Top Banner
DEMU C&W Maintenance
50

DEMU C&W Maintenance - Indian Railways

Apr 04, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DEMU C&W Maintenance - Indian Railways

DEMU C&W Maintenance

Page 2: DEMU C&W Maintenance - Indian Railways

Objectives

• DEMU component design & functional operations

• Specifically bogie & Air suspension system

• DEMU interior’s look

• Special J&K DEMUs

• Schaku couplers

• Newly introduced BEML SS DEMU/EMU

Page 3: DEMU C&W Maintenance - Indian Railways

Special DEMU coaches introduced in J&K : Each coach will run twice daily in both directions & 8 coach rakes will be plying in 12 service trips daily -

Page 4: DEMU C&W Maintenance - Indian Railways

J&K DEMU DPC Special Engine

• Aerodynamic High Power diesel multiple units • 1400 HP diesel engine in the train {peak speed =

100Kmph, Seating capacity/trailer coach = 576} • Engine has heating system for quick & troublefree

starts in the freezing winters {Engine OST=2000rpm} • The driver's cabin has heating & defogging unit to

take care of cold climatic conditions • DPC has single lookout glass windows giving

panoramic view • Snowcutting type cattle guard attached at the

driving end of the train for clearing snow on the tracks during winter

Page 5: DEMU C&W Maintenance - Indian Railways

Salient features of J&K DEMU rake

• Public information system with display & announcement facilities included in the coaches having air suspension on bogie bolster giving 10% better riding comfort characteristics

• Compartment with wider doors for physically challenged people

• Broad view {panoramic} windows • Overhead water tanks having side filling system in two

lavatories at one end of the coach • Coaches are vestibuled for passenger migration in the

train {preventing uneven overcrowding in coaches} & maintained at 20 degree Celsius during winter

Page 6: DEMU C&W Maintenance - Indian Railways

DEMU maintenance in J&K

• Maintenance of all ICF built rolling stock {DEMU} will be at newly built Badgam workshop just north of Srinagar in N.Rly. Ferozepur Division

• Frequencies for POH – Ist POH 3 yr.s following mfg.

– Subsequent POH intervals = 18 months

– Codal life = 25 yr.s

• Frequencies for IOH = 9 months at Workshops

Page 7: DEMU C&W Maintenance - Indian Railways

Special Bogie components • Air suspension system under bogie bolster

– 4 point suspension on air filled rubber bellows – 4 Levelling valves per coach – 2 Duplex valves per coach

• EPU, Magnet valve, Relay valve in twin pipe Air Brake System connected to MR {FP NLB = 20mm dia. & BP NLB = 25mm dia.}

• Newly introduced Failure Indicator cum Brake Applicator {FIBA} as a fail safe mode function

• Duplex valve operates if pressure differential across 2 rubber bellows on a bogie bolster exceeds 1 +/- 0.5 bars in uneven loading on the bogie bolster

• Air bellows follow equation of state for open & closed systems • Air pressure in bellow balances load • Bogie bolster height is sensed by the Levelling valves & the

levelling lever remains insensitive within +/-10 degrees angular deflections

• Air bellow height is dependent on its air volume

Page 8: DEMU C&W Maintenance - Indian Railways

Newly installed FIBA

Page 9: DEMU C&W Maintenance - Indian Railways

Duplex valve & Levelling valves

Page 10: DEMU C&W Maintenance - Indian Railways

Vertical Ride Index Comparisons : Trial speed - 70 Kmph.

Page 11: DEMU C&W Maintenance - Indian Railways

Side horizontal Ride Index comparisons between air suspensions & coiled springs in DEMU bogie bolsters

Page 12: DEMU C&W Maintenance - Indian Railways

Air Springs’ technical data

Page 13: DEMU C&W Maintenance - Indian Railways

Air Spring’s structural details

Page 14: DEMU C&W Maintenance - Indian Railways

Levelling valve’s delayed reactions

Page 15: DEMU C&W Maintenance - Indian Railways

Air spring’s working principle

Page 16: DEMU C&W Maintenance - Indian Railways

Air spring adjusting deflections

Page 17: DEMU C&W Maintenance - Indian Railways

Air Suspension spring loads

Page 18: DEMU C&W Maintenance - Indian Railways

Air suspension spring overloaded

Page 19: DEMU C&W Maintenance - Indian Railways

Height adjustment

Page 20: DEMU C&W Maintenance - Indian Railways

Air suspension spring offloaded

Page 21: DEMU C&W Maintenance - Indian Railways

Height readjusted

Page 22: DEMU C&W Maintenance - Indian Railways

Air spring technical parameters

Page 23: DEMU C&W Maintenance - Indian Railways

Air spring testing at 6 bars {gauge}: Inflation heights {255-260}mm

Page 24: DEMU C&W Maintenance - Indian Railways

Air spring rubber bellow wall structure

Page 25: DEMU C&W Maintenance - Indian Railways

Duplex Check Valve

Page 26: DEMU C&W Maintenance - Indian Railways

Duplex Check Valve

Page 27: DEMU C&W Maintenance - Indian Railways

Levelling valves

Page 28: DEMU C&W Maintenance - Indian Railways

3 – POINT AIR SUSPENSION SYSTEM

AS

DUPLEX

CHECK

VALVE

INSTALLATION

LEVER

ISOLATING COCK FOR

AIR-SUSPENSION

TWO WAY DIRT

COLLECTOR

AS

CHECK

VALVE

MAIN RESERVOIR PIPE LINE

INSTALLATION LEVER

LEVELING VALVE

20

LTR

S. R

ESER

VO

IR

20

LTR

S. R

ESER

VO

IR

150

LT

RS

.

RE

SE

RV

• In this system the bellow of one bogie is controlled by individual levelling valves. • But the bellows of other bogie are controlled by only one leveling valve. PNEUMATIC OPERATION

UNBALANCE BALANCE

Page 29: DEMU C&W Maintenance - Indian Railways

MAIN RESERVOIR PIPE LINE

LEVELING

VALVE

LEVELING VALVE

SCHEMATIC DIAGRAM FOR 4-POINT AIR-SUSPENSION

DUPLEX

CHECK

VALVE

AS

DUPLEX

CHECK

VALVE

INSTALLATION

LEVER

ISOLATING COCK FOR

AIR-SUSPENSION

TWO WAY DIRT

COLLECTOR

AS

CHECK

VALVE

INSTALLATION LEVER

20

LTR

S. R

ESER

VO

IR

20

LTR

S. R

ESER

VO

IR

15

0 L

TR

S.

RE

SE

RV

OIR

In this system the each bellow is controlled by individual leveling valve. So, there are four levelling valves & Installation levers, four bellows and two duplex check valves in each coach.

PNEUMATIC OPERATION

UNBALANCE

BALANCE

Page 30: DEMU C&W Maintenance - Indian Railways

Air Brake system controls & Cut off Angle Cocks

Page 31: DEMU C&W Maintenance - Indian Railways

Hydraulic Shock Absorber supporting Bogie Bolster

Page 32: DEMU C&W Maintenance - Indian Railways

ICF Axleguide Dashpot

Page 33: DEMU C&W Maintenance - Indian Railways

DEMU Schaku Couplers having Split Sleeved Collar

Page 34: DEMU C&W Maintenance - Indian Railways

ICF DEMU Solebar Cambering

• +12 mm hogging camber at headstock ends

• 0 mm hogging/sagging at Body Bolster points

• +24 mm hogging camber at carriage centreline

• -10 mm deflection at headstock ends in reverse solebar cambering

• -20 mm deflection at carriage centreline in reverse solebar cambering

Page 35: DEMU C&W Maintenance - Indian Railways

SS EMU/DEMU

Page 36: DEMU C&W Maintenance - Indian Railways

New SS EMU/DEMU by BEML

Page 37: DEMU C&W Maintenance - Indian Railways

SS EMU BEML

Page 38: DEMU C&W Maintenance - Indian Railways

SS EMU Design

Page 39: DEMU C&W Maintenance - Indian Railways

SS DEMU Car body models

Page 40: DEMU C&W Maintenance - Indian Railways

SS DEMU furnishing development

Page 41: DEMU C&W Maintenance - Indian Railways

SS EMU Interior & Exterior

Page 42: DEMU C&W Maintenance - Indian Railways

SS DEMU DPC & TC

Page 43: DEMU C&W Maintenance - Indian Railways

SS DEMU TC & DPC

Page 44: DEMU C&W Maintenance - Indian Railways

SS DEMU Manufacturing by BEML

Page 45: DEMU C&W Maintenance - Indian Railways

SS DEMU Underframe, Roof & Body walls manufacturing by BEML

Page 46: DEMU C&W Maintenance - Indian Railways

SS DEMU fabrication infrastructures

Page 47: DEMU C&W Maintenance - Indian Railways

SS EMU Production planning

Page 48: DEMU C&W Maintenance - Indian Railways

RDSO/RITES passed SS EMU at BEML

Page 49: DEMU C&W Maintenance - Indian Railways

SS EMU 1st Prototype Rake

Page 50: DEMU C&W Maintenance - Indian Railways

THANKS