www.trcsolutions.com POWER ENGINEERING Webinar August 7, 2014 "Fossil Fuel Plant Retirement: Planning and Lessons Learned”
18

Decommissioning: The Benefits, Risks and Liabilities

Dec 18, 2014

Download

Environment

If your company is planning to retire a coal-fired power plant, you’ll need more information about decommissioning, decontamination and demolition. What are the risks, benefits and long-term liabilities? This presentation features a comprehensive discussion about the cost of decommissioning, the liabilities, the remediation and the opportunities for repurposing old sites.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 2: Decommissioning: The Benefits, Risks and Liabilities

Introduction to TRC

• TRC [TRR:NYSE] is a national energy, environmental

and infrastructure engineering and construction

management firm with $425M in sales and 3,000

professional and technical employees.

• TRC has been a partner to the utility sector since 1969

and derives 40% of its revenue from energy clients.

• Developed its RE POWER™ Program in 2007 - Over

Twenty Decommissioning Projects to Date.

2

Page 3: Decommissioning: The Benefits, Risks and Liabilities

Announced Power Plant Closures

Page 4: Decommissioning: The Benefits, Risks and Liabilities

Market Opportunities and Timing

• 150 Sites, 500 Boiler-Turbine Units

• Markets Started in Oil Burners on the Coasts

• Economic Drivers – Gas Prices and Heat Rate

• Regulatory Drivers – MATS, CSAPR, 316(b),

CCRs

• Peak Closure Years 2015-6

• $2B decommissioning market using EPRI

numbers

• Major Driver of Transmission Projects

Page 5: Decommissioning: The Benefits, Risks and Liabilities

Reserve Margins

5

Page 6: Decommissioning: The Benefits, Risks and Liabilities

www.trcsolutions.com

TRC RE POWER™ Initiative

• Created in 2007 to help generating companies transform

aging power plants through replacement, retirement, retrofit or

redevelopment

• Twenty-two projects, fifteen as Owner’s Engineer, five as

Prime Contractor and two as a Consultant

– Playbooks

– Engineering and construction management during decommissioning

– Turnkey solutions as prime contractor

• Working relationships with power utilities, independent power

national, asset recovery and abatement and demolition

contractors

6

Page 7: Decommissioning: The Benefits, Risks and Liabilities

RE POWER™ Project Goals

• Safety

– Protect the health and safety of workers and the public and third party

property.

• Environmental excellence

– Compliance with law and regulation, maximizing beneficial reuse of

building materials and real estate.

• Cost

– Maximizing asset recovery, managing carry and decommissioning

costs, recovering costs in regulated states and maximizing

redevelopment credits.

• Schedule

– Meet schedule commitments.

• Quality,

– Stakeholder requirements, including system reliability.

7

Page 8: Decommissioning: The Benefits, Risks and Liabilities

www.trcsolutions.com 8

Power Plant Retirement Business Models

• Retain Assets for Reuse as Generation or Transmission

• Retrofit for CSAPR, MATS, GHG Regulations

• Sell for Utility Use by Another Firm

• Sell for Redevelopment / Adaptive Use

• Sell for Scrap – Caveat Emptor

• Donations and Public-Private Partnerships with Local Government

• Declare Bankruptcy and Auction Sites

Page 9: Decommissioning: The Benefits, Risks and Liabilities

RE POWER™ Playbooks

It’s Best to Have a Plan

• Based on Existing Information

• Asbestos, Hazardous and Regulated Materials

• Transmission and Other Utilities

• Asset Valuation – Salvage, Scrap and Real Estate

• Permits

• Environmental Site Assessments

• Means and Methods Constraints

• Community and Stakeholder Relations

• Future Use Scenarios

• Cost Estimate

• Schedule

9

Page 10: Decommissioning: The Benefits, Risks and Liabilities

RE POWER™ Engineering During

Decommissioning

• Pre-demolition Surveys

• Plans and Specifications

• Commercial Requirements and Pricing Sheet

• Allocation of Risk

• Bid Package

• Work Plans

• Permit Applications

• Community and Stakeholder Relations

• Procurement Support Services

10

Page 11: Decommissioning: The Benefits, Risks and Liabilities

RE POWER™ Construction Support Services

• Project Management

• Site Management

• Contract Administration

• Change Management

• Health And Safety Inspections

• Environmental Coordination

• Project Documentation

11

Page 12: Decommissioning: The Benefits, Risks and Liabilities

Asset Recovery – Salvage and Scrap Metal

• Think about fair price for salvage equipment – what would you

pay for salvage equipment?

• Scrap quantities correlate well with steam capacity

• Average scrap steel prices have ranged from less than $200

to more than $400 per long ton for plate and structural steel,

prepared and delivered to mill or port.

• Copper quantities somewhat less predictable.

• American Metal Market and LME Published Indices

• Risk / reward options

– assign quantity and market risk to demolition contractor or share risk &

reward

– risk sharing based on open book or published index e.g. American Metals

Market plate & structural

12

Page 13: Decommissioning: The Benefits, Risks and Liabilities

Waterside Station, New York City

13www.trcsolutions.com

Page 14: Decommissioning: The Benefits, Risks and Liabilities

Austin Energy Holly Street

• TRC is Serving as Prime

Contractor for abatement,

demolition and restoration of this

570 MW power plant

• Prescriptive requirements, over

and above legal, regulatory and

commercial requirements

• Extensive community involvement,

35% M/WBE participation

• Future use is transmission and

waterfront park in Austin, TX

14www.trcsolutions.com

Page 15: Decommissioning: The Benefits, Risks and Liabilities

National Grid Portfolio

Far Rockaway

Barrett

Glenwood

Port Jefferson

15www.trcsolutions.com

Page 16: Decommissioning: The Benefits, Risks and Liabilities

New York Power Authority Poletti Station

• TRC provided permitting support for the new

NYPA 500 MW plant, Astoria Energy I & II,

totaling 1500 MW of CCGTs with air cooled

condensers

• TRC won competitive bid for engineering

during decommissioning of Poletti Station, an

825 MW Plant

– asset recovery

– pre-demolition surveys

– plans and specifications for bid

– procurement support

– engineer of record

– health, safety and environmental

inspections during decommissioning.

• LVI is performing abatement & demolition

16www.trcsolutions.com

Page 17: Decommissioning: The Benefits, Risks and Liabilities

17

PPL Hydroelectric Expansion

Geotechnical Study

• TRC was retained as the

geotechnical engineer-of-record to

execute a geotechnical investigation

associated with A 125 MW

expansion of PPL’s Holtwood hydro-

electric generating facility on the

Susquehanna River. The

investigation included a coal ash

landfill, which was subsequently

covered with 750,000 CY of rock

from the one-mile long channel

below the powerhouse.

www.trcsolutions.com

Page 18: Decommissioning: The Benefits, Risks and Liabilities

Questions?