Top Banner
Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray Connie Burgo
9

Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

Apr 20, 2018

Download

Documents

phungque
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

Deep Energy Makeover for POSS Camp

Tanadgusix Corp.St. Paul, AK

Neil MurrayConnie Burgo

Page 2: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

St. Paul IslandPopulation ~500

Located about 750 air miles from Anchorage and 200 miles north of the Aleutian chain in the Bering Sea

Page 3: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

Tanadgusix Corporation (TDX) is an Alaska Native Village Corporation whose mission is to provide economic

well being for the Tanadgusix indigenous peoples and the current residents of St. Paul Island, Alaska

600+ employees across the US and internationally

Provides services to commercial, industrial, and public sectors:

• Hotels and Tourism• Alternative Energy• Electric Utilities• Power Plant O&M

• Wireless & Fiber Optic Technologies• Construction and Environmental Remediation• Marine Support Services• Satellite Technologies

Page 4: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

Our Vision80% of ALL energy consumed on St. Paul Island comes from renewable energy sources by 2025

The ProblemCurrently, 98% of all energy – fuel for electrical generation, heating, and transportation – comes from off-island

Page 5: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

POSS Camp

“Petroleum Offshore Supply Support” Camp

Initially built to support oil exploration programs in the 1980s

First Native-owned and operated independent wind-diesel hybrid plant in the US

• Built in 2000• Can run “diesels off”• Provides 34% of facility electrical and heating• Excess energy stored and used for heat

Page 6: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

Project Goals

Increase percentage of renewable energy on St. Paul

Utilize excess wind capacity to generate heat

Increase usable space in POSS Camp while significantly decreasing fossil fuel consumption

Training, employment, and educational opportunities for community members and outside investment on St. Paul

Page 7: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

POSS Camp ImprovementsBased on findings from 2015 energy audit

• Building envelope• Electrical upgrades• Wind to heat system• Energy efficiency improvements

Scheduled for summer 2018

Page 8: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

Wind Turbine InstallVestas V27 wind turbine

To be located near current turbines next to airport

Scheduled for summer 2019

Page 9: Deep Energy Makeover for POSS Camp – St. Paul, AK ·  · 2017-11-28Deep Energy Makeover for POSS Camp Tanadgusix Corp. St. Paul, AK Neil Murray ... • Power Plant O&M ... Reduce

Overall energy improvementReduce electricity use by approximately 54%

Reduce the thermal load of the existing heated space by 23%

Almost double the contribution of wind power (from 34% to 67%)

Reduce diesel fuel purchases by an estimated $239,000 per year - a net annual savings of nearly $200,000

Increased revenue from leasing the additional 28,000 square feet of climate-controlled space

Environmental benefits accrued from reducing the facility’s carbon emissions by 560 tons per year