Transcript
Page 1: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

Arizona Canal Multiuse Path Improvements

Chaparral Road to Indian Bend Wash

December 6, 2012Public Meeting

Page 2: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

AZ Canal Multiuse Path

Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to the Indian Bend Wash

Project also includes: Pedestrian Bridges Neighborhood Connections Landscaping Lighting Public Art

Page 3: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

AZ Canal Multiuse Path

Enhance mobility for bicyclists and pedestrians throughout the region

Provide connectivity to Papago Park, the Phoenix Zoo, the Desert Botanical Gardens, Tempe Town Lake and the Indian Bend Wash path system

The cities of Tempe, Phoenix and Scottsdale have been working to complete a 17-mile regional pathway system

Once constructed, this project will complete Scottsdale’s portion of the 17-mile loop

Total Project Budget of approximately $4M

Page 4: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

Project Team Olsson Associates and Jody Pinto

Partnership between the City of Scottsdale, Salt River Project and Scottsdale Public Art

Includes Federally Funding Congestion Mitigation and Air Quality Funds Follow the Federal Process Required Clearances Min. 2 year Design Process

AZ Canal Multiuse Path

Page 5: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

AZ Canal Multiuse Path

Page 6: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

AZ Canal Multiuse Path

Page 7: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

AZ Canal Multiuse Path

Page 8: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

AZ Canal Multiuse Path

Page 9: December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

Next Steps Develop Master Plan and Artist concepts Second Public Meeting – Winter 2013 Design Review Board – Winter/Spring 2013

Project Schedule Complete design – Summer 2014 Start construction – Fall 2014

AZ Canal Multiuse Path