MOM of OCC meeting dt. 07.07.15 Page 1 of 14 DELHI TRANSCO LIMITED (Regd. Office: Shakti Sadan, Kotla Road, New Delhi-110002) Office of Dy. Gen. Mgr. (OS & Lines) 220KV S/Stn. Bldg. Naraina, New Delhi-110010 Tele: 25683304 MINUTES OF THE OCC MEETING DT. 07.07.2015 ED(Tech) O&M-I, DTL, Chairman-Delhi OCC welcomed all the members of OCC and distinguished guests to the meeting. List of participants is enclosed. The point-wised deliberations made during the meeting are as below: 1.0 Confirmation of minutes of OCC meeting dtd. 08.06.2015 Last OCC meeting was held on 08.06.15 in accordance with the agenda circulated vide letter dt.05.06.15. Minutes of the aforesaid OCC meeting were issued vide letter dated 12.06.2015. No comments were received. Members confirmed the same. 2.1 Status of Installation of Capacitors Study by Planning Deptt., DTL DTL had entrusted CPRI to study the installation of shunt capacitors in Delhi system on the advice of OCC. Accordingly CPRI carried out the study for reactive power compensation in Delhi. Final report was submitted by CPRI and for its implementation; a copy of report had been emailed to all DISCOMs and GENCOs. SLDC convened a meeting with DISCOMs on dt. 18.02.15 to discuss on the Reactive Power Study report submitted by CPRI. Planning department, DTL informed that comments from BRPL, TPDDL and BYPL have been received. Comments from NDMC have not yet been received even after repetitive reminders. NDMC could not attend the meeting. OCC advised NDMC member to attend the meeting regularly and offer their comments within a week time to Planning and SLDC department of DTL. (Action by NDMC) 2.2 Status of Hot Reserve of transformers at all levels. DTL updated the status of following hot reserves: S. No Capacity Present population in nos. Status of the hot reserve as on 09.07.15 1. 220/66kV, 18 DTL informed the work has been awarded to M/s
14

DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

Jun 03, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 1 of 14

DELHI TRANSCO LIMITED (Regd. Office: Shakti Sadan, Kotla Road, New Delhi-110002)

Office of Dy. Gen. Mgr. (OS & Lines) 220KV S/Stn. Bldg. Naraina, New Delhi-110010

Tele: 25683304

MINUTES OF THE OCC MEETING DT. 07.07.2015

ED(Tech) O&M-I, DTL, Chairman-Delhi OCC welcomed all the members of OCC and

distinguished guests to the meeting.

List of participants is enclosed.

The point-wised deliberations made during the meeting are as below:

1.0 Confirmation of minutes of OCC meeting dtd. 08.06.2015

Last OCC meeting was held on 08.06.15 in accordance with the agenda circulated vide letter

dt.05.06.15. Minutes of the aforesaid OCC meeting were issued vide letter dated 12.06.2015. No

comments were received.

Members confirmed the same.

2.1 Status of Installation of Capacitors – Study by Planning Deptt., DTL

DTL had entrusted CPRI to study the installation of shunt capacitors in Delhi system on the

advice of OCC. Accordingly CPRI carried out the study for reactive power compensation in

Delhi. Final report was submitted by CPRI and for its implementation; a copy of report had been

emailed to all DISCOMs and GENCOs. SLDC convened a meeting with DISCOMs on dt.

18.02.15 to discuss on the Reactive Power Study report submitted by CPRI.

Planning department, DTL informed that comments from BRPL, TPDDL and BYPL have been

received. Comments from NDMC have not yet been received even after repetitive reminders.

NDMC could not attend the meeting. OCC advised NDMC member to attend the meeting

regularly and offer their comments within a week time to Planning and SLDC department of

DTL.

(Action by NDMC)

2.2 Status of Hot Reserve of transformers at all levels.

DTL updated the status of following hot reserves:

S.

No Capacity

Present

population

in nos.

Status of the hot reserve as on 09.07.15

1. 220/66kV, 18 DTL informed the work has been awarded to M/s

Page 2: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 2 of 14

160MVA Tx Kanohar. Completion period is 5 months from date of

award of work i.e. by the end of September, 2015.

2. 220/66kV,

100MVA Tx

41 DTL informed that indent has been sent for 220/66/33kV

100MVA Tx as hot reserve at 220kV Patparganj

Substation. 3. 220/33kV,

100MVA Tx,

36

OCC advised DTL to expedite the work.

(Action by DTL)

2.3 Long/Recent outage of Elements in Delhi power system as on 03.07.2015 at 08:00 Hrs.

Members updated the status of Long/Recent outage of Elements in Delhi Power system as

below: S.

No. Element’s Name

DISCOM/D

TL

Date and Time of

outage

Remarks/ Status as on

07.07.2015

1

33kV BAY -3 (IP – Kilokri) BRPL 22.02.11

Clearance from Railways for

laying of Underground cables

near Bhairon Road is pending.

DTL informed that railways has

issued the order for carrying

maintenance work along railway

lines without any charges and

advised BRPL to take up with

railways for revival of circuit.

2 66kV Vasant Kunj – Ridge Valley Ckt.-II (‘Y’

Ph. Cable) BRPL 13.01.14

BRPL informed that contract is

to be awarded for laying new

cable.

3 33kV Kilokri – Jamia CKT. (‘R’ & ‘B’ Ph.

Cable)

BRPL 15.03.14 Expected by 30.08.15

4. 33kV RIDGE VALLEY - KHEBAR LINE

CKT.-I

BRPL 08.02.15

Y-PH. Cable and breaker faulty

(Single Cable). Expected by

30.08.15

5. 66kV V.KUNJ - PALAM CKT. BRPL 13.06.15 Y-PH. Spare Cable faulty.

Energized on 17.06.15.

6. 33kV OKHLA (220kV)-ALAKHNANDA

CKT.-I BRPL 29.06.15

'R' and 'B' Phase Single Cable

faulty. Energized on 05.07.15

7. 66kV G-5 MATIALA - DELHI JAL BOARD

CKT.-II BRPL 12.06.15

Y-PH. Cable faulty. Expected by

31.07.15

8. 66kV PPG INDL. AREA - KHICHRIPUR

CKT.-II BYPL 03.05.15

R phase Cable faulty. Expected

by 08.08.15

9. 66kV GH-II - GH-I CKT-I

BYPL 17.06.15 Cable faulty. Expected by

20.07.15

10. 66kV WAZIRABAD - GONDA CKT.-I

BYPL 29.06.15 Cable faulty. Expected by

20.07.15

11. 33kV VIDYUT BHAWAN - SCHOOL LANE

CKT. NDMC 14.05.15

Y-Phase faulty. Expected by

20.07.15

Page 3: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 3 of 14

12. 66kV GT- VIDYUT BHAWAN CKT.-II

NDMC 18.06.15 Cable faulty. Energized on

20.06.15

13. 33kV GT-SCHOOL LANE CKT.-I

NDMC 02.07.15 R-Phase faulty. Expected by

08.07.15

14. 220kV MAHARANI BAGH - ELECTRIC

LANE CKT.-II DTL 17.04.15

Cable faulty during digging by

MTNL. Expected by the end of

July, 2015

15. 400kV BAMNAULI - JHATIKARA CKT.-I DTL 27.05.15 Joint Box burnt. Expected by

15th August, 2015

OCC advised members to expedite the work of attending faulty feeders/ equipments.

(Action by DTL, BRPL, BYPL and NDMC)

2.4 Phasing out of 66/33kV, 30MVA Power Transformer at 220kV Narela Substation.

DTL informed that the said transformer is currently being utilized for feeding only 01 No. 33kV

Circuit i.e. Khampur of TPDDL since 2010. 2nd

feeder namely Haiderpur is under B/D since long

time. Due to shortage of space in 66KV yard, the transformer is on single bus selection and the

same needs to be switched ‘OFF’ during bus maintenance activities. Further, the transformer is

placed adjacent to 20MVAR capacitor bank and thereby always remains in risk of fire during

failure of any capacitor unit / cell.

In addition the 33KV yard construction is of vertical pole mounted type with single bus and

maintenance works are thus quite difficult to carry out. The necessary clearances of 33KV yard

have also not been maintained, as the construction is just touching the Control Room building.

The transformer has already lived its useful life period of 25 years successfully as per DERC

guidelines and is now under outlived condition.

In view of all above, DTL’s proposal for phasing out of 30MVA, 66/33KV power transformer

along with 33KV yard equipments has been initiated in the year 2010. The case has been

examined / approved by the Planning Deptt. and put up in OCC accordingly. OCC recommended

for consideration of the matter in Streeing Committee, in which approval has also been provided

for shifting of 33KV load from Narela end by TPDDL.

The subjected transformer has developing acetylene gas during DGA testing, the concentration

of which is increasing day by day which indicates some internal high temperature fault. The

overhauling / internal inspection of transformer at this stage is not economically feasible (being

outlived) and the same may be required to be taken out of service at any time.

Accordingly, DTL proposed for phasing out of 30MVA, 66/33KV power transformer along with

33KV yard equipments at 220KV S/Stn. Narela on priority basis, by directing TPDDL for

immediate shifting of 33KV load from Narela end.

TPDDL informed that there is alternative feed for khampur is available; however the same is not

reliable.

During the meeting dt. 08.06.15, OCC advised DTL to carry out internal inspection and

dehydration of the transformer and outage for the same shall be provided by TPDDL.

Page 4: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 4 of 14

DTL informed that the internal inspection by BHEL i.e. OEM is being planned during the end of

August, 2015.

OCC advised TPDDL to witness the internal inspection.

(Action by DTL, TPDDL)

2.5 Strengthening of Earthing of 66kV Cables emanating from 220kV PPK-II substation.

DTL informed that at 220kV Sub Station PPK-II, 66kV Out going cables are with BRPL and the

earthing of these cables are very degraded position. Due to this, at the time of any fault in 11kV

System of BSES, 66kV Yard equipments at PPK-II substation are being affected.

Recently on dt.23.05.2015, 66kV Dwarka G-15 Ckt.-I tripped with heavy jerk (tripping might be

due to weak earthing) because of which, 66kV Line Isolator (B phase) at 220kV PPK-II yard got

damaged.

BRPL informed that their team visited the PPK-II substation and needful done in the presence of

DTL official.

2.6 Back feed & RMU provision for 11 kV feeders by TPDDL at 220 kV Substation

Kanjhawala

220 kV Substation Kanjhawla has 9 Nos. of 11 kV feeders feeding to TPDDL. Out of these 9

feeders, 04 No. feeders i.e Ghewara, SOS Bawana, JJ cluster, ABC Kanjhawala does not have

back feed by any other TPDDL grid. These feeders feed to the area nearby Kanjhawala S/Stn

and outage of these lines for any reason result in gathering of miscreants /local public at the

substation demanding for total black out.

Further, several areas of TPDDL are fed without RMU through auto reclose system i.e directly

from DTL which results in numerous tripping at Kanjhawala sub-station. One such feeder is

11kV Ghewara.

In this regard, DTL requested TPDDL to make arrangement in line with DERC guidelines for

back-feeding of the said 4 feeders to avoid any unwanted situation and to safeguard DTL system

for any fault at TPDDL end

The issue got deliberated and OCC advised TPDDL and DTL to have joint inspection visiting

TPDDL’s first switching substations to check protection system and back-feeding provision.

(Action by Protection deptt. of DTL, TPDDL)

Page 5: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 5 of 14

3.1 Issue of supply restoration on 66 KV O/G feeders from Harsh Vihar grid

BYPL have 4 nos. 66 KV feeders from 400/220/66 KV Harsh Vihar grid station. In case of

tripping of any of the feeders, the restoration process is very difficult and complex. There is no

arrangement for PT isolation at Harsh Vihar end, hence high voltage testing of feeders is not

possible. The only way is to call the OEM and get the cable ends isolated from the GIS panels

and test thereafter. This involves lot of efforts, time and cost. In summer months when there will

be no/little margin available on alternate sources, this unwanted delay may lead to large scale

load shedding in parts of east Delhi.

BYPL informed that they have already written couple of times to DTL with the request to

address this issue on priority, but we are still waiting for a response from DTL. Therefore, it is

requested to make suitable arrangement to test the feeders at DTL end to avoid any unwanted

delay in restoration of feeder and thereby any load shedding in the area.

During the OCC meeting dt. 11.05.15, OCC advised BYPL and DTL to have joint inspection at

the substation for looking into the feasibility of testing.

The following members from DTL have been nominated for the said inspection:

1. Hitesh Kumar, Manager (T)-Protection

2. Mukesh Rana, Manager(T)-400kV Harsh Vihar

66kV/33kV Cable testing procedure for FLC and energizing shall be conveyed to BYPL. From

BYPL, officers from Protection department and Maintenance department have been nominated

for the said inspection.

DTL informed that there is no provision for isolating the line PT without de-gassing the GIS

chamber which is very exhaustive and time consuming process. Hence, as there is no alternative

except taking out the cable from the GIS end for any testing purpose. Otherwise, BYPL should

arrange an isolator outside GIS premises of Harsh VIihar S/Stn. for isolation of cable for testing.

(Action by BYPL, DTL)

4.0 Proposed Shutdowns

4.1 Proposed shutdown at 220kV Kashmere Gate.

The following shutdown proposed by DTL at 220kV Kashmere Gate S/S has already been

availed on the proposed date i.e. 03.07.15:

S.

No.

Proposed Date &

time of S/D

Name of the feeder /

equipment

Work to be carried out

1

03.07.15 (07:00Hrs.

to 10:00Hrs.)

33kV Civil Line Ckt-II Drying of SF6 gas in feeder compartment of 33kV Civil

Line II Feeder bay by GIS Expert team as ppmw of SF6

gas is high

Page 6: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 6 of 14

4.2 Proposed shutdown at 220kV Pappankalan-I.

OCC approved the following shutdowns proposed by DTL at 220kV Pappankalan-I S/S:

S.

No.

Proposed Date &

time of S/D

Name of the feeder /

equipment

Work to be carried out

Approved Date & time

of S/D

1 03.07.15 (06:30Hrs.

to 09:30Hrs.)

66kV Bus Coupler

along with Bus-I

To attend hot points on Y-phase

isolator Bus-I side

Already availed

2 04.07.15 (06:30Hrs.

to 09:30Hrs.)

66kV Rewari Line To replace Spring Charge Motor and

Gen. Mtc.

12.07.15 (06:30Hrs. to

09:30Hrs.)

(Action by DTL)

4.3 Proposed shutdown at 220kV Gopalpur.

OCC approved the following shutdowns proposed by DTL at 220kV Gopalpur S/S:

S.

No.

Proposed

Date & time

of S/D

Name of the

feeder /

equipment

Work to be carried out

Remarks

Approved Date

& time of S/D

1

06.07.2015(06

AM to 11AM)

33kV Indira

Vihar ckt.-I

For attending hotpoints at B

phase jackbus Dropdown

conductor & line isolator

alignment

The load may please be

transfer at 33kV Indira

Vihar ckt.-II

Already availed

2

10.07.2015(06

AM to 11AM)

33kV DIFR ckt. For attending hotpoint at Y

phase line isolator clamp CT

side.

The load may please be

transfer at 33kV Civil

Line ckt.

10.07.2015(06

AM to 11AM)

3

15.07.2015(06

AM to 10AM)

33kV Wazirabad

ckt.-II

For attending hotpoint at

33kV Y phase CT clamp

towards line isolator.

The load may please be

transfer at 33kV

Wazirabad ckt.-I

15.07.2015(06

AM to 10AM)

4

19.07.2015(06

AM to 11AM)

33kV Indira

Vihar ckt.-II

For doing line isolator

alignment

The load may please be

transfer 33kV Indira

vihar ckt.-I

19.07.2015(06

AM to 11AM)

5

24.07.2015(06

AM to 9AM)

33kV Civil Line

Ckt.

For doing general

maintenance work

The load may please be

transfer at 33kV DIFR

ckt.

24.07.2015(06

AM to 9AM)

6

26.07.2015(06

AM to 11AM)

33kV Wazirabad

ckt.-I

For line isolator alignment

and general maintenance

work.

The load may please be

shifted t 33kV

Wazirabad ckt.-II.

26.07.2015(06

AM to 11AM)

(Action by DTL)

4.4 Proposed shutdown at 220kV Okhla.

OCC approved the following shutdowns proposed by DTL at 220kV Okhla S/S:

S.

No.

Proposed

Date & time

of S/D

Name of the feeder /

equipment

Work to be carried

out

Remarks

Approved

Date & time

of S/D

1

11.07.2015

(08:00Hrs to

17:00Hrs.)

100 MVA, 220/66/11

KV Power Transformer

No. I along with I/c No-

Replacement of 220

KV Bushing of B-

Phase (Having high

Load to be taken on

220/66/11 KV Power

Transformer No. II. Excess

11.07.2015

(06:00Hrs to

11:00Hrs.)

Page 7: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 7 of 14

I Tan delta) load if any, to be managed

by BRPL.

2

12.07.2015

(08:00Hrs to

12:30Hrs.)

33 KV East of Kailash

along with 33 KV Bus-

II and 33 KV I/c-III &

IV

Earthing of Bus &

line isolator

Load to be managed by

BRPL.

12.07.2015

(06:00Hrs to

12:00Hrs.)

3

12.07.2015

(13:00Hrs to

17:30Hrs.)

33 KV Alaknanda Ckt-I

along with 33 KV Bus-

II and 33 KV I/c-III &

IV

Load will be taken on

Alaknanda Ckt-II Excess

load, if any, to be managed

by BRPL.

4

13.07.2015

(09:30Hrs to

17:30Hrs.)

100 MVA, 220/33/11

KV Power Transformer

No. V and 33 KV I/c-V

Work to be done by

OEM, i.e. M/s CGL

for replacement of

PRV stud, Seal in

relay of SPR,

Mounting of PRV

support pipes and

Remote TPI.

Load to be taken on

220/33/11 KV Power

Transformer No. III and IV.

13.07.2015

(06:00Hrs to

11:00Hrs.)

5

13.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV Alaknanda Ckt-

II along with 33 KV

Bus-I and 33 KV I/c-V

Earthing of Bus &

line isolator

Load will be taken on

Alaknanda Ckt-I Excess

load, if any, to be managed

by BRPL.

13.07.2015

(06:00Hrs to

11:00Hrs.)

6

14.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV Okhla Ph-II

Ckt-I

Earthing of Bus &

line isolator

Load will be taken on Okhla

Ph-II, Ckt-II. Excess load,

if any, to be managed by

BRPL.

Already

availed

7

15.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV Okhla Ph-II

Ckt-II

Earthing of Bus &

line isolator

Load will be taken on Okhla

Ph-II, Ckt-I. Excess load, if

any, to be managed by

BRPL.

Already

availed

8

16.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV Balaji Ckt-II Earthing of Bus &

line isolator

Load will be taken on 33

KV Balaji Ckt-I. Excess

load, if any, to be managed

by BRPL.

16.07.2015

(06:00Hrs to

11:00Hrs.)

9

17.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV i/c-III along

with 100 MVA,

220/33/11 KV Power

Transformer No.III

Earthing of Bus &

line isolator

Load to be taken on

220/33/11 KV Power

Transformer No. IV and V.

17.07.2015

(06:00Hrs to

11:00Hrs.)

10

18.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV i/c-IV along

with 100 MVA,

220/33/11 KV Power

Transformer No.IV

Earthing of Bus &

line isolator

Load to be taken on

220/33/11 KV Power

Transformer No. III and V.

18.07.2015

(06:00Hrs to

11:00Hrs.)

11

20.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV i/c-V along with

100 MVA, 220/33/11

KV Power Transformer

No.V

Earthing of Bus &

line isolator

Load to be taken on

220/33/11 KV Power

Transformer No. III and IV.

20.07.2015

(06:00Hrs to

11:00Hrs.)

12

21.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV Tughlakabad Earthing of Bus &

line isolator

Load to be managed by

BRPL.

19.07.2015

(06:00Hrs to

11:00Hrs.)

13

22.07.2015

(09:30Hrs to

14:00Hrs.)

33 KV Capacitor Bank Earthing of Bus &

line isolator

22.07.2015

(09:30Hrs to

14:00Hrs.)

(Action by DTL)

Page 8: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 8 of 14

4.5 Proposed shutdown at 400kV Bamnauli Substation.

OCC approved the following shutdowns proposed by DTL at 400kV Bamnauli S/S:

S.

No. Proposed Date & time of S/D

Name of the feeder /

equipment

Work to be carried

out

Approved Date & time of S/D

1 28.07.15(06:00hrs to 11:00hrs) 220 KV DIAL-Ckt-1 CT &CVT Tan delta

testing and general

maintenance work.

05.08.15(06:00hrs to 11:00hrs)

2 29.07.15(06:00hrs to 11:00hrs) 220 KV DIAL-Ckt-2 06.08.15(06:00hrs to 11:00hrs)

3 30.07.15(06:00hrs to 11:00hrs) 220 KV PPK1 CKT2 16.08.15(06:00hrs to 11:00hrs)

(Action by DTL)

4.6 Proposed shutdown at 400kV Tikri Kalan Substation.

OCC approved the following shutdowns proposed by DTL at 400kV Tikri Kalan S/S:

S.

No.

Proposed Date &

time of S/D

Name of the feeder / equipment

Work to be carried out

Approved Date &

time of S/D

1 10.07.15(8:00Hrs. to

12:00Hrs.)

160MVA Tr. No.3 (Bay no. 213,

along with 66kV I/c-3) For preventive mtc work

10.07.15(8:00Hrs. to

12:00Hrs.)

2 09.07.15 (9:30Hrs.

to 12:00Hrs.)

220kV Bus Section 210A & 210B For rectification of faulty

configuration with M/s

Schneider Engineer

09.07.15 (9:30Hrs. to

12:00Hrs.)

3 09.07.15(13:30Hrs.

to 17:30Hrs.)

66kV Bus Section 615A & 615B 09.07.15(13:30Hrs. to

17:30Hrs.)

(Action by DTL)

5.0 Additional agenda points with the permission of the Chair.

5.1 Proposed shutdown at 220kV Sarita Vihar Substation.

OCC approved the following shutdowns proposed by DTL at 220kV Sarita Vihar S/S:

S.

No.

Proposed

date & time

of s/d

Name of the

feeder /

equipment

Work to be carried out

Remarks Approved

date & time

of s/d

1

10.07.15

(06:00 hrs to

13:00 hrs)

220 kV

B.T.P.S. Ckt –

I along with

220kvbus - I

To attend minor oil leakage of Y&B

ph. CTs, hot spots and to conduct

c&tan- delta test of line CVTs & CTs

and bus – I CVTs as per pms

Load to be taken on

B.T.P.S. Ckt –II&

pragati ckt-I.

10.07.15

(06:00 hrs to

11:00 hrs)

2

12.07.15

(06:00 hrs to

15:00 hrs)

100 MVA Tx -

II

To attend the oil leakages from oil

pumps, carrying out CFT test,

insulation resistance (IR), voltage

ratio, magnetizing current &

magnetizing balance test on

transformer as per pms

Load to be taken on 100

MVA tx –I. Excess load,

if any, to be managed by

bses.

12.07.15

(06:00 hrs to

11:00 hrs)

3

13.07.15

(06:00 hrs to

13:00 hrs)

220 kV

B.T.P.S. Ckt –

II along with

220kv bus - II

To attend oil leakage from CTs, red

hot spots of isolators and to conduct

c&tan- delta test of line CVTs & CTs

and bus – I CVTs as per pms

Load to be taken on

BTPS Ckt –I & pragati

ckt-I.

13.07.15

(06:00 hrs to

11:00 hrs)

Page 9: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 9 of 14

4

10.07.15

(14:00 hrs to

17:00 hrs)

66 kV DMRC

ckt – I

For attending various red hot spots

and to conduct C & tan- delta test of

line CVTs & CTs as per pms

Load to be taken on

DMRC ckt –II. Excess

load, if any, to be

managed by DMRC. 17.07.15

(00:00 hrs to

05:30 hrs) one

after one ckt. 5

13.07.15

(14:00 hrs to

17:00 hrs)

66 kV DMRC

ckt - II

To attend red hot spots and

conducting c&tan- delta test of line

CVTs & CTs as per pms

Load to be taken on

DMRC Ckt –II. Excess

load, if any, to be

managed by DMRC.

6

14.07.15(06:

00 hrs to

10:00 hrs)

66 kv mathura

road ckt -II

To attend various red hot spots of

CTs, CBs and line isolator and

conducting C& tan- delta test of line

CVTs & CTs as per pms

Load to be taken on

mathura road ckt -I .

Excess load, if any, to be

managed by bses.

14.07.15(06:00

hrs to 10:00

hrs)

7

14.07.15

(10:00 hrs to

13:00 hrs)

220 kV bus-

coupler

To attend the red hot spots and

conducting c& tan- delta test of CTs

as per pms

Nil 14.07.15

(10:00 hrs to

13:00 hrs)

8

15.07.15(06:

00 hrs to

15:00 hrs)

100 MVA Tx -

I

To attend the various red hot spots,

oil leakages from oil pumps and

carrying out CFT test, IR, Voltage

ratio, magnetizing current &

magnetizing balance test on

transformer as per pms

Load to be taken on 100

MVA Tx –II. Excess

load, if any, to be

managed by bses.

15.07.15(06:00

hrs to 11:00

hrs)

(Action by DTL)

5.2 Proposed shutdown at 220kV Narela.

OCC approved the following shutdowns proposed by DTL at 220kV Narela S/S:

S.

No.

Proposed Date &

time of S/D

Name of the feeder /

equipment

Work to be

carried out

Remarks Approved Date

& time of S/D

1 05.07.15 (06:00 to

11:00 Hrs.) 66KV Cap. Bank No.- II

To check &

attend Hot-

Spot

observed

during

Thermo-

scanning.

NIL Already availed

2 08.07.15 (06:00 to

12:00 Hrs.)

100MVA Trf. No.- II along

with 66KV I/C No.- II

Load will be shifted on

100MVA Trf. Nos.- I & III

08.07.15 (06:00

to 12:00 Hrs.)

3 11.07.15 (06:00 to

12:00 Hrs.) 220KV PANIPAT CKT.- II

Load will be shifted by

BBMB.

11.07.15 (06:00

to 12:00 Hrs.)

4 13.07.15 (06:00 to

11:00 Hrs.)

220KV DSIIDC BWN CKT.-

I

Load will be shifted on

220KV MANDOLA

CKTS.- I & II

13.07.15 (06:00

to 11:00 Hrs.)

5 15.07.15 (06:00 to

14:00 Hrs.)

220KV ROHTAK ROAD- II

ALONG WITH 220KV

BUS-II

Load will be shifted by

BBMB.

15.07.15 (06:00

to 14:00 Hrs.)

6 18.07.15 (06:00 to

12:00 Hrs.)

100MVA Trf. No.- I along

with 66KV I/C No.- I

Load will be shifted on

100MVA Trf. Nos.- II &

III

18.07.15 (06:00

to 12:00 Hrs.)

7 20.07.15 (06:00 to

10:00 Hrs.) 66KV BHALSWA CKT.- I

Load will be shifted by

TPDDL.

20.07.15 (06:00

to 10:00 Hrs.)

8 22.07.15 (06:00 to

14:00 Hrs.)

220KV ROHTAK ROAD- I

ALONG WITH 220KV

BUS-II

Load will be shifted by

BBMB.

22.07.15 (06:00

to 14:00 Hrs.)

9 25.07.15 (06:00 to

12:00 Hrs.) 220KV PANIPAT CKT.- I

Load will be shifted by

BBMB.

25.07.15 (06:00

to 12:00 Hrs.)

Page 10: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 10 of 14

10 27.07.15 (06:00 to

10:00 Hrs.)

100MVA Trf. No.- III along

with 66KV I/C No.- III

To check &

attend Hot-

Spot

observed

during

Thermo-

scanning.

Load will be shifted on

100MVA Trf. Nos.- I & II

27.07.15 (06:00

to 10:00 Hrs.)

11 29.07.15 (06:00 to

12:00 Hrs.) 220KV PANIPAT CKT.- III

Load will be shifted by

BBMB.

29.07.15 (06:00

to 12:00 Hrs.)

(Action by DTL)

5.3 Proposed shutdown at 400kV Bawana.

OCC approved the following shutdowns proposed by DTL at 400kV Bawana S/S:

S.

No.

Proposed

Date & time

of S/D

Name of the

feeder /

equipment

Work to be carried out

Remarks

Approved Date

& time of S/D

1

08.07.2015

(07.30Hrs to

13:00 Hrs)

315 MVA ,

400/220/33kV,

Transformer-3

To attend hot spot on Y & B

phase LV Bushing(Tem. 125)

No load will be affected

Load shall be shared on

ICT-1,2 4,5&6

08.07.2015

(07.30Hrs to

13:00 Hrs)

2

09.07.2015

(07.30Hrs to

13:00 Hrs)

315 MVA ,

400/220/33kV,

Transformer-4

To attend hot spot on 422-89 B

Isolator R & Y Phase dropper

jumper(Tem 115) ICT-4 side and

1489 L isolator

No load will be affected

Load shall be shared on

ICT-1,2 ,3,5&6

09.07.2015

(07.30Hrs to

13:00 Hrs)

3

11.07.2015

(07.30Hrs to

13:00 Hrs)

100MVA

Transformer

To attend hot spot on Bushing

clamp LV side R phase & 66kv

Incomer Isolator clamp R phase

CT side (Tem. 108)

Load will be meet through

220kv Kanjhwala Circuit

11.07.2015

(07.30Hrs to

13:00 Hrs)

4

13.07.2015

(07.30Hrs to

13:00 Hrs)

220kV SMB-II To attend hot spot on CT( B

Phase Temp 63), CB ( R Ph Temp

59& line Isolator Clamp( B Ph

Temp 95) & Bus - I Isolator

Clamp( R ph Temp 54)

Load will be meet through

220kv Shalimar Bagh-1

13.07.2015

(07.00Hrs to

11:00 Hrs)

5

14.07.2015

(07.30Hrs to

13:00 Hrs)

315 MVA ,

400/220/33kV,

Transformer-1

To attend hot spot on Y & B

phase LV Bushing(Tem. 98)

&420-89 B isolator R phase

dropper jumper

No load will be affected

Load shall be shared on

ICT-2 3,4,5&6

14.07.2015

(07.30Hrs to

13:00 Hrs)

6

15.07.2015 315 MVA ,

400/220/33kV,

Transformer-2

To attend hot spot on B phase

LV Bushing(Tem. 75)

No load will be affected

Load shall be shared on

ICT-1 3,4,5&6

15.07.2015

(Action by DTL)

Page 11: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 11 of 14

5.4 Proposed Shutdowns by Lines department, DTL.

OCC approved the following shutdowns proposed by DTL Lines division:

S.

No.

Proposed Date &

time of S/D

Name of the feeder /

equipment

Work to be carried out

Approved Date & time of S/D

1

10.07.15 & 11.07.15

daily basis (08:00

Hrs to 10:00Hrs.)

33kV Khyber Place

Ckt-I&II

S/D required for carrying

HTLS reconductoring work on

220kV Bamnuali-Naraina Ckts.

10.07.15 & 11.07.15 daily basis

(08:00 Hrs to 10:00Hrs.)

subject to approval by MES

2 12.07.15 (08:00 to

14:00Hrs.)

220kV SOW-Mandola

Ckt-III

To attend hot points on the line 12.07.15 (08:00 to 14:00Hrs.)

(Action by DTL)

5.5 Non-Reliable Supply from Dedicated Connection at DTL, 220KV GIS Sub-Station

Maharani Bagh under MLHT category.

DTL informed that due to frequent failure of supply from O/H feeder at 220kV S/Stn. Maharani

Bagh and to resolve the power Supply problem at this station, it was decided to get uninterrupted

power supply through dedicated connection from BSES. Accordingly, payment of Rs.

15089353/- was made by SSC-II Division DTL to BSES Rajdhani Power Ltd. in April 2009 for

providing 11 KV double connection under MLHT category at 220KV GIS S/Stn. Maharani

Bagh, i.e. one supply from the available O/H 11KV line and other one dedicated supply direct

from Kilokari Grid.

Dedicated supply connection from Kilokari Grid via CNG filling station Sarai Kale Khan was

completed by BRPL in 2013, but un-interrupted power supply from this dedicated feeder (U/g

cable) could not be achieved as supply failed 118 times (78Hrs.) during the period from April

2013 – March 2014, 87 times (505 Hrs.) during the period April 2014- March 2015 and 22 times

(14 Hrs.) from April 2015-till date. A lot of jerks & voltage Fluctuations were also been

observed and it is not good for smooth functioning of auxiliary system of the substation and very

importantly the S/Stn. data which needs to be send to SLDC, Minto Road for real time data

monitoring also gets effected.

DTL further informed the selection of HT switchgear of 11KV feeder and back feeding of O/H

feeder / underground cable feeder from 11KV HT switchgear at Maharani Bagh S/Stn. are being

frequently made by BSES staff as per their requirement.

DTL requested that the intent of 11KV dedicated supply connection may be completed by

providing the supply direct from Kilokari Grid to Maharani Bagh Substation without

tapping/termination from this dedicated feeder to avoid any disturbances due to frequent failure

of LT supply.

BRPL informed that they shall look into the issue and revert back in next OCC meeting.

However, a formal request for dedicated supply is required from DTL.

(Action by BRPL, DTL)

Page 12: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 12 of 14

5.6 Proposed Shutdowns at 220kV Patparganj S/S.

OCC deferred the following shutdowns proposed by DTL at 220kV Patparganj S/Stn. To

next OCC meeting:

S.

No.

Proposed Date & time

of S/D

Name of the feeder / equipment

Work to be carried out

1 11.07.15 09:00Hrs to

15.07.15 17:00Hrs

100MVA, 220/33KV TRANSFORMER

NO-IV

Replacement of outlived 245kv

circuit breaker

2 16.07.15 09:00Hrs to

19.07.15 17:00Hrs

100MVA, 220/33KV TRANSFORMER

NO-III ALONGWITH BUS-I

Replacement of outlived 245kv

circuit breaker

3 20.07.15 09:00Hrs to

23.07.15 17:00Hrs 220KV GEETA COLONY CKT-I

Replacement of outlived 245kv

circuit breaker

4 24.07.15 09:00Hrs to

27.07.15 17:00Hrs 220KV GEETA COLONY CKT-II

Replacement of outlived 245kv

circuit breaker

5 28.07.15 09:00Hrs to

31.07.15 17:00Hrs 220KV I.P. CKT-I

Replacement of outlived 245kv

circuit breaker

6 01.08.15 09:00Hrs to

04.08.15 17:00Hrs 220KV I.P. CKT-II

Replacement of outlived 245kv

circuit breaker

7 05.08.15 09:00Hrs to

08.08.15 17:00Hrs 220KV BUS-COUPLER

Replacement of outlived 245kv

circuit breaker

8 09.08.15 09:00Hrs to

12.08.15 17:00Hrs 220KV GAZIPUR

Replacement of outlived 245kv

circuit breaker

5.7 Proposed Shutdowns at 220kV I.P. S/S.

OCC deferred the following shutdowns proposed by DTL at 220kV I.P. S/Stn. To next OCC

meeting:

S.

No.

Proposed Date & time

of S/D

Name of the feeder /

equipment

Work to be

carried out

Remarks

1 10.07.15 094:00Hrs to

11.07.15 22:00Hrs 220kV Bus-I South Section

Bus bar

replacement

work

Load can be shifted on 220kV Bus-

II South Section

2 12.07.15 094:00Hrs to

13.07.15 22:00Hrs 220kV Bus-II South Section

Load can be shifted on 220kV Bus-

I South Section

3 14.07.15 094:00Hrs to

15.07.15 22:00Hrs 220kV Bus-I North Section

Load can be shifted on 220kV Bus-

II North Section

4 18.07.15 094:00Hrs to

19.07.15 22:00Hrs 220kV Bus-II North Section

Load can be shifted on 220kV Bus-

I North Section

6.0 Meeting ended with vote of thanks to the chair.

Page 13: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 13 of 14

Page 14: DELHI TRANSCO LIMITED Office of Dy. Gen. Mgr. (OS & Lines ...

MOM of OCC meeting dt. 07.07.15

Page 14 of 14