Top Banner
Delivery Strategy for the Anchorage Port Modernization Project 2015 AAPA Facilities Engineering Seminar Presented by: Todd Cowles, P.E. Port Engineer, Port of Anchorage October 21, 2015
20

Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

Mar 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

Delivery Strategy for the Anchorage Port

Modernization Project

2015 AAPA Facilities Engineering Seminar

Presented by:Todd Cowles, P.E.

Port Engineer, Port of Anchorage

October 21, 2015

Page 2: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Port of Anchorage Overview• Landlord Port / Department of the Municipality of Anchorage• Cargo: Petroleum, Cement, Container, Project Cargo• Critical to Alaska (~3.5M tons of cargo)• Dept. of Defense Designated National Strategic Seaport

Southcentral In-Bound Freight Distribution Southcentral Refined Petroleum Distribution

Page 3: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Conditions in the Knik Arm of Cook Inlet

• Over 29’ average tide swing

• Tidal currents and eddies

• Ice flow and encasement

• Glacial sediment

• Endangered Beluga Whales

Page 4: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Existing Wharf Pile Conditions as of 2014

Terminal/POL Age (years)Min. Thickness

ObservedPercent

Loss

Terminal 1 54 0.15” 67%

POL Terminal 1 50 0.15” 67%

Terminal 2 46 (avg) 0.20” 55%

Terminal 3 40 (avg) 0.18” 59%

POL Terminal 2 20 0.13” 71%

Page 5: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Port of Anchorage Overview

Page 6: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Project Team, Goals & ConstraintsProject Team

– Owner: Municipality of Anchorage / Port of Anchorage– PM/CM: CH2M-HDR

Project Goals– Replace T2 & T3

• Minimize investment in the North Extension– Provide modern, safe, and efficient port facilities– Provide for future growth

• Support larger vessels• Allow for deeper draft (-45’ berth depth)

Operational Constraint: Keep Cargo Moving– Keep one POL terminal in operation at all times– Keep existing container terminals operating until new terminals are complete– Must complete both container terminals once started

Funding Constraints– $130M Initially Available

Page 7: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Project Stakeholders

• Municipality of Anchorage (MOA)

– Geotechnical Advisory Commission (GAC)

• Port of Anchorage (POA)

• Totem Ocean Trailer Express (TOTE)

• Horizon Lines (now Matson)

• ABI Cement

• Cook Inlet Tug & Barge

• Southwest Alaska Pilots Association

• US Army Corps of EngineersAlaska District (USACE)

• CH2M/HDR Project Team

Page 8: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Anchorage Port Modernization Project - Overview

Page 9: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

PHASE 1

CUT BACK AND STABILIZE NORTH EXTENSION

DEMOLISH PORT ADMIN. BUILDING

NEW PORT ADMIN BUILDING

NEW POL 1

Page 10: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

PHASE 2

NEW TERMINAL 1ADDITIONAL ACREAGE FROM FILL

Page 11: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

PHASE 3

NEW TERMINAL 2 WITH TEMPORARY TRESTLES

Page 12: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

PHASE 4

MOVE TOTE TO TERMINAL 2 USING TEMPORARY TRESTLES

Page 13: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

PHASE 5

COMPLETE NEW TERMINAL 2

DEMOLISH TERMINAL 3 AND TEMPORARY TRESTLES

Page 14: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

PHASE 6

NEW POL 2

Page 15: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Anchorage Port Modernization Project - Complete

Page 16: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

APMP Delivery Strategy

Replace Port Administration Bldg Design-Build– Have sufficient funding for both design & construction

– Programming has been completed

– Building requirements are not specialized

– Seeking rapid delivery

Page 17: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

APMP Delivery Strategy

Replace Marine Terminals Design-Bid-Build– Sufficient funding available to perform design, but not construction

– Concept design has been completed

– Executing test pile program to reduce design risk

• Collecting additional geotechnical data

• Confirming pile structural performance and constructability

• Collecting acoustic information and testing in-water noise mitigation measures to facilitate permitting

– Owner controlled design process best ensures stakeholder requirements are met

– Planning two design teams

• Container Terminals

• POL Terminals

Page 18: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

APMP Delivery Strategy

Stabilize North Extension Progressive Design-Build– Concept design has been completed

– Seeking early builder involvement to arrive at GMP

– Project can be scaled to available funding

– Risks are primarily means & methods driven and best managed by the builder

– Design is conventional

Page 19: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Before

After

Page 20: Delivery Strategy for the Anchorage Port Modernization Projectaapa.files.cms-plus.com/SeminarPresentations/2015Seminars/2015FacEngineering/Todd...ANCHORAGE PORT MODERNIZATION PROJECT

ANCHORAGE PORT MODERNIZATION PROJECT

Questions?

Thank You!

Todd Cowles, P.E.

[email protected]