Top Banner
Decking Installation Guide v20151224
20

Decking Installation Guide v20151224

Nov 05, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Decking Installation Guide v20151224

Decking Installation Guide

v20151224

Page 2: Decking Installation Guide v20151224

IMPORTANT: Read all sections before you startFor the most up to date information please visit our website @ www.newtechwood.com

Prior to installing any composite decking it is recommended that you check with local building codes for any special requirements or restrictions. The diagrams and instructions outlined in this guide are for illustration purposes only and are not meant or implied to replace a licensed professional. Any construction or use of NewTechWood must be in accordance with all local zoning and/or building codes. The consumer assumes all risks and liability associated with the construction and use of this product.

SafetyWhen dealing with any type of construction project it is necessary to wear appropriate safety equipment to avoid any risk of injuries. NewTechWood recommends but is not limited to the following safety equipment when handling, cutting, and installing NewTechWood: gloves, a respiratory protection, long sleeves, pants, and safety glasses.

ToolsStandard woodworking tools may be used. It is recommended that all blades have a carbide tip. Standard stainless steel or acceptable coated deck screws and nails are recommended.

EnvironmentA clean, smooth, flat, and strong surface is needed to install NewTechWood’s products correctly. Please check with local building codes before ever installing any type of decking. If installation does not occur immediately NewTechWood’s products need to be put on a flat surface at all times. Never ever should it be put on a surface that isn’t flat.

PlanningPlan a layout for your decking before starting it to ensure the best possible looking decking for your project. Building codes and zoning ordinances generally apply to permanent structures, meaning anything that is anchored to the ground or attached to the house. So nearly every kind of decking requires permits and inspections from a local building department. We recommend drawing out a site plan of your proposed project that you intend to do to minimize errors and make your perfect decking.

ConstructionNewTechWood UltraShield is NOT intended for use as columns, support posts, beams, joist stringers or other primary load-bearing members. NewTechWood must be supported by a code-compliant substructure. While NewTechWood products are great for retrofits NewTechWood’s products CANNOT be installed on existing decking boards.

StaticStatic build-up is a natural occurring phenomenon that can occur with many plastic products. Dry and windy environments may make this even more apparent, this all varies depending on the climate and age of the decking.

Ventilation NewTechWood products CANNOT be directly installed onto a flat surface. It must be installed onto a substructure, so there is adequate and unobstructed air flow under the decking to prevent excessive water absorption. A minimum of 4 inches of continuous net free area under the decking surface is required for adequate ventilation on all decking so air can circulate between adjacent members to promote drainage and drying.

v20151224

Page 3: Decking Installation Guide v20151224

Heat and FireExcessive heat on the surface of NewTechWood products from external sources such as but not limited to fire or reflection of sunlight from energy efficient window products. Low-emissivity (Low-E) glass can potentially harm NewTechWood products. Low-E glass is designed to prevent passive heat gain within a structure and can cause unusual heat build-up on exterior surfaces. This extreme elevation of surface temperatures, which exceeds that of normal exposure, can possibly cause NewTechWood products to melt, sag, warp, discolor, increase expansion/contraction, and accelerate weathering.

Current or potential NewTechWood customers that have concerns about possible damage by Low-E glass should contact the manufacturer of the product which contains Low-E glass for a solution to reduce or eliminate the effects of reflected sunlight.

All fasteners should be on their own independent joists, when two boards ends meet each other there must be a sister joist. The end of each board must sit on its own joist.

Use white chalk, straight boards, or string lines as templates for straight lines. NEVER USE COLORED CHALK. Colored chalk will permanently stain NewTechWood’s products and are highly not recommended.

All nails/screws that are face fixed should always be stainless steel. When face fixing always go in at least from the ends and width of the board by 1”1/2 as shown in Diagram 3.

90 degree angle

Composite Board

Joist

Fasteners When fastening NewTechWood’s products all screws that are face fastened should always be driven in at a 90 degree angle to the decking surface. Toe nailing/screwing should never be done to the products. An extra joist should be added if a 90 degree angle cannot be driven into the board.

Diagram 2

Diagram 3

1”1/2

1”1/2

Sister Joist

v20151224

Diagram 1

Page 4: Decking Installation Guide v20151224

Fasteners Continued

Always use screws designated for use with composite decking material. Always test the screws on a scrap piece of board to ensure the screws do not cause the surface of the decking to mushroom or bulge around the head of the screw. If it does cause this issue, change to a different brand of screw.

When choosing which screws/nails to use always check first with your local home centers and hardware stores to see if they have screws that are engineered specifically for composite wood. These screws/nails will always work and give NewTechWood’s products the best looking outcome, using other screws/nails that are not recommended for composite could potentially damage/harm the decking. If you are unsure which screw/nail to use contact your manufacturer for more information.

Recommend screws from other manufacturers:

1. Cap-tor xd screws by Starborn Industries

AcclimateAcclimating at least 2 days prior to installation is recommended

Acclimating the boards will get rid of any unwanted shrinkage issues seen during and after installation.

Note: Always remember when allowing the boards to acclimate at the job site it is important to put it on a flat and even surface. If put on an uneven surface there is a possibility that the boards could warp to the shape of the terrain.

v20151224

Sealant

NewTechWood recommends the following sealants to be used on cut ends:

1. Armorseal Rexthane by Sherwin-Williams2. Corothane I-Aliphatic by Sherwin-Williams

Routing

Solid boards can be routed for hidden fasteners to be placed in them as shown below.

Note: Boards should never be routed the entire length.

Fascia boards can also be routed to allow for expansion and contraction.

Page 5: Decking Installation Guide v20151224

v20151224

Storage

NewTechWood’s products always need to be stored on flat solid surfaces. Surfaces such as dirt and grass are not sufficient as they can move over time.

NewTechWood products shown above put on a flat surface on joists, this is the correct way for storage.

NewTechWood products shown above on an uneven surface which will make the products prone to warping and distortion.

NewTechWood products shown shown above can be on pedestals or jacks if the surface is uneven. Consult with the pedestal or jack manufacturer before using the product to ensure its compatibility with NewTechWood’s products

Page 6: Decking Installation Guide v20151224

FramingFirst, determine the decking span, that is , how far apart your joists will be.

The frame needs to be completely level before installing any boards.

Note: Adequate spacing in the joists is required to keep the deck boards from bending. Please review the chart on page 9 of this installation guide to see what spacing is required for your profile.

Maximum Decking Spans on Center-to-CenterMaximum Decking Spans on Center-to-CenterMaximum Decking Spans on Center-to-CenterMaximum Decking Spans on Center-to-CenterMaximum Decking Spans on Center-to-Center

Region Profile Dimensions Residential Span Commercial Span

North America South America South Africa

Europe South Korea

US07, Solid Board 5.5 x 0.9 inches 16 inches 12 inches

North America South America South Africa

Europe South Korea

US01, Grooved Solid Board 5.5 x 0.9 inches 16 inches 12 inches

North America South America South Africa

Europe South Korea

US02, Grooved Channeled Solid Board

5.5 x 0.9 inches 16 inches 12 inchesNorth America South America South Africa

Europe South Korea

UH02, Grooved Circle Hollow Board

5.5 x 0.9 inches 16 inches 12 inches

North America South America South Africa

Europe South Korea

UH07, Grooved Channeled Hollow Board

5.5 x 0.9 inches 16 inches 12 inches

North America South America South Africa

Europe South Korea

UH01, Grooved Channeled Square Hollow Board

5.5 x 0.9 inches 12 inchesOnly to be used for residential

Joist Spanning on Center-to-Center with Angled Decking InstallationsJoist Spanning on Center-to-Center with Angled Decking InstallationsJoist Spanning on Center-to-Center with Angled Decking Installations

Degree of Angle Dimensions Spacing

90 5.5 x 0.9 inches Refer to the above tables

60 5.5 x 0.9 inches 2 inches less than the stated above tables

45 5.5 x 0.9 inches 4 inches less than the stated above tables

30 5.5 x 0.9 inches 1/2 the distance stated in the above tables

v20151224

Page 7: Decking Installation Guide v20151224

Expansion and Contraction ValuesNewTechWood deck boards will experience expansion and contraction with changes in temperature. Expansion and contraction are most significant where extreme temperature changes occur. Fastening the deck planks according to the gapping requirements noted in the following table accommodates for this movement.

Length (Feet)

Installation Temperature (°F)

3.3 8.0 9.2 9.8 12 12.8 13.1 16 17.8  

32 1/16 1/8 7/8 7/8 13/64 7/32 7/32 17/64 19/64

Gap

41 3/64 53/64 1/8 9/64 11/64 3/16 3/16 15/64 1/4

Gap50 3/64 3/32 7/64 7/64 9/64 5/32 5/32 3/16 7/32

Gap59 1/32 49/64 25/32 3/32 7/64 1/8 1/8 5/32 11/64 Gap68 1/64 1/16 1/16 1/16 3/32 3/32 3/32 1/8 1/8

Gap

77 1/64 1/32 1/32 3/64 45/64 1/16 1/16 5/64 25/32

Gap

86 + Higher 1/64 1/64 1/64 1/64 1/32 1/32 1/32 1/32 1/32

Gap

Diagram 5

v20151224

If the country you are installing for cannot be found in the above tables a manual calculation can be done:

What you will need to know:

-Coefficient of Linear Expansion (CLE): 20.2 x 10E-6 inch/inch/ (℉)-Installation Temperature (℉)-Max or Minimum Temperature in your region (℉)

a. When installing at a low temperature always use the maximum temperature in your region to calculate b. When installing at a high temperature always use the minimum temperature in your region to calculate

-Length of the Board (inches)

Gapping = Coefficient of Linear Expansion (CLE, ℉) x Length of the Board (inches) x (Max. or Min. Temp. in your region - Installation Temp., ℉)

Note: If you are still unsure of what gapping to use contact the manufacturer and they will give you the correct gapping requirements based on your environment and area.

Page 8: Decking Installation Guide v20151224

Expansion and Contraction Values Continued

When installing boards one full length across the deck we recommended locking the board in the middle to allow for even expansion and contraction to take place on both ends as shown in Diagram 7.

Expansion and Contraction

Diagram 7

Expansion and Contraction Values Continued

When installing boards two boards are installed across the deck locking clips are recommended to be used at the butt joints to ensure proper gapping during expansion and contraction as shown in Diagram 8.

Note: When butt jointing boards sister joisting must be used so that each individual board is on its own joist to ensure that the board will not slide off the joist, failure to do so will void the warranty, as shown in Diagram 8.

Sister JoistLocking Clips

We recommend where there is a length of more than two boards needed to make the deck, a breaker board should be introduced as shown in Diagram 9.

Diagram 8

v20151224

Page 9: Decking Installation Guide v20151224

Ladder Joist

Breaker Board

Ladder Joist

Diagram 9

Diagram 10

Breaker Board InstallationDiagram 9 and 10 below show how framework and installation of the breaker board respectively.

Diagram 9 framework uses a ladder joist installation where the user is building a frame perpendicular for the board that will be running down it.

Note: The T-Clip can be used as a breaker board clip by cutting it in half as shown in Diagram 11.

T Clip

Note: Above view of completed breaker board with T-Clips cut in half.

v20151224

Diagram 11

Page 10: Decking Installation Guide v20151224

Maximum Spacing Center-to-Center on Stair Stringers and BullnoseMaximum Spacing Center-to-Center on Stair Stringers and BullnoseMaximum Spacing Center-to-Center on Stair Stringers and Bullnose

Profile Dimensions Spacing

US07 Solid Board 5.5 x 0.9 inches 12 inches

US01 Solid with Grooves 5.5 x 0.9 inches 12 inches

US33 Bullnose 5.5 x 0.9 inches 12 inches

36 inches minimum width with 4

stringers required

11 inch minimum depth

Stair Tread

Stringer

Minimum 13/64 inch gapping

Stair Tread InstallationReview Diagram 12 and the table below with the maximum spacing from center to center for stair tread installation.

Stair treads built with NewTechWood must meet requirements by the major national building codes. Consult your local municipality for specific requirements.

A minimum of four (4) stringers are required.

Overhang on a stair tread should not exceed more than 5/8 inch.

Note: Stair treads should only be installed using solid profiles. Using any type of hollow board for stair treads will not be warrantied.

Diagram 12

v20151224

Page 11: Decking Installation Guide v20151224

Bullnose InstallationUse the table on the previous page to determine the center to center spacing for the bullnose profile.

A minimum of four (4) stringers are required when installing the bullnose profile.

Overhang on a stair tread should not exceed more than 5/8inch.

Diagram 13

Diagram 14

Starting Accessory Installation:1. First determine how many boards your stair is going to take to finish (with clips) and then you can start to measure where the TC-5 starting clip will go. Use a white chalk line (NEVER USE COLORED CHALK) to ensure that all TC-5 starting clips are lined up on each joist.

Note: The bullnose profile can only cantilever 5/8 inch. If the bullnose profile cantilevers more than this the warranty will be void.

Bullnose Installation:1. Now take the bullnose profile and place it right over all the TC-5 starting clips and push down as show in Diagram 14.

2. Now that the TC-5 starting clips are inside the underside of the bullnose, the final step is to push forward to ensure that it secured into place.

Diagram 15

v20151224

Page 12: Decking Installation Guide v20151224

Bullnose Installation Continued: 3. Now take the next board and have it situated behind the bullnose profile as shown in Diagram16.

Diagram 16

4. Slide in the clips into the two grooves and glide them along until they are on their respective joists and then screwing down onto the joists as shown in Diagram 17 and 18.

Diagram 17

5. Finally, finish your last board by face fixing into the board at every joist as shown in Diagram 19.

Note: Remember to pre-drill before face fixing into the board. Also face fixing must happen at a 90 degree angle and must be at least 1” 1/2 by 1” 1/2 from the ends and the width of the board.

Diagram 18

Diagram 19

v20151224

Page 13: Decking Installation Guide v20151224

Bullnose Installation ContinuedDiagram 20 below shows a completed staircase from the side to get a better idea of how the final installation will look.

Stringer

Face Screw

Starting Clip

T-Clip

Riser

v20151224

Diagram 20

Page 14: Decking Installation Guide v20151224

FramingFirst, determine the decking span, that is , how far apart your joists will be.

The frame needs to be completely level before installing any boards.

Note: Adequate spacing in the joists is required to keep the deck boards from bending. Please review the chart on page 5 of this installation guide to see what spacing is required for your profile.

Decking InstallationWhen installing the deck the first and last board of your project will need to use a starting accessory. Every other board will use the hidden fastener for its installation.

Starting Accessory Installation:1. After calculating the decking span and making

the frame of your deck the first board is ready to be installed.

2. First pre-drill into the joist then fix the starting accessory into the joist as shown in Diagram 21.

Diagram 21

Starting Accessory Installation Continued:3. Then take your first board and push it into the starting accessory as shown in Diagram 22.

Option 1: T-Clip and Locking Clip Installation1. First slide the TC-1 and TC-2 clips into the grooves of the boards with screws facing up as show in Diagram 23.

Diagram 22

Diagram 23

Locking Clip T-Clip

v20151224

Page 15: Decking Installation Guide v20151224

T Clip and Locking Clip Installation Continued:2. After getting all the TC-1 and TC-2 clips into position above each respective joist, begin to fasten them from above as shown in Diagram 24 and 25.

Diagram 24

Diagram 25

3. The final installed clips should look like Diagram 26.

Diagram 26

Note: The fastest way of installation is by pushing all the boards together and then coming back and sliding the clips into the grooves from the side and then fixing from above.

Note: The locking clip is in the middle of Diagram 26 to show the expansion and contraction is happening in both directions. For more information on how to install the locking clips and their placement check page 9 of this installation guide.

Locking Clip

T Clip

v20151224

Page 16: Decking Installation Guide v20151224

Option 2: UltraLock System1. First slide the UL-1 and UL-2 clips into the

grooves of the boards at a 30-45 degree angle at their respective joists as shown in Diagram 27.

Diagram 27

3. Next, screw the clips into the joists using a 45 degree angle

Diagram 29

Note: Using hidden fasteners that are not manufactured by NewTechWood nor recommended by NewTechWood are not warranted. Use these fasteners at your own risk.

Diagram 28

2. Once the clip is in press down and the clip will be ready to install into the joists as shown in Diagram 27 & 28.

4. Once all clips are screwed down the next board will come in at a 30-45 degree angle and then pushed down into place as shown in Diagram 30.

Diagram 30

v20151224

Page 17: Decking Installation Guide v20151224

Option 2: UltraLock System Continued:

5. Repeat steps 1-4 until the deck is complete.

6. The final installed clips should look like Diagram 31.

Note: The locking clip is in the middle of Diagram 31 to show the expansion and contraction is happening in both directions. For more information on how to install the locking clips and their placement check page 9 of this installation guide.

Diagram 31

UL-1

UL-2

v20151224

Page 18: Decking Installation Guide v20151224

Fascia Board Installation

Installing against the width and length of decking1. The fascia should be installed on the rim board of the frame. The fascia should be installed as shown in

Diagram 32. The distance between screws must be less than or equal to 12 inches. Two screws must be used 1” 1/2 away from the ends

2. First pre-drill the holes for the fascia board. The fascia board should be drilled with bigger holes or routed to allow for expansion and contraction and fixed either at either end or in the middle as shown in Diagram 32. When fixing the bigger holes it is recommended to use washers.

3. The fascia board will be installed into the the block wood and through the joist.

Note: NEVER install the fascia by drilling into the decking ALWAYS install the fascia into the joist and ALWAYS pre-drill the fascia board

v20151224

Diagram 32

300 mm

12 inches

Page 19: Decking Installation Guide v20151224

v20151224

End Cap InstallationInstalling the end cap1. Place the end cap infront of the hollow boards

holes (UH02 or UH07) and push in as shown in Diagram 33.

Note: A mallet could be used as well to push in the end caps.

Diagram 33

Diagram 34

2. The final finish should look like Diagram 34 below.

Note: A dab of silicon (shown in Diagram 33) can be used on the end cap or inside the holes of the board in order to secure the end caps better.

Silicon

Page 20: Decking Installation Guide v20151224

Installation Guide v20151224

NewTechWood Ltd. 19111 Walden Forest Dr. Suite B Humble, TX 77346, USA

Toll Free in USA: 1-866-728-5273Tel: (+1) 281-570-6450Fax: (+1) 281-661-1167Email: [email protected]: www.newtechwood.com