SUMMER • Q3 2020 TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT 0955_073020 Connecting You With Texas DENTON COUNTY PLANNED MOBILITY PROJECTS UTP (2020 UNIFIED TRANSPORTATION PROGRAM) PROJECTS IN PLANNING 10 YEAR LIST Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 CONTACT INFORMATION Emily McCann – Public Information Officer (214) 320-4485 [email protected] DENTON COUNTY MOBILITY PROJECTS IN PLANNING (UNFUNDED; SUMMER Q3 2020) # CSJ Hwy Project Limits Description Est. Let Date Est. Cost Funding Status 1 0081-13-065 I-35W Dale Earnhardt Way to S of I-35E/I-35W IC Construct 0 to 4-lane FRs; construct grade separations and ramps Sep-2025 $310 M Unfunded 2 0081-03-049 US 377 SH 114 to S of FM 1171 Reconstruct and widen 2-lane rural highway to 4-lane divided urban Aug-2045 $52 M Unfunded 3 0196-01-108 I-35E Turbeville Rd. to US 77 Reconstruct 6/8 to 8 GP lanes; reconstruct and convert 2 reversible to 4 concurrent MLs Aug-2045 $501.4 M Unfunded 4 1311-01-055 FM 1171 W of FM 156 to I-35W Construct 0 to 6-lane divided roadway Sep-2027 $76 M Unfunded 5 2250-02-013 SL 288 US 380 W of Denton to I-35 at LP 288 Construct 2-lane rural roadway on new location Phase 1 of Ultimate frwy. - extension of LP 288 Sep-2026 $20 M Unfunded 6 2250-02-014 SL 288 I-35W S of Denton to US 380 W of Denton Construct 0 to 2-lane rural roadway (Phase 1 of Ultimate freeway - extension of LP 288) Sep-2026 $37 M Unfunded 7 0353-02-037 SH 114 I-35W to BI-114K Construct new 4-lane rural freeway Aug-2023 $63 M Unfunded 8 1951-01-011 FM 1515 Masch Branch St. to Bonnie Brae St. Widen 2-lane rural roadway to 6-lane divided urban Aug-2028 $37 M Unfunded 9 0135-10-061; 0135-10-062 US 380/ US 377 From I-35 to Collin County Line Feasibility Study to Determine Options for Improving Mobility for the US 380 Corridor TBD TBD Unfunded 10 0353-09-003 SH 114 BI-114K to East of US 377 Construct 0 to 6 Lane Grade Separation Over US 377 Aug-2025 $15 M Unfunded 11 0081-04-038 US 377 N of Hickory Creek to FM 1830 Reconstruct and widen 2-lane rural highway as 4-lane divided urban Aug-2045 $11.2 M Unfunded 12 1315-01-030 FM 1385 US 380 to FM 455 Construct new roadway lanes Jun-2024 $132 M Unfunded 13 2979-01-011 FM 2931 US 380 to FM 428 Construct new roadway lanes Jun-2024 $68 M Unfunded 14 0081-06-040 US 377 US 380 to N of BS 377E Reconstruct and widen 2-lane undivided roadway to 4-lane divided facility (Ultimate 6-lane) Aug-2028 $128 M Unfunded 15 2352-02-024 FM 2449 FM 156 to W of I-35W Feasibility study for widening 2-lane urban to 4-lane urban (Ultimate 6-lane) TBD TBD Unfunded 16 0081-13-050 I-35W SH 114 to I-35/I-35E interchange Widen and reconstruct 4-lane rural to 6-lane urban MLs and 2/4-lane to 4/6-lane FRs Aug-2025 $339 M Unfunded 17 1059-01-047 FM 1173 FM 156 to I-35 Widen and reconstruct 2-lane rural to 6-lane urban divided with a raised median Aug-2040 $50 M Unfunded 18 1310-01-045 FM 407 FM 156 to FM 1830 Feasibility study to determine options for improving mobility for the FM 407 arterial corridor TBD TBD Unfunded * 0081-05-048 FM 428 East Winsor Drive to West Sherman Drive Feasibility study TBD TBD TBD ESTIMATED TOTAL $2 B+ TxDOT graphic SOURCE: Texas Department of Transportation. DENTON COUNTY UTP MOBILITY PROJECTS IN PLANNING; (PROJECTS IN PLANNING 10 YEAR LIST) # CSJ Hwy Project Limits Description Est. Let Date Est. Cost Funding Status 19 0196-02-124** I-35E Dallas C/L to FM 407 Reconstruct/convert 2-lane reversible to 4-lane concurrent MLs; 6 to 6/8 CD lanes; 4/6 to 2/6 continuous FRs; reconstruct existing 8 GPLs; 2/6 to 2/8 concurrent FRs TBD $746 M Partially 20 0196-02-125** I-35E FM 407 to Turbeville Rd. Reconstruct existing 4 GPLs(NB only); widen & convert 2 reversible to 4 concurrent MLs; widen 4/6 to 4/8 lane continuous FRs TBD $671 M Partially ESTIMATED TOTAL $1.4 B *Unmapped. **UTP Mobility Projects in Planning (Projects in Planning 10 Year List) 35E 35W 1 2 3 4 5 6 7 8 9 10 11 13 12 14 15 16 17 18 19 20 455 455 455 428 428 428 428 35W 35E DNT 377 380 377 377 TARRANT CO. DENTON CO. DENTON CO. COOKE CO. DENTON CO. DENTON CO. COLLIN CO. DENTON CO. COLLIN CO. 51 2450 2450 1173 2622 2153 Hackberry Hebron Sanger Aubrey Lincoln Park Cross Roads Oak Point The Colony Lewisville Coppell Copper Canyon Hickory Creek Corinth Shady Shores Krum Bolivar Ponder Northlake Justin Flower Mound Roanoke Trophy Club Pilot Point Krugerville Argyle DENTON Denton Municipal Airport Texas Motor Speedway Ray Roberts Lake Grapevine Lake Lewisville Lake 156 156 156 407 407 407 407 288 720 288 423 3163 2449 1830 1171 1171 2499 2499 2499 2164 2931 121 121 190 121 121 114 114 170 423 380 380 377 1385 380 455 Corral City 35 35 35 377 377 Mobility Projects in Planning (Unfunded) UTP Mobility Projects in Planning (Funded) N 2 miles NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of SUMMER Q3 2020.
1

Denton County Planned Mobility Projectsftp.dot.state.tx.us/pub/txdot-info/dal/maps-project/planned/denton... · TEXAS DEPARTMENT OF TRANSPORTATION SPRING • Q2 2020 DALLAS DISTRICT

Jul 30, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Denton County Planned Mobility Projectsftp.dot.state.tx.us/pub/txdot-info/dal/maps-project/planned/denton... · TEXAS DEPARTMENT OF TRANSPORTATION SPRING • Q2 2020 DALLAS DISTRICT

SUMMER • Q3 2020TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0955

_073

020

Connecting You With TexasDENTON COUNTY PLANNED MOBILITY PROJECTSUTP (2020 UNIFIED TRANSPORTATION PROGRAM) PROJECTS IN PLANNING 10 YEAR LIST

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONEmily McCann – Public Information Officer (214) 320-4485 • [email protected]

DENTON COUNTY MOBILITY PROJECTS IN PLANNING (UNFUNDED; SUMMER Q3 2020)

# CSJ Hwy Project Limits Description Est. Let Date Est. Cost Funding

Status

1 0081-13-065 I-35W Dale Earnhardt Way to S of I-35E/I-35W IC Construct 0 to 4-lane FRs; construct grade separations and ramps Sep-2025 $310 M Unfunded

2 0081-03-049 US 377 SH 114 to S of FM 1171 Reconstruct and widen 2-lane rural highway to 4-lane divided urban Aug-2045 $52 M Unfunded

3 0196-01-108 I-35E Turbeville Rd. to US 77 Reconstruct 6/8 to 8 GP lanes; reconstruct and convert 2 reversible to 4 concurrent MLs Aug-2045 $501.4 M Unfunded

4 1311-01-055 FM 1171 W of FM 156 to I-35W Construct 0 to 6-lane divided roadway Sep-2027 $76 M Unfunded

5 2250-02-013 SL 288 US 380 W of Denton to I-35 at LP 288 Construct 2-lane rural roadway on new location Phase 1 of Ultimate frwy. - extension of LP 288 Sep-2026 $20 M Unfunded

6 2250-02-014 SL 288 I-35W S of Denton to US 380 W of Denton Construct 0 to 2-lane rural roadway (Phase 1 of Ultimate freeway - extension of LP 288) Sep-2026 $37 M Unfunded

7 0353-02-037 SH 114 I-35W to BI-114K Construct new 4-lane rural freeway Aug-2023 $63 M Unfunded

8 1951-01-011 FM 1515 Masch Branch St. to Bonnie Brae St. Widen 2-lane rural roadway to 6-lane divided urban Aug-2028 $37 M Unfunded

9 0135-10-061; 0135-10-062

US 380/ US 377

From I-35 to Collin County Line Feasibility Study to Determine Options for Improving Mobility for the US 380 Corridor TBD TBD Unfunded

10 0353-09-003 SH 114 BI-114K to East of US 377 Construct 0 to 6 Lane Grade Separation Over US 377 Aug-2025 $15 M Unfunded

11 0081-04-038 US 377 N of Hickory Creek to FM 1830 Reconstruct and widen 2-lane rural highway as 4-lane divided urban Aug-2045 $11.2 M Unfunded

12 1315-01-030 FM 1385 US 380 to FM 455 Construct new roadway lanes Jun-2024 $132 M Unfunded

13 2979-01-011 FM 2931 US 380 to FM 428 Construct new roadway lanes Jun-2024 $68 M Unfunded

14 0081-06-040 US 377 US 380 to N of BS 377E Reconstruct and widen 2-lane undivided roadway to 4-lane divided facility (Ultimate 6-lane) Aug-2028 $128 M Unfunded

15 2352-02-024 FM 2449 FM 156 to W of I-35W Feasibility study for widening 2-lane urban to 4-lane urban (Ultimate 6-lane) TBD TBD Unfunded

16 0081-13-050 I-35W SH 114 to I-35/I-35E interchange Widen and reconstruct 4-lane rural to 6-lane urban MLs and 2/4-lane to 4/6-lane FRs Aug-2025 $339 M Unfunded

17 1059-01-047 FM 1173 FM 156 to I-35 Widen and reconstruct 2-lane rural to 6-lane urban divided with a raised median Aug-2040 $50 M Unfunded

18 1310-01-045 FM 407 FM 156 to FM 1830 Feasibility study to determine options for improving mobility for the FM 407 arterial corridor TBD TBD Unfunded

* 0081-05-048 FM 428 East Winsor Drive to West Sherman Drive Feasibility study TBD TBD TBD

ESTIMATED TOTAL $2 B+

TxDOT graphicSOURCE: Texas Department of Transportation.

DENTON COUNTY UTP MOBILITY PROJECTS IN PLANNING; (PROJECTS IN PLANNING 10 YEAR LIST)

# CSJ Hwy Project Limits Description Est. Let Date

Est. Cost

Funding Status

19 0196-02-124** I-35E Dallas C/L to FM 407Reconstruct/convert 2-lane reversible to 4-lane concurrent MLs; 6 to 6/8 CD lanes; 4/6 to 2/6 continuous FRs; reconstruct existing 8 GPLs; 2/6 to 2/8 concurrent FRs

TBD $746 M Partially

20 0196-02-125** I-35E FM 407 to Turbeville Rd.Reconstruct existing 4 GPLs(NB only); widen & convert 2 reversible to 4 concurrent MLs; widen 4/6 to 4/8 lane continuous FRs

TBD $671 M Partially

ESTIMATED TOTAL $1.4 B

*Unmapped.

**UTP Mobility Projects in Planning (Projects in Planning 10 Year List)

35E

35W

1

2

3

4

5

6

7

8

9

10

11

13

1214

15

16

17

18

19

20

455455

455

428 428428

428

35W

35E

DNT

377

380

377

377

TARRANT CO.

DENTON CO. DENTON CO.

COOKE CO.

DENTON CO.

DENT

ON CO

.

COLL

IN CO

.

DENT

ON CO

.

COLL

IN CO

.

51

2450

2450

1173

1173

2622

2153

Hackberry

Hebron

Sanger

Aubrey

Lincoln Park

Cross Roads

Oak Point

The Colony

Lewisville

Coppell

CopperCanyon

HickoryCreek

Corinth

Shady Shores

Krum

Bolivar

Ponder

Northlake

Justin

FlowerMound

RoanokeTrophy Club

PilotPoint

Krugerville

Argyle

DENTONDentonMunicipalAirport

Texas MotorSpeedway

Ray RobertsLake

GrapevineLake

LewisvilleLake

156

156

156

407

407 407407

288

720

288

423

3163

2449

1830

1171 1171

2499

2499

2499

21642931

121

121

190

121

121

114

114

170

423

380

380 3771385

380

455

Corral City

35

35

35

377

377

Mobility Projects in Planning (Unfunded)

UTP Mobility Projects in Planning (Funded)

N

2 miles

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of SUMMER Q3 2020.