incorporated into the flare stack base,
the liquid seal is used to provide positive pressure
on the flare gas relief header and to be a positive
flame arrestor in the event a flashback occurs in
the flare stack.
-The internals are specially designed to ensure a
stready flow of gases to the tip thus increasing the
maximum smokeless capacity of the flare without
supplemental energy.
-The liquid seal internals also decrease the noise
caused by combustion at the flare.
General presentation
Page 16
16
Engineering
Flare Stack
Guyed support stack Fixed derrick structure Self supported structure
General presentation
Page 17
17
Manufacture
General presentation
Page 18
18
Manufacture
Enclosed Ground FlareSpecial burner
Multi products
General presentation
Page 19
19
Manufacture
Welding process (TIG, arc, flux cored wire)
SS 310S, 316L, 304L, CS…
Non destructive controls (Xrays, penetration test, PMI…)
documentation
General presentation
Page 20
20
Revamping
24’’tip
Penetration test
Sand blasting
Sound insulation
High energy igniter
General presentation
Page 21
21
Revamping
Short radius bending
(Steam injection)
General presentation
Page 22
22
Revamping
Reconstruction of 2 Tips 36 and 30’’
Steam injection, new pilots
New internal refractory
General presentation
Page 23
23
Survey
Flare 90m High
Stack + Tip, Platform
Temperature control
Front flame generator
Cables tension + lubrication
Verticality
General presentation
Page 24
24
Maintenance
Most major maintenance has to occur during a Shutdown
Consideration for inspection, repair or replacement
- Tip
- Pilots
- Thermocouples
- Clean/ check fuel and FFG piping for leaks and pluggage
- Critical instrumentation
- Stack (feeder, Platform and ladders)
- Guy wire connections at stack (cables tension, lubrication and
Verticality)
- Molecular seal
- Water seal
- KO Drum
- Aviation lights
General presentation
Page 25
25
Maintenance
Works in hight (140m) Cables lubrication
General presentation
Page 26
26
Maintenance
Handling of Tips (45m)
General presentation
Page 27
27
Maintenance
Installation of new pilots Piping 1’’(front flame + pilot gas)
General presentation
Page 28
28
Maintenance
Temperature control
(thermocouples, ATEX Junction box)Pilot gas lines
General presentation
Page 29
29
Refractory
Concrete and ceramic fiber repairs
General presentation
Page 30
30
Assembly
Ground Enclosed flare Handling
Front flame generator
General presentation
Page 31
31
Commissioning
Control cabinet
Pressure, flow
Temperature,
Ignition2500 Nm3/h biogas burner
General presentation
Page 32
32
Piping
ANGUILLE project / TOTAL Gabon
54000 welded inches by ETCM
Structures 1200t by ECM
General presentation
Page 33
33
Piping
ANGUILLE project / TOTAL Gabon
ECM yard in Fos sur Mer France
EIFFAGE CONSTRUCTIONS METALLIQUES
General presentation
Page 34
34
Installation 3 new ground enclosed flare 2500 Nm3h Biogas + maintenance 5
flares + delivery and installation 1 tip 10’’
Shutdown 1 flare 45m + installation 2 new tips + 600m piping 1’’
Maintenance 12 flares, 4 different site, maintenance 1 burner 40’’
Delivery 1 tip 24’’ steam assisted + 1 front flame generator
NOVAPEX / TRANSUGIL PROPYLENE Maintenance 1 flare 16m 8’’
Installation 1 new ground enclosed flare
Delivery 2 burn pits 10 and 20’’ + 2 front flame generators
+ 2 purge gas skids (Algeria)
General presentation
Survey 2 flares 90 and 45m, fabrication 8 pilot burners Revamping 2 tips
30 and 36’’ + maintenance flare24m 8’(TOTAL E&P)
Installation 1 flare 20’’ + front flame generator
Installation 1 flare 15 Nm3h + front flame generator
Maintenance 2 flares MABRUCK offshore site AL JURF (Libya)
Page 35
35
Thank you for your attention
General presentation
Page 36
36 General presentation