Transcript
Page 1: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAIENGINEERING TOMORROW

HYU

NDAI

ENG

INEE

RING

CO

., LT

D. I

HYU

NDAI

BLD

G. 7

5, Y

ULG

OK-

RO, J

ONG

NO-G

U, S

EOU

L, 0

3058

, KO

REA

I T

el 8

2 2

213

4 1

114

I F

ax 8

2 2

203

8 6

456

I w

ww

.hec

.co.

krD

esig

n by

iPub

lics GLOBAL PREMIER ENGINEERING PARTNER

HYU

NDAI ENG

INEERING &

TOM

ORRO

W &

ENGLISH

Page 2: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

CONTENTS02 CORPORATE CULTURE I 08 HYUNDAI MOTOR GROUP I 10 LETTER FROM CEO & PRESIDENT I 12 PROCESS PLANT I 16 POWER & ENERGY PLANT

20 BUILDING WORKS I 24 HOUSING WORKS I 28 INFRASTRUCTURE & ENVIRONMENT I 32 ASSET MANAGEMENT I 36 CORPORATE SUSTAINABILITY MANAGEMENT

38 QUALITY MANAGEMENT I 39 RESEARCH AND DEVELOPMENT I 40 HEALTH & SAFETY AND ENVIROMENTAL MANAGEMENT I 41 TALENT MANAGEMENT

42 MAJOR OVERSEAS PROJECTS I 44 GLOBAL NETWORK

We constantly work hardfor higher customer satisfaction and

a better world for all

2014 •Received the Presidential Award at the Good Apartment for Living Awards •Won a hydroelectric power plant contract in Indonesia •Received a credit rating upgrade to AA- with a stable outlook (highest rating in the industry) •Merged into an integrated construction entity (Hyundai Amco acquired) •Won an oil refinery contract in Karbala, Iraq •Won combined cycle power plant contracts in Jijel and Biskra, Algeria2013 •Awarded the 2 Billion Dollar Export Tower on the 50th Trade Day •Received the Presidential Citation for Contributions to Job Creation •Awarded the Civil Engineering Structure of the Year Prize for Geogeum Grand Bridge2012 •Issued the Sustainability Report Received the Platinum Award at the 2012 Spotlight Awards •Awarded the 1 Billion Dollar Export Tower on the 49th Trade Day2011 •Incorporated into Hyundai Motor Group •Won the Grand Prize at the Seoul Volunteer Awards2010 •Ranked 1st in the Korean Sustainability Index in the Engineering Company Category •Awarded the Tin Tower Order of Industrial Service Merit on the 44th Tax Payers' Day

2010

•Ranked 1st in overseas orders (USD 5.76 billion / by the International Contractors' Association of Korea)•Received 1st prize at Korean Architecture Awards for the construction of Jeonbuk Hyundai Motors Clubhouse•Named No. 1 on the Best Workplaces in Korea list•Ranked 9th in construction capabilities•Engineering News-Record(ENR) Ranked 26th

in the Top 225 International Design Firms in the World(No. 1 both in Korea and Asia)•Won a contract for Kandym Field Gas Processing Plant Project•Won a contract for Gas to Liquid Plant Project in Turkmenistan

2015

2009 •Received 1st Prize in Engineering Category at Overseas Construction Awards •Awarded the Prize of Civil Engineering Structure of the Year for Machang Grand Bridge •Received Grand Prize at the 10th Prize of Korea Financial Management •Received the Minister Citation for Contribution to Environment-Friendly Industry & Low Carbon-Green Growth •Won Order for Gas Desulfurization Plant Project in Turkmenistan2008 •Received Great Award of Korea Technical innovation in Engineering & Construcion Company Category2007 •Awarded the Prize of Civil Engineering Structure of the Year for 2nd Jindo Grand Bridge •Awarded National Environmental Management Prize2004 •Received the Grand Prize at 1st National Environment-Friendly Management Awards •Received IRS2 Jang Young Shill Award for HSC Process2001 •Established the Research Institute •Developed a Membrane Water Treatment Process (HANT Process)2000 •Towards a Top-class Global company •Designed the World’s Largest Gas Process Plant (South Pars Phase 2 & 3 Project, Iran)

2000

1996 •Received the Environmental Technology Award for HAF Process •Obtained ISO 14001 accreditation1994 •Obtained ISO 9001 accreditation1991 •Received Iron Tower Order of Industrial Service Merit on the 24th World Science Day1990 •Transforms into General Engineering Company

1990

1974 •Established Hyundai Technology Development Co., Ltd.

1970

1985 •The 1st overseas consulting project as a private Korean company1980 •Growing Stage

1980

2016

Page 3: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

PIONEER With our creative insight and limitless passion, we are building a better future.

Our innovative ideas and unyielding spirit of challenge have served

as the foundation of our extraordinary accomplishments in every

business environment. Hyundai Engineering's untiring quest for

engines of future growth continues today.

Page 4: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

ChallENgE aND aCCOMPlISh

Polypropylene Plant Project / Vietnam

PIONEER

Our innovative ideas and unyielding spirit of challenge have served

as the foundation of our extraordinary accomplishments in every

business environment. Hyundai Engineering's untiring quest for

engines of future growth continues today.

With our creative insight and limitless passion, we are building a better future.

Page 5: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

PROFESSIONal

With our originative and systematic project planning and management,

we deliver top-notch solutions around the world. With an unlimited

commitment to our customers, we guarantee satisfaction.

Our technological prowess and world-leading quality management system ensure customer satisfaction.

Page 6: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

TOwaRD ThE bESTPROFESSIONalOur technological prowess and world-leading quality management system ensure customer satisfaction.

SIPCO Combined Cycle Cogeneration Power Plant / Thailand

With our originative and systematic project planning and management,

we deliver top-notch solutions around the world. With an unlimited

commitment to our customers, we guarantee satisfaction.

Page 7: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

hUMaNIST

Our sustainability management is an integral part of our

commitment to the greater good of humanity and a greener and

more prosperous planet. Today, we continue our growth to realize

the dream of a better tomorrow.

We strive to achieve two often-conflicting goals: human happiness and environmental preservation.

Page 8: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

hUMaNIST We strive to achieve two often-conflicting goals: human happiness and environmental preservation.

wITh OPEN EyES aND MIND

The Mabuk Institute for Human Resource Development / Korea

Our sustainability management is an integral part of our

commitment to the greater good of humanity and a greener and

more prosperous planet. Today, we continue our growth to realize

the dream of a better tomorrow.

Page 9: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 08 - 09

Hyundai Motor Group provides outstanding products and services through the value chain

from automobile, steel mill and construction to automotive parts, logistics, financing and IT.

HYUNDAI MOTOR GROUP

TOgEThER FORa bETTER FUTURE

HYUNDAI MOTOR GROUP

AUTOMOBILE

STEEL

CONSTRUCTION

FINANCE

PARTS

OTHERS

Hyundai Motor Group brings maximum value to humanity through

eco-friendly management, and the pursuit of mutual benefit with shareholders.

Hyundai Motor Group Chung Mong-Koo

Finance

Distribution

Steel

Heavy Machinery

IT

Automobile

Construction

Parts

Page 10: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 10 - 11

glObal PREMIERENgINEERINg PaRTNERHyundai Engineering will lead the engineering world

with innovative and challenging determination.

As showcased by our outstanding capabilities built through strenuous efforts

for change and innovation, we provide optimal plant engineering solutions in the

fields of chemical engineering, power generation and energy, and infrastructure;

develop new business opportunities in renewable energy as well as in the

housing and construction sectors; and create greater customer value with

superior quality and services.

Furthermore, with our sustained efforts to enhance our brand value and support

our employees to realize their full potential and capacity, we are gaining more

recognition and becoming more competitive than ever before.

As a member of Hyundai Motor Group, we will continue to strive to facilitate

communication with our employees through sharing our group vision and core

values, deliver the highest quality for customer satisfaction, and ensure fair and

transparent management for shared growth with our partners.

We greatly appreciate your continued support for, and interest in, the better

future we are creating through the synergy of harmony and innovation.

Hyundai Engineering - creating maximum value through ultimate quality, Outstanding services and sophisticated technologyto accomplish customer satisfaction.

CEO & President of Hyundai Engineering Kim Wee-Chul

LETTER FROM CEO & PRESIDENT

Page 11: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 12 - 13PROCESS PLANT

PROCESS PlaNTA chemical plant business requires sufficient know-how and advanced technologies. Hyundai Engineering has executed 450 projects including gas process plant in South Yoloten, Turkmenistan; petrochemical complex project in Kiyanly, Turkmenistan; oil refinery plant project in Karbala, Iraq; polysilicon plant in Jubail, Saudi Arabia; Daesan MMA/PMMA facility project; Hyundai-Shell base oil plant project; and Hyundai Petrochemical Complex-first and second projects and etc. It has applied the advanced process management system and different construction techniques to comply with project schedule. Hyundai Engineering will open the door to the future with superior HR, accumulated expertise and excellent EPC execution capability.

Chemical Engineering Plant / Synergies of Expertise and HR

Turkmenistan Gas Desulfurization PlantClient : turKmengAz / Turkmenistan

Capacity : Acid gas removal Unit(4 Trains) : 1,200 mmsCFd

Dew Point Control Unit(2 Trains) : 1,150 mmsCFd

Condensate stabilization Unit(Common Facilities)

Sulfur Recovery Unit(2 Trains) : 2,100 tpd

Period : 2010. 01 ~ 2013. 09

Page 12: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 14 - 15

PROCESS PlaNT PORTFOLIO

PROCESS PLANT

Upstream Oil & GasGas To Liquid Project (UZGTL) Uzbekistan

Gas Treatment Plant Onshore Gas Terminal Turkmenistan

Satah Al Razboot (SARB) Field Development - PKG 4 UAE

Compressor Station Bangladesh

Kandym Fields Gas Processing Plant Uzbekistan

Kandym Early Gas Project Uzbekistan

Bir-el-M’sana (BMS) Field Development Algeria

Musandam Oil & Gas Plant Oman

PGB Plant Rejuvenation and Revamp 2 Project Malaysia

KOC Oil and Gas Pipelines Project - Part A & B Kuwait

Gas Desulfurization Plant Turkmenistan

Habshan-5 Utilities & Offsite Facilities UAE

Karan Gas Facilities Saudi Arabia

Khurais Gas Processing Facilities Saudi Arabia

Crude Export Facility Project Kuwait

Escravos Gas Plant Phase-3 Nigeria

KNPC New Ethane Recovery Plant Kuwait

KNPC MAA New Oil Pier Berth #5&6 Expansion Kuwait

Suban Gas Project - Phase 1 & 2 Indonesia

Badin Oil Gathering System FEED Services Pakistan

Bonny Terminal Integrated Project Nigeria

South Pars Field Development - Phase 2&3, 4&5 Iran

KOC Pipeline Facilities Kuwait

New Oil Pier & Associated Topside Facilities at MAA Refinery Kuwait

Sumpal Gas Project Indonesia

Attahaddy Gas Field Development Libya

NGL-4 Project Qatar

Pirkoh Gas Field Development Pakistan

Hawiyah Inlet and Auxiliary Facilities Saudi Arabia

Petronas Gas Processing Plant - Phase 2&3&4 Malaysia

RefineryHDC MX Project (FEED & LLI) Korea

Karbala Refinery Project Iraq

Santa Ines Refinery Project Venezuela

ARL Upgradation Project Pakistan

Shymkent Lube Base Oil Project Kazakhstan

RPLC Deep Conversion Facilities Venezuela

SK Energy Incheon Complex V-Project (Package II) Korea

Turkmenbashi Refinery Project Turkmenistan

Hyundai-Shell LBO Project Korea

HCP #2 BTX Project Korea

Takreer Group III Base Oil Production Facilities UAE

Arzew Refinery Project Algeria

HDO #2 HOU Project Korea

MCR DHDS Unit Pakistan

MOC Aromatics Recovery Unit Thailand

Pertamina Dumai Revamping Project Indonesia

Base Oil Plant Kuwait

Pearl GTL C-5 Project Qatar

SK No.2 FCC Project Korea

Lube Base Oil Plant Taiwan

HDO Clean Fuels Project Korea

Capro Hydrogen Plant Korea

HAR Crude & Vacuum Distillation Unit Greece

Hyundai-Shell LBO ProjectClient : Hyundai Oilbank Co., Ltd. & Shell / Korea

Capacity : Lube Base Oil Unit (20,000 BPSD) /

Vacuum Distillation Unit (existing)

Revamp (76,000 BPSD) /

Hydrocracking Unit (existing)

Revamp (37,000 BPSD > 40,000 BPSD)

Period : 2012. 04 ~ 2014. 06

Jubail Polysilicon Plant Client : Polysilicon Technology Company (PTC) / Saudiarabia

Capacity : Photovoltaic Polysilicon (3,000 MTPA) / Ammonia (2,200 TPD x 2 Trains)

Period : 2011. 03 ~ 2014. 06

Page 13: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 16 - 17PROCESS PLANT

Honam MMA/PMMA Plant Expansion Client : Daesan MMA Corp. / Korea

Capacity : MMA (Methyl Methacrylate) (105,000 TPA) / PMMA (Poly Methyl Methacrylate) (60,000 TPA)

Period : 2011. 02 ~ 2012. 12

HPCL Hydrogen Generation Unit India

Petron TCCU Revamp & Mixed Xylene Unit Philippines

Hyundai Aromatics Complex Project Korea

Hyundai Oil Refinery - Phase 1 & 2 Korea

PetrochemicalLotte-Versalis SR Project Korea

Kiyanly PE/PP Project Turkmenistan

Asahimas VCM Project Indonesia

Linear Alkyl Benzene (LAB) Project Thailand

Ustyurt Gas Chemical Complex (UGCC) Uzbekistan

Borouge-3 XLPE & Utilities & Offsite Project UAE

Honam MMA/PMMA Plant Expansion Korea

Honam 4th Polyethylene Plant Korea

PVTEX PET Plant Vietnam

Dung Quat Polypropylene Plant Vietnam

AAC Ethyleneamines Plant Saudiarabia

Honam MMA Plant Korea

Honam PMMA Plant Korea

Lotte Offsite Expansion Korea

Dongbu SM Upgrade Project Korea

UAB #3 Plant Indonesia

Ras Lanuf Petrochemical Complex Libya

Hyundai Petrochemical Complex - Phase 1 & 2 Korea

Yukong-Arco PO/SM Complex Korea

Fertilizer & ChemicalJubail Polysilicon Plant Saudiarabia

Phosphoric Acid Plant Tunisia

QAFCO Ammonia & Urea Plant - Phase 5 & 6 Qatar

KCC Silicone Plant Korea

KCC Polysilicon Plant Korea

KCC Polysilicon Pilot Plant Korea

KCC Silicone Plant Expansion Korea

Hannong Project Korea

Pingdingshan Urea Plant China

Shannxi Urea Plant China

Chisui Urea Plant China

Thailand National Fertilizer Complex Thailand

LNG FacilitiesLNG Import Terminal Project Kuwait

Hiranandani LNG Terminal (FEED) India

Inchon LNG Receiving Terminal (1st & 2nd Expansion) Korea

Zhuhai LNG Terminal (FEED) China

Kwang Yang LNG Terminal Extension Korea

Sempra Baja LNG Terminal Mexico

Inchon LNG Receiving Terminal Korea

Offshore FacilitiesDonghae-1 Natural Gas Production Facilities Korea

West Seno Field Development Indonesia

Tokdo Observation Offshore Platform Korea

BCP-A&B Booster Compressor Platform India

ONGC Neelam Process Complex India

MetallurgyMBAC Alumina Refinery EPC Contract Saudiarabia

Hyundai Steel Powder Plant Project Korea

Jubail Polysilicon Plant Client : Polysilicon Technology Company (PTC) / Saudiarabia

Capacity : Photovoltaic Polysilicon (3,000 MTPA) / Ammonia (2,200 TPD x 2 Trains)

Period : 2011. 03 ~ 2014. 06

Hyundai-Shell LBO ProjectClient : Hyundai Oilbank Co., Ltd. & Shell / Korea

Capacity : Lube Base Oil Unit (20,000 BPSD) /

Vacuum Distillation Unit (existing)

Revamp (76,000 BPSD) /

Hydrocracking Unit (existing)

Revamp (37,000 BPSD > 40,000 BPSD)

Period : 2012. 04 ~ 2014. 06

Page 14: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 18 - 19POWER & ENERGY PLANT

Power and energy plant is a technology-intensive business with high added value.Hyundai Engineering provides project management services in all power and energy plant sectors, based on its rich experience and technology. Its services include consulting, feasibility studies, basic and detailed design, procurement , construction, supervision and commissioning. Based on superior technical experience, Hyundai Engineering aims to reinforce its reputation in the global power market, where continuous growth is expected.

Power & Energy Plant / Shaping the future of Energy

UCHI II 390MW Combined Cycle Power PlantClient : Uch Power Limited / Pakistan

Capacity : 390MW

Period : 2011. 03 ~ 2014. 04

POwER ENERgy PlaNT

&

Page 15: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 20 - 21

Olkaria I & IV Geothermal Power PlantClient : KENGEN / Kenya

Capacity : 140MW

Period : 2011.11 ~ 2014. 12

Samchonpo 2,240MW Thermal Power Plant Units No. 1, 2, 3 & 4Client : Korea South East Power Co., Ltd. / Korea

Capacity : 2,240MW

Period : 1978 ~ 1984, 1989.12 ~ 1994.09

Ashuganj 225MW Combined Cycle Power Plant ProjectClient : Ashugnj Power Station Company Ltd. / Bangladesh

Capacity : 225MW

Period : 2013.02 ~ 2015.12

Gas Turbine Power PlantBiskra 1,400MW Combined Cycle Power Plant Project Algeria

Jijel 1,400MW Combined Cycle Power Plant Project Algeria

Ain Arnat 3 x 400MW Combined Cycle Power Plant Project Algeria

Rumaila 5x292MW Gas Turbine Power Plant Project Iraq

Al-Qudus 4x125MW Gas Turbine Power Plant Iraq

Taza 292MW Gas Turbine Power Plant Project Iraq

Ashuganj 225MW Combined Cycle Power Plant Project Bangladesh

MEB 22MW ADD-ON CCPP Indonesia

Dalle Add-on Combined Cycle Power Plant Indonesia

Uch II Power Expansion Project Pakistan

SIPCO 160MW Combined Cycle Cogeneration Power Plant Thailand

Meghnaghat 450MW Combined Cycle Power Plant Bangladesh

Mangalore Barge Mounted Combined Cycle Power Plant India

Boryeong 2,000MW Combined Cycle Power Plant Korea

Yulchon 550MW Combined Cycle Power Plant Korea

Yeongwol 900MW Combined Cycle Power Plant Korea

Gunsan 700MW Combined Cycle Power Plant Korea

Oil/Coal Fired Power PlantKalsel 1,200MW Coal-Fired Thermal Power Plant Indonesia

Jimah East 2,000MW Coal-Fired Power Plant Project Malaysia

Therma Visayas 300MW Coal-Fired Power Project Philippines

Termotasajero II 160MW Coal Fired Power Plant Project Colombia

Tripoli West 1,400MW Thermal Power Plant Libya

Al Khalij 1 1,400MW Thermal Power Plant Libya

Al Mussaib 1,280MW Thermal Power Plant Iraq

Nueva Ventanas 250MW Thermal Power Plant Chile

Angamos 520MW Thermoelectric Power Plant Units No. 1 & 2 Chile

Campiche 240MW Coal Fired Power Plant Chile

Taean 1,000MW Thermal Power Plant Units No. 7 & 8 Korea

Namjeju 200MW Thermal Power Plant Units No. 3 & 4 Korea

Samchonpo 2,240MW Thermal Power Plant Units No. 1, 2, 3 & 4 Korea

Yong Hung 1740MW Thermal Power Plant Units No. 5 & 6 Korea

Cogeneration Power PlantElectrical Power and Steam Project(114MW) Thailand

Ambatovy Cogeneration Power Plant Madagascar

Century Paper Mill Cogeneration Power Plant Pakistan

DPetrobrazi Cogeneration Plant Romania

Aspex Cogeneration Plant Indonesia

Goyang Samsong District Mass-Energy Facility(100MW) Korea

Daejeon-Seonambu Mass-Energy Facility Korea

Busan Jeong-Guan District Cogeneration Power Plant Korea

Geothermal Power PlantBac-Man 3 28MW Geothermal Power Project Philippines

Olkaria I Additional Geothermal Power Plant Units No. 4 & 5 Kenya

Olkaria IV Geothermal Power Plant Units No. 1 & 2 Kenya

Darajat Geothermal Power Plant Station I & II (Mech. & Elec.) Indonesia

POwER ENERgy PlaNT PORTFOLIO&

POWER & ENERGY PLANT

Page 16: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 22 - 23

루마일라 5 x 292MW 가스터빈 발전소

발주처 Daesan MMA Corp, 한국

용량 5 x 292MW

공사기간 2011. 01 ~ 2014. 05

올카리아 140MW 지열발전소 4 & 5호기

발주처 KENGEN / 캐냐

용량 140MW

공사기간 2011. 11 ~ 2014. 12

Diesel Power PlantBarbados Diesel 60MW Power Plant Barbados

GMR Madras 200MW Diesel Power Plant India

Melawa 50MW Diesel Power Plant Malaysia

Tawau 40MW Diesel Power Plant Malaysia

Jeju Diesel Power Plant Unit No. 1 & 2 Korea

Nuclear Power PlantKori #1 - Construction for Temporary Equipment Hatch of Containment Building Korea

Kori #1 - Replacement of Emergency Diesel Generators Korea Korea

Wolsung #1 - Design Improvement of Mechanical System Korea

Analysis & Improvement of Spent Fuel Pool Cooling Capacity Korea

ADesign Improvement of Blind Flange for Fuel Transfer Tube Korea

Reactor Coolant Pump Test Facility Design Korea

Spent Fuel Consolidated Dry Storage Facility Design Korea

Power Transmission / Substation & DistributionNicaraqua 138kV Substation Project Nicaraqua

GEPCO 132kV Substation Project Pakistan

Electricity Transmission Rehabilitation Project, Phase II Kazakhstan

Northern Panay 138kV Transmission & Substation Project Philippine

Maramag-Buanawan 230kV Transmission & Substation Project Philippine

Northern Luzon 230kV Substation Project Philippine

Clark-Concepcion 230kV Substation Project Philippine

Provincial Power Supply Project Cambodia

KESC 5th. Power Project Pakistan

POWER & ENERGY PLANT

Olkaria I & IV Geothermal Power PlantClient : KENGEN / Kenya

Capacity : 140MW

Period : 2011.11 ~ 2014. 12

Ashuganj 225MW Combined Cycle Power Plant ProjectClient : Ashugnj Power Station Company Ltd. / Bangladesh

Capacity : 225MW

Period : 2013.02 ~ 2015.12

Page 17: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 24 - 25BUILDING WORKS

bUIlDINg wORKSHyundai Engineering continually engages in R&D activities to set the trend in building design and construction.Expertise and experience gained by successfully delivering industrial, residential and other facilities, both domestice and overseas will enable Hyundai Engineering to expand the scope of its activities into the private construction sector and real estate development.

Building Project / Setting the Trend

Hyundai Motor America National HeadquartersClient : Hyundai Motor / Fountain Valley, CA, USABuilding Size : 1F ~ 6F, Gross Floor Area 25,633m2

Period : 2012. 05 ~ 2013. 11

Page 18: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 26 - 27

bUIlDINg wORKS PORTFOLIO

BUILDING WORKS

HMC High Technology R&D centerClient : Hyundai Motor / Korea

Building Size : B3F ~ 21F, Gross Floor Area 63,986m2

Period : 2005. 05 ~ 2006. 12

Jeonbuk Hyundai Motor Soccer Team ClubhouseClient : Hyundai Motor / Korea

Building Size : Total Floor Area 47,282m2,

Site Area 2,629m2

Period : 2010.08 ~ 2013.08

Industrial ConstructionMobis PDC in Munbai India

Mobis the 2nd Factory in Beijing China

Mobis the 4th Factoy in Wuxi Jiansu China

Glovis Warehouse in Sichuan China

Hyundai Motor Manufacturing Russia Automobile Factory in St.Petersburg Russia

Hyundai Motor Manufacturing Czech Automobile Factory in Nosovice Czech

Hyundai Heavy Industries New Factory in Rio de Janeiro Brazil

Hyundai Motor Brazil Automobile Factory in Sao Paulo Brazil

Kia Motors Manufacturing Georgia Automobile Factory in West Point U.S.

Hyundai Motor Manufacturing Alabama Theta Engine Factory in Montgomery U.S.

Hyundai Motor India Automobile Factory Phase2 in Chennai India

HMMR Suppliers’ Factory in St. Petersburga Russia

Hyundai Motor Manufacturing Russia Automobile Factory Extension in St. Petersburg Russia

Hyundai Steel Factory in Dangjin Korea

Hyundai Translead Engine Casting Factory in Tijuana Mexico

Monterrey KIA Motors Manufacturing Plant Mexico

HMC Factory in Ulsan Korea

Extension Work of The 2nd Factory for Kia Motors in Gwangju Korea

Unit Modification Work of The Press Factory for Kia Motors in Sohari Korea

Kia Motors Slovakia Engine Factory #2 in Zilina Slovakia

Kia Motors Slovakia Automobile Factory in Zilina Slovakia

KMC Factory in Hwasung Korea

Mobis Research Center in Poseung Korea

Hyundai Mobis PDC Warehouse in St. Petersburg Russia

Construction of Factory for Hyundai Mobis in Gimcheon Korea

Hyundai Mobis Parts Middle East 2nd Warehouse in Dubai UAE

Hyundai Mobis Module Factory in Chennai India

Hyundai Mobis Module Factory in Izmit Turkey

Extension Work of The 2nd CGL Factory for Hyundai Hysco in Suncheon Korea

Hyundai Hysco Coil Factory in Izmit Turkey

Construction of Warehouse for Hyundai Glovis in junju Korea

Construction of KD Center for Hyundai Glovis in Ulsan Korea

Construction of CVT Factory for Hyundai Powertech in Seosan Korea

Hyundai Powertech Powertrain Factory #2 in Rizhao China

Construction of Module Factory for Hyundai Wia in Gwangju Korea

Hyundai Wia Engine Factory #3 in Rizhao China

Construction of FA Assembly Factory for Hyundai Wia in changwon Korea

Hyundai Dymos Seat Factory in Nosovice Czech

Donghee Automobile Parts Factory in Cesky Tesin Czech

Construction of Total Research Office for Hyundai Rotem in Changwon Korea

Construction of Distribution Center for Homeplus in Ahnsung Korea

Research ConstructionMobis R&D Center Renovation in Michigan U.S.

Glovis KD Center in Asan Korea

Kefico Electromagnetic Control R&D Center in Gunpo Korea

Partecs Warehouse in Seosan Korea

Hyundai-Kia Automotive Group Technology Institute in Namyang Korea

Construction of High Technology R&D Center, in Seoul Korea

Construction of Design Building for Kia Motors in Namyang Korea

Construction of Environmental Technology R&D Center, in Seoul Korea

Building Construction of R&D Center, in Uiwang Korea

Kia Motors America Design Center in California U.S.

Building Construction of The Advanced Automotive Research Center for Seoul University Korea

Building Construction of R&D Center for Hyundai Mobis in Mabuk Korea

Construction of Steel R&D Center for Hyundai Steel in Dangjin Korea

Hyundai Motor India Engineering R&D Center in Hyderabad India

Page 19: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 28 - 29BUILDING WORKS

Kia Motors Europe Office Building and Design Center in Frankfurt Germany

Kia Motors (DYK) R&D Center in Yancheng China

Hyundai Motor R&D Center in Yantai China

Construction of Design Building for Hyundai Motor in Namyang Korea

Culture / Education / Athletic ConstructionFuture Automobile R&D Center in Hanyang Univ Korea

Construction of Mabuk Training Institute Korea

Construction of Cheonan Training Institute for Hyundai Capital Korea

Construction of Building for Business Adminstration Korea

Construction of Building for Power Train Fitness Facility for Hyundai Motor in Namyang Korea

Construction of Turkmenistan National University in Turkmenistan Turkmenistan

Construction of Club house in Chuncheon Korea

Construction of Hampyeong Training Institute for Kia Motors Korea

Construction of Hangul Museum Korea

Construction of International Trading Building for Ulsan University Korea

Construction of Offshore Technology Building for Ulsan University Korea

Construction of Architecture Building for Ulsan University Korea

Construction of Welfare Service Center for Hyundai Motor in Ulsan Korea

Construction of Haneul High School in Incheon Korea

Construction of Yedang Junior High School (BTL) Korea

Construction of Jeonbuk Hyundai Motor Soccer Team Clubhouse Korea

Hotel / Residential ConstructionHHI Employee's Accommodations in Ulsan Korea

Construction of Havichi Hotel in Jeju Korea

Remodeling Construction of Rolling Hill’s hotel Korea

Construction of Haiphong Resort in Vietnam Vietnam

Construction of 2,000 Household Units and Infrastructural Facilities in Qubbah, Libya Libya

Construction of Dormitory for Hyundai Powertect in Seosan Korea

Construction of Dormitory 2 for Hyundai Heavy Industries co. in Ulsan Korea

Construction of A-3Block LH Apartment in Goyang Korea

Construction of Apartment in Gangil 1,3 Complex Korea

Office / Commercial BuildingHyundai Motor America New Building in California U.S.

Construction of Cheongju Hyundai Department Store Korea

Construction of Office Building for Hyundaicard in Yeongdeungpo Korea

Construction of Terminal in Goyang, Gyeonggi-do Korea

Hyundai Motor Europe Building Extension in Offenbah Germany

Development Work of Moonhyun Innovation City in Busan Korea

Monivong Office Building Project in Cambodia Cambodia

Extension of Acleda Bank Plc Headquarters Building Cambodia

Construction of Computation Center in Paju Korea

Construction of Hyundai Motor Office in Australia Australia

Construction of Yeoksam-dong Office Building Korea

Construction of Homplus in Homaesil, Suwon Korea

Public / Military ConstructionConstruction of MND USFK Base in Pyeongtaek, Gyeonggi-do Korea

CY ROCKFC In-kind, PN A13R653 VMF080, FIRE SUPPORT VMFs II, USAG HUMPHREYS, KOREA Korea

Medical ConstructionConstruction of The Korea Veterans Hospital Korea

Construction of Yen Bai Provincial General Hospital in Vietnam Vietnam

HMC High Technology R&D centerClient : Hyundai Motor / Korea

Building Size : B3F ~ 21F, Gross Floor Area 63,986m2

Period : 2005. 05 ~ 2006. 12

Monterrey KIA Motors Manufacturing PlantClient : KIA Motors / Mexico

Building Size : Total Floor Area 555,327m2,

Site Area 4,991,735m2

Period : 2014.09 ~ 2016.04

Jeonbuk Hyundai Motor Soccer Team ClubhouseClient : Hyundai Motor / Korea

Building Size : Total Floor Area 47,282m2,

Site Area 2,629m2

Period : 2010.08 ~ 2013.08

Page 20: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 30 - 31HOUSING WORKS

hOUSINg wORKS

Seoul Sangbong-dong Premier’s amcotownClient : Hyundai Engineering / Korea

Project Scale : B7F ~ 48F, a total 497 housing units in three buildings

Gross Floor Area : 232,943m2

Period : 2005. 05 ~ 2006. 12

Hyundai Engineering’s housing business has contributed to a new housing culture by providing a human-oriented housing environment in harmony with nature and the community. In particular, Hyundai Engineering has introduced innovative design in apartment buildings, residential-commercial complexes and officetels setting the trend. Hyundai Engineering will constantly seek to maximize customer satisfaction by providing future housing solutions that take into account convenience, health, leisure and the emotions.

Housing Business / Enhancing the Living Environment

Page 21: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 32 - 33

hOUSINg wORKS PORTFOLIO

HOUSING WORKS

Seoul Sangdo-dong amcotown Central ParkClient : Sangdo 134 housing association / Korea

Building Size : B3F ~ 18F, a twenty-two-Building Apartment 1,559 housing units

Gross Floor Area : 251,674m2

Period : 2009.12 ~ 2012.09

Jinju Pyeonggeo-dong amcotown The PrahaClient : Hunghan / Korea

Building Size : B1F ~ 36F, a fourteen-Building

Apartment 1,813 housing units

Gross Floor Area : 302,683m2

Period : 2011.06 ~ 2014.04

ApartmentSeoul Sangdo-dong Amcotown Central Park Korea

Seoul Sangdo-dong Amcotown Aston Park Korea

Seoul Seocho Amcotown Gentrice Korea

Incheon Yonghyeon-dong Amcotown Korea

Ulsan Sincheon-dong Amcotown Korea

Ulsan Hwajeong-dong Amcotown Eastern Bay Korea

Sejong Amcotown Korea

Hillstate Sejong 2nd Complex Korea

Anyang Seoksu-dong Amcotown Korea

Bupyeong Samsan-dong Amcotown Korea

Wirye Amcotown Floriche Korea

Dangjin Amcotown Korea

Gimcheon Amcotown The Planet Korea

Jeonju Pyeonghwa-dong Housing Association Korea

Jinju Pyeonggeo-dong Amcotown The Praha Korea

Jinju chojang Amcotown The Eastern Park Korea

Gunsan 1st complex Amcotown Korea

Gunsan 2nd complex Amcotown Korea

Mixed-use Apartment (Building)Seoul Sangbong-dong Premier’s Amcotown Korea

Seoul Gongneung Nowon Premier’s Amcotown Korea

Studio ApartmentBundang Gumi-dong Amco Heritz Korea

Bundang Jeongja-dong Amco Heritz Korea

Magok Amco Geniustar Korea

Page 22: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 34 - 35HOUSING WORKS

Bundang Gumi-dong amco HeritzClient : Seowoo / Korea

Building Size : B4F ~ 12F, a one-Building

Apartment 570 housing units

Gross Floor Area : 57,800m2

Period : 2011.12 ~ 2014. 02

Seoul Sangdo-dong amcotown Central ParkClient : Sangdo 134 housing association / Korea

Building Size : B3F ~ 18F, a twenty-two-Building Apartment 1,559 housing units

Gross Floor Area : 251,674m2

Period : 2009.12 ~ 2012.09

Jinju Pyeonggeo-dong amcotown The PrahaClient : Hunghan / Korea

Building Size : B1F ~ 36F, a fourteen-Building

Apartment 1,813 housing units

Gross Floor Area : 302,683m2

Period : 2011.06 ~ 2014.04

Page 23: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 36 - 37INFRASTRUCTURE & ENVIRONMENT

Under the motto “Development of Human-Oriented Infrastructure and Environment”, Infrastructure & Environmental Division takes part in business development to achieve healthy life and prosperity of humankind.We offer infrastructure such as road, harbor, industrial complex and water resource development in order to establish the base of economic activity. Furthermore, we focus on preserving the clean natural environment and pleasant life environment by executing environmental projects such as sewage and waste water treatment facility and waste to energy plant and so on. We continue to move forward with our high quality engineering skills and excellent resources.

Infrastructure & Environment / Human-Oriented Infrastructure and Environment Business

INFRaSTRUCTURE ENVIRONMENT&

Andong Bridge Project, VietnamClient : Ninh Thuan PMU / Vietnam

Capacity : 1,020m Extradosed Bridge + 2,500m Road)

Main Bridge : Extradosed Type (FCM), Length=580m,

Width =21m, Lane=Four Lanes

Approach Bridge : Super T Girder Type, Length =440m,

Width =21m, Span =11 (40m)

Road : Asphalt Paving, Length =2.5km, Lane =Four Lanes

Period : 2011.05.17 ~ 2015.12.30

Page 24: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 38 - 39INFRASTRUCTURE & ENVIRONMENT

Raw material and Product Container Terminalfor Hyundai Steel in Pyeongtaek - Dangjin PortClient : Hyundai Steel / Korea

Capacity : 30,000 / 50,000 / 100,000 / 200,000 Ton

Period : 2005. 03 ~ 2009. 03

Cheongsong Pumped Storage Power PlantClient : Korea Western Power Co., Ltd. / Korea

Capacity : 600MW (300MW X 2)

Period : 1997. 07 ~ 2007. 03

Port and HarborContainer Terminal Phase 1-1 of Incheon New Port: Section No. 2 Korea

Yeosu Port Improvement Phase 2 Korea

Raw Material and Product Container Terminal for Hyundai Steel in Pyeongtaek - Dangjin Port Korea

(30,000/50,000/100,000/200,000 Ton)

Hyundai Steel Raw Material Container Terminal (5000 Ton) in Dangjin Korea

Hyundai Steel Tar/Slag Berth in Dangjin Korea

Exclusive Container Terminal for Automobiles at Pyeongtaek Port (Berth No.9,10,11,12) Korea

Ulsan New Port (Phase I, II) / Berth No.2- 3 of Southern Quay Korea

Cement Berth No. 5 of Pyeongtaek Port Korea

Ship Repair Complex in Turkmenistan Turkmenistan

Road and BridgeNational Highway No.38 Relocation Korea

Jeju Bypass (Hamduc-Dongbok) Korea

Detail Design for the 2nd Yeongdong Expressway BTO Construction Project Korea

Basic and Detail Design for Expansion and Pavement Work of the National Road No. 46 and BRT Construction Korea

Feasibility Study for Namhae Expressway (Gonyang-Sanin) Expansion Korea

Detail Design for Janheung - Songchoo Road Expansion Korea

Basic Design for Yecheon Airport Expansion Korea

Basic and Detail Design for High Tech Driving Aptitude Road Construction Korea

Basic and Detail Design for Geougeum Grand Bridge Turn Key Project (Phase II) Korea

Basic and Detail Design for Machang Grand Bridge Private Investment Project Korea

Basic and Detail Design for the 2nd Jindo Grand Bridge Turn Key Project Korea

Basic and Detail Design for The Hwayang-Jeokgeum Road Construction (Phase II) Korea

Establishment of Structure Standards for The Bimodal Tram System Korea

Construction of 6 Road (210Km) in Cambodia Cambodia

Hyundai-Kia Motor CA Proving Ground U.S

Andong Bridge in Vietnam Vietnam

Detail Design for The Kanti Rajpath Improvement in Nepal Nepal

Complex Cheongju Enterprise City Korea

Songsan 2nd Industrial Complex Korea

Songsan General Industrial Complex Korea

Ulsan Module Complex Korea

Wonju Innovation City Korea

Daegu Innovation City Korea

Banchun Industrial Complex in Ulsan Korea

Seosan General Industrial Complex Korea

Gwangju Distribution Complex Korea

Onsan Industrial Complex Korea

Chilgok Distribution Center Korea

Jeonju Science Park Korea

Site Renovation for Gangdong Sanha Area in Ulsan Korea

Urban Basic Planning of Andong Korea

2012 Yeosu International Exposition Schematic Planning Korea

Taean Enterprise City Planning Korea

Design for The Mirae Industrial Complex in Naju Korea

Paju National Football Team Trainining Center Planning and Supervision Korea

Concept Design for The Alnoor City in Yemen and Djibouti Yemen

Water Resource DevelopmentDetail Design for Pumped Storage Power Plant (Mooju, Sancheong, Yang yang, Yecheon, Cheongsong) Korea

Basic and Detail Design for The Youngwol Multi-Purpose Dam Korea

Basic and Detail Design for The Gunnam Flood Control Dam Korea

Basic Plan for The Flood Control improvement of The Daecheong Dam Korea

Feasibility Study and Detail Design for The Garolim Tidal Power Plant Korea

Feasibility Study and Detail Design for The Incheon Tidal Power Plant Korea

Feasibility Study and Basic Plan for Shiwha Tidal Power Plant Korea

Basic Plan for River improvement of Keum River, Yeongsan River, Hyungsan River and Mankyung River Korea

Master Plan and Detail Design for Renaissance for Han River, Nakdong River, Keum River and Yeungsan River Korea

Pre-Feasibility Study for Pusat Hydropower Plant Cambodia

Feasibility Study for Cambodia PREK LIANG Hydropower Project Cambodia

Detail Design for New Bong HydroPower Plant Parkistan

Small Dams Irrigation projects Parkistan

Detail Design for Nepal Modikhola Hydropower Plant Nepal

Detail Design for Nepal Chameliya Hydropower Plant Nepal

Water Supply and Sewerage SystemGosung Sewage Treatment Plant Korea

Cheonan MBR Sewage Treatment Plant (Phase III, Phase IV) Korea

Cheongsim Water Quality Restoration Center Korea

Sewage Treatment Plant (Hwaseong-Dongtan) Korea

INFRaSTRUCTURE ENVIRONMENT PORTFOLIO&

Page 25: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 40 - 41INFRASTRUCTURE & ENVIRONMENT

Raw material and Product Container Terminalfor Hyundai Steel in Pyeongtaek - Dangjin PortClient : Hyundai Steel / Korea

Capacity : 30,000 / 50,000 / 100,000 / 200,000 Ton

Period : 2005. 03 ~ 2009. 03

Cheongsong Pumped Storage Power PlantClient : Korea Western Power Co., Ltd. / Korea

Capacity : 600MW (300MW X 2)

Period : 1997. 07 ~ 2007. 03

Hyundai Steel Integrated Steel Mill in DangjinClient : Hyundai Steel / Korea

Capacity : 12 million Ton

Period : 2007. 04 ~ 2013. 09

Industrial WWTP for The Jumoonjin Agricultural Complex Korea

Industrial WWTP for The Yangyang Agricultural Industrial Complex Korea

Industrial WWTP for The Icheon Hynix Semiconductor Korea

Industrial WWTP for The Jeonju KCC Korea

Industrial WWTP for The Cheongju Hynix Semiconductor Korea

Basic Design for Reconstruction of Yeongdeungpo Water Treatment Plant and Advanced Water Treatment Plant Korea

Detail Design for Sewage Pipeline Improvement of Han River (Section No. 2, 3-1) Korea

Basic and Detail Design for Improvement of Namgang Dam (Area 1) Korea

Detail Design for Sewerage Systems Expansion in Upstream of Chungju Dam (1st Sector) Korea

Detail Design for Sewerage Systems Expansion in Upstream of Hapcheon Dam Korea

Basic Design for BTL Project of Moonkyeong Sewage Pipeline Improvement Korea

Sewage Treatment Plant in Sihanoukville Cambodia

Water Supply and Sewerage System in Equatorial Guinea Equatorial Guinea

(Mongomo, Ebibeyin, Ebinayong, Nsoc Nsomo, Anisok, San Jose)

O&M Project (Water supply and Sewarage system of 3 cities in Equatorial Guinea) Equatorial Guinea

Columbia Bello Wastewater Treatment Plant Columbia

Water Supply and Sewerage System in Azerbaijan Azerbaijan

Oman A’seeb Sewerage Treatment Plant Oman

Sriranka Polonnaruwa Water Supply System Sriranka

Detail Design for Thu Duc Purification Plant and Water Transmission Pipeline in Ho Chi Minh Vietnam

Renewable EnergyDesign for Yangyang Wind Power Project Korea

Feasibility Study for Jeonnam 5GW Onshore Wind Farm Korea

Design for Yungduk Wind Power Plant Korea

Design for Hoengseong Wind Power Plant Korea

Basic Plan and Feasibility Study for The Jeonnam Marine Wind Power Complex Korea

Basic Design for Jeju Wolryung Wind Power Plant Korea

Construction of Wood Pallet Manufacturing Facility in Danyang Korea

Bulgaria 9MW Solar Power Plant Bulgaria

Environmental IndustriesSewage Sludge Composting Facility (Goseong, Miryang, Geoje, Andong, Boseong, Korea

Chilgok, Gochang, Goryeong, Changnyeong, Seocheon, Mungyeong)

Chungju Food Waste to Energy Facility Korea

Mappo EM Facility Korea

Basic Design for Resource Recovery and Recycling Facility Korea

Basic and Detail Design for Jangyu Resource Recovery Facility Korea

Basic and Detail Design for Changwon Resource Recovery Facility Korea

Basic and Detail Design for Taean/Hadong Thermal Power Plant Desulfurization Facility Korea

Detail Design for Gwacheon Resource Recovery Facility Korea

Detail Design for Sanggye Resource Recovery Facility Korea

Singapore Sembcorp ICW Incineration Plant Singapore

Steel MillHyundai Steel Integrated Steel Mill in Dangjin Korea

New Public Transportation and RailwaysBasic and Detail Design for Seoul Metropolitan Subway Line 9, Route No.912 Turn Key Project Korea

Basic and Detail Design for Bimodal Tram Test Line Korea

Bus Rapid Transit Project in Sejong Metropolitan City Korea

Yeosu Expo Bimodal Tram Line Korea

Feasibility Study and Basic Design for Gimpo Light Electric Railway Korea

Basic Plan for Seoul-Hanam Light Railway Korea

Basic and Detail Design for Honam High-Speed Railway(Section No. 2-3) Korea

Detail Design for Seoul Metropolitan Subway Line No.5, 6, 7, 8, 9 Korea

Basic and Detail Design for The Incheon Metropolitan Railway Line No.3 Korea

Detail Design for The Daejeon Metropolitan Railway Line 1(Oi-Sam depot) Korea

Basic Design for Metropolitan High Speed Railways(Suseo-Pyeongteak) (Section No. 9) Korea

Detail Design for Gyeongbu High Speed Railway (Section No. 13) Korea

Detail Design for Moran Depot of The Seoul Metropolitan Subway Line No.8 Korea

Basic Design for Daegu Metropolitan Subway Line No.2 Korea

Basic Design for Extension of Daegu Metropolitan Railway Line No.1 (Section No.2) Korea

Environmental Impact AssessmentEIA for Donggang Dam Construction Korea

EIA for Sihwa Tidal Power Plant Construction Korea Korea

EIA for Pyeongtaek Oil Storage Facility Construction for Korea National Oil Corporation Korea

EIA for Youlchon Combined Thermal Power Plant Construction Korea

EIA for Pyeongtaek Oil Storage Facility Expansion Korea

EIA for Multifunctional Administrative City Water Center Construction Korea

Soil and GroundwaterSite Survey on The Nuclear Waste Disposal Facility Korea

Survey on The Low and Interim Level Radioactive Waste Disposal Facility Korea

HDO Deasan Complex Remediation of Contaminated Soil and Groundwater Korea

Survey on Groundwater and Underground Water and Development Projects Korea

Detail Design for Remediation Projects for Contaminated Underground Water and Soil Korea

Cement PlantDangjin Cement Plant Korea

Page 26: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 42 - 43ASSET MANAGEMENT

aSSET MaNagEMENTHyundai Engineering provides efficient asset management services that fully satisfy customers by creating a convenient business environment.Hyundai Engineering provides FM, PM, and consulting services for the improvement of real estate values, and continuously expands its competencies and business scope to maximize customer satisfaction. Hyundai Engineering will continue to lead the asset management industry by offering differentiated services and remaining the business partner of choice.

Asset Management and Services that Exceed Customer Expectations

Page 27: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 44 - 45

Information Services

Facility Management Services aSSET MaNagEMENT PORTFOLIO

ASSET MANAGEMENT

KMC Soha-ri Plant Korea

KMC Gwangju Plan Korea

KMC Osan Campus Korea

KMC Branch Offices (12 including Gangdong Office) Korea

KMC A/S Center (18places) Korea

Hyundai-Steel Incheon Works Korea

Hyundai-Steel Pohang Works Korea

Hyundai-Steel Dangjin Works Korea

Hyundai Steel Suncheon/Suncheon Forging Works Korea

Hyundai Card/Capital Office Building (Yeouido) Korea

Hyundai Card/Capital Office Building (11places) Korea

Hyundai Card/Capital Cheonan Training Center Korea

Hyundai Mobis R&D Center (Mabuk) Korea

Hyundai Mobis Asan Distribution Center Korea

Hyundai MOBIS Plants (9 including Changwon Plant) Korea

Hyundai Glovis Sales Offices/Logistics Centers (16 including Hyangnam Center) Korea

Hyundai Wia Plants (5 including Changwon Plant) Korea

Hyundai Rotem Changwon Plant Korea

Hyundai Rotem Dangjin/Seosan Plant Korea

Hyundai Dymos Seosan Plant Korea

Hyundai Dymos Dongtan Seat R&D Center Korea

Hyundai Dymos Hwaseong Powertrain R&D Center Korea

Hyundai E&S Industries Cheonan Plant Korea

Hyundai E&S Industries Yulchon Plant Korea

Hyundai Powertec Seosan Plant Korea

Hyundai Partecs Seosan Plant Korea

Facility ManagementHYUNDAI ENG America(GA), Inc. U.S.

HYUNDAI ENG America(AL), Inc. U.S.

HYUNDAI ENG America(CA), Inc. U.S.

HYUNDAI ENGINEERING DEUTSCHLAND GmbH Germany

HYUNDAI ENGINEERING CZECH s.r.o. Czech

HYUNDAI ENGINEERING SLOVAKIA s.r.o. Slovakia

HYUNDAI ENGINEERING RUS Russia

HYUNDAI ENGINEERING INDIA PRIVATE LIMITED India

HYUNDAI ENGINEERING CHINA Co.,Ltd China

HMC Office Building (Yangjae-dong) Korea

Hyundai Ulsan Plant Korea

Hyundai Asan Plant Korea

Hyundai Jeonju Plant Korea

HMC R&D Center (Namyang) Korea

HMC Wonhyo-ro Building Korea

R&D Center (Mabuk) Korea

HMC Cheonan Training Center Korea

HMC Paju Campus Korea

HMC Branch Offices (26 including Seongnae Office) Korea

HMC A/S Center (22places) Korea

Distribution Centers (9 including Seongbuk Center) Korea

Office Building (Gye-dong) Korea

Uiwang R&D Center Korea

KMC Office Building (Apgujeong) Korea

KMC Hwaseong Plant Korea

Incident monitoring center (Uiwang R&D Center)

Page 28: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 46 - 47

시설관리서비스

ASSET MANAGEMENT

Information Services Incident monitoring center (Uiwang R&D Center)

Hyundai Autoever Paju IDC Korea

Landmark Tower Korea

Hyundai BNG Steel Gwangju Plant Korea

Wia Magna Powertrain Asan Plant Korea

Wia IHI Turbo Seosan Plant Korea

Hyundai Engineering Cheonan 4S Korea

Hyundai Life Boramae Nasan Suite Korea

Hyundai Life Sinsong Center Korea

Hyundai Kefico Gunpo Plant Korea

SK E&C SK Myongdong Building Korea

Mateplus Imgwang Bldg Korea

ShinYoung Asset POBA Gangnam Tower Korea

Di Asset Dong il Tower Korea

Mateplus Hosu Bldg Korea

S-1 Trees Building Korea

S-1 Twin Tree Building Korea

Hana-asset Management Samhwan Bldg Korea

Igis Asset Management Autoway Tower Korea

Woori P&S Woori W Tower Korea

Savills G Tower Korea

13 KT Estate Buildings (including Jayang Building) Korea

Property ManagementOffice Building (Gye-dong) Korea

Uiwang R&D Center Korea

Hana-asset Management Samhwan Bldg Korea

Autoway Tower Korea

Consulting (Lease, Sale, and Purchase of Property and Real Estate)Property and Real Estate including those of Hyundai Motor Group

Page 29: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 48 - 49

To build upon the Volunteers of Love launched in 1996 and run by our employees, we established a task force team solely devoted to social contribution in 2009. This dedicated team has allowed us to practice sharing management more systematically and at the corporate level. The launch of our combined business in April 2014 has further expanded the role and scope of our social contribution efforts. By closely aligning our business activities with the needs of society and focusing on integrity, sustainability, and public interest, we will continue to create shared value and, in turn, a positive cycle of company and community prosperity.

we carry out community engagement programs designed to provide life solutions at home and abroad. Our 'Didimdol House Project' offers those living in urban slum areas inclusive support for housing welfare and self-help survival. In less developed countries, we run the 'New Hope School' program. This program aims at improving access to education for underprivileged children by building schools and youth centers. Anchored in our commitment to becoming a "Happy Energy Contributor," our social contribution efforts are creating a positive ripple effect all over the world.

Sharing Management through Giving Back and Creating Shared Value

CSR Programs Tailored to Provide Life SolutionsAs part of our efforts to fulfillour corporate social responsibility

Descriptions

Major CSR Activities[Housing] Modular relief housing assistance for disaster victims (Hope House/ Gift House)[The Disabled] Support for the establishment and operation of workplaces for the severely disabled (including donation of PCs)[Multi-Cultural Families] Assistance for the purchase or lease of residential properties

Local Communities•Free movie screening for low-income and disabled children on our company anniversary•"One Company Maintains One Grave Site in the National Cemetery"•Lunch and snack service for those with chronic kidney disease•Building homes of love, HABITAT •Care packages for needy children

Overseas / Project Sites•Safe drinking water project for children, Kenya •Sponsorship for a bazaar for the needy, Pakistan•Healthcare volunteer program and sponsorship for the Remembrance Day event, Uzbekistan•Job fair and scholarships, the Philippines

Headquarters / Business Divisions / Offices[Process Plant Division] Beautiful Store

[Power & Energy Plant Division] Cultural Property Protection Campaign

[Building Works Division] Aid to needy neighbors in Jungnang-gu, Seoul

[Infrastructure & Environmental Execution Group] Knit for Kids Program

[Finance & Accounting Division] Sharing the Rice of Love / Donation of

equipment and supplies at overseas project sites

[General Administration & Management Division] Cleaning service for

Changdeokgung Palace

[Planning Office] Aid to needy neighbors in

Yangcheon-gu, Seoul / Sharing the Bread of Love

[Business & Marketing Office] Sharing the Briquettes of Love

[HSE Innovation & Quality Management Office]

Hope Diapers

[Asset Management Office] Cleaning the Tancheon Stream

[Procurement Execution Group] Sharing the Kimchi of Love

OthersDonation of PCs, blood donation, and blood donor's certificates

Strategies•Systematically apply flagship CSR programs at business sites

•Expand the scope of CSR programs•Achieve continued CSR performance

Action Plans•Develop strategic CSR activities at business sites - home and abroad

•Develop an experience-based volunteer program model•Establish the CSR management system

VolunteerActivities for

Local Communities

Strategic CSR Activities at

Business Sites -Home and Abroad

Contributions to NGOs and

Other Partners

Vision

ParticipationSustainable

SharingHappy Mutual

Growth

Goals•Global sharing for happiness and mutual prosperity•A great workplace and a great corporate culture•Leadership in corporate social responsibility

Happy EnErgy Contributor

Key CSR Programs

[Korea] Didimdol (Stepping-Stone) House Project·Facility assistance: provide convenience facilities for those living in substandard housing·Support for job skills: provide self-help assistance for community businesses and job training workshops·Emotional support: Expand the coverage of Didimdol Culture Class

[Overseas] New Hope School·The 5th New Hope School built (Laos)·New CSR programs to be developed (at strategic business sites)

CORPORATE SUSTAINABILITY MANAGEMENT

Ethics Management in the Pursuit of Fair and Transparent Values

Our Ethics Management Activities•CEO's ethics statement (text and video) and employees' pledge of ethical conduct

•Stronger online and offline ethics training for employees and business partners

•Cyber Audit Center for the prevention and resolution of unethical behaviors

•Publications such as ethics newsletters and posters

Sustainability Management System

Win-Win Management•Greater Support for Good Business Partners•More Inclusive Performance Sharing System

Health & Safety and Environmental(HSE) Management

•More Rigorous HSE Management System

Value Management•Greener Technologies

•Stricter On-Site Quality Management

Talent Management•MoreProactiveCoreTalentCultivation

•TopTalentAcquisition

Sharing Management•GreaterGlobalSocialContribution

With increased demand for fairness and transparency in the

process of business execution, we declared our commitment

to ethical management on January 1, 2009 and have

continued our enterprise-wide efforts to transform into

a transparent and reliable business partner by educating

employees through various contents, installing the Cyber

Audit Center to prevent unethical acts, and issuing an ethics

management newsletter.

We have introduced and implemented our sustainability management system in order to fulfill not only our role as a good

corporate citizen but also our responsibilities to promote happiness for all people. Motivated by the guiding spirit of our

Ethics Management; Health & Safety and Environmental Management; Value Management; Talent Management; and

Win-Win Management, we are exerting our best efforts to fulfill our corporate social responsibility.

Sustainability Management Centered on Trust and Respect Our Commitment to Corporate Social Responsibility

EthicsManagement

EthicsManagement

System

Business StrategiesAligned withCorporate Vision

Continuous Monitoringand Feedback

CEO's Commitmentto Ethics

A DedicatedTeam Focusing on Ethics

Systematic Guidelines

Compliance andSocial Contribution

Strong Penaltiesfor Unethical Behaviors

Evaluation andRewards

Three Key Principles

Scope ofActivities

Page 30: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 50 - 51QUALITY MANAGEMENT RESEARCH AND DEVELOPMENT

Quality Management in ConstructionAt the earliest stage of project execution, we set up a site quality management

system. This system comprises a complete overview of quality assurance, quality risk

management, strict personnel training, and quality inspections, allowing us to achieve

zero defects. In addition, we have introduced advanced IT tools, including construction

and quality management systems (HCQM and AQMS) and a pipe welding management

system (WIT) to effectively control construction quality.

Nuclear Power Quality AssuranceWe have established the Nuclear Power Quality Assurance System that satisfies the

standards of the Korea Electric Power Industry Code (KEPIC) and all nuclear power-

related laws and regulations. This system is used in our nuclear power plant engineering

works that span geological surveys to the engineering, inspection, construction, and

maintenance of nuclear power plants and related facilities. With this integrated quality

assurance approach, we deliver both safety and reliability to our customers.

Quality Management in EngineeringWe developed the online project portal "ProjectSpace" to ensure standardization and

transparency in our engineering works. This tool allows the real-time monitoring of

project engineering, helping us efficiently manage communication between our business

divisions, teams, and project partners. In addition, the portal provides optimum design

quality through its 3D Modeling Review function and peer review and verification by

expert groups.

Quality Management in ProcurementWith our integrated materials and procurement system, MAPS, we have built a quality

information database, actively shared quality information with relevant teams, and

improved the effectiveness of our quality inspection. We have also introduced advanced

inspection techniques and a rigorous special management system to better control

low-quality equipment and materials, ensuring the soundness of the equipment and

materials used in our projects.

Customer satisfaction is our top priority.

Leveraging our top-notch technology

capabilities and human resources, extensive

experience, and know-how, we go to great

lengths to deliver a higher level of satisfaction

to our customers. Our rich history of

challenges and accomplishments made

throughout the world is evidence of our strong

commitment to providing the most innovative

and stable solutions through proactively

responding to changes in the market and

project variables. We are determined to

deliver more than satisfaction and assure the

continued success of our partners.

We believe that continuous

technological advancement is the

key to sustainable growth and

development. With our technology

convergence and integration

efforts to maximize our corporate

brand power and future corporate

value, our accurate and timely

decision-making system, and our

integrated engineering solutions

that enable unparalleled quality

and efficiency, we are not only

leading business trends but also

serving as the exemplary model

of global standards. From our

headquarters to our project sites

around the world, we will continue

to take on challenges to create

a brighter and more convenient

future with our technology.

Continuous Quality Managementfor Customer Satisfaction

Differentiated Competitiveness throughResearch and Development

Quality Management SystemTo create future value for customers, we operate an

enterprise-wide quality management system that

covers all stages of project execution. We conduct

regular and systematic quality education for

each project tier and phase and apply the Project

Quality Rating System to quantitatively measure

the quality level of every project. Furthermore, with

our regular quality audits, quality trend analysis,

and management review based on the findings, we

are dedicated to delivering optimal quality service

to our customers.

New "Growth Engine" BusinessesWith High Added-Value We constantly reinforce the alignment between R&D and each business

area to maximize our future corporate value and develop new businesses that will drive future

growth. We continue to undertake R&D projects and carry out industry-academia research projects

for the commercialization of technology (including technology transfer) and the enhancement

of productivity (cost reduction, quality improvement, and risk management). Furthermore, we

are fully dedicated to convergence and integration among our business areas, which will serve to

underpin our technological competitiveness and drive the growth of the nation’s industry.

Global Real-Time Management Information SystemFor strategic and tactical decision-making, we operate a management information system that

makes information available for analysis in real-time. This information is organized by function,

organization, and tier. We also run a knowledge management system that encompasses all types

of knowledge, including technical and professional expertise, experience, and performance. This

system helps us innovate our technology and improve our workflow.

Integrated Intelligent Engineering SolutionAs part of our efforts to enhance our engineering procurement and construction management

(EPCM) at the enterprise level, we have developed engineering technology road mapping

(TRM) for systematic technology development. We will continue to build a world-class project

management system and global collaboration system through constant improvement in business

process standardization, structuring, and systemization. Through promoting the integration of the

common solutions required by potential partners' bidding invitations and our own solutions, we

are doing our best to deliver quality beyond the level of customer satisfaction.

Page 31: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 52 - 53HEALTH & SAFETY AND ENVIRONMENTAL MANAGEMENT TALENT MANAGEMENT

Major HSE ActivitiesRisk Assessment Development We categorize, identify, and

assess risk factors throughout our work process that ranges

from design to procurement and construction, and select

measures to minimize them.

Compliance with HSE Laws and RegulationsWe comply with all local HSE laws and regulations and strive to meet the needs of both

customers and local residents. We keep complete records of all decisions made and

actions taken in relation with HSE management and provide training on a regular basis.

HSE Golden Rules

ㆍDistribution of HSE Handbook ㆍCompliance with Life Saving Rules

Site HSE ManagementIn order to prevent any potential HSE incidents, we establish an effective HSE

management system at our construction sites and conduct HSE monitoring periodically

(on a daily, weekly, and monthly basis).

Management-Led Safety InspectionWe emphasize the importance of safety management through our "Safety Inspection

Day" that is led and participated in by our top management. Through this event, we

seek to declare our commitment to safety management, improve safety awareness, and

prevent workplace accidents.

Performance Review and ImprovementWe convene safety performance conferences presided over by our CEO. At these

conferences, we review the operations and outcomes of our safety management practices

and set out measures to improve our safety management.

HR Management SystemWith our fair HR management system, we are imbuing our

organization new energy and improving transparency. We do not

accept any form of discrimination on the basis of gender, age, religion,

educational background, or physical ability; comply with local and

global labor laws; and strictly prohibit child labor in accordance with

the UNGC labor rules. Furthermore, we provide career development

opportunities for all employees throughout their tenure, helping them

build their career more effectively and nurturing specialized experts.

We also offer our employees opportunities to work overseas and

provide performance-based rewards, helping to motivate them and

improve their job performance.

H-Type Ideal Employee‘H-Type Ideal Employee’ refers to the ideal Hyundai Engineering

talent who demonstrates rich expertise and knowledge, a warm

heart, respect for humanistic values, pride, eagerness to seek out

challenges, and global perspective.

Opportunitiesto work overseas

Cultivation of specialized experts

through effective career management

PROFESSIONALISMSpecialist

PASSIONDedication, Drive,and Responsibility

PERFORMANCEPerformance Creation

GENERALISTCombined Knowledgeand Skills

PRIDEPride and Loyalty

GLOBAL TALENTLinguistic Proficiency,Presentation / Writing,Communication

HFocus on the

aptitude and personal career goal of

each employee

HSE Management

System

HSE Policy ManagementReview

Implementationand Operation

Planning Checking andEvaluating

Health & Safety and Environmental Management:Enhancing the Planet's Value

Talent Management to Cultivate ‘H-Type Talent’with Passion and Eagerness to Seek Out New Challenges

We seek to enhance the value of our planet for a better future. We strive to systematically manage

health & safety and the environment (HSE) in order to develop the potential value of the space

where we work and live and successfully complete our projects.

Top talent cultivation is one of our key management philosophies. With our focus on work-life balance,

we develop future talents with our own education and training system. As a global company,

we strive to create a corporate culture that values harmony and open communication, enabling talents

with multi-cultural or multi-ethnic backgrounds to fulfill their potential.

Page 32: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

HYUNDAI ENGINEERING 54 - 55MAJOR OVERSEAS PROJECTS

BEYOND THE BORDERON THE WORLD STAGEAmidst today's fiercely competitive global landscape, we will continue to go beyond our limits by expanding our global presence and growing into a global company with our world-class engineering solutions and top-notch technological capabilities.

EUROPEGreceHAR Crude & Vacuum Distillation Unit

GermanyHME Europe Head Office, GermanyKia Motors Europe Design Center, GermanyHYUNDAI ENGINEERING DEUTSCHLAND GmbH

RussiaAutoparts Supplier’s ComplexSPB Factory Expansion for Auto Parts Supplier HYUNDAI ENGINEERING RUS

Romania DPetrobrazi Cogeneration Plant Romania

Bulgaria9MW Solar Power PlantCherveniakvo 4MW Solar Power Plant Palauzovo 5MW Solar Power Plant

Slovakia KMS (Kia Motors Slovakia) Project2nd Engine Plant in KMSHYUNDAI ENGINEERING SLOVAKIA s.r.o.

CzechHMMC (Hyundai Motor Manufacturing Czech) ProjectHyundai Mobis Module Plant in HMMCHYUNDAI ENGINEERING CZECH s.r.o.

AFRICANigeriaEscravos Gas Plant Phase-3Bonny Terminal Integrated Project

LibyaAL-QUBA AL-GADIDA 2000 Housing & Public BuildingsTripoli West 1400MW Thermal Power Plant Al Khalij1 1400MW Thermal Power Plant

MadagascarAmbatovy Cogeneration Power Plant

AlgeriaBir-el-M’sana (BMS) Field DevelopmentArzew Refinery ProjectBiskra 1,400MW Combined Cycle Power Plant Project Jijel 1,400MW Combined Cycle Power Plant Project Ain Arnat 1200MW Combined Cycle Power Plant Project

Equatorial GuineaWater Supply and Sewerage System(Mongomo, Ebibeyin, Ebinayong, Nsoc Nsomo, Anisok, San Jose)

KeyaOlkaria I & IV Geothermal Power Plant

TunisiaPhosphoric Acid Plant

MIDDLE EASTDubaiMPME(Mobis Parts Middle East) 2nd Warehouse

SaudiarabiaJubail Polysilicon PlantAAC Ethyleneamines PlantSaudi Aramco Cogeneration

U.A.ETakreer Group III Base Oil Production FacilitiesBorouge-3 XLPE & Utilities & Offsite Project

OmanMusandam Oil & Gas PlantOman A’seeb Sewerage Treatment Plant

IraqKarbala Refinery ProjectAl-Qudus 4x125MW Gas Turbine Power PlantRumaila 5x292MW Gas Turbine Power Plant Project Taza 292MW Gas Turbine Power Plant Project

IranSouth Pars Field Development - Phase 2&3, 4&5

YemenRas Issa Refinery Project

QatarNGL-4 ProjectPearl GTL C-5 Project

KuwaitAl-Zour LNG Import ProjectKOC Oil and Gas Pipelines Project - Part A & BKNPC New Ethane Recovery PlantShuaiba North Combined Cycle Cogeneration Power Plant

TurkeyHyundai Mobis Module Plant, TurkeyHyundai Hysco Coil Factory, Turkey

CENTRAL ASIA AzerbaijanWater Supply and Sewerage System

UzbekistanGas To Liquid Project (UZGTL)Kandym Fields Gas Processing Plant

KazakhstanShymkent Lube Base Oil Project

TurkmenistanKiyanly PE/PP ProjectGas Desulfurization PlantShip Repair Complex in TurkmenistanTurkmenistan National UniversityTurkmenbashi Oil Refinery Project

ASIANepalDetail Design for Nepal Chameliya Hydro Power Plant

TaiwanLube Base Oil Plant

MalaysiaJimah East 2,000MW Coal-Fired Power Plant ProjectPGB Plant Rejuvenation and Rev1damp 2 ProjectPetronas Gas Processing Plant - Phase 2&3&4Melawa 50MW Diesel Power Plant Coloane B Combined Cycle Power Plant

MongoliaDalanzadgad Cogeneration Plant

BangladeshCompressor StationAshuganj 225MW Combined Cycle Power Plant ProjectHaripur Combined Cycle Power Plant

VietnamAndong Bridge ProjectPVTEX PET PlantDung Quat Polypropylene PlantBa Ria Add-on Combined Cycle Power Plant Yen Bai Provincial General Hospital Haiphong Song Gia Golf Resort Complex

SrirankaPolonnaruwa Water Supply System

SingaporeSembcorp ICW Incineration Plant

IndiaHiranandani LNG Terminal (FEED)HPCL Hydrogen Generation UnitMangalore Barge Mounted Combined Cycle Power PlantHiranabdani 2,500MW Combined Cycle Power PlantNew Construction of Hyundai 2nd Factory in ChennaiHyundai Motors R&D Center, Hyderabad, IndiaHYUNDAI ENGINEERING INDIA PRIVATE LIMITED

IndonesiaKalsel 1,200MW Coal-Fired Thermal Power PlantAsahimas VCM ProjectMEB 23MW ADD-ON CCPP Darajat Geothermal Power Plant Station I & IISIPCO 160MW Combined Cycle Cogeneration Power Plant

ChinaZhuhai LNG Terminal (FEED)Urea Plant (Pingdingshan, Shannxi, Chisui)Kia Motors R&D center, Yancheng DYK, ChinaHyundai Motors R&D center, Yantai, ChinaHYUNDAI ENGINEERING CHINA(YANTI)Co.,LtdHYUNDAI ENGINEERING CHINA(RIZHAO)Co.,Ltd

CambodiaMonivong Office Building Project, Cambodia(Phnom Penh Tower)Acleda Bank Plc Headquarters Office Building Project, CambodiaSewage Treatment Plant in Sihanoukville

ThailandLinear Alkyl Benzene (LAB) ProjectMOC Aromatics Recovery UnitSIPCO 160MW Combined Cycle Cogeneration Power Plant

PakistanARL Upgradation ProjectMCR DHDS UnitUCHI II 390MW Combined Cycle Power PlantNew Haripur 412MW CCPP Power PlantDetail Design for New Bong HydroPower Plant

PhilippinesTherma Visayas 300MW Coal-Fired Power ProjectBac-Man 3 28MW Geothermal Power ProjectTVI 300MW Coal Fired Power Plant

KoreaLotte-Versalis SR ProjectHyundai-Shell LBO ProjectHyundai Petrochemical Complex - Phase 1 & 2Hyundai Oil Refinery - Phase 1 & 2Incheon Thermal Power Plant Unit 3 & 4Goyang Samsong District Mass-Energy Facility(100MW)Yeongwol 900MW Combined Cycle Power PlantRaw material and Product Container Terminal for Hyundai Steel in Pyeongtaek - Dangjin Port Ulsan New Port (Phase I, II) / Berth No.2- 3 of Southern QuayContainer Terminal Phase 1-1 of Incheon New Port: Section No. 2Wonju Innovation City Daegu Innovation CityCheonan MBR Sewage Treatment Plant (Phase III, Phase IV)Sewage Sludge Composting FacilityHMC High Technology R&D centerHavivhi Hotel in JejuSeoul Sangbong-dong Premier’s amcotownSeoul Sangdo-dong amcotown Central ParkBundang Gumi-dong amco HeritzGunsan 1st/2nd Complex AmcotownHillstate Sejong 2nd ComplexAnyang Seoksu-dong AmcotownHMC Office building (Yangjae-dong)Hyundai Ulsan PlantHMC R&D Center (Namyang)

OCEANIAFijiBasic Design for Fiji-Ba & Sigatoka Bridge

AustraliaHyundai Motors office Building, Australia

NORTH AMERICANicaraguaNicaragua 138kV Substation Project

U.S.AHyundai-Kia Motors CA Proving GroundEngine Plant in HMMA(Hyundai Motors Manufacturing Alabama)KMMG (Kia Motors Manufacturing Georgia)Hyundai Motor America New Headquarters (HMA)HYUNDAI ENG America(GA), Inc.HYUNDAI ENG America(AL), Inc.HYUNDAI ENG America(CA), Inc.

MexicoSempra Baja LNG TerminalHyundai Trenslead Cast Material Factory, Tijuana, MexicoMonterrey KIA Motors Manufacturing Plant Project

LATIN AMERICABrazilHHIB (Hyundai heavy industries Plant in Brazil) ProjectHMB (Hyundai Motors Brazil) Project

VenezuelaSanta Ines Refinery ProjectRPLC Deep Conversion Facilities

UruguayUTE Punta del Tigre 500MW CCPP Power Plant

ChileNueva Ventanas 250MW Thermal Power Plant

ColombiaTermotasajero II 180MW Coal Fired Power Plant ProjectColumbia Bello Wastewater Treatment Plant

PROCESS PLANT : Greece, Nigeria, Algeria, Tunisia, Saudiarabia, United Arab Emirates, Oman, Iran, Iraq, Yemen,

Kuwait, Qatar, Uzbekistan, Kazakhstan, Turkmenistan, Taiwan, Bangladesh, Vietnam, India, China, Thailand, Pakistan,

Korea, Mexico, Venezuela

POWER & ENERGY PLANT : Bulgaria, Romania, Libya, Madagascar, Algeria, Kenya, Saudiarabia, Iraq, Kuwait, Nepal,

Malaysia, Mongolia, Bangladesh, Vietnam, India, Indonesia, Thailand, Philippines, Korea, Nicaragua, Uruguay, Chile

BUILDING WORKS : Germany, Russia, Slovak, Czech, Libya, Dubai UAE, Turkey, Turkmenistan, Vietnam, India, China,

Cambodia, Korea, Australia, USA, Mexico, Brazil

HOUSING WORKS : Korea

INFRASTRUCTURE & ENVIRONMENT : Bulgaria, Equatorial Guinea, Oman, Jordan, Azerbaijan, Turkmenistan, Nepal,

Srilanka, Singapore, Indonesia, Cambodia, Pakistan, Philippines, Korea, Fiji, USA, Colombia

ASSET MANAGEMENT : Germany, Russia, Slovak, Czech, India, China, Korea, USA

Page 33: Design by ENGINEERING - hec.co.kr · hyundai engineering tomorrow hyundai engineering co., ltd. i hyundai bldg. 75, yulgok-ro, jongno-gu, seoul, 03058, korea i tel 82 2 2134 1114

TOTALPROJECT MANAGEMENT

FEEDPMC

Feasibility StudyFEEDPMC Services

E

ConceptualEngineeringBasic & DetailEngineering

EPProcurement

EPC

ConstructionConstruction ManagementCommissioning & Start-upOperation & Maintenance

AM

Facility ManagementProperty ManagementAsset Management

GLOBAL NETWORK

THAILAND252/91 MUANG THAI-PHATRA COMPLEX TOWER 2, 16TH

FLOOR, RATCHADAPHISEK ROAD, HUAyKWANG SUB-

DISTRICT, HUAyKWANG DISTRICT, BANGKOK

TEL. +66-87-360-9779

VIETNAMUNIT 1202, KEANGNAM HANOI LANDMARK TOWER, PLOT

E6, CAU GIAy URBAN AREA, ME TRI COMMUNE. TU LIEM

DISTRICT, HANOI

TEL. +070-8280-2544

CAMBODIA11TH F, PHNOM PENH TOWER, #445, MONIVONG BLVD,

PHNOM PENH, CAMBODIA

TEL. +855-23-964-001

INDONESIALT 7, MENARA JAMSOSTEK (SOUTH TOWER), JL JEND. GATOT

SUBROTO KAV.38, KELURAHAN KUNINGAN BARAT, JAKARTA

SELATAN 12710, INDONESIA

TEL. +62-21-5296-4214

ALGERIALOT PONS Nº39 GARIDI KOUBA, ALGER

TEL. +213-(0)21-46-19-61

UZBEKISTAN4TH FLOOR, 38/1, SHAKHRISABz STREET, MIRABAD DISTR.,

TASHKENT CITy, REPUBLIC OF UzBEKISTAN

TEL. +998 71 205 0628

EQUATORIAL GUINEA NO.206, EDIFICIO 'DA VINCH', MALABO II, MALABO CITy,

GUINEA ECUATORIAL

TEL. +240-222-759-836

HEADQUARTERSHYUNDAI ENGINEERING CO., LTD.HyUNDAI BLDG, 75, yULGOK-RO, JONGNO-GU,

SEOUL 03058 KOREA

TEL. + 82-2-2134-1114

OVERSEAS SUBSIDIARIESUSA111 PETERS CANyON RD IRVINE, CA 92606, USA

TEL. +1-949-422-2362

GERMANYKAISERLEIPROMENADE 5,63067 OFFENBACH AM MAIN,

GERMANy

TEL. +49-69-271-472-642

TURKEYDAIRE 62, VARyAP MERIDIAN A BLOCK, BARBAROS MAH.,AL

zAMBAK SOK. BATI ATASEHIR, POSTAL zIP CODE #34746,

ISTANBUL, TURKEy

TEL. +82-70-8280-2562

CZECHT.G. MASARyKA 1117, FRyDEKMISTEK 73801, CzECH REPUBLIC

TEL. +420-596-142-140

SLOVAK REPUBLICMARIANSKE NAMESITE 29/6 010 01 zILINA SLOVAKIA

TEL. +420-596-142-140

CHINAC-10F, RM NO.1014, STAR CITy INTERNATIONAL BLDG, NO.10

JIUXIANqIAO ROAD, CHAOyANG DISTRICT, BEIGING, CHINA

TEL. +070-8280-2850

INDIASRI BALAVINAyAGAR BUILDINGS, OLD NO. 4, NEW NO. 35/5,

A.R.K COLONy, ELDAMS ROAD, ALWARPET, CHENNAI - 600 018

TEL. +91-44-3710-5868

RUSSIA11TH FLOOR, LIT. A, HOUSE 21, GAKKELEVSKAyA STREET, ST.

PETERSBURG, 197227, RUSSIA

TEL. +7-921-762-3066

BRAZILRUA ALEXANDRE HERCULANO, 120 - SALA 93 - TORRE A

VILA MONTEIRO - PIRACICABA - SP – BRAzIL

TEL. +55-199-9901-3161

MEXICOBATALLON OF SAN PATRICIO SUR NO. 109 INT. 2011 STREET,

COL. VALLE ORIENTE, POSTAL CODE. 64 650, SAN PEDRO

GARzA GARCIA, NUEVO LEON, MEXICO

TEL. +521-81-1497-8612

CAMBODIA11TH F, PHNOM PENH TOWER, #445, MONIVONG BLVD,

PHNOM PENH, CAMBODIA

TEL. +855-23-964-001

THAILAND252/91 MUANG THAI-PHATRA COMPLEX TOWER 2, 16TH

FLOOR, RATCHADAPHISEK ROAD, HUAyKWANG SUB-

DISTRICT, HUAyKWANG DISTRICT, BANGKOK

TEL. +66-87-360-9779

PHILIPPINESGALING POWER & ENERGy CONSTRUCTION CO. INC.

TEL. +82-2-2159-3853

INDONESIAMENARA JAMSOSTEK (SOUTH TOWER) 7TH FLOOR, JL.

JEND GATOT SUBROTO KAV.38, SOUTH JAKARTA 12710,

INDONESIA

TEL. +62-813-1507-3457

OVERSEAS BRANCHESBELGIUMNEUSENBERG 2, 3583 BERINGEN, BELGIUM

TEL. +32-472-959-378

TURKMENISTANTURKMENISTAN, ASHGABAD, 1972(ATATURK STREET) NO.82,

BERKERAR BUSINESS CENTER 12TH FLOOR

TEL. +993-468386

UAEMOHAMMED KHALFAN BIN KHERBASH - UNIT 1103, OPAL

TOWER, DELMA STREET C-53 ABU DHABI, U.A.E.

TEL. +971-2-643-7408

ONE STEP CLOSERTO THE CUSTOMER SIDE

With our worldwide presence in not only emerging markets but also advanced markets in the Middle East, Europe, Africa, Central and Latin America, Central Asia, and North America, we provide optimized technology and solutions that are tailored to the needs of our customers.