DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Nov 2014 492.61 164.96 2116.63 1305.69
Dec 2014 617.47 152.76 1776.57 1399.92
Jan 2015 590.20 211.08 1907.92 1489.62
Feb 2015 422.89 173.97 1587.68 1112.14
Mar 2015 490.57 210.88 1800.82 1416.07
Apr 2015 469.72 265.44 1909.45 1365.38
May 2015 492.00 113.78 1813.54 1349.09
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
1,880
474
1,236
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Nov-
2014
Dec-
2014
Jan-
2015
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 January 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Nov 2014 96.40 605.90 21.80 23.00 106.40
Dec 2014 95.70 612.50 21.60 22.90 103.30
Jan 2015 95.10 599.70 21.40 22.80 100.10
Feb 2015 94.40 589.60 21.20 23.00 100.50
Mar 2015 94.30 565.50 21.00 23.40 100.50
Apr 2015 93.80 542.90 20.70 23.20 100.90
May 2015 93.60 518.90 20.60 23.20 99.70
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.50P 402P 17.80P 21P 97.40P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
147
0
50
100
150
200
250
300
Nov-
2014
Dec-
2014
Jan-
2015
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Steel Bars
Page 3/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 7 January 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
Oct 2015 P 400.00 685.00 15.00 272.00 58.00 520.00 260.00 120.00 520.00 120.00 1253.00 1717.00
Nov 2015 P 390.00 680.00 10.00 270.00 75.00 530.00 260.00 120.00 520.00 110.00 1255.00 1710.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN NOVEMBER 2015
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Primary Education Review & Implementation (PERI) Phase 4: Additions and Alterations to the Existing Teck Ghee Primary School & Zhonghua Primary School at Serangoon Avenue 4 & Ang Mo Kio Street 32 (Contract Cost: $15.60m)
Institutional Architects Vista Kuan Aik Hong Construction
Upgrading of the Existing Maha Bodhi School with the Erection of a 6-Storey Teaching Block with Elevated Field at the 3rd Storey at Ubi Avenue 1 (Contract Cost: $15.90m)
Institutional Interconsultants Kwan Yong Construction
Erection of a 2-Storey 66/22kV Substation with an Eco Deck at One North Phase 2 at Portsdown Road (Contract Cost: $25.20m)
Building (Others)
Interconsultants Expand Construction
CONTRACT COST (MORE THAN S$42M TO S$90M)
Design and Build of an 8-Storey Single User Light Industrial Development comprising a 6-Storey Warehouse and a 2-Storey Production/Ancillary Facility with a Basement Carpark at Leng Kee Road
Industrial AC Consortium LS Construction
Upgrading of Upper Bukit Timah Road and Jalan Anak Bukit (Contract Cost: $47.48m)
Civil Engineering
Not Applicable Feng Ming Construction
CONTRACT COST (ABOVE S$90M)
HDB Building Works at Tampines N6 C2A comprising 1,216 units, a Park and Contingency Works (Contract Cost: $163.98m)
Residential Surbana International Consultants
Qingdao Construction (Singapore)
HDB Building Works at Dawson Contract 3 comprising 1,217 units and Contingency Works (Contract Cost: $236.80m)
Residential Surbana International Consultants
Teambuild Engineering & Construction
The Poiz Residences/Centre: Erection of a 3/4-Storey Retail Podium Block comprising 77 Shops & 7 Restaurants, and 8 Blocks of 18-Storey Residential Development comprising 731 units with a Swimming Pool and Communal Facilities at Meyappa Chettiar Road
Residential ADDP Architects
China Jingye Engineering Corporation
Limited (Singapore
Branch)
Page 5/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (ABOVE S$90M)
Additions and Alterations to an Existing 3-Storey Clubhouse with a Carpark, a Tennis Court, a Driving Range, a Maintenance Facility and a New 6-Storey Hotel and Clubhouse Facility at Laguna Golf Green
Commercial A.M. Associates (Singapore)
Thompson Industries
Construction of a Viaduct from TPE to PIE (Westbound) and Upper Changi Road East (Contract Cost: $94.63m)
Civil Engineering
Not Applicable Or Kim Peow Contractors
Thomson-East Coast MRT Line: Construction of Marine Parade Station & Tunnels (Contract Cost: $555.32m)
Civil Engineering
Not Applicable Samsung C&T Corporation
Page 6/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Dec 2014 617.47 152.76 1776.57 1399.92
Jan 2015 590.20 211.08 1907.92 1489.62
Feb 2015 422.89 173.97 1587.68 1112.14
Mar 2015 490.57 210.88 1800.82 1416.07
Apr 2015 469.72 265.44 1909.45 1365.38
May 2015 492.00 113.78 1813.54 1349.09
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
1,686
476
1,305
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Dec-
2014
Jan-
2015
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Tho
usa
nd
Cu
bic
Met
res
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 15 February 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Dec 2014 95.70 612.50 21.60 22.90 103.30
Jan 2015 95.10 599.70 21.40 22.80 100.10
Feb 2015 94.40 589.60 21.20 23.00 100.50
Mar 2015 94.30 565.50 21.00 23.40 100.50
Apr 2015 93.80 542.90 20.70 23.20 100.90
May 2015 93.60 518.90 20.60 23.20 99.70
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 90.50P 395P 17.10P 20.40P 95.90P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
70
0
50
100
150
200
250
300
Dec-
2014
Jan-
2015
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Tho
usa
nd
To
nn
es
Month-Year
Monthly Demands for Steel Bars
Page 8/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 February 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
Dec 2015 P 410.00 660.00 10.00 270.00 55.00 590.00 265.00 155.00 645.00 160.00 1385.00 1835.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN DECEMBER 2015
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
McNair Towers: HDB Building Works at Kallang Whampoa Contract 20C comprising 861 units (Balance of Work; Contract Cost: $35.98m)
Residential Surbana Jurong Consultants
Teambuild Engineering & Construction
Piling & Basement Works for the Design and Build of 9 Blocks of 14/15/16-Storey Executive Condominium comprising 526 units at Chua Chu Kang Avenue 5
Residential ADDP Architects
Qingjian International
(South Pacific) Group Devt Co
Repairs & Redecoration Works to Tampines Industrial Park (Contract Cost: $24.76m)
Industrial Sqft Architects Chiong Construction
Improvement to Sungei Pandan Kechil - West Coast Road to the Sea (Contract Cost: $33.16m)
Civil Engineering
Not Applicable Koon Construction & Transport Co
Additions and Alterations with an Extension to the Existing Transfer Station TS1 and Modifications to the Existing Conveyor at Berth J22 & J23 at Jurong Port Road
Civil Engineering
Bit Architects JS Metal
CONTRACT COST (MORE THAN S$42M TO S$90M)
Capri Hotel by Fraser: Erection of a 16-Storey Hotel Development comprising 304 rooms and Additions and Alterations to the Existing China Square Central's Basements 1 & 2 at South Bridge Road/Cross Street
Commercial DP Architects Nakano Singapore
Erection of a Block of 6-Storey Learning Hub North at Nanyang Drive (Contract Cost: $49.28m)
Institutional DCA Architects Lian Ho Lee Construction
Development of Ulu Pandan Bus Depot (Contract Cost: $70.00m)
Building (Others)
Ong & Ong Tiong Seng Contractors
CONTRACT COST (ABOVE S$90M)
HDB Building Works at Sembawang N1 C6 & N1 C12 comprising 441 and 600 units respectively with a Neighbourhood Centre & Contingency Works (Contract Cost: $152.60m)
Residential SAA Architects Nanjing Dadi Construction (Group) Co.,
Ltd. Singapore Branch
Page 10/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (ABOVE S$90M)
Lake Grande: Erection of 4 Blocks of 17-Storey Condominium Development comprising 710 units with 2 Basement Carparks, a Childcare Centre and Communal Facilities at Jurong West Street 41
Residential ADDP Architects
China Construction
(South Pacific) Development
Co
Page 11/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Jan 2015 590.20 211.08 1907.92 1489.62
Feb 2015 422.89 173.97 1587.68 1112.14
Mar 2015 490.57 210.88 1800.82 1416.07
Apr 2015 469.72 265.44 1909.45 1365.38
May 2015 492.00 113.78 1813.54 1349.09
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
1,740
440
1,217
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Jan-
2015
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Tho
usa
nd
Cu
bic
Met
res
Tho
usa
nd
To
nn
es
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 March 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Jan 2015 95.10 599.70 21.40 22.80 100.10
Feb 2015 94.40 589.60 21.20 23.00 100.50
Mar 2015 94.30 565.50 21.00 23.40 100.50
Apr 2015 93.80 542.90 20.70 23.20 100.90
May 2015 93.60 518.90 20.60 23.20 99.70
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.50P 399P 16.70P 20.40P 92.90P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
112
0
50
100
150
200
250
300
Jan-
2015
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Thou
sand
Ton
nes
Month-Year
Monthly Demands for Steel Bars
Page 13/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 March 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
Jan 2016 P 422.00 655.00 8.00 250.00 55.00 550.00 270.00 140.00 620.00 140.00 1375.00 1735.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN JANUARY 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Erection of a 5-Storey Commercial Development comprising a Hawker Centre, a Supermarket, Shops and a Multi-Storey Carpark at Woodlands Street 12 (Contract Cost: $26.86m)
Commercial Architects Project Group
Conint
Construction of a Flyer from Seletar West Link to SLE (Contract Cost: $16.20m)
Civil Engineering
Not Applicable Samwoh Corporation
Redevelopment of Choa Chu Kang Cemetery Phase 2C - Part 2 comprising Landscaping Works, Amenities and Block C 3-3 Grave Plot (Contract Cost: $19.84m)
Civil Engineering
CPG Consultants
Toh Kim Bock C-E Contractor
CONTRACT COST (MORE THAN S$42M TO S$90M)
Shell Marina LOBP-GMP Project (Re-award): Engineering, Procurement & Construction Contract (EPC) of an Industrial Complex comprising a Lube Oil Blending Plant (LOBP) and a Grease Manufacturing Plant (GMP) with Ancillary Facilities including a Canteen at Tuas South Avenue 5
Industrial CKM Consultants
Amec Foster Wheeler Asia
Pacific
CONTRACT COST (ABOVE S$90M)
HDB Building Works at Punggol North Contracts 6 & 7 comprising 1,402 units with a Neighbourhood Centre and Contingency Works (Contract Cost: $220.00m)
Residential HDB In-House Ken-Pal (S)
Design and Build of a 9-Storey Multi-User Ramp-Up Factory Development comprising 110 units with Mezzanine and 139 Factory units, with a Heavy Vehicle Park, a Canteen and Ancillary Facilities at Tampines North Drive 1
Industrial AC Consortium Lian Beng Construction
(1988)
Outram Community Hospital: Erection of a 19-Storey Community Hospital including the Campus Logistics Centre, Offices with 4 Basements and Contingency Works at Singapore General Hospital in Jalan Bukit Merah (Contract Cost: $674.13m)
Institutional Ciap Architects Penta-Ocean Construction
Company
Erection of an 11-Storey Centre for Oral Health and Services Building with a Basement comprising Ancillary Offices, a Carpark, a Mechanical & Electrical Plant and a Basement Tunnel Connection at Lower Kent Ridge Road (Contract Cost: $204.93m)
Institutional Architects 61 Obayashi Singapore
Page 15/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (ABOVE S$90M)
Thomson-East Coast MRT Line: Construction of Katong Park Station & Tunnels (Contract Cost: $293.45m)
Civil Engineering
DP Architects Shanghai Tunnel
Engineering Co (Singapore)
Thomson-East Coast MRT Line: Construction of Tanjong Rhu Station & Tunnels (Contract Cost: $293.86m)
Civil Engineering
DP Architects Bachy Soletanche
Singapore / Wai Fong
Construction JV
Thomson-East Coast MRT Line: Construction of Marine Terrace Station & Tunnels (Contract Cost: $360.59m)
Civil Engineering
SAA Architects Ssangyong Engineering &
Construction Co / Hyundai
Engineering & Construction Co
JV
Page 16/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Feb 2015 422.89 173.97 1587.68 1112.14
Mar 2015 490.57 210.88 1800.82 1416.07
Apr 2015 469.72 265.44 1909.45 1365.38
May 2015 492.00 113.78 1813.54 1349.09
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
1,250
433
983
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 12 April 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1
(16-32mm High Tensile)
($/Tonne) +
Granite2
(20mm Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Feb 2015 94.40 589.60 21.20 23.00 100.50
Mar 2015 94.30 565.50 21.00 23.40 100.50
Apr 2015 93.80 542.90 20.70 23.20 100.90
May 2015 93.60 518.90 20.60 23.20 99.70
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.80P 446P 16.30P 20.60P 90.80P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
99
0
50
100
150
200
250
300
Feb-
2015
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Tho
usa
nd
To
nn
es
Month-Year
Monthly Demands for Steel Bars
Page 18/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 6 April 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
Feb 2016 P 390.00 600.00 10.00 240.00 60.00 610.00 255.00 130.00 600.00 140.00 1315.00 1720.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN FEBRUARY 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Office Fit-Out Works to 3rd & 4th Storey Main Office Space at Terminal 2 Singapore Changi Airport
Commercial Ata Architects New Art Interior
Erection of a 6-Storey Development, Extension of West Wing L1-4 & Additions and Alterations to Internal Wards on Level 3 of Ang Mo Kio-Thye Hua Kwan Hospital at Ang Mo Kio Avenue 9
Institutional SKM (Singapore)
ACP Construction
NUS Data Storage Institute (DSI): Additions and Alterations to the Existing 7-Storey Data Storage Institute within National University of Singapore (Contract Cost: $21.50m)
Institutional CPG Consultants
Lian Soon Construction
Yishun Polyclinic: Development of a 7-Storey Yishun Polyclinic and a Senior Care Centre with a Basement Carpark at Yishun Avenue 9/Yishun Central (Contract Cost: $25.69m)
Institutional RDC Architects Hytech Builders
Woodlands Nursing Home: Development of a 9-Storey Nursing Home at Woodlands Rise (Contract Cost: $31.20m)
Institutional Surbana Jurong Consultants
Dragages Singapore
Oiltanking Phase 6: Erection of a New Jetty MJ22 at Jurong Island
Civil Engineering
Not Applicable Rotary Engineering
CONTRACT COST (MORE THAN S$42M TO S$90M)
Additions and Alterations to the Existing 4-Storey Northpoint Shopping Centre involving New Linkways from Adjacent Development at Yishun Avenue 2/Central 1
Commercial Liu & Wo Architects
W'Ray Construction
Additions and Alterations to the Existing Grand Park City Hall Hotel comprising a 10-Storey Hotel Development with 2 Basement Carparks and 10 Units of Conservation Shop Houses at Coleman Street
Commercial RSP Architects Planners & Engineers
Gennal Industries
CONTRACT COST (ABOVE S$90M)
New State Courts Complex: Erection of the New State Courts Building with 3 Basement Levels at Havelock Square (Contract Cost: $450.91m)
Institutional CPG Consultants
Samsung C&T Corporation
Page 20/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Mar 2015 490.57 210.88 1800.82 1416.07
Apr 2015 469.72 265.44 1909.45 1365.38
May 2015 492.00 113.78 1813.54 1349.09
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
1,727
417
1,299
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 May 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Mar 2015 94.30 565.50 21.00 23.40 100.50
Apr 2015 93.80 542.90 20.70 23.20 100.90
May 2015 93.60 518.90 20.60 23.20 99.70
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.60P 534P 16.00P 20.60P 85.70P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
149
0
50
100
150
200
250
300
Mar-
2015
Apr-
2015
May-
2015
Jun-
2015
Jul-2015 Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Steel Bars
Page 22/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR
(Data as at 5 May 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
Mar 2016 P 390.00 590.00 12.00 240.00 53.00 600.00 300.00 200.00 800.00 120.00 1555.00 1750.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN MARCH 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
HDB Building Works at Choa Chu Kang N1 C15 comprising 126 units with a Basement Carpark, Social Communal Facilities, an Electrical Substation and Contingency Works (Contract Cost: $16.20m)
Residential ADDP Architects
Kay Lim Construction &
Trading
Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G23D and Contingency Works at Jurong East Street 13 & Tampines Street 81 (Contract Cost: $23.04m)
Residential Surbana Jurong Consultants
HPC Builders
Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21C and Contingency Works at Tampines Street 12/21 and Tampines Avenue 5 (Contract Cost: $23.71m)
Residential Surbana Jurong Consultants
Incorporated Builders
Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21D and Contingency Works at Marsiling Lane/Woodlands Streets 31&32/Woodlands Avenue 1 (Contract Cost: $23.73m)
Residential The Architects Circle
B-Construction
Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21E and Contingency Works at Jurong West Street 52 & Bukit Batok East Avenue 5 (Contract Cost: $24.88m)
Residential Surbana Jurong Consultants
CKR Contract Services
Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21B and Contingency Works at Yishun Streets 22/72 & Yishun Avenue 3 (Contract Cost: $25.30m)
Residential AWP Progressive Builders
Home Improvement Programme (HIP): Design & Build of Upgrading Projects for G22G and Contingency Works at Lorong Ah Soo & Ang Mo Kio Avenue 3 (Contract Cost: $27.08m)
Residential 3P Ecotecture Fujian Chengjian
Construction Corporation (Singapore
Branch)
Home Improvement Programme (HIP): Design & Build of Upgrading Projects for G20F and Contingency Works at Bukit Batok Street 52 and Clementi Avenues 2/5 (Contract Cost: $27.90m)
HDB Building Works at Toa Payoh Bidadari C4 comprising 350 units with Common Green, a 66 kV Electrical Substation and Contingency Works at Bidadari (Contract Cost: $62.40m)
Residential ADDP Architects
Chiu Teng Construction Co
Construction of a 2200mm Diameter Pipeline from PIE/Rifle Road to Tanglin Halt Road (Contract Cost: $34.91m)
Civil Engineering
Not Applicable Sing & San Construction
CONTRACT COST (ABOVE S$90M)
HDB Building Works at Sengkang N4 C30 comprising 1,160 units, Contingency Works and Linear Green at Pasir Ris Street 51 (Contract Cost: $126.00m)
Residential P & T Consultants
Kay Lim Construction &
Trading
HDB Building Works at Punggol North Contract 3 comprising 1,021 units with Common Green and Contingency Works (Contract Cost: $131.00m)
Residential Cesma International
Rich Construction
Company
HDB Building Works at Bidadari Contracts 1/2/3 comprising 1,789 units with Common Green and Contingency Works (Contract Cost: $235.67m)
Residential MKPL Architects
Rich Construction
Company
HDB Building Works at Punggol North Contracts 1 & 2 comprising 1,694 units with Common Greens 1 & 2 and Contingency Works (Contract Cost: $293.67m)
Residential Not Applicable China Construction
(South Pacific) Development
Co
Thomson-East Coast MRT Line: Construction of Siglap Station (Contract Cost: $175.74m)
Civil Engineering
Not Applicable John Holland - Zhenhua (S) Engineering
Joint Venture
Thomson-East Coast MRT Line: Construction of Bayshore Station and Tunnels (Contract Cost: $295.87m)
Civil Engineering
Not Applicable Woh Hup - Shanghai Tunnel
Engineering Joint Venture
Thomson-East Coast MRT Line: Construction of Xilin Station and Tunnels (Contract Cost: $833.61m)
Civil Engineering
Not Applicable Samsung C&T Corporation
East Coast Integrated Depot: Construction of a 4-in-1 Rail and Bus Depot and Reception Tunnels for Thomson-East Coast MRT Line (Contract Cost: $1,988.00m)
Civil Engineering
Not Applicable GS Engineering & Construction
Corp
Page 25/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Apr 2015 469.72 265.44 1909.45 1365.38
May 2015 492.00 113.78 1813.54 1349.09
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
Apr 2016 432.23 91.19 1837.19 1255.60
1,837
432
1,256
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Apr-
2015
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 10 June 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Apr 2015 93.80 542.90 20.70 23.20 100.90
May 2015 93.60 518.90 20.60 23.20 99.70
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.50 534.50 16.00 20.10 86.90
May 2016 83.80P 544P 16P 19.10P 86.40P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
91
0
50
100
150
200
250
300
Apr-
2015
May-
2015
Jun-
2015
Jul-2015 Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Steel Bars
Page 27/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR
(Data as at 6 June 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering
Total
Public Private Public Private Public Private Public Private Public Private Public Private
Apr 2016 P 320.00 530.00 10.00 225.00 65.00 480.00 285.00 140.00 720.00 140.00 1400.00 1515.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN APRIL 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Home Improvement Programme (HIP): Design and Build of HDB Upgrading Projects for G23F and Contingency Works at Yishun Ring Road and Yishun Street 11 (Contract Cost: $19.50m)
Residential Surbana Jurong Consultants
Kuan Aik Hong Construction
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G20E and Contingency Works at Jalan Bukit Merah / Queen's Close / Bukit Merah Central/Lane 1 / Bukit Purmei (Contract Cost: $25.10m)
Residential SD Architects & Associates
Asiabuild Construction
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21A and Contingency Works at Hougang Avenue 8 / Hougang Streets 21 & 51 / Hougang Avenues 8 & 10 (Contract Cost: $25.35m)
Residential Surbana Jurong Consultants
Thong Huat Brothers
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21F and Contingency Works at Ang Mo Kio Avenues 1/4/5/8/10 (Contract Cost: $25.29m)
Residential Surbana Jurong Consultants
Chiong Construction
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21G and Contingency Works at West Coast Drive / Clementi Avenue 3/West Street 2 / Chua Chu Kang Avenue 3 / Jurong West Street 91 / Bukit Batok East (Contract Cost: $21.49m)
Residential AWP Wing Tuck Engineering/So
on Thong Construction JV
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21H and Contingency Works at New Upper Changi Road / Simei Street 2 / Bedok South Avenue 3 / Bedok North Road/ Bedok North Street 4/Avenue 4 (Contract Cost: $27.78m)
Residential 3P Ecotecture Fujian Chengjian
Construction Corp (Singapore
Branch)
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22A and Contingency Works at Bishan Street 22 and Serangoon Avenue 4/Jalan Raja (Contract Cost: $24.67m)
Residential AWP Welltech Construction
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22B and Contingency Works at Serangoon Avenues 1 to 3 (Contract Cost: $19.59m)
Residential 3P Ecotecture Expand Construction
Page 29/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22C and Contingency Works at Hougang Avenues 5 & 7 / Potong Pasir Avenues 1 & 2 / Lorong 1 Toa Payoh / Sin Ming Avenue (Contract Cost: $25.50m)
Residential The Architects Circle
Wing Tuck Engineering/So
on Thong Construction JV
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22D and Contingency Works at Ang Mo Kio Avenues 5 & 10 (Contract Cost: $25.77m)
Residential Surbana Jurong Consultants
Ken-Pal (S)
Home Improvement Programme (HIP): Design and Build of HDB Upgrading Projects for G22E and Contingency Works at Pending Road / Bukit Batok West Avenue 6 and Bukit Batok Street 11 (Contract Cost: $25.28m)
Residential SD Architects & Associates
Teambuild Engineering & Construction
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22F and Contingency Works at Lorong Ah Soo / Haig Road / Ubi Avenue 1 / Bedok North Street 3 / Bedok Reservoir Road / Eunos Road 5 (Contract Cost: $27.96m)
Residential Surbana Jurong Consultants
LBD Engineering
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23A and Contingency Works at Marine Parade Central / Lengkong Tiga / Aljunied Avenue 2 / Jalan Batu / Geylang East Avenue 1 / Tampines Street 12 (Contract Cost: $26.28m)
Residential Architects SG Expand Construction
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23B and Contingency Works at Bukit Batok Streets 31 & 32/34 / Jurong East Streets 24 & 31 / Petir Road / Clementi Street 14 (Contract Cost: $23.97m)
Residential Surbana Jurong Consultants
Kah Engineering
(1986)
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23C and Contingency Works at Yishun Central 1 / Marsiling Rise / Teck Whye Lane / Yishun Ring Road/Street 21 (Contract Cost: $23.77m)
Residential Surbana Jurong Consultants
Ken-Pal (S)
Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23E and Contingency Works at Tampines Streets 23/24/43/44/82/83 / Pasir Ris Streets 13/21/Drive 6 (Contract Cost: $25.85m)
Residential Surbana Jurong Consultants
H P Construction &
Engineering
Design and Build of a 3-Storey Single-User Industrial Development (Business 2) at Tuas Avenue 20
Industrial Ha Architects Boustead Projects
Erection of a 4-Storey Single-User General Industry Material Recovery Facility with a Temporary Ancillary Workers' Dormitory at Tuas South Street 7
Industrial Arya Architects Buildforms Construction
Additions and Alterations to Woodgrove Primary School at Woodlands Drive 14 and Bedok Green Primary School at Bedok South Avenue 2 (Contract Cost: $20.50m)
Institutional Interconsultants Kwan Yong Construction
Erection of Damai Primary School at Bedok Reservoir (Contract Cost: $27.99m)
Institutional MKPL Architects
BHCC Construction
Page 30/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Additions and Alterations to the Existing Elias Park, Park View, Pasir Ris and Tampines North Primary Schools at Pasir Ris/Tampines (Contract Cost: $37.65m)
Institutional CPG Consultants
Kwan Yong Construction
Supply, Laying of 1800mm/1200m Diameter Potable Water Pipeline along Brickland Road / Bukit Batok Road / Kranji Expressway to Bukit Batok West Avenue 2 (Contract Cost: $18.51m)
Civil Engineering
Not Applicable Shingda Construction
Site Clearance, Earthworks, Construction of Drains, Sewers and Related Ancillary Works at Yio Chu Kang Road / Lentor Drive (Contract Cost: $32.66m)
Civil Engineering
Not Applicable Samwoh Corporation
CONTRACT COST (MORE THAN S$42M TO S$90M)
HDB Building Works at Bukit Batok N4 C12 comprising 636 units and Contingency Works (Contract Cost: $65.39m)
Residential P & T Consultants
BHCC Construction
Watercove Ville: Erection of 47 units of Terrace Houses and 2 Pairs of Semi-Detached Houses each with a Basement, 29 units of Terrace Houses each with a Basement and an Attic at Sembawang Road
Residential P & T Consultants
V3 Construction
TripleOne Somerset: Additions and Alterations to the Existing 17-Storey Commercial Development at Somerset Road
Commercial DCA Architects Sunray Woodcraft
Construction
Additions and Alterations to the Existing Petroleum Additives Chemical Plant at Seraya Rise
Industrial Not Applicable Lend Lease Singapore
Design and Build of a 6-Storey Single-User Factory and Warehouse comprising Ancillary Offices and a 2-Storey Canteen at Tanjong Penjuru
Industrial CPG Consultants
SH Design & Build
Erection of a 5-Storey Single-User Warehouse with an Industrial Canteen at Pioneer Road
Industrial Point Architects Wee Hur Construction
CONTRACT COST (ABOVE S$90M)
City Gate: Erection of a 30-Storey Commercial Mixed Development comprising a 2-Storey with a Basement Commercial Podium comprising 188 units, a 3-Storey Podium Carpark and a 25-Storey Residential Tower comprising 311 units at Beach Road
Residential SAA Architects Woh Hup
Erection of 2 Blocks of 44-Storey Condominium Development comprising 736 units with a Swimming Pool, 3 Retail units, a Childcare Centre and 6 Levels of Carpark at Dundee Road
Residential Aga Architects China Jingye Construction Engineering (Singapore)
TuasOne Waste-to-Energy Plant: Engineering, Procurement and Construction of the 6th Waste-to-Energy Plant at Tuas South Avenue 3
Industrial Tenwit Consultants
Hydrochem (S)
Page 31/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (ABOVE S$90M)
Thomson-East Coast MRT Line: Construction of Bedok South Station and Tunnels (Contract Cost: $188.28m)
Civil Engineering
SAA Architects China Jingye Engineering Corporation (Singapore
Branch)
Page 32/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
May 2015 492.00 113.78 1813.54 1349.09
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
Apr 2016 432.23 91.19 1837.19 1255.60
May 2016 449.48 100.11 1697.04 1159.38
1,697
449
1,159
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
May-
2015
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 14 July 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
May 2015 93.60 518.90 20.60 23.20 99.70
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.50 534.50 16.00 20.10 86.90
May 2016 84.20 548.10 15.70 19.70 85.80
Jun 2016 84P 493P 15.70P 19.70P 85.60P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
100
0
50
100
150
200
250
May-
2015
Jun-
2015
Jul-2015 Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Tho
usa
nd
To
nn
es
Month-Year
Monthly Demands for Steel Bars
Page 34/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 8 July 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering
Total
Public Private Public Private Public Private Public Private Public Private Public Private
May 2016 P 340.00 550.00 15.00 215.00 110.00 450.00 270.00 150.00 620.00 140.00 1355.00 1505.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN MAY 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Erection of 2 Blocks of 3-Storey Ancillary Buildings and a Block of Single Storey Guardhouse at Tuas South Boulevard
Industrial Surbana Jurong Consultants
Sing Tec Development
Additions & Alterations to Existing Fajar Secondary School at 31 Gangsa Road (Contract Cost: $27.40m)
Institutional CPG Consultants
Kwan Yong Construction
Construction of Equipment Buildings and Facilities at Singapore Changi Airport (Contract Cost: $29.38m)
Building (Others)
Surbana Jurong Infrastructure
SCB Building Construction
Sewers in North Woodlands Area (Package B) – Contract 1 (Contract Cost: $25.80m)
Civil Engineering
Not Applicable Eng Lee Engineering
Construction of T2 to T4 Service Road at Singapore Changi Airport
Civil Engineering
RSP Architects Planners & Engineers
Chan & Chan Engineering
CONTRACT COST (ABOVE S$90M)
Parc Riviera: Erection of 2 Blocks of 36-Storey Condominium (752 Units) with a 4-Storey MSCP & Communal Facilities at West Coast Vale
Residential ADDP Architects LLP
(DO Team)
Evan Lim & Co
Outpost/Village Hotel Sentosa: Erection of a 7-Storey Hotel with car & coach parks & Additions and Alterations to Conservation Buildings at 12 Artillery Avenue/21 Beach View
Commercial ARC Studio Architecture +
Urbanism
Woh Hup
Page 36/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Jun 2015 461.11 165.98 1738.69 1369.68
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
Apr 2016 432.23 91.19 1837.19 1255.60
May 2016 449.48 100.11 1697.04 1159.38
Jun 2016 487.40 129.01 1646.57 1180.83
1,647
487
1,181
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 August 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Jun 2015 93.00 506.60 19.90 23.20 99.90
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.50 534.50 16.00 20.10 86.90
May 2016 84.20 548.10 15.70 19.70 85.80
Jun 2016 82.60 493.10 15.30 19.40 84.60
Jul 2016 81.20P 490P 15P 18P 83.50P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
129
0
50
100
150
200
250
Jun-
2015
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Steel Bars
Page 38/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 2 August 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering
Total
Public Private Public Private Public Private Public Private Public Private Public Private
Jun 2016 P 400.00 600.00 15.00 230.00 55.00 470.00 310.00 150.00 620.00 130.00 1400.00 1580.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN JUNE 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$14M TO S$42M)
Erection of a Part 3/Part 2-Storey Single User Warehouse Development at Pandan Road
Industrial A Y Consultants
Welltech Construction
Modifications to the Existing Hougang Bus Depot at Defu Avenue 1 (Contract Cost: $21.40m)
Building (Others)
DP Architects Quek & Quek Civil
Engineering
Station Enhancement Works at North-South & East-West Lines for 17 Stations (Contract Cost: $14.85m)
Civil Engineering
DP Architects Sunray Woodcraft
Construction
Construction of Sewers in Bukit Batok East Avenue 3 (Contract Cost: $15.69m)
Civil Engineering
Not Applicable Building Construction Co
Improvement to Roadside Drains V Contract 2 - Lorong 22 to Geylang Areas (Contract Cost: $17.99m)
Civil Engineering
Not Applicable Eng Lam Contractors Co
Road Resurfacing Works along ECP, SLE, BKE, CTE and KPE (Contract Cost: $26.81m)
Civil Engineering
Not Applicable Eng Lam Contractors Co
Road Resurfacing Works along PIE, AYE and Other Expressways (Contract Cost: $27.85m)
Civil Engineering
Not Applicable Eng Lam Contractors Co
Murnane Pipeline Contract 3: Construction of a 2200mm Diameter Pipeline from Tanglin Halt Road to AYE/Henderson Road (Contract Cost: $28.29m)
Civil Engineering
Not Applicable Ah Boon Civil Engineering &
Building Contractor
Murnane Pipeline Contract 4: Construction of a Twin 1600mm Diameter Pipeline from AYE/Henderson Road to Keppel Road and a 1600mm Diameter Pipeline from Keppel Road to Maxwell Road/Shenton Way (Contract Cost: $33.58m)
Civil Engineering
Not Applicable Ley Choon Constructions
and Engineering
Construction of Sewers in North Woodlands Area Package A - Contract 1 (Contract Cost: $39.81m)
Civil Engineering
Not Applicable Eng Lee Engineering
Page 40/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$42M TO S$90M)
The Clan: Erection of a 30-Storey Hotel Development with a Basement and Additions and Alterations to the Existing 7-Storey Carpark in Far East Square at Telok Ayer/Cross Street
Commercial DP Architects Hexacon Construction
Design & Build of Road Access at Tuas View Basin (Contract Cost: $84.16m)
Civil Engineering
Not Applicable McConnell Dowell South
East Asia
CONTRACT COST (ABOVE S$90M)
Design and Build of 9 Blocks of 15/16-Storey Executive Condominium comprising 497 units with a Landscaped Deck/Basement Carparks at Chua Chu Kang Avenue 5
Residential ADDP Architects
Qingjian International
(South Pacific) Group Devt Co
Design and Build of HDB Public Housing Project B (Contract Cost: $106.19m)
Residential P & T Consultants
Teambuild Engineering & Construction
Process Upgrading at Choa Chu Kang Waterworks Contract 2: Ozone & Biologically Activated Carbon Facilities and Civil Works (Contract Cost: $111.67m)
Industrial Not Applicable Chye Joo Construction /
Sanli M&E Engineering
Construction of a 1600mm Diameter Pipeline from AYE/Henderson Road to River Valley Road - Contract 5 (Contract Cost: $98.26m)
Civil Engineering
Not Applicable Tiong Seng Contractors
Thomson-East Coast MRT Line: Construction of a Facility Building and Tunnels (Contract Cost: $242.37m)
Civil Engineering
Not Applicable China Railway First Group Co.
(Singapore Branch)
Thomson-East Coast MRT Line: Construction of Sungei Bedok Station and Tunnels (Contract Cost: $417.50m)
Civil Engineering
Not Applicable KTC Civil Engineering & Construction
Page 41/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Jul 2015 495.98 166.40 1824.78 1448.48
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
Apr 2016 432.23 91.19 1837.19 1255.60
May 2016 449.48 100.11 1697.04 1159.38
Jun 2016 487.40 129.01 1646.57 1180.83
Jul 2016 320.14 172.49 1497.58 1158.47
1,498
320
1,158
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 13 September 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Jul 2015 92.60 486.40 19.30 22.90 99.80
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.50 534.50 16.00 20.10 86.90
May 2016 84.20 548.10 15.70 19.70 85.80
Jun 2016 82.60 493.10 15.30 19.40 84.60
Jul 2016 81.20 489.20 15.10 17.90 83.70
Aug 2016 81.10P 500P 15P 16.50P 83.20P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
172
0
50
100
150
200
250
Jul-
2015
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Steel Bars
Page 43/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 2 September 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering
Total
Public Private Public Private Public Private Public Private Public Private Public Private
Jul 2016 P 380.00 550.00 15.00 225.00 50.00 440.00 330.00 160.00 620.00 110.00 1395.00 1485.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN JULY 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$13M TO S$40M)
Renovation & Refurbishment to Tower Wing Guest Rooms, Corridors and Lift Lobbies for Shangri-La Hotel at Orange Grove Road
Commercial Chao Tse Ann & Partners
Shanghai Chong Kee Furniture &
Construction
Changi Water Reclamation Plant Phase 2 Contract C21B: Civil & Structural, Mechanical & Electrical Works for Wet Weather Facility (Contract Cost: $31.30m)
Industrial Not Applicable Koh Brothers Building &
Civil Engineering Contractor
Erection of a 5-Storey Single-User Ramp-Up Warehouse Development with an Ancillary Office at Benoi Road
Industrial CS Consulting Engineers
HPC Builders
Design and Build of a 6-Storey Business Park Development with a Basement Carpark at Pasir Panjang Road (Singapore Science Park 2)
Industrial P & T Consultants
Nakano Singapore
Erection of 3 Blocks of 6-Storey Classroom, a Block of 6-Storey Canteen, a Multi-Purpose Hall, an Indoor Sports Hall, a Block of 6-Storey Administration Office, a Staff Room and an Ancillary Building at Fernvale Link/Street (Contract Cost: $34.78m)
Institutional Architects Vista Zheng Keng Engineering & Construction
Rejuvenation Works (Phase 8-3) to Ngee Ann Polytechnic at Clementi Road (Contract Cost: $23.99m)
Institutional RSP Architects Planners & Engineers
Gennal Industries
Cable Installation, Jointing and Road Reinstatement Works at West Zone B
Civil Engineering
Not Applicable K.H. Lee Engineering & Construction
Construction of 800mm Diameter Pipelines from Pioneer Road to Tuas South Avenue 5 and along Tuas South Boulevard (Contract Cost: $20.99m)
Civil Engineering
Not Applicable HSC Pipeline Engineering
Construction of Sewers in Upper Changi Road East Area - Contract 1 (Contract Cost: $21.78m)
Civil Engineering
Not Applicable Megastone Holdings
Page 45/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$40M TO S$85M)
Northwave: Construction of 6 Blocks of 16-Storey Executive Condominium Development comprising 358 units with a Basement Carpark, Communal Facilities and Swimming Pools at Woodlands Avenue 12/Woodlands View
Residential Design Link Architects
China Jingye Construction Engineering (Singapore)
Additions and Alterations & Change of Use to the Existing Raffles City Shopping Centre at North Bridge Road
Commercial RSP Architects Planners & Engineers
Gennal Industries
Erection of a Block of 14-Storey Multiple-User Light Industrial Building at Boon Keng Road/Kallang Place
Industrial ADDP Architects
Lum Chang Building
Contractors
Erection of an 8-Storey Industrial Food Building at Buroh Lane (Contract Cost: $81.83m)
Industrial Surbana Jurong Consultants
HPC Builders
Development of Jurong Lake Gardens West (Contract Cost: $62.89m)
Civil Engineering
CPG Consultants
Hon Industries
CONTRACT COST (ABOVE S$85M)
HDB Building Works at Sengkang N3 C28A comprising 921 units, Common Green and Contingency Works (Contract Cost: $96.00m)
Residential P & T Consultants
LC&T Builder (1971)
HDB Building Works at Bukit Batok N4 C18 to 21 comprising 1,962 units and Contingency Works (Contract Cost: $184.98m)
Residential Surbana Jurong Consultants
Qingjian International
(South Pacific) Group Devt Co
Page 46/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Aug 2015 561.04 227.51 1772.14 1327.67
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
Apr 2016 432.23 91.19 1837.19 1255.60
May 2016 449.48 100.11 1697.04 1159.38
Jun 2016 487.40 129.01 1646.57 1180.83
Jul 2016 320.14 172.49 1497.58 1158.47
Aug 2016 392.81 167.86 1679.67 1189.81
1,680
393
1,190
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Aug-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 October 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Aug 2015 92.60 473.90 19.30 22.90 99.60
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.50 534.50 16.00 20.10 86.90
May 2016 84.20 548.10 15.70 19.70 85.80
Jun 2016 82.60 493.10 15.30 19.40 84.60
Jul 2016 81.20 489.20 15.10 17.90 83.70
Aug 2016 81.10 500.30 14.80 16.40 82.80
Sep 2016 81P 495P 14.70P 16.30P 82.40P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
168
0
50
100
150
200
250
Aug-
2015
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Aug-
2016
Tho
usa
nd
To
nn
es
Month-Year
Monthly Demands for Steel Bars
Page 48/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 October 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
Aug 2016P 380.00 540.00 20.00 220.00 60.00 500.00 340.00 160.00 620.00 120.00 1420.00 1540.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN AUGUST 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$13M TO S$40M)
Erection of a 2-Storey Detached House with a Basement, an Attic and a Swimming Pool at Yarwood Avenue
Residential Tellus Architects
Eco Energy
Luxus Hills Phase 16: Development of 36 units of 3-Storey Terrace House, 2 units of 3-Storey Semi-Detached House, and a 3-Storey Detached House at Ang Mo Kio Avenue 5/Seletar Road/Yio Chu Kang Road
Residential RSP Architects Planners & Engineers
Seah Construction
Bayview Hotel Singapore: Additions and Alterations to the Existing 13-Storey Hotel Development comprising 131 rooms at Bencoolen Street
Design and Build of a Part Single Storey and Part 2-Storey Single User Factory Development with an Ancillary Office at 2nd Storey at Benoi Road
Industrial Liu & Wo Architects
Erecon Construction Co
Aims @ Marsiling: Design and Build of a 5-Storey Single User Industrial Development (Business 2) with an Industrial Canteen on 5th Storey at Marsiling Road
Industrial Ha Architects Boustead Projects
Reconstruction of the Existing Darul Ghufran Mosque to a 4-Storey Mosque with a Semi-Basement Carpark at Tampines Avenue 5 (Contract Cost: $20.60m)
Institutional Ata Architects Khian Heng Construction
Erection of an Interim Bus Terminal and a URA Carpark at Spooner Road, Widening of Kampung Bahru Road, Extension of Spooner Road, Associated Ancillary Works and Contingency Works (Contract Cost: $16.45m)
Civil Engineering
23.5 Degree G-Architects
CCECC Singapore
Supply, Laying and Installation of a 1200mm Diameter Potable Water Pipeline from Marina East Desalination Plant to Joo Seng Road (Contract Cost: $31.99m)
Civil Engineering
Not Applicable Ri Dong Corporation
Murnane Pipeline Contract 1: Construction of a 2200mm Diameter Pipeline from Murnane Service Reservoir from Jalan Kampong Chantek to PIE/Rifle Range Road (Contract Cost: $35.35m)
Civil Engineering
Not Applicable Teacly (S)
Page 50/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$40M TO S$85M)
HDB Building Works at Hougang N3 C13 comprising 285 units and a Neighbourhood Centre and Contingency Works (Contract Cost: $73.85m)
Residential ADDP Architects
CKR Contract Services
Changi Water Reclamation Plant Phase 2 Contract C22A: Foundation Works for Train 5 (Contract Cost: $73.46m)
Industrial Not Applicable Sembcorp Design and
Construction
CONTRACT COST (ABOVE S$85M)
HDB Building Works at Toa Payoh Bidadari Contracts 6 & 7 comprising 1,594 units and Contingency Works (Contract Cost: $191.85m)
Residential Surbana Jurong Consultants
CES Engineering & Construction
Development of Changi East to Effect 3 Runway Operations (Package 2) at Singapore Changi Airport
Civil Engineering
Not Applicable Hock Lian Seng Infrastructure -
Sembcorp Design &
Construction JV
Page 51/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Sep 2015 522.04 107.74 1742.62 1298.95
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
Apr 2016 432.23 91.19 1837.19 1255.60
May 2016 449.48 100.11 1697.04 1159.38
Jun 2016 487.40 129.01 1646.57 1180.83
Jul 2016 320.14 172.49 1497.58 1158.47
Aug 2016 392.81 167.86 1679.67 1189.81
Sep 2016 450.06 244.89 1538.66 1114.79
1,539
450
1,115
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Aug-
2016
Sep-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 November 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Sep 2015 92.40 462.00 18.60 23.00 99.80
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.50 534.50 16.00 20.10 86.90
May 2016 84.20 548.10 15.70 19.70 85.80
Jun 2016 82.60 493.10 15.30 19.40 84.60
Jul 2016 81.20 489.20 15.10 17.90 83.70
Aug 2016 81.10 500.30 14.80 16.40 82.80
Sep 2016 80.50 496.00 14.60 16.20 82.20
Oct 2016 80.20P 494P 14.60P 16.20P 82P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
245
0
50
100
150
200
250
300
Sep-
2015
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Aug-
2016
Sep-
2016
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Steel Bars
Page 53/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 November 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
= Preliminary figures SELECTED PROJECTS AWARDED IN SEPTEMBER 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$13M TO S$40M)
Additions and Alterations to the Existing 32-Storey Commercial Development comprising a Block of 32-Storey Office Building with a Basement, Retail and Elevated Carparks at Raffles Quay/Boulevard
Commercial RSP Architects Planners & Engineers
Dragages Singapore
Design and Build of an 8-Storey Nursing Home at Tampines Street 61 (Contract Cost: $26.10m)
Institutional Forum Architects
LC&T Builder (1971)
Design and Construction of a 66kV Electrical Substation at Tagore Road (Contract Cost: $17.52m)
Building (Others)
DP Architects China Jingye Engineering Corporation
Limited (S'pore Branch)
Design, Supply, Installation, Testing and Commissioning of Passenger Loading Bridge in Terminal 1 at Singapore Changi Airport
Building (Others)
Not Applicable Shinmaywa (Asia)
A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 3) B) Widening of Bukit Batok West Avenue 2, Construction of Bukit Batok West Avenue 5 (Extension) and Bukit Batok West Avenue 8 (Part 3) C) Relocation of Bus Bay and Bus Shelter at Bukit Batok Road (Contract Cost: $16.79m)
Civil Engineering
Not Applicable Huationg Contractor
Supply and Laying of 1200mm Diameter Water Pipeline along Clementi Road and West Coast Highway (Contract Cost: $21.70m)
Civil Engineering
Not Applicable Dongah Geological Engineering
Co., Ltd, Singapore
Branch
Reinstatement Works for North-South Corridor (Contract Cost: $23.70m)
Civil Engineering
Ata Architects CCECC Singapore
Page 55/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$40M TO S$85M)
Erection of a Boys' Complex comprising 4 Residential Blocks, a Centre for Education, a Medical Centre, an Administration Block and a Jogging Track and Field, and Construction of a New Road to connect Jalan Bahar and Jurong West Street 25 at Jalan Bahar (Contract Cost: $53.88m)
Institutional CPG Consultants
China Construction
(South Pacific) Development
Co
Erection of a 6-Storey Block with 2 Basements and a 6-Storey Annex Block (Customs Operations Command Complex) at Jalan Bahar (Contract Cost: $61.38m)
Institutional CPG Consultants
Newcon Builders
1) Erection of a Single Storey and Part 2-Storey Airport Passenger Terminal Building with Ancillary Offices, Business Aviation Centre and a Carpark at Seletar Aerospace Road 1 2) Erection of New Aircraft Parking Stands with a Single Storey Cargo Shed and Associated Works at Seletar Aerospace Road 1
Building (Others)
3HPArchitects Takenaka Corporation
CONTRACT COST (MORE THAN S$85M)
Additions, Alterations and Extension to the Existing 52-Storey AXA Tower at Shenton Way
Commercial DCA Architects PBT Engineering
Park Mall: Erection of a 2-Storey Retail/Restaurant comprising 19 units and an 8-Storey Office comprising 184 units with a Basement Carpark at Penang Road
Commercial P & T Consultants
China Construction
(South Pacific) Development
Co
Woods Square: Erection of 2 Blocks of 4-Storey (101 units), a Block of 12-Storey (8 units) and a Block of 16-Storey (365 units) Office Development with a 2-Storey Podium for Retail and Restaurant Uses (39 units), Communal Facilities, a Childcare Centre and 2 Basement Carparks at Woodlands Square
Commercial DP Architects Woh Hup
Paya Lebar Quarter: Erection of 3 Blocks of 17-Storey Residential Development comprising 429 units, a Block of 13-Storey and 2 Blocks of 14-Storey Office Development and a Block of 7-Storey Commercial Development with 2 Basement Shopping Centres (234 units) and 3 Basement Carparks at Paya Lebar Road/Sims Avenue
Mixed DP Architects Lend Lease Singapore
Page 56/60
DEMAND FOR CONSTRUCTION MATERIALS
Material Cement in Bulk
(‘000 Tonnes)
Steel Bars
(‘000 Tonnes)
Granite
(‘000 Tonnes)
Ready Mixed Concrete
('000 Cubic Metre)
Oct 2015 564.29 142.84 1752.09 1373.36
Nov 2015 473.58 147.37 1879.89 1236.07
Dec 2015 476.23 70.07 1686.31 1305.13
Jan 2016 439.51 111.85 1740.48 1216.71
Feb 2016 432.92 98.72 1249.88 982.62
Mar 2016 417.27 148.82 1727.33 1299.35
Apr 2016 432.23 91.19 1837.19 1255.60
May 2016 449.48 100.11 1697.04 1159.38
Jun 2016 487.40 129.01 1646.57 1180.83
Jul 2016 320.14 172.49 1497.58 1158.47
Aug 2016 392.81 167.86 1679.67 1189.81
Sep 2016 450.06 244.89 1538.66 1114.79
Oct 2016 395.91 163.38 1504.14 1111.33
1,504
396
1,111
0
500
1,000
1,500
2,000
2,500
0
500
1,000
1,500
2,000
2,500
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Aug-
2016
Sep-
2016
Oct-
2016
Th
ou
san
d C
ub
ic M
etr
es
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Granite, Cement and Ready-Mixed Concrete
CONSTRUCTION MATERIAL MARKET PRICES (Data as at 12 December 2016)
Material
Cement in Bulk (Ordinary
Portland Cement) ($/Tonne)
Steel Bars 1 (16-32mm High
Tensile) ($/Tonne) +
Granite2 (20mm
Aggregate) ($/Tonne)
Concreting Sand 2
($/Tonne)
Ready Mixed Concrete
($/Cubic Metre) #
Oct 2015 92.00 449.60 18.50 22.00 98.80
Nov 2015 91.00 424.60 18.20 21.40 98.10
Dec 2015 90.80 397.10 17.80 21.20 95.90
Jan 2016 88.90 391.60 16.70 20.40 92.90
Feb 2016 87.30 410.50 16.30 20.60 90.80
Mar 2016 86.70 446.60 16.00 20.60 87.20
Apr 2016 84.50 534.50 16.00 20.10 86.90
May 2016 84.20 548.10 15.70 19.70 85.80
Jun 2016 82.60 493.10 15.30 19.40 84.60
Jul 2016 81.20 489.20 15.10 17.90 83.70
Aug 2016 81.10 500.30 14.80 16.40 82.80
Sep 2016 80.50 496.00 14.60 16.20 82.20
Oct 2016 80.10 493.60 14.60 15.90 81.60
Nov 2016 79.40P 553P 14.60P 15.80P 81.10P p
= Preliminary figures
1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.
+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.
163
0
50
100
150
200
250
300
Oct-
2015
Nov-
2015
Dec-
2015
Jan-
2016
Feb-
2016
Mar-
2016
Apr-
2016
May-
2016
Jun-
2016
Jul-
2016
Aug-
2016
Sep-
2016
Oct-
2016
Th
ou
san
d T
on
ne
s
Month-Year
Monthly Demands for Steel Bars
Page 58/60
VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 6 December 2016) ($ Million)
Sector Residential Commercial Industrial
Institutional & Others
Civil Engineering Total
Public Private Public Private Public Private Public Private Public Private Public Private
Oct 2016P 350.00 510.00 15.00 300.00 70.00 420.00 345.00 150.00 550.00 120.00 1330.00 1500.00 p
= Preliminary figures SELECTED PROJECTS AWARDED IN OCTOBER 2016
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$13M TO S$40M)
Erection of 20 units of 2-Storey Terrace Factory with Mezzanine Flooring on the First Storey, 4 units of 2-Storey Terrace Factory and a 4-Storey Terrace Factory at Woodlands Sector 2
Industrial Kung & Tan Architects
Yee Hong
Design and Build of a 6-Storey Single-User Business Park Development and 2 Basement Carparks at Changi Business Park Central 2
Industrial Kyoob Architects
Precise Development
Evonik ME6: Erection of a 2-Storey Operational Building and a Single Storey Spare Parts Warehouse at Banyan Avenue
Industrial RSP Architects Planners & Engineers
Amec Foster Wheeler Asia
Pacific
Additions, Alterations and Restoration to the Existing 3-Storey Conserved Main Building comprising 20 beds and 3 Blocks of Single-Storey Conserved Buildings for Kwong Wai Shiu Hospital at Serangoon Road
Institutional Liu & Wo Architects
Guan Ho Construction Co
Erection of a Block of 6-Storey (Zero Energy Building) for School of Design and Environment at Clementi Road/Kent Ridge Crescent (Contract Cost: $33.30m)
Institutional Surbana Jurong Consultants
Kajima Overseas Asia
NUS Deepwater Ocean Basin: Erection of Deepwater Ocean Basin with Workshop and 4-Storey Research Building at Prince George's Park within National University of Singapore (Contract Cost: $39.39m)
Institutional CPG Consultants
Lian Soon Construction
Relocation, Restoration and Reinstatement of Tanjong Pagar Railway Station Platforms (Contract Cost: $33.58m)
Building (Others)
RDC Architects Shanghai Chong Kee Furniture &
Construction
CONTRACT COST (MORE THAN S$40M TO S$85M)
HDB Building Works at Bedok N4 N9 comprising 660 units and Contingency Works (Contract Cost: $61.70m)
Residential ADDP Architects
Welltech Construction
HDB Building Works at Ang Mo Kio N2 C31 comprising 590 units and Contingency Works (Contract Cost: $69.50m)
Residential Surbana Jurong Consultants
Welltech Construction
Page 60/60
Project Description Development
Type Consultant Contractor
CONTRACT COST (MORE THAN S$40M TO S$85M)
Sturdee Residences: Erection of 2 Blocks of 30-Storey Condominium Development comprising 305 units with a Landscape Deck, Basement Carpark, a Swimming Pool and Communal Facilities at Sturdee Road
Residential Aga Architects China Construction
Realty Co
Phases 1 & 2 of the Erection of 81 units of Intermediate Terrace Houses, 14 units of Corner Terrace Houses, 2 units of Semi-Detached Houses and a Detached House at Nim Road/Ang Mo Kio Avenue 5
Residential W Architects TPS Construction
Ferra: Erection of a Block of 22-Storey Residential Apartment comprising 104 units with a Basement Carpark and Ancillary Facilities at Leonie Hill
Residential RSP Architects Planners & Engineers
Hexacon Construction
Additions and Alterations involving Data Processing Space on the 5th Storey, 2 Underground Fuel Storage Tanks on the First Storey and Extension of the 6th Storey with Mezzanine at Pioneer Walk
Industrial AWP RCS Engineering
CONTRACT COST (MORE THAN S$85M)
The Alps Residences: Erection of 2 Blocks of 10-Storey, a Block of 12-Storey, 2 Blocks of 13-Storey and 4 Blocks of 15-Storey Condominium Development comprising 626 units with a Swimming Pool, Ancillary Facilities, 2 Commercial Lots and 2 Levels of Basement Carpark at Tampines Street 86
Residential Aga Architects China Jingye Engineering Corporation
Limited (Singapore
Branch)
Construction of JTC Furniture Hub at Sungei Kadut (Contract Cost: $121m)
Industrial Not Available Straits Construction
Singapore
Evonik ME6: Engineering, Procurement and Construction of Evonik's 2nd Plant in Singapore for DL-Methionine Production next to the Existing DL-Methionine Complex at Banyan Avenue
Industrial Engineers 9000 Not Known
Additions and Alterations to the Existing Tanah Merah Station and Viaducts (Contract Cost: $325.00m)
Civil Engineering
Hassell Architecture (Singapore)
Lum Chang Building
Contractors
Building and Construction Authority _____________________________________________________________________________________________________________________________________________________________________________________________________
52 Jurong Gateway Road #11-01 Singapore 608550 Tel : 1800-3425 2222 Fax : 6325 4800 Email Address : [email protected] Web Site Address : http://www.bca.gov.sg