Page 1: Delivering liquid energy cost effectively on tap to the working face - Mark

WealthUnearthed

Delivering liquid energy, cost

effectively “on tap” to the working

face

Page 2: Delivering liquid energy cost effectively on tap to the working face - Mark

Conventional emulsion delivery

Page 3: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop

Page 4: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop delivery

Page 5: Delivering liquid energy cost effectively on tap to the working face - Mark

Components of a vertical drop installation

Page 6: Delivering liquid energy cost effectively on tap to the working face - Mark

Tanker arrives at mine

Page 7: Delivering liquid energy cost effectively on tap to the working face - Mark

Surface infrastructure

Page 8: Delivering liquid energy cost effectively on tap to the working face - Mark

Surface delivery point detail

Page 9: Delivering liquid energy cost effectively on tap to the working face - Mark

Underground delivery point

Page 10: Delivering liquid energy cost effectively on tap to the working face - Mark

Underground delivery point to isotainers and tanks

Page 11: Delivering liquid energy cost effectively on tap to the working face - Mark

Isotainers outlet piping

Page 12: Delivering liquid energy cost effectively on tap to the working face - Mark

Charging of MCU’s

Page 13: Delivering liquid energy cost effectively on tap to the working face - Mark

Guideline costing for a vertical drop installation

Estimated total cost: USD 400K (~200m drop)

Page 14: Delivering liquid energy cost effectively on tap to the working face - Mark

Case Study 1 – Vertical drop

Page 15: Delivering liquid energy cost effectively on tap to the working face - Mark

Base case

Base case

• 180 000 tons production• ~220 tons emulsion

Page 16: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop

Option 1

Page 17: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop

Option 2

Page 18: Delivering liquid energy cost effectively on tap to the working face - Mark

Tangible Benefits

Option 1 Option 2

CAPEX 400 000 400 000

NPV 260 169 401 473

IRR 48% 62%

Payback ~1.7 years ~1.5 years

Page 19: Delivering liquid energy cost effectively on tap to the working face - Mark

Non-tangible Benefits

Page 20: Delivering liquid energy cost effectively on tap to the working face - Mark

Case Study 2: Liquid energy on “tap”

Page 21: Delivering liquid energy cost effectively on tap to the working face - Mark

Mining issues

Poor hangingwall conditions

Overbreak

Page 22: Delivering liquid energy cost effectively on tap to the working face - Mark

Poor fragmentation

Mining issues cont…

Page 23: Delivering liquid energy cost effectively on tap to the working face - Mark

Large bouldersrequiring secondary blasting

Mining issues cont…

Page 24: Delivering liquid energy cost effectively on tap to the working face - Mark

Mining issues cont…

Poor inventory control and wastage

Page 25: Delivering liquid energy cost effectively on tap to the working face - Mark

AEL MS Actions

• Blast redesign to address:

• Perimeter control

• Reduction of large boulders and minimise secondary blasting

• Improved fragmentation profile

• Manage explosive use

• Achieve design face advance of >=92%

Page 26: Delivering liquid energy cost effectively on tap to the working face - Mark

Blast design:

• Reduced drilled holes

• Reduced powder factor

• Perimeter control

Page 27: Delivering liquid energy cost effectively on tap to the working face - Mark

Blasting results

Page 28: Delivering liquid energy cost effectively on tap to the working face - Mark

Barrels on the side walls

Half-casts in sidewall

35% on every face!!!

Page 29: Delivering liquid energy cost effectively on tap to the working face - Mark

Barrels

Barrels on the hanging wall

Half-casts in hangingwall

Page 30: Delivering liquid energy cost effectively on tap to the working face - Mark

Fragmentation profile

Page 31: Delivering liquid energy cost effectively on tap to the working face - Mark

0

25

50

75

100

0 200 400 600 800 1000 1200 1400

% passing

Size - mm

Fragmentation analysis

96% Passing at 300mm

Page 32: Delivering liquid energy cost effectively on tap to the working face - Mark

Face advance

88%

89%

90%

91%

92%

93%

94%

95%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

advance/drilled length average advance/drilled length

Page 33: Delivering liquid energy cost effectively on tap to the working face - Mark

Inventory control

Page 34: Delivering liquid energy cost effectively on tap to the working face - Mark

Further benefits

Page 35: Delivering liquid energy cost effectively on tap to the working face - Mark

Conclusions

AEL MS have formulations and equipment that allow for

perimeter blasting to reduce rockwall damage

deliver on customer specifications

AEL MS Use blast designs in conjunction with in-situ results to deliver on customer specifications

By means of vertical drop By means of vertical drop

AEL MS Innovate to create solutions for their

customers problems