Summary of Dissemination Activities Deliverable 9.3 Date: April, 2015 “This project has received funding from the European Union’s Seventh Programme for research, technological development and demonstration under grant agreement No 608554” Prepared by: Greenovate! Europe www.swipproject.eu SWIP – New innovative solutions, components and tools for the integration of wind energy in urban and peri-urban areas Grant Agreement: 608554 From October 2013 to January 2017
22
Embed
Deliverable 9.3 Summary of Dissemination Activitiesswipproject.eu/wp-content/uploads/2017/03/D9.3-Summary... · 2017-03-17 · Summary of Dissemination Activities Deliverable 9.3
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Summary of Dissemination Activities
Deliverable 9.3
Date: April, 2015
“This project has received funding from the European Union’s Seventh Programme for research, technological development
and demonstration under grant agreement No 608554”
Prepared by: Greenovate! Europe
www.swipproject.eu
SWIP – New innovative solutions, components and tools for the integration of wind energy in urban and peri-urban areas
Grant Agreement: 608554
From October 2013 to January 2017
2
Document:
Summary of Dissemination Activities
Author:
Refere
R
Re
Re
Greenovate! Europe Version:
Reference: D9.3 Date: 1/6/15
Summary of Dissemination Activities
Disclaimer of warranties and limitation of liabilities
This document has been prepared by SWIP project partners as an account of work carried out within
the framework of the EC-GA contract no 608554.
Neither Project Coordinator, nor any signatory party of SWIP Project Consortium Agreement, nor
any person acting on behalf of any of them:
(a) makes any warranty or representation whatsoever, express or implied,
(i). with respect to the use of any information, apparatus, method, process, or similar
item disclosed in this document, including merchantability and fitness for a
particular purpose, or
(ii). that such use does not infringe on or interfere with privately owned rights,
including any party's intellectual property, or
(iii). that this document is suitable to any particular user's circumstance; or
(b) assumes responsibility for any damages or other liability whatsoever (including any
consequential damages, even if Project Coordinator or any representative of a signatory
party of the SWIP Project Consortium Agreement, has been advised of the possibility of
such damages) resulting from your selection or use of this document or any information,
apparatus, method, process, or similar item disclosed in this document.
3
Document:
Summary of Dissemination Activities
Author:
Refere
R
Re
Re
Greenovate! Europe Version:
Reference: D9.3 Date: 1/6/15
Summary of Dissemination Activities
Document info sheet
Document Name: Summary of Dissemination Activities
Responsible Partner: Greenovate! Europe
WP: 9 – Dissemination & Exploitation
Task: 9.1, 9.2, 9.4 & 9.5
Deliverable nº: 9.3
Version: 1
Version Date: 1 June 2015
Diffusion list
All partners.
Approvals
Company Author/s Simon Hunkin Greenovate! Europe
Task Leader Greenovate! Europe WP Leader Greenovate! Europe
Documents history
Revision Date Main modification Author 1 15 April 2015 First Draft G!E 2 1 June 2013 Final G!E
4
Document:
Summary of Dissemination Activities
Author:
Refere
R
Re
Re
Greenovate! Europe Version:
Reference: D9.3 Date: 1/6/15
Summary of Dissemination Activities
Executive Summary
This Deliverable gives an overview of the Dissemination activities that have taken place in the first
18 Months of the SWIP project. A full summary of activities will be produced at the end of the
project in Month 44.
By month 4, the project website (Deliverable 9.2) had been established, to act as the main
communication tool of the project. Nine presentations of the project have been held in the first
period of the project, targeting academia, industry and the general public. Further, information
about the project has been disseminated in four publications, targeted towards both professionals
and the general public.
By the end of 2015, we are expecting to see SWIP presented at a further four international events, and the first five research publications being produced. More information is presented in the final section of this Deliverable.
3 Events and Presentations ...................................................................................................................... 8
3.1 GENERA 2014 ....................................................................................................................................... 8
3.2 Presentation of the SWIP Project in Choczewo commune .................................................................. 8
3.3 Presentation of SWIP given in Stare Pole............................................................................................. 9
3.4 SWIP presented to the Kościerzyna Partnership for Socio-Economic Development ......................... 10
3.5 CIRCE take part in IEA Task 27 Meetings ........................................................................................... 10
3.6 GENERA 2015 ..................................................................................................................................... 12
3.7 Meteodyn present abstract at CWE 2014 .......................................................................................... 12
3.8 Presentation of SWIP at Kokoszki Business Park ............................................................................... 14
3.9 TCD produce poster for research showcase ...................................................................................... 14
3.10 SWIP presented at International Conference on Advances in Civil, Structural and Mechanical
4.3 Daily Bulletin of the Spanish Wind Energy Association...................................................................... 19
4.4 BAPE promote the SWIP project in Choczewo newsletter ................................................................ 20
5 Social Media ........................................................................................................................................ 21