DeKalb Avenue Corridor Improvements Public Meeting AGENDA March 30, 2017 6:00 p.m. – 6:30 p.m. Open House/Public Input Activities Review Informational Boards Ask Questions Fill Out Comment Card 6:30 p.m. – 7:15 p.m. Project Overview Presentation Re-Visioning DeKalb Avenue What We Heard 7:15 p.m. – 7:45 p.m. Questions and Answers 7:45 p.m. – 8:00 p.m. Review Informational Boards Ask Questions Fill Out Comment Card
65

DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Jun 27, 2018

Download

Documents

vukhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

DeKalb Avenue Corridor ImprovementsPublic Meeting

AGENDAMarch 30, 2017

6:00 p.m. – 6:30 p.m. Open House/Public Input ActivitiesReview Informational Boards Ask QuestionsFill Out Comment Card

6:30 p.m. – 7:15 p.m. Project Overview PresentationRe-Visioning DeKalb AvenueWhat We Heard

7:15 p.m. – 7:45 p.m. Questions and Answers

7:45 p.m. – 8:00 p.m. Review Informational Boards Ask QuestionsFill Out Comment Card

Page 2: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

DeKalb AvenueCorridor Improvements

PUBLIC MEETING

Page 3: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Agenda

1 PROJECT OVERVIEW

2 RE-VISIONING DEKALB AVENUE

3 WHAT WE HEARD

4 QUESTIONS AND ANSWERS

Page 4: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Meeting PurposeShare Information About:

• Recap previous meeting

• What we heard

Obtain Input on:

• Concept cross sections and intersections

• Concerns and issues

Presenter
Presentation Notes
Sufficiency ratings are based on four separate factors. Structural evaluation (BIGGEST) Functional Obsolescence Essentiality for Public Use Special factors that may contribute An analysis based on these factors allows us to assign a sufficiency rating from 0 to 100. A score of 100 means the bridge is entirely sufficient. A score of 0 means it is entirely insufficient or deficient. In this case the substructure was previously scored a 4 out of 10, and that plays a major role in the structural integrity of the bridge.
Page 5: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

1 PROJECT OVERVIEW

Presenter
Presentation Notes
Page 6: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Renew Atlanta• $250 million infrastructure bond

• Approved by voters on March 17, 2015

• Over 80% of voters approved

• DeKalb Avenue identified as High Priority

• TSPLOST approved November 8, 2016 (includes a Multi-use trail from Inman Park to Rocky Ford Road)

www.renewatlantabond.com

Presenter
Presentation Notes
Sufficiency ratings are based on four separate factors. Structural evaluation (BIGGEST) Functional Obsolescence Essentiality for Public Use Special factors that may contribute An analysis based on these factors allows us to assign a sufficiency rating from 0 to 100. A score of 100 means the bridge is entirely sufficient. A score of 0 means it is entirely insufficient or deficient. In this case the substructure was previously scored a 4 out of 10, and that plays a major role in the structural integrity of the bridge.
Page 7: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

DeKalb Avenue Corridor Improvements

• Operational Improvements

• Complete Streets Improvements

• Resurfacing

• Traffic Signal and Communication Upgrades

Presenter
Presentation Notes
Sufficiency ratings are based on four separate factors. Structural evaluation (BIGGEST) Functional Obsolescence Essentiality for Public Use Special factors that may contribute An analysis based on these factors allows us to assign a sufficiency rating from 0 to 100. A score of 100 means the bridge is entirely sufficient. A score of 0 means it is entirely insufficient or deficient. In this case the substructure was previously scored a 4 out of 10, and that plays a major role in the structural integrity of the bridge.
Page 8: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Project Location

I-75

Presenter
Presentation Notes
Between Pineland Road and Hillside Drive Constructed in 1946 Construction based on old design standards based on smaller volumes of traffic
Page 9: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Purpose & Need StatementThe purpose of DeKalb Avenue corridor improvement is to provide a safe corridor for all modes of users: pedestrians, cyclists, vehicular traffic, buses, and rail.

Pedestrians: safe, improved sidewalks, updated pedestrian signals, crosswalks, and improved ADA accessibility

Cyclists: safe, marked, and attractive facilities

Vehicular Traffic: safe facility through resurfacing, improved signalization, left-turn lanes, and improved roadway signs

Buses: improving ease of ridership through better access and facilities (bus shelter, lighting, crosswalks)

Rail: improving ease of ridership through better access and facilities

Presenter
Presentation Notes
Sufficiency ratings are based on four separate factors. Structural evaluation (BIGGEST) Functional Obsolescence Essentiality for Public Use Special factors that may contribute An analysis based on these factors allows us to assign a sufficiency rating from 0 to 100. A score of 100 means the bridge is entirely sufficient. A score of 0 means it is entirely insufficient or deficient. In this case the substructure was previously scored a 4 out of 10, and that plays a major role in the structural integrity of the bridge.
Page 10: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

2 RE-VISIONING DEKALB AVENUE

Presenter
Presentation Notes
The Process – how did we get to the conceptual layout we’re showing you today?
Page 11: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Challenges• Reversible Lanes

• Narrow Sidewalks

• Pedestrian and Bicycle Facilities

• High Speed

• Commercial Parking

• Pavement Condition

• Signal Timing

• Left Turns

Presenter
Presentation Notes
Damage at concrete joint
Page 12: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Re-Visioning DeKalb Avenue

Page 13: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Re-Visioning DeKalb Avenue…..

Improved Quality of Life

Increased Pedestrian Mobility &

Safety

Increased Bicycle

Mobility & Safety

Improved Transit Access

Increased Safe

Pedestrian Crossings

Improved Traffic Signal

Operations

More Street

Lighting

Presenter
Presentation Notes
Damage at concrete joint
Page 14: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

3WHAT WE HEARD

Presenter
Presentation Notes
The Process – how did we get to the conceptual layout we’re showing you today?
Page 15: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Fact or Fiction?

• The design for DeKalb Avenue has been decided…….

• Input from the community/public will be incorporated in the DeKalb Avenue Corridor Improvement……..

Presenter
Presentation Notes
Damage at concrete joint
Page 16: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

CommentsBike Lanes – 69 comments• Add bike-friendly lanes• Use McLendon and Edgewood as bike routes

Turn lanes and Signals– 53 comments• Dedicated left turn lanes needed• Eliminate middle lane and make longer left turn lanes

Safety and Pedestrians – 51 comments• Design a safer roadway for all users• Pedestrian safety is critical• Better lighting

Presenter
Presentation Notes
Damage at concrete joint
Page 17: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

CommentsReversible Lanes – 24 comments• Confusing and end abruptly

• Unsafe

• Keep reversible lanes and adjust the traffic signals

• Concerned that travel time and congestion will get

worse if removed

Infrastructure Conditions- 17 comments• Sidewalk and roadway in bad condition

• Drainage issues

• Need resurfacing

Presenter
Presentation Notes
Damage at concrete joint
Page 18: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

CommentsComplete Streets – 16 comments• Top priority is a safe corridor

• Complete Streets should include left turn lanes, bike lane,

sidewalk, and easy access to public transit

• Support Complete Street, concern about implementation

• Think of the future transportation needs, trends, and

demographics

Presenter
Presentation Notes
Damage at concrete joint
Page 19: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

CommentsSpeed – 15 comments• Slow down traffic

• Cars currently drive too fast

Landscaping – 14 comments• Provide safety buffer

• Screen MARTA train/associated infrastructure&

improves visuals

• Provide shade

• Reduce Noise

Presenter
Presentation Notes
Damage at concrete joint
Page 20: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

CommentsTraffic – 8 comments• High traffic volume• Do not force traffic into neighborhoods• Utilize traffic calming devices

Quality of Neighborhood – 7 comments• Reduce noise pollution• Increase economic activity• Connect north and south neighborhoods• Beautification

Presenter
Presentation Notes
Damage at concrete joint
Page 21: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Not Viable OptionsBuild a raised pathway off of the existing MARTA

Pros• Separates Peds/Bike lanes from traffic

• Allows the capacity of the road to stay at current levels

Cons• Cost

• Access to elevated pathway

• Coordination with MARTA

• Utility relocations

• Existing wall is not tall enough or located along entire corridor

1.

Presenter
Presentation Notes
Damage at concrete joint
Page 22: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Not Viable OptionsBuild an elevated pathway in the center lane or south side of DeKalb Ave.

Pros• Separates Peds/Bike lanes from traffic

• Allows for large area and additional green space

Cons• Cost

• Access to elevated pathway

• Reduced traffic capacity

• Bridging over intersections

2.

Presenter
Presentation Notes
Damage at concrete joint
Page 23: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Not Viable OptionsMARTA gets relocated underground3.

Pros• Separates Peds/Bike

lanes from traffic• Allows for large area

and additional green space

Cons• Cost• Access to elevated

pathway• Coordination with

MARTA• Safety issues being

located next to active rail line

Presenter
Presentation Notes
Damage at concrete joint
Page 24: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

1. Go to http://DeKalbAve.participoll.com

2. Wait for the speaker to announce when it is time to enter your answer.

3. Choose the button on your screen that matches with the selection of your choice.

4. Stay on the web page for next poll. There will be a total of 7 polling opportunities.

Instructions for Polling

http://DeKalbAve.participoll.com/

Presenter
Presentation Notes
Damage at concrete joint
Page 25: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Typical Cross Section 50’ ROW Polling Options

2 travel lanes with separated bike lane

2 travel lanes, turn lane/median with separated bike lane

2 travel lanes, turn lane/median with on-street bike lanes

2 travel lanes with shared use path

2 travel lanes, turn lane/median with no bike lanes

http://DeKalbAve.participoll.com/

A

B

C

D

E

Page 26: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 27: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 28: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 29: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 30: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 31: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

A

Typical Cross Section 50’ ROWWhich section best represents what you feel the DeKalb Corridor should become?

2 travel lanes with separated bike lane

B. 2 travel lanes, turn lane/median with separated bike lane

C. 2 travel lanes, turn lane/median with on-street bike lanes

D. 2 travel lanes with shared use path

E. 2 travel lanes, turn lane/median with no bike lanes

http://DeKalbAve.participoll.com/

0A B C D E

B

C

D

E

Page 32: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Typical Cross Section 70’ ROW Polling Options

2 travel lanes, with median/turn lane, on-street parking and separate bike lane

2 travel lanes, with median/turn lane, and separate bike lane

2 travel lanes, with median/turn lane and on-street buffered bike lane

4 travel lanes, with median/turn lane

http://DeKalbAve.participoll.com/

A

B

C

D

Page 33: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 34: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 35: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 36: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford
Presenter
Presentation Notes
Damage at concrete joint
Page 37: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Typical Cross Section 70’ ROWWhich section best represents what you feel the DeKalb Corridor should become?

2 travel lanes, with median/turn lane, on-street parking and separate bike lane

2 travel lanes, with median/turn lane, and separate bike lane

2 travel lanes, with median/turn lane and on-street buffered bike lane

4 travel lanes, with median/turn lane

http://DeKalbAve.participoll.com/

0A B C D

A

B

C

D

Page 38: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Intersection Concept Polling Options

Traditional Signalized Intersection

Streetscape Signalized Intersection

Roundabout Intersection

http://DeKalbAve.participoll.com/

A

B

C

Page 39: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

A Krog Street Intersection Traditional Signalized Intersection

Page 40: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

B Krog Street Intersection Streetscape Signalized Intersection

Page 41: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

C Krog Street Roundabout Intersection

Page 42: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Krog Street Intersection Concept PollWhich intersection concept best represents what you feel the DeKalb Corridor should become?

Traditional Signalized Intersection

Streetscape Signalized Intersection

Roundabout Intersection

http://DeKalbAve.participoll.com/

0A B C

A

B

C

Page 43: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

A Moreland Ave. Intersection Traditional Signalized Intersection

Page 44: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

B Moreland Ave. Intersection Streetscape Signalized Intersection

Page 45: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

C Moreland Ave. Roundabout Intersection

Page 46: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Moreland Ave. NE Intersection Concept PollWhich intersection concept best represents what you feel the DeKalb Corridor should become?

Traditional Signalized Intersection

Streetscape Signalized Intersection

Roundabout Intersection

http://DeKalbAve.participoll.com/

0A B C

A

B

C

Page 47: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

A Clifton Road Intersection Traditional Signalized Intersection

Page 48: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

B Clifton Road Intersection Streetscape Signalized Intersection

Page 49: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

C Clifton Road Roundabout Intersection

Page 50: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Clifton Rd. Intersection Concept PollWhich intersection concept best represents what you feel the DeKalb Corridor should become?

http://DeKalbAve.participoll.com/

0A B C

Traditional Signalized Intersection

Streetscape Signalized Intersection

Roundabout Intersection

A

B

C

Page 51: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

A Arizona Ave. NE Intersection Traditional Signalized Intersection

Page 52: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

B Arizona Ave. NE Intersection Streetscape Signalized Intersection

Page 53: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

C Arizona Ave. NE Roundabout Intersection

Page 54: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Arizona Ave. NE IntersectionConcept PollWhich intersection concept best represents what you feel the DeKalb Corridor should become?

http://DeKalbAve.participoll.com/

0A B C

Traditional Signalized Intersection

Streetscape Signalized Intersection

Roundabout Intersection

A

B

C

Page 55: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

A Rocky Ford Rd. NE Intersection Traditional Signalized Intersection

Page 56: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

B Rocky Ford Rd. NE Intersection Streetscape Signalized Intersection

Page 57: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

C Rocky Ford Road NE Roundabout Intersection

Page 58: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Rocky Ford Rd. NE IntersectionConcept PollWhich intersection concept best represents what you feel the DeKalb Corridor should become?

http://DeKalbAve.participoll.com/

0A B C

Traditional Signalized Intersection

Streetscape Signalized Intersection

Roundabout Intersection

A

B

C

Page 59: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Present

•Present recommended concept

•Share next steps for implementation

Share

•Present what we heard

•Receive feedback from the community

Listen

•Project Overview

•Existing conditions

•Hear issues, concerns & ideas of the community

Community Engagement Process

WE ARE

HERE

Presenter
Presentation Notes
Damage at concrete joint
Page 60: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Schedule

Community Engagement

Presenter
Presentation Notes
REGAN The final concept will include an phasing plan. We’ll share that phasing strategy when we present the final concept to you later this spring. We’ll begin design in the second half of 2017 Construction will begin in early 2018 and, in some sections, may carry on into 2019.
Page 61: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Feedback

Presenter
Presentation Notes
Open the floor for questions. Invite everyone to view displays and talk to staff. Encourage everyone to submit their comments on the comment card.
Page 62: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

FeedbackWebsite: www.RenewAtlantaBond.com

Twitter: @RenewATL2015, #RenewATL

Email: [email protected]

Presenter
Presentation Notes
Open the floor for questions. Invite everyone to view displays and talk to staff. Encourage everyone to submit their comments on the comment card.
Page 63: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Subscribe to the Renew Atlanta Update Portal at

Feedback

www.RenewAtlantaBond.com

Presenter
Presentation Notes
REGAN To receive project updates and info about future public meetings, please sign up to the Renew Atlanta Update Portal
Page 64: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

4QUESTIONS AND ANSWERS

Visit informational boards & discuss with City of Atlanta representatives

Complete a comment card

Next Steps

Page 65: DeKalb Avenue Corridor Improvements Public Meeting …renewatlantabond.com/wp-content/uploads/2017/03/DeKalb-Avenue... · (includes a Multi -use trail from Inman Park to Rocky Ford

Project Decision Process• Technical analysis and evaluation: to determine

concept or alternatives for further evaluation (traffic studies, crash data, area growth, turning movements, etc)

• Public input on the concepts or alternatives

• Refinement of the technical analysis and evaluation: based upon public comment as well as additional engineering evaluation resulting in the recommended alternative(s).

• Additional public outreach on the recommended alternative(s)

• Recommendation is finalized and legislation for awarding contract is submitted for approval to City Council.