DECivil GESTEC 1/67 /67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30) POWER POINT PRESENTATION IN 15min DISCUSSION IN 20-30 min B) 8 DAYS AFTER – A PDF REPORT BY E- MAIL
7

DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

Apr 21, 2015

Download

Documents

Internet User
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

DECivil

GESTEC

11/67/67

TE

CN

. D

E O

BR

AS

DE

EN

GEN

HA

RIA

Mest

rado e

m E

ngenhari

a C

ivil

PROBLEMS FOR ENGLISH SPEAKING STUDENTS

A) IN THE CLASS (FROM 10h45 TO 11h30)

• POWER POINT PRESENTATION IN 15min

• DISCUSSION IN 20-30 min

B) 8 DAYS AFTER – A PDF REPORT BY E-MAIL

Page 2: DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

DECivil

GESTEC

22/67/67

TE

CN

. D

E O

BR

AS

DE

EN

GEN

HA

RIA

Mest

rado e

m E

ngenhari

a C

ivil

PROBLEM A (Presentation March 14th)

DESCRIPTION OF3 MAJOR INOVATIONS IN

CONSTRUCTION TECHNOLOGY (BUILDINGS OR BRIDGES)

WITH REAL APPLICATIONS IN THE PAST 5 YEARS

Page 3: DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

DECivil

GESTEC

33/67/67

TE

CN

. D

E O

BR

AS

DE

EN

GEN

HA

RIA

Mest

rado e

m E

ngenhari

a C

ivil

PROBLEM B (Presentation April 11th )

1. Description of the building technology for a submerged undersea precast tunnel.

2. Durability procedures for the concrete elements

Page 4: DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

DECivil

GESTEC

44/67/67

TE

CN

. D

E O

BR

AS

DE

EN

GEN

HA

RIA

Mest

rado e

m E

ngenhari

a C

ivil

PROBLEM C (Presentation May 2nd)A BUILDING WAS BUILT WITH

SHALLOW FOUDATION IN A SOFT SOIL FOUNDATION (NEXT FIGURE)

AFTER SOME TIME IT BEGAN TO TILT

a)SOLUTIONS TO STOP THE TILTING

b) SOLUTIONS TO PUT IT VERTICAL

Page 5: DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

DECivil

GESTEC

55/67/67

TE

CN

. D

E O

BR

AS

DE

EN

GEN

HA

RIA

Mest

rado e

m E

ngenhari

a C

ivil

Foundation

FUNDAÇÕES DIRECTAS CORRENTESFUNDAÇÕES DIRECTAS CORRENTES

Land fill (5m)

Soft soil (mud) (10m)

Rock

PROBLEM C

Page 6: DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

DECivil

GESTEC

66/67/67

TE

CN

. D

E O

BR

AS

DE

EN

GEN

HA

RIA

Mest

rado e

m E

ngenhari

a C

ivil

PROBLEM D (Presentation May 16th)

COLLAPSE OF THE SCAFOLDING DURING CONCRETING OF A BRIDGE

DECK FORMWORK

a)POSSIBLE CAUSES

b)WHAT TO CONTROL TO PREVENT ACCIDENTS

c) WHAT TO INSPECT TO FIND THE CAUSES

Page 7: DECivil GESTEC 1/67 TECN. DE OBRAS DE ENGENHARIA Mestrado em Engenharia Civil PROBLEMS FOR ENGLISH SPEAKING STUDENTS A) IN THE CLASS (FROM 10h45 TO 11h30)

DECivil

GESTEC

77/67/67

TE

CN

. D

E O

BR

AS

DE

EN

GEN

HA

RIA

Mest

rado e

m E

ngenhari

a C

ivil

PROBLEM D