DEEP C INDUSTRIAL ZONES Exploring Vietnam 2.0
ECONOMIC POWERHOUSES OF THE NORTH
10
10.96% 11.03%
8.12%
7.15%
8.90%10.18%
13.47%14.01%
16.27%16.68%
12.30% 12.06%
7.40%
7.50%
8.80%
11.00%
10.10% 10.20%
11.10%
12.10%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
18.00%
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Hanoi Ho Chi Minh city Hai Phong Da Nang Quang ninh Can Tho Vietnam
Hai Phong
Quang Ninh
ECONOMIC GROWTH OF HAIPHONG AND QUANG NINH COMPARED TO NATIONAL AVERAGE
2016 2017 2018 2019 National(2019)
HP QN HP QN HP QN HP QN
Economic Growth Rate 11.0% 10.1% 14.0% 10.2% 16.3% 11.1% 16.68% 12.1% 7.02%
Manufacturing Growth Rate
16.6% 20.35% 21.88% 4.95% NA 12.7% 25.06% 13.15 11.29%
Service Growth Rate 9.8% 10% 11.0% 14.5% 9.7% 14.2% 11.3% 13.1% 7.3%
Industrial Growth Rate 16.9% 13.07% 20.6% 7.5% 25.3% 9.8% 24.3% 13.5% 8.86%
GDP per Capita (USD) 2,661 4,050 2,963 4,528 3,587 5,110 5,300 6,131 2,587
Source: JETRO, Haiphong, Quang Ninh
INFRASTRUCTURE
13* Source: Hai Phong People Committee (2018, Socioeconomic report)
CHINA
JAN 2018
FEB 2019
HAIPHONG – HA LONG HIGHWAY (2018/9)
・Length: 25km・30 minutes to Halong・150km from Halong to the border of China
VAN DON – MONG CAI HIGHWAY (2020/4 COMPLETION)
・2019/4: Start of Construction・Length: 80km・Final Section to the China Border
POWER SUPPLY IN VIETNAM
38.12%
18.48%
35.06%
7.16%1.18%
Power Sources in Vietnam (2018)
Coal
Gas & Oil
Hydropower
Renewable Energy
Import17000
85000
75000
32000
70000
95000
0 20000 40000 60000 80000 100000
CENTRAL
SOUTH
NORTH
Power supply and demand in Vietnam (2017)
Supply Demand
› Vietnam will face severe power shortages from 2021: Ministry of Industry and Trade› Vietnam’s demand for electricity will exceed its supply by 6.6 billion kWh in 2021, increasing to 15
billion kWh by 2023
Source: EVN17
RENEWABLE ENERGY vs GRID supply
→ Supplement 50% of DEEP C’s electricity demand with renewable energy by 2030.
→ Target first wind and solar operational in Q3 2020.
DEEP C Quang Ninh I & II315 MVA
DEEP C Hai Phong I98 MVA
DEEP C Hai Phong II +121 MVA
DEEP C Hai Phong III97.5 MVA
EVNCoal-fired and
hydroelectricity
626 MVA
Solar farmsDEEP C HYBRID POWER
GRID
Excessive power for e-barge
Wind farms
Waste-to-energy Battery storage
Hydrogen storage
› Expected to complete within 2020
› Land area: 5,022m2
› Phase-able subject to demand
› Office for PO, Engineering, Land Reclamation
› Office space, meeting rooms, seminar room for rent
› Canteen, coffee shop, restaurants, ATM booths
DEEP C II SERVICE COMPLEX
INVESTMENT INCENTIVETax Incentives: Economic Zone Tax Package
22
Year 4 Year 15 Year 13
Economic zone incentive CIT=10%
Year 0
20%
Tax exemption 50% reduction of payable CIT
CIT=0% CIT=5% CIT=10%
4.35%
*Remark: Economic Zone Tax Package to be effective in DEEP C Quang Ninh from 2020
0
100
200
300
0
10
20
30
2019 2020 2021
GW
h
MW
/MW
p
Total Baseload MW Potential Solar MWp
Operational Solar MWp
SOLAR ENERGY
INDUSTRIAL SYMBIOSIS
› Treated water: 20,000m3/day
› Raw water: 20,000m3/day
› Waste water treatment: 12,000m3/day with ISO 9001 & 14001
› Recycled waste water for Nam Thuan cooling tower and PVTEX.
INDUSTRIAL SYMBIOSIS
› In cooperation with DOW Chemicals to build Plastic Road
› 200m in DEEP C II completed in Sep 2019, 1.2km to be completed in Nov 2019.
› Target: use plastic waste to cover the surface of road to create more durability.
FIRST PLASTIC ROAD IN VIETNAM
Partners5th Floor, Harbour View Office Tower12 Tran Phu Street, Ngo Quyen Dist., Haiphong, Vietnam
My Gia 4-8, 9 Vinhomes Dragon Bay, Ben Doan, Ha Long city, Quang Ninh
T: +84 225 3836 169F: +84 225 3859 [email protected]
30
THANK YOU FOR YOUR ATTENTION!