Top Banner
New Economics on Desalination Desalination on demand Julio Zorrilla International Construction Director ACCIONA Agua 19 April 2016
10

"Desalination on demand", Julio Zorrilla

Jan 20, 2017

Download

Business

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: "Desalination on demand", Julio Zorrilla

New Economics on Desalination

Desalination on demand

Julio ZorrillaInternational Construction Director

ACCIONA Agua19 April 2016

Page 2: "Desalination on demand", Julio Zorrilla

Water scarcity

The concept of scarcity needs to be understood as a relative concept, i.e., an imbalance between “supply” and “demand” that varies according to local conditions (*)

Permanent

Seasonal + Other factors

Seasonal

(*) source: FAO

ACCIONA Agua – Your partner in the Water Cycle1

Page 3: "Desalination on demand", Julio Zorrilla

Permanent water scarcity Middle East

Countries , The Canaries , Algeria

The choice is the process not the source

Source : H M Ettourney, Cost Analysis

ACCIONA Agua – Your partner in the Water Cycle2

Page 4: "Desalination on demand", Julio Zorrilla

Ciudadela

Arzew 90 MLD

Mactaa 500 MLD

Mostagenem 200 MLDTenes 200 MLD

Fouka 120 MLDHamma 200 MLD

Cap Dignet 100 MLD

Skidda 100 MLD

Turf 50 MLD

Main Algerian desal plants

Page 5: "Desalination on demand", Julio Zorrilla

Seasonal droughts : CA

Source : Pacific InstituteSource : Equinox Center

Good water transfers infrastructure Different options available

ACCIONA Agua – Your partner in the Water Cycle4

Page 6: "Desalination on demand", Julio Zorrilla

Desalination On Demand : Spain Seasonal water droughts Massive summer population increase Only two feasible options to increase the water resources Cost benefit analysis only based on money is not enough Water must be available when needed

ACCIONA Agua – Your partner in the Water Cycle5

Page 7: "Desalination on demand", Julio Zorrilla

Potential water transfers. Source : WWF P Arrojo U Zaragoza

First attempt : PNH

Two large water transfers

ACCIONA Agua – Your partner in the Water Cycle6

Page 8: "Desalination on demand", Julio Zorrilla

Ciudadela

Atabal 140 MLD

Alicante I, II 120 MLD

San Pedro I, II 120 MLD

Sagunto 60 MLD

Prat 180 MLD

Tordera I,II 60 MLD

Oropesa 50 MLDB Palma 100 MLD

Carboneras 120 MLD

Main Spain desal plants

Valdelentisco 200 MLD

Campo Dalias 50 MLD

Ibiza 15 MLD

Torrevieja 240 MLD

750 Facilities400 Hm3

Page 9: "Desalination on demand", Julio Zorrilla

Desal Facilities only used when needed

Source : Pacific Institute

Source : MC Taibilla Anual Report 2013

29.7%

3.0%

Hm3

ACCIONA Agua – Your partner in the Water Cycle8