Delivering a quality rapid transit system in a challenging environment Tom Hacker Project Advisor Louise Porter Programme Manager
9

Delivering a quality rapid transit system in a challenging environment

Jul 03, 2015

Download

Engineering

New Generation Transport (NGT) www.ngtmetro.com

presentation by Louise Porter & Tom Hacker, delivered to postgraduate students at the Institute for Transport Studies (ITS) University of Leeds, UK. 27 November 2014
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Delivering a quality rapid transit system in a challenging environment

Delivering a quality rapid

transit system in a challenging environment

Tom Hacker Project Advisor

Louise Porter Programme Manager

Page 2: Delivering a quality rapid transit system in a challenging environment

120,000 students in 8 institutions

Largest ‘creative’ sector outside London

36,500

Page 3: Delivering a quality rapid transit system in a challenging environment

Congestion constraining

growth

Leeds population

to grow 12% (90k) by

2021

35,000 new jobs by 2028

Largest City in EU without

Rapid Transit

10% less productive

than national average

15th in UK for inward investment

Some areas amongst 5%

most deprived in

UK

29% houses economically

inactive

HS2 HS3?

Page 4: Delivering a quality rapid transit system in a challenging environment

Making public transport more attractive

1) Greater capacity 2) Reduced journey times 3) Improved punctuality 4) Improved infrastructure

Conditions where rapid transit appropriate

1) Busiest routes + standing passengers 2) Most congested corridors 3) Scope to reduce journey times 4) Scope to improve reliability

Page 5: Delivering a quality rapid transit system in a challenging environment

M62

A647

Skipton & Ilkley

Bradford

Huddersfield

Wakefield

York & Selby

Wetherby

Harrogate Otley

Dewsbury

Leeds

Page 6: Delivering a quality rapid transit system in a challenging environment
Page 7: Delivering a quality rapid transit system in a challenging environment

Bus Rapid Transit (BRT)

14.8km trolleybus network

Vehicle + infrastructure + park and ride +

marketing

11 million passengers

+

£250.5m (£173m

from DFT)

45,000 households

BCR of 2.96:1

2,350 P&R

Spaces

20 x 160 capacity vehicles

Up to 1,600 PPH

Page 8: Delivering a quality rapid transit system in a challenging environment

40% Journey time saving

65% segregation Flexible

+ off wire capabilities

Quieter, cleaner & smoother

Less disruption

during construction

£235m per annum

boost to local economy

Increased property

prices

Fares Set by LCC

and the WYCA

4,000 New jobs

Benefits of NGT

Regeneration

Page 9: Delivering a quality rapid transit system in a challenging environment

2009

2020

March 2009 - MSBC Submitted July 2012 -Programme Entry Approval

2008/09 - Consultation

2012/13 – Public Engagement

Sept 2013 – TWAO Submission April/Oct 2014 –

Public Inquiry Late 2015 – anticipated SoS decision 2016 – select

preferred bidders 2017 – Begin construction

2019 – Testing and commissioning

2020 – start of operations