December 2020 ACS Rail Updates Welcome to the December 2020
edition of ACS Rail updates. The following pages contain summaries
of updates which may be relevant to you. Please brief and
distribute this information to the relevant people as per your
internal procedures. We have included on the last page of this
newsletter our Bridgeway Calendar for 2021/22 which includes
Network Rail Periods and Week Numbers. We hope that you may find
this useful. The past year has been very tough for everyone with
lots of changes to the way we work. We would like to wish all our
clients a safe Happy Christmas and hope for a better New Year for
us all. The ACS Team Content Page Changes to Network Rail Standards
2
Making sure you are aware of the relevant
standards......................................................................................................................
2 Welcome to the Network Rail Standards Portal
...............................................................................................................................
2 New and Up-Issued Standards
........................................................................................................................................................
3 Withdrawn, Closed and Superseded Documents
.............................................................................................................................
5 Emergency Changes (Previously Known as Letters of Instruction)
..................................................................................................
7
RSSB - Standards and the rail industry 9 Railway Group Standards
(RGSs)
...................................................................................................................................................
9 Rule Book (GE/RT8000)
.................................................................................................................................................................
9 Rule Book App
................................................................................................................................................................................
9 GE/RM8000 Master Module Manual
...............................................................................................................................................
9
Controlled Document List 05 December 2020 10 Network Rail Safety
Central – Information Section 23
Code of Conduct
...........................................................................................................................................................................
23 Network Rail Safety Bulletins
........................................................................................................................................................
23 Lessons Learnt / Shared Learning
.................................................................................................................................................
23 Health & Wellbeing
........................................................................................................................................................................
24 Risk Management
.........................................................................................................................................................................
24 Safety Films
..................................................................................................................................................................................
24 Resource Library
...........................................................................................................................................................................
24 SCO 24:7 (Supply Chain – Operations) Telephone
.......................................................................................................................
24 Emergency
....................................................................................................................................................................................
24 To report a crime
...........................................................................................................................................................................
24 Coronavirus (COVID -19)
..............................................................................................................................................................
25
Useful Links 26 Other Bulletins 29
Track Safety
Alliance.....................................................................................................................................................................
29 Southern
Shield.............................................................................................................................................................................
29
Safety 3-4-3 and Fleet 3-4-3 39 Bridgeway Rail Calendar 2021/22
40
BRIEFING REQUIREMENTS: NOTE: Contractors are responsible for
arranging and undertaking and recording their own Safety
and Awareness Briefings in accordance with their own processes
and procedures.
-
Standards Updates
December 2020 ACS Rail Updates Page 2 of 40
Changes to Network Rail Standards Issue 118: 05th December 2020
– 05th March 2021 Making sure you are aware of the relevant
standards Every employee has a duty to comply with any mandatory
Network Rail company standards and procedures relevant to their
role. It is vital therefore that all employees are aware of which
standards are relevant to their area of work, and where to find
them.
Welcome to the Network Rail Standards Portal
https://global.ihs.com/csf_home.cfm?&csf=NR This site
provides access to Network Rail standards. These are made freely
available to all Network Rail suppliers and partner organisations
through the use of a membership function. For this access you will
need to do the following:
• Create an online account by clicking My Account and selecting
Create New Account. • Search for the standard(s) that you wish to
obtain and click Add to Cart • When you have finished shopping,
click on Cart then click on View Shopping Cart • In the Membership
Information section of the shopping cart, enter your Company
Registration Number in the Membership# box and click the Add
button At that point, a 100% discount will be applied to your
order, and you may proceed to checkout. All first time users will
need to be verified for eligibility before receiving the
standard(s) ordered. This may take up to seven days. Once your
eligibility has been verified you will receive an e-mail with a
link to the PDF of the standard. NOTE: Organisations with access to
the online collection of Network Rail Standards delivered via IHS
Markit’s Engineering Workbench platform should continue to access
standards via that service. Other Information
Network Rail Standards Subscriptions IHS Global Ltd Phone: 01344
328000 or email [email protected] Network Rail Standards
& Controls Publications Manager Neil Whitaker Phone: 01908
782564 Network Rail Standards Hard Copy Document Centre IHS Retail
Phone: 01344 328039 Fax: 01344 328005 or email: [email protected]
Railway Group Standards Rail Safety & Standards Board Enquiry
Desk Phone: 020 3142 5400 Website www.rssb.co.uk Network Rail
Technical Drawings National Records Group Email:
[email protected]
You must make sure that the team and the activities for which
you are responsible comply with the Network Rail company standards
and procedures. By doing this, you will be complying with the
Network Rail Health & Safety Management System and relevant
legislation. The following pages contain summary extracts of the
changes / new issue to the Network Rail Company Standards which may
be relevant to you.
https://global.ihs.com/csf_home.cfm?&csf=NRmailto:[email protected]:[email protected]://www.rssb.co.uk/mailto:[email protected]
-
Standards Updates
December 2020 ACS Rail Updates Page 3 of 40
New and Up-Issued Standards Issue 118 - 05 December 2020
References Title Replaces
NR/GN/CIV/100 Issue 1 Strategic Design Manual New at Issue
118
NR/GN/CIV/200 Issue 1 Station Design Manual New at Issue 118
NR/GN/CIV/300 Issue 1 Compliance Design Manual New at Issue
118
NR/GN/CIV/400 Issue 1 Operational Property Design Manual New at
Issue 118
NR/L1/ADG/004 Issue 1 Geospatial Referencing New at Issue
118
NR/L1/ELP/27000 Issue 3 Policy Requirements for Electrical Power
Assets NR/L1/ELP/27000 Issue 2
NR/L1/INF/02230 Issue 3 Corporate Archive Policy NR/L2/INF/02230
Issue 2
NR/L2/ELP/21090 Issue 1 OLE Seasonal Preparation Response for
Extreme Weather New at Issue 118
NR/L2/ELP/23002 Issue 1 Specification for High Voltage AC
Cables, AC Traction Earthing and Bonding Cables
DC Traction Cables, Pilot Cables and Associated Accessories
New at Issue 118
NR/L2/ELP/27023 Issue 1 Conductor Rail Heating Standard New at
Issue 118
NR/L2/ELP/27800 Issue 1 Specification for 25 kV a.c. Earthing
Pantographs and Interface with Vehicle (On Track Plant or Road Rail
Vehicles)
New at Issue 118
NR/L2/INI/P3M/107 Issue 1 Contingency Management for Capital
Delivery Projects, Programmes, and Portfolios
New at Issue 118
NR/L2/OHS/019 Issue 10 Safety of People at Work On or Near the
Line NR/L2/OHS/019 Issue 9
NR/L2/OHS/032 Issue 2 Training, Competence and Assessment in
Accident and Incident Investigation
NR/SP/CTM/032 Issue 1
NR/L2/OHS/069 Issue 3 Lineside Facilities for Personnel Safety
RT/CE/S/069 Issue 2
NR/L2/OHS/501 Issue 2 Trackworker Protection and Warning Systems
NR/SP/OHS/501 Issue 1
NR/L2/OTK/5201 Issue 5 Lineside Vegetation Management Manual
NR/L2/OTK/5201 Issue 4
NR/L2/RMVP/01327 Issue 2 Maintenance Facilities for Rail
Vehicles NR/L2/RVE/01327 Issue 1
NR/L2/RSE/0005 Issue 5 Product Design for Reliability
NR/L2/RSE/0005 Issue 4
NR/L2/SIG/10160 Issue 3 Specification for Application of the
IRSE Licensing Scheme NR/L2/SIG/10160 Issue 2
NR/L2/SIG/11201 Issue 12 Signalling Design Handbook
NR/L2/SIG/11201 Issue 11
NR/L2/SIG/14201 Issue 5 Signalling Risk Assessment Handbook
NR/L2/SIG/14201 Issue 4
NR/L2/SIG/19812 Issue 2 Cross Track Cable Management
NR/SP/SIG/19812 Issue 1
NR/L2/SIG/19820 Issue 6 Signalling and Level Crossing Product
Specifications NR/L2/SIG/19820 Issue 5
RT/E/S/10062 Issue 1
NR/L2/SIG/30009 Issue 19 Signalling Principles Handbook
NR/L2/SIG/30009 Issue 18
NR/L2/SIG/30014 Issue 17 Signalling Works Testing Handbook
NR/L2/SIG/30014 Issue 16
NR/L2/SIG/31000 Issue 1 Provision of Off-Grid Power Supply for
Signalling and Level Crossings
New at Issue 118
NR/L2/TEL/30066 Issue 8 Clearance from Fixed Radio Frequency
Transmitters NR/L2/TEL/30066 Issue 7
NR/L2/TRK/001 Issue 16 Inspection and Maintenance of Permanent
Way NR/L2/TRK/001 Issue 15
NR/L2/TRK/2500 Issue 4 Engineering Assurance Arrangements for
the Design and Construction of Track
NR/L2/TRK/2500 Issue 3
NR/L2/TRK/6100 Issue 4 The Installation and Maintenance of
Stretcher Bars NR/L2/TRK/6100 Issue 3
NR/L2/XNG/001 Issue 3 Provision and Risk Management of Level
Crossings NR/L2/OPS/100 Issue 2
NR/L3/ELP/27237 Issue 21 Overhead Line Work Instructions
NR/L3/ELP/27237 Issue 20
NR/L3/ELP/27240 Issue 11 Distribution Work Instructions
NR/L3/ELP/27240 Issue 10
NR/L3/INV/3001 Issue 6
Reporting and Investigation Manual
NR/L2/INV/002 Issue 13
NR/L3/INV/3001 Issue 5
NR/SP/RSC/01702 Issue 1
NR/L3/MTC/OTP0233 Issue 1 Rail Grinding Through Obstacles and
Lineside Furniture Areas (in traffic)
New at Issue 118
NR/L3/MTC/RCS0216 Issue 19 Risk Control Manual NR/L3/MTC/RCS0216
Issue 18
NR/L3/OPS/045 Issue 12 National Operating Procedures Index
NR/L3/OPS/045 Issue 11
NR/L3/OPS/045 Issue 13 National Operating Procedures Index
NR/L3/OPS/045 Issue 12
NR/L3/OPS/045 Issue 14 National Operating Procedures Index
NR/L3/OPS/045 Issue 13
NR/L3/SCO/204 Issue 1 Switches and Crossings Recycling Process
New at Issue 118
NR/L3/SCO/313 Issue 9 On-Track Machines (OTMs) Driver and
Operations Standards Manual
NR/L3/SCO/313 Issue 8
NR/L3/SIG/10064 Issue 9 General Instructions to Staff Working on
S&T Equipment NR/L3/SIG/10064 Issue 8
NR/L3/SIG/10661 Issue 20 Signalling Maintenance Task Intervals
NR/L3/SIG/10661 Issue 19
-
Standards Updates
December 2020 ACS Rail Updates Page 4 of 40
NR/L3/SIG/10663 Issue 12 Signal Maintenance Specifications
NR/L3/SIG/10663 Issue 11
NR/L3/SIG/10665 Issue 19 Reliability Centred Maintenance of
Signalling Equipment NR/L3/SIG/10665 Issue 18
NR/L3/SIG/11231 Issue 15 Signal Maintenance Testing Handbook
NR/L3/SIG/11231 Issue 14
NR/L3/TEL/30181 Issue 5
Telecoms Maintenance Work Instructions Handbook
NR/L2/TEL/30117 Issue 2
NR/L2/TEL/30119 Issue 2
NR/L2/TEL/30121 Issue 2
NR/L2/TEL/30120 Issue 2
NR/L3/TEL/30181 Issue 4
NR/L3/TRK/003 Issue 34 Index of Track Engineering Forms
NR/L3/TRK/003 Issue 33
NR/L3/TRK/055 Issue 4 Work Instructions for Ultrasonic Rail
Testing NR/L3/TRK/055 Issue 3
NR/L3/TRK/063 Issue 2 Recycling and Reuse of Switches &
Crossings RT/CE/S/063 Issue 1
NR/L3/TRK/3418 Issue 1 Repair of Concrete Bearer and Sleeper
Fastening Systems and Bearer Joints
New at Issue 118
NR/L3/TRK/7012 Issue 1 Critical Rail Temperature Management for
Projects NR/PRC/MPI/TK0022 Issue 1
-
Standards Updates
December 2020 ACS Rail Updates Page 5 of 40
Withdrawn, Closed and Superseded Documents
References Title Replaced by/Status
NR/L1/ELP/27000 Issue 2 Asset Management Policy for Electrical
Power Assets NR/L1/ELP/27000 Issue 3
NR/L2/INF/02230 Issue 2 Corporate Archive Policy NR/L1/INF/02230
Issue 3
NR/L2/INV/002 Issue 13 Accident and Incident Reporting and
Investigation NR/L3/INV/3001 Issue 6
NR/L2/MTC/CP008 Issue 3 COVID-19 Works Contingency Plan
Withdrawn
NR/L2/OHS/019 Issue 9 Safety of People Working on or Near the
Line NR/L2/OHS/019 Issue 10
NR/L2/OPS/100 Issue 2 Provision, Risk Assessment and Review of
Level Crossings NR/L2/XNG/001 Issue 3
NR/L2/OTK/5201 Issue 4 Lineside Vegetation Management Manual
NR/L2/OTK/5201 Issue 5
NR/L2/RSE/0005 Issue 4 Product Design for Reliability
NR/L2/RSE/0005 Issue 5
NR/L2/RVE/01327 Issue 1 Depot Facilities NR/L2/RMVP/01327 Issue
2
NR/L2/SIG/10160 Issue 2 Signal Engineering: Implementation of
IRSE Licensing Scheme - the Route to Competence
NR/L2/SIG/10160 Issue 3
NR/L2/SIG/11201 Issue 11 Signalling Design Handbook
NR/L2/SIG/11201 Issue 12
NR/L2/SIG/14201 Issue 4 Signalling Risk Assessment Handbook
NR/L2/SIG/14201 Issue 5
NR/L2/SIG/19820 Issue 5 Signalling and Level Crossing Product
Specifications NR/L2/SIG/19820 Issue 6
NR/L2/SIG/30009 Issue 18 Signalling Principles Handbook
NR/L2/SIG/30009 Issue 19
NR/L2/SIG/30014 Issue 16 Signalling Works Testing Handbook
NR/L2/SIG/30014 Issue 17
NR/L2/TEL/30066 Issue 7 Signalling and Telecommunications
Telecoms Clearance for Fixed Transmitters
NR/L2/TEL/30066 Issue 8
NR/L2/TEL/30117 Issue 2 Specification for the Maintenance of
Help Points NR/L3/TEL/30181 Issue 5
NR/L2/TEL/30119 Issue 2 Specification for the Maintenance of
Public Address PCs NR/L3/TEL/30181 Issue 5
NR/L2/TEL/30120 Issue 2 Specification for the Maintenance of
Public Address Systems NR/L3/TEL/30181 Issue 5
NR/L2/TEL/30121 Issue 2 Specification for the Maintenance of
Recorded Announcement Equipment
NR/L3/TEL/30181 Issue 5
NR/L2/TRK/001 Issue 15 Inspection and Maintenance of Permanent
Way NR/L2/TRK/001 Issue 16
NR/L2/TRK/2500 Issue 3 Engineering Assurance Arrangements for
Track Engineering Projects
NR/L2/TRK/2500 Issue 4
NR/L2/TRK/6100 Issue 3 The Installation and Maintenance of
Stretcher Bars NR/L2/TRK/6100 Issue 4
NR/L3/ELP/27237 Issue 20 Overhead Line Work Instructions
NR/L3/ELP/27237 Issue 21
NR/L3/ELP/27240 Issue 10 Distribution Work Instructions
NR/L3/ELP/27240 Issue 11
NR/L3/INV/3001 Issue 5 Reporting and Investigation Manual
NR/L3/INV/3001 Issue 6
NR/L3/MTC/CP007 COVID-19 Contingency Plan - Relaxation of
Specific Red Clauses, Extending Occupational
Competence and Prioritising Maintenance Activities
Withdrawn
NR/L3/MTC/RCS0216 Issue 18 Risk Control Manual Issue
NR/L3/MTC/RCS0216 Issue 19
NR/L3/OPS/045 Issue 11 National Operating Procedures Index
NR/L3/OPS/045 Issue 12
NR/L3/OPS/045 Issue 12 National Operating Procedures Index
NR/L3/OPS/045 Issue 13
NR/L3/OPS/045 Issue 13 National Operating Procedures Index
NR/L3/OPS/045 Issue 14
NR/L3/SCO/313 Issue 8 On-Track Machines (OTMs) Driver and
Operations Standards Manual
NR/L3/SCO/313 Issue 9
NR/L3/SIG/10064 Issue 8 General Instructions to Staff Working on
S & T Equipment NR/L3/SIG/10064 Issue 9
NR/L3/SIG/10661 Issue 19 Signalling Maintenance Task Intervals
NR/L3/SIG/10661 Issue 20
NR/L3/SIG/10663 Issue 11 Signal Maintenance Specifications
NR/L3/SIG/10663 Issue 12
NR/L3/SIG/10665 Issue 18 Reliability Centred Maintenance of
Signalling Equipment NR/L3/SIG/10665 Issue 19
NR/L3/SIG/11231 Issue 14 Signalling Maintenance Testing Handbook
NR/L3/SIG/11231 Issue 15
NR/L3/TEL/30181 Issue 4 Telecommunications Maintenance Work
Instructions Handbook NR/L3/TEL/30181 Issue 5
NR/L3/TRK/003 Issue 33 Index of Track Engineering Forms
NR/L3/TRK/003 Issue 34
NR/L3/TRK/055 Issue 3 Work Instructions for Ultrasonic Rail
Testing NR/L3/TRK/055 Issue 4
NR/PRC/MPI/TK0022 Issue 1 Critical Rail Temperature (CRT)
Management Plan NR/L3/TRK/7012 Issue 1
NR/PS/ELP/21101 Issue 1 Track Cable for DC Electrified Lines
NR/L2/ELP/23002 Issue 1
NR/SP/CTM/032 Issue 1 Training, Competence and Assessment in
Accident and Incident Investigation
NR/L2/OHS/032 Issue 2
NR/SP/OHS/501 Issue 1 Track Warning Systems NR/L2/OHS/501 Issue
2
-
Standards Updates
December 2020 ACS Rail Updates Page 6 of 40
NR/SP/RSC/01702 Issue 1 Actions in Response to Confidential
Incident Reporting and Analysis System (CIRAS) Reports
NR/L3/INV/3001 Issue 6
NR/SP/SIG/19812 Issue 1 Cross Track Cable Management
NR/L2/SIG/19812 Issue 2
RT/CE/S/063 Issue 1 Serviceable Switches and Crossings
NR/L3/TRK/063 Issue 2
RT/CE/S/069 Issue 2 Lineside Facilities For Personal Safety
NR/L2/OHS/069 Issue 3
RT/E/S/10062 Issue 1 Requirement Specification for Performance
of Long Range Colour Light Signals
NR/L2/SIG/19820 Issue 6
--``
-
Standards Updates
December 2020 ACS Rail Updates Page 7 of 40
Emergency Changes (Previously Known as Letters of Instruction)
To access any active Emergency Change you need to refer to its
associated Network Rail Standard. The front page of the standard
will provide details of the relevant change. When using the online
service there will be an active link to each relevant change.
Historic changes (where text has been crossed out) will be removed
next publication. Please note, some changes may stay current after
the stated Expiry Date
Reference Title Issue Date
NR/BS/LI/456 Standard/control document affected: NR/L3/ELP/21067
(Issue 5), Instructions for making out, issuing and cancelling high
voltage Permits to Work, Sanctions for Test and Circuit State
Certificates
1 14/09/2020
NR/BS/LI/455 Standard/control document affected:
NR/L3/OPS/045/3.17 Weather Arrangements (Issue 03)
1 14/09/2020
NR/BS/LI/454 Standard/control document affected: NR/L3/OPS/021
Module 13 Managing the Weather – Extreme Weather Response Process
(Issue 01)
1 14/09/2020
NR/BS/LI/453 Standard/control document affected: NR/L3/OPS/021
Module 8 Managing The Weather - Earthworks (Issue 01)
1 18/08/2020
NR/BS/LI/452 Standard/control document affected: NR/L3/ELP/29987
[Working On or About 25 kV a.c Electrified Lines]
1 14/08/2020
NR/BS/LI/448 Standard/control document affected: NR/L2/CTM/025
(Issue 1), Competence & Training in On-Track Plant
Operation
1 23/10/2020
NR/BS/LI/447 Standard/control document affected: NR/SP/ELP/21060
(Issue 2), Issue of Safety Documentation for Work on 650/750 V dc
Apparatus
1 12/06/2020
NR/BS/LI/446 Standard/control document affected: NR/L3/ELP/29987
Issue 5 [Working On or About 25 kV a.c Electrified Lines]
1 22/05/2020
NR/BS/LI/445 Standard/control document affected: NR/L3/ELP/27241
(Issue 4), Fixed Plant Work Instructions
1 27/03/2020
NR/BS/LI/444 Standard/control document affected: NR/L2/ELP/27238
(Issue 7), Maintenance Specification for Fixed Plant Equipment
1 27/03/2020
NR/BS/LI/443 Standard/control document affected: NR/L2/ELP/21088
(Issue 3), General Maintenance Parameters for Overhead Line
Electrification Equipment
1 25/03/2020
NR/BS/LI/442 Standard/control document affected: NR/L2/TRK/1054
(Issue 5), Inspection of cast, welded and fabricated crossings in
the track
1 25/03/2020
NR/BS/LI/441 Standard/control document affected: NR/L2/TRK/053
(Issue 9), Inspection and Repair to Control the Risk of Derailment
at Switches
1 25/03/2020
NR/BS/LI/440 Standard/control document affected: NR/L2/TRK/001
(Issue 15), Inspection and Maintenance of Permanent Way
1 25/03/2020
NR/BS/LI/432 Standard/control document affected: NR/L3/SIG/10661
(Issue 18/19), Signalling Maintenance Task Intervals – WITHDRAWN -
HISTORIC ON 05/12/2020
1 23/03/2020
NR/BS/LI/429 Standard/control document affected: NR/SP/CTM/016
Issue 1, Competency & Training in Fixed Plant Engineering
1 15/06/2020
NR/BS/LI/428 Standard/control document affected:
NR/L3/TRK/3510/A01 (Issue 1), Lubrication of Plain Line Running
Rails, Check Rails and S&C
1 22/07/2020
NR/BS/LI/426 Standard/control document affected: NR/L1/CIV/032
(Issue 2), The Management of Structures
2 20/07/2020
NR/BS/LI/424 Standard/control document affected: NR/SP/SIG/19812
(issue 1), Cross Track Cable Management – SUPERSEDED BY
NR/L2/SIG/19812 Issue 2 – HISTORIC ON 06/03/2021
2 22/05/2020
NR/BS/LI/419 Standard/control document affected: NR/L3/ELP/29987
[Working On or About 25 kV a.c. Electrified Lines] (Issue 5)
2 13/02/2020
NR/BS/LI/389 Standard affected: NR/L2/SIG/30009 (Issue 11).
Signalling Principles Handbook – SUPERSEDED BY NR/L2/SIG/30009
Issue 19 – HISTORIC ON 06//03/2021
1 13/02/2017
NR/BS/LI/383 Standard affected: NR/L2/CTM/021 (Issue 4).
Competence and Training 2 08/12/2016
NR/BS/LI/371 Standard affected: NR/L2/CIV/162 (Issue 2).
Platform Extensions. Location of metal structures on Third Rail
area Station Platforms
1 02/03/2016
NR/BS/LI/348
Requirements for undertaking the roles of Lead Examiner and
Examining Engineer for the examination of Tunnels. Standards
affected: NR/L3/CIV/006 Part 4A Issue 1, NR/L3/CIV/006 Part 4B
Issue 1 and NR/L3/CIV/006 Part 1D Issue 1. SUPERSEDED BY
NR/L3/CIV/006 ISSUE 9 – HISTORIC ON 1 APRIL 2021
1 23/02/2015
-
Standards Updates
December 2020 ACS Rail Updates Page 8 of 40
Reference Title Issue Date
NR/BS/LI/347 Standard affected: NR/L2/CTM/028 (Issue 2).
Competence and Training 1 16/01/2015
NR/BS/LI/342 Standard affected: NR/SP/ELP/21028 (Issue 3).
Specification for ancillary wiring of electrical distribution
equipment on A.C. and D.C. electrified lines
1 13/04/2016
NR/BS/LI/331 Requirements for parapet heights on over bridge and
footbridge structures spanning overhead line electrification
equipment
2 07/08/2015
NR/BS/LI/328 Standard affected: NR/SP/ELP/21104 (ISSUE 2).
Design and Installation of Electric Track Equipment for DC
Electrified Lines
1 28/03/2014
NR/BS/LI/326 Standard affected: NR/L2/OHS/050 (Issue 4),
Sentinel Scheme Rules 1 16/04/2014
NR/BS/LI/306 Standard affected: NR/L1/CIV/032: The Management of
Structures [Issue 2] 2 26/09/2014
NR/BS/LI/305 Standards Affected: NR/L2/TRK/001 Issue 6.
NR/L2/TRK/2102 Issue 6. NR/L2/TRK/3038 Issue 5. NR/L2/TRK/0032
Issue 5.NR/L2/TRK/0132 Issue 6. NR/L3/TRK/3510/A01 Issue 1.
NR/L3/TRK/3510/B01 Issue 1.NR/L3/TRK/1015 Issue 2
2 31/01/2014
-
Standards Updates
December 2020 ACS Rail Updates Page 9 of 40
RSSB - Standards and the rail industry Access all current (and
many withdrawn) Railway Group Standards, Rail Industry Approved
Codes of Practice (RACOPs), Guidance Notes (GNs) and Rail Industry
Standards (RISs). http://www.rssb.co.uk/railway-group-standards
Useful links:
• Catalogues
• Latest Updates to Standards
• Using Standards
• Finding and staying up-to-date with standards Railway Group
Standards (RGSs) Mandatory requirements for the GB mainline railway
system are defined in Railway Group Standards (RGSs). They
facilitate the management and operation of the mainline railway as
a shared system. RGSs set out technical requirements applicable to
vehicles or the infrastructure, or processes applicable to
transport operators. http://www.rssb.co.uk/railway-group-standards
Rule Book (GE/RT8000) The Rule Book (GE/RT8000) and other National
Operations Publications are documents that contain direct
instructions for railway staff. The Rule Book is held in printed
copy by over 100,000 people, and as such is probably the best known
and most widely distributed in the entire RSSB catalogue. Even
greater numbers of people are known to use it as a reference and
information document both from the United Kingdom and abroad using
the online version. You can still order hard copies of individual
standards and Rule Book modules or handbooks from Willsons External
link (Tel: 01636 702334) or download them from the Railway Group
Standards section of this site. Rule Book App Get 24/7 access to
the Rule Book via your phone, tablet, desktop or laptop with the
Rule Book App. It’s easy to use, search, personalise and update,
and you can acknowledge amendments with one touch. Find out more on
our dedicated Rule Book App page. Rule Book Briefing Leaflet
GERT8000-RBBL Iss 34.1 Supersedes GERT8000-RBBL Iss 34 with effect
from 05/12/2020
GE/RM8000 Master Module Manual RSSB has produced this manual to
provide end-users with access to the content of GE/RT8000 (The Rule
Book) that is relevant to all roles as defined in the Rule Book
Matrix published by RSSB. GERM8000-master-module Iss 8.1 Issued:
05/12/2019 In Force: 05/12/2019
http://www.rssb.co.uk/railway-group-standardshttp://www.rssb.co.uk/railway-group-standards/catalogueshttps://www.rssb.co.uk/standards-and-safety/Using-Standards/Finding-and-staying-up-to-date-with-standards/Latest-Updates-to-Standardshttps://www.rssb.co.uk/standards-and-safety/Using-Standardshttps://www.rssb.co.uk/standards-and-safety/Using-Standards/Finding-and-staying-up-to-date-with-standardshttp://www.rssb.co.uk/railway-group-standardshttps://www.rssb.co.uk/standards-and-safety/Using-Standards/Finding-and-staying-up-to-date-with-standards/RSSB-rule-book-apphttps://www.rssb.co.uk/standards-catalogue/catalogueitem/gert8000-rbbl%20iss%2034-1https://www.rssb.co.uk/standards-catalogue/catalogueitem/germ8000-master-module%20iss%208-1
-
Controlled Documents
December 2020 ACS Rail Updates Page 10 of 40
Controlled Document List 05 December 2020
Ref. / Title Issue
No Issue Date
RAIL MANAGEMENT SYSTEM
Rail Management System
Ref. / Title Issue
No Issue Date
GROUP STANDARDS -
http://www.rssb.co.uk/railway-group-standards
GERM8000 Possession Workers Manual 5 09/2020
GERM8000 Track Workers Manual 7 09/2020
GERM8000 Track Workers Manual 7.1 12/2020
GERM8000-master-module Master Module Manual 8 09/2020
GERM8000-master-module Master Module Manual 8.1 12/2020
Modular Rulebook GE/RT8000/ (See separate page for listed
modules and issue dates)
------ ------
GLRT1210 AC Energy Subsystem and Interfaces to Rolling Stock
Subsystem 2 12/2019
GLRT1212 DC Conductor Rail Energy Subsystem and Interfaces to
Rolling Stock Subsystem
1 09/2015
GOGN3655 Guidance on Medical Fitness for Railway Safety Critical
Workers 2 06/2014
RIS-1530-PLT Rail Industry Standard for Technical Requirements
for On-Track Plant and their Associated Equipment and Trolleys
6 12/2015
RIS-2750-RST Supplier Assurance 1 12/2017
RIS-3118-TOM Incident Response Planning & Management 2
12/2019
RIS-3119-TOM Accident and Incident Investigation 2.2 03/2019
RIS-3279-TOM High Visibility Clothing 2 09/2019
RIS-3701-TOM Confidential Reporting System for Rail Staff 2.1
12/2019
RIS-8046-TOM Spoken Safety Critical Communications 2 12/2016
RIS-8047-TOM Reporting of Safety Related Information 2
03/2018
RIS-8070-TOM Testing Railway Safety Critical Workers for Drugs
and Alcohol 1 12/2016
Ref. / Title Issue
No Issue Date
LONDON UNDERGROUND (LU) STANDARDS
LUL G1163 Stations DLO - Failure Reporting Analysis &
Corrective Action System (FRACAS)
A2 11/2015
LUL G1164 Making a Referral to the Drug and Alcohol Advisory and
Treatment Service A2 04/2014
LUL G1234 Incident recording, investigation and reporting A4
04/2017
LUL G1241 Alcohol and Drugs at Work Guidelines and Information
For Managers 6 07/2009
LUL G1242 Alcohol and Drugs at Work – Managers For Cause and
Post Incident Check List
A4 04/2020
LUL G1249 Environmental Incident Categories A5 07/2018
LUL G2020 Wuhan novel coronavirus A1 01/2020
LUL G557 Electronic Incident Reporting Form (eIRF) A5
03/2014
LUL LF29 Incident investigation & reporting or recording
What you need to remember 01 n/a
LUL R0350 Guidance and advice for the use of personal protective
equipment A1 01/2014
LUL R0403 Personal Protective Equipment (PPE) catalogue 1.1
01/2014
LUL S1251 Alcohol and Work; includes Written Notice 12/24/2014,
6/16/2015 A2 11/2011
LUL S1257 Drugs and Work; Includes Written Notice 01317:
12/24/2014 A2 11/2011
LUL S1538 Assurance A16 04/2020
LUL S1548 Safety Critical Work A6 02/2020
http://www.rssb.co.uk/railway-group-standardshttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=FSFFNFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=XLNUHFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=NFQKKFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=VOYSTEAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=CVYMHFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=JNQGJFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=BWKRHFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=FRQHSCAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=IYYMHFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=LYYMHFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=QCNQKFAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=QVBRJFAAAAAAAAAA
-
Controlled Documents
December 2020 ACS Rail Updates Page 11 of 40
Ref. / Title Issue
No Issue Date
LONDON UNDERGROUND (LU) STANDARDS
LUL S1552 Contract QUENSH Conditions Incorporating written
notice: 10/05/2017, 02/05/2019
A18 11/2016
LUL S1601 Management Arrangements to Assure Medical Fitness A5
01/2012
LUL TE-HBS-0017 Managing competence and training A1 Cat
3 02/1995
Ref. / Title Issue
No Issue Date
NETWORK RAIL STANDARDS
NR/CAT/STP/001 Catalogue of Network Rail Standards 118
12/2020
PTS Handbook RT 3170 09 06/2013
NR/L2/AMG/1030 Working Safely in the Vicinity of Buried Services
1 12/2008
NR/GN/CIV/208 Ground Investigation 1 12/2018
NR/L2/CIV/003 Engineering and Architectural Assurance of
Building and Civil Engineering Works
6 09/2020
NR/L2/CIV/035 Management of Structures 2 06/2019
NR/L2/CIV/086 Management of Earthworks 9 03/2019
NR/L2/CIV/250 Landlord’s Consent 1 03/2020
NR/L2/CIV/295 Scour Assessment of Bridges, Culverts and
Retaining Walls 2 09/2018
NR/L3/CIV/00012 Road Vehicle Incursions: Risk Assessment of
Public and Non-Public Bridge and Neighbouring Sites
2 09/2020
NR/L3/CIV/006 Handbook for the Examination of Structures 9
09/2019
NR/L3/CIV/040 Work Instruction for the use of Protective Coating
Systems 2 06/2019
NR/L3/CIV/170 Assessment of Tunnels 1 03/2019
NR/L3/CIV/185 Management of Reports of Safety Related
Geotechnical Incidents 3 09/2020
NR/L3/CIV/190 Developing Extreme Weather Plans 1 12/2017
NR/GN/CPR/401 Guidance on Contractual Health and Safety
Requirements 1 12/2008
NR/L2/CPR/201 Supplier Qualification 2 12/2011
NR/L2/CPR/302 Supplier Qualification - Core Requirements (For
PCL / POL Holders) 2 09/2011
NR/L2/CSG/STP001 Standards and Controls Management Manual 8
06/2020
NR/CS/CTM/001 Competence Management 1 12/2006
NR/L2/CTM/017 Competence and Training in Civil Engineering 1
06/2006
NR/L2/CTM/021 Competence & Training in Track Safety 4
12/2010
NR/L2/CTM/201 Competence Management 2 03/2012
NR/L2/CTM/202 Quality Assurance in Training & Assessment 3
12/2019
NR/L2/CTM/207 Competence & Training in Planning 2
06/2012
NR/L2/CTM/209 Competence & Training in Safe System of Work
Planner 1 12/2010
NR/L2/CTM/220 Competence & Training in Portable,
Transportable & Mobile Plant Operation
1 06/2012
NR/L2/CTM/223 Competence & Training in Managing Site Safety
1 06/2011
NR/L2/ELP/21085 Earthing and Bonding on A.C. Electrified
Railways 4 06/2020
http://specs4.ihserc.com/Document/Document/ViewDoc?docid=BNQNUEAAAAAAAAAAhttp://specs4.ihserc.com/Document/Document/ViewDoc?docid=NCIGLCAAAAAAAAAA
-
Controlled Documents
December 2020 ACS Rail Updates Page 12 of 40
Ref. / Title Issue
No Issue Date
NETWORK RAIL STANDARDS
NR/L2/ELP/21087 Risk Based Maintenance for Overhead Line Assets
9 06/2020
NR/L2/ELP/21088 General maintenance parameters for 25 kV
overhead line electrification equipment
3 12/2015
NR/L2/ELP/21090 OLE Seasonal Preparation Response for Extreme
Weather 1 12/2020
NR/L2/ELP/23002 Specification for High Voltage AC Cables, AC
Traction Earthing and Bonding Cables DC Traction Cables, Pilot
Cables and Associated Accessories
1 12/2020
NR/L2/ELP/27023 Conductor Rail Heating Standard 1 12/2020
NR/L2/ELP/27009 Overhead Line Equipment Campaign Changes 3
03/2017
NR/L2/ELP/27307 Management of M&EE Safety Related Event
Reports 4 12/2017
NR/L2/ELP/27402 Specification for protection and control devices
for electrical systems
1 12/2009
NR/L2/ELP/27715 Overhead Contact System Design Specification 3
09/2018
NR/L2/ELP/27800 Specification for 25 kV a.c. Earthing
Pantographs and Interface with Vehicle (On Track Plant or Road Rail
Vehicles)
1 12/2020
NR/L3/ELP/27051 Working Instructions for d.c. Electrified Lines
in the Liverpool Area 6 09/2019
NR/L3/ELP/27115 Arrangements for Isolation of the Conductor Rail
for Pre-Planned Possessions of the Line
4 09/2018
NR/L3/ELP/27140 Application of Short Circuits for Conductor Rail
Isolations 4 03/2019
NR/L3/ELP/27237 Overhead Line Work Instructions 20 09/2020
NR/L3/ELP/27237 Overhead Line Work Instructions 21 12/2020
NR/L3/ELP/3091 DC Electrified Lines Working Instructions 5
09/2019
NR/SP/ELP/29987 Working on or About 25 KV AC Electrified Lines 5
12/2018
NR/L2/ENV/120 Waste Management 1 12/2019
NR/L2/ENV/121 Managing Environmental and Social Impact of Noise
and Vibration 1 12/2019
NR/L2/ENV/123 Prevention of Pollution to Land and Water 1
12/2019
NR/L2/ENV/015 Environment and Social Minimum Requirements for
Projects – Design and Construction
8 03/2019
NR/L2/ENV/115 Environment and Social Management System
Requirements 1 03/2018
NR/L2/INF/02203 Controlled Publications - Issue & Receipt 2
12/2011
NR/L3/INF/02204 Controlled Publications - Process &
Accountabilities 3 12/2011
NR/L3/INF/02226 Corporate Records Retention Schedule 3
12/2017
NR/GN/INI/001 Guidance on the Management of Door to Door Work
& Travel Time 1 12/2008
NR/L2/INI/CP0070 Principal Contractor Licensing Scheme 5
06/2017
NR/L2/INI/EDT/CP0091 Specification for Computer Aided Design 4
12/2018
NR/L2/INI/P3M/101 Business Process - Governance of Railway
Investment Projects (GRIP) – for Projects
5 09/2017
NR/L2/INI/P3M/104 Network Rail Requirements (formerly
NR/L1/INI/CP0095) 2 09/2017
NR/L3/INI/CP0028 Contract Requirements - Quality 3 06/2012
NR/L3/INI/CP0036 Provision of Welfare Facilities 4 08/2008
NR/L3/INI/CP0064 Delivering Work Within Possessions 5
06/2017
NR/L2/INV/002 Accident and Incident Reporting and Investigation
13 12/2011
NR/L3/INV/3001 Reporting and Investigation Manual 5 06/2016
NR/L3/INV/3001 Reporting and Investigation Manual Also replaces
NR/L2/INV/002
6 12/2020
-
Controlled Documents
December 2020 ACS Rail Updates Page 13 of 40
Ref. / Title Issue
No Issue Date
NETWORK RAIL STANDARDS
NR/GN/MTC/089 Guidance for the Exchange of Asset Data and the
Continuing Maintenance of Assets Undergoing Change
1 09/2020
NR/L2/MTC/089 Arrangements for the Exchange of Asset Data and
the Continuing Maintenance of Assets Undergoing Change
2 12/2018
NR/L3/MTC/CP009 COVID-19 Contingency Plan: Safe Working
Practices 3 05/2020
NR/L3/MTC/EN0100 Waste Management 3 06/2012
NR/L3/MTC/EN0101 Management of Discharges to Sewers &
Controlled Waters 3 06/2012
NR/L3/MTC/EN0225 Environ Management System for Infrastructure
Maintenance 1 06/2012
NR/L3/MTC/EP0152 Working on or Adjacent to Conductor Rail 5
12/2011
NR/L3/MTC/MG0173 Monitoring of Spoken Safety Communications 3
06/2019
NR/L3/MTC/MG0210 Management of Maintenance Work within a
Worksite to Prevent a Possession Overrun
3 06/2019
NR/L3/MTC/MG0213 Index of Standard Maintenance Forms 16
09/2020
NR/L3/MTC/RCS0216 Risk Control Manual 18 09/2020
NR/L3/MTC/RCS0216 Risk Control Manual 19 12/2020
NR/L3/MTC/RCS0216/OLE02 Risk Control Manual: Working on Red
Bonds/Impedance Bonds
2 03/2012
NR/L3/MTC/SE0115 Confined Spaces Working & Entry Procedure 2
06/2008
NR/L3/MTC/SE0117 Planned Assurance Inspections and Site
Surveillance 4 09/2018
NR/L3/MTC/SE0220 Planning and Delivering Safe Working at Height
2 09/2020
NR/CS/OHS/002 Policy on Working Safely 1 02/2007
NR/GN/OHS/00155 Short-term Changes in the Creation and
Application of Safe Work Packs and Briefing Arrangements COVID-19
Contingency Plan (Guidance for Regions on NR/L2/OHS/019)
1 06/2020
NR/L1/OHS/051 Drugs and Alcohol 6 12/2015
NR/L1/OHS/052 Traumatic Incident Management 1 06/2016
NR/L1/OHS/053 Assessing Risk of Stress in the Workplace 1
06/2016
NR/L2/OHS/00110 First Aid at Work 6 09/2017
NR/L2/OHS/00112 Worksafe Procedure 3 09/2020
NR/L2/OHS/00120 Testing for Drugs and Alcohol 5 12/2015
NR/L2/OHS/00124 Competence Specific Medical Fitness Requirements
and Occupational Health Provider Requirements for Medical
Assessments
3 12/2016
NR/L2/OHS/003 Fatigue Risk Management 9 12/2019
NR/L2/OHS/0044 Planning and Managing Construction Work replaces
NR/L3/INI/CP0044 Work Package Planning
5 12/2016
NR/L2/OHS/0047 Managing Health and Safety in Construction
(Application of the Construction (Design and Management)
Regulations to Network Rail)
7 06/2019
NR/L2/OHS/005 High Street Environment & Conditions for Work
outside Network Rail Managed Infrastructure
7 09/2010
NR/L2/OHS/019 Safety of People working on or near the Line 9
03/2017
NR/L2/OHS/019 Safety of People working on or near the Line 10
12/2020
NR/L2/OHS/020 Track Visitor Permits 5 08/2008
NR/L2/OHS/021 Personal Protective Equipment and Work Wear 3
06/2009
NR/L2/OHS/022 Working Safely at Height 2 03/2020
NR/L2/OHS/032 Training, Competence and Assessment in Accident
and Incident Investigation
2 12/2020
NR/L2/OHS/050 Sentinel Scheme Rules 4 03/2011
NR/L2/OHS/157 Health surveillance for silica and asbestos and
the management of diagnosed occupational respiratory conditions
1 03/2017
NR/L3/OHS/0046 The Reporting, Investigation and Recording of
Safety and Sustainable Development Events and Close Calls within
Infrastructure Projects
3 06/2018
-
Controlled Documents
December 2020 ACS Rail Updates Page 14 of 40
Ref. / Title Issue
No Issue Date
NETWORK RAIL STANDARDS
NR/L3/OHS/019-IP Planning and Delivering Safe Work –
Implementation Principles for Infrastructure Projects
1 06/2018
NR/L2/OPS/033 Recording Spoken Safety Critical Communications
between Possession Management and Engineering Trains / On-Track
Plant Drivers when Working in Possessions and Worksites.
3 06/2019
NR/L2/OPS/291 Railway Crime Risk Management 1 12/2019
NR/L3/OPS/084 Line Clear Arrangements Following Engineering
Works in Axle Counter Areas – Line Clear Verification Process
5 03/2020
NR/L3/OPS/251 Unmanned Aircraft System (Drone/UAS) Operations 3
09/2019
NR/OPS/DEV/009 Network Rail: Good Practice Guide for Working at
Operational Locations (Signal Boxes, Electrical Control Rooms,
Controls) During COVID 19
2 06/2020
NR/GN/OTK/5000 Issue 1 Index of Off-Track Drawings 1 06/2019
NR/L2/OTK/5201 Lineside Vegetation Management Manual 4
03/2020
NR/L2/OTK/5201 Lineside Vegetation Management Manual 5
12/2020
NR/GN/RMVP/0200 Infrastructure Plant Manual Guidance 1
12/2018
NR/L2/RMVP/0200 Infrastructure Plant Manual 10 12/2018
NR/L3/RMVP/0201 Calibration Work Instruction Manual Replaces
NR/L3/MTC/ME0201 This standard provides the index and version
control of Calibration Work Instructions for the internal
calibration and comparison checking of Inspection, Measuring and
Test Equipment (IMTE).
2 09/2011
NR/L2/RSE/0005 Product Design for Reliability 4 03/2020
NR/L2/RSE/0005 Product Design for Reliability 5 12/2020
NR/L2/RSE/070 Engineering Verification 2 12/2011
NR/L2/RSE/100 Network Rail Acceptance Panel processes 5
06/2019
NR/L1/RSK/001 Network Rail Risk Policy 3 09/2019
NR/L2/SCO/302 Supplier Qualification Requirements 1 06/2020
NR/L3/SCO/313 On-Track Machines (OTMs) Driver and Operations
Standards Manual 8 09/2020
NR/L3/SCO/313 On-Track Machines (OTMs) Driver and Operations
Standards Manual 9 12/2020
NR/L3/SCO/314 Engineering Assurance for T&RS, OTM and OTP
Projects 1 12/2018
NR/L3/SCO/320 Supplier Quality Assurance (SQA) 2 09/2020
NR/SIN/185 Identification and Inspection of Plain-Lined S&C
1 06/2019
NR/L2/SIG/11201 Signalling Design Handbook 11 06/2018
NR/L2/SIG/11201 Signalling Design Handbook 12 12/2020
NR/L2/SIG/14201 Signalling Risk Assessment Handbook 4
03/2019
NR/L2/SIG/14201 Signalling Risk Assessment Handbook 5
12/2020
NR/L2/SIG/30009 Signalling Principles Handbook 18 12/2019
NR/L2/SIG/30009 Signalling Principles Handbook 19 12/2020
NR/L2/SIG/30014 Signalling Works Testing Handbook 16 03/2020
NR/L2/SIG/30014 Signalling Works Testing Handbook 17 12/2020
NR/L3/SIG/10064 General Instructions to Staff Working on S&T
Equipment 8 06/2019
NR/L3/SIG/10064 General Instructions to Staff Working on S&T
Equipment 9 12/2020
-
Controlled Documents
December 2020 ACS Rail Updates Page 15 of 40
Ref. / Title Issue
No Issue Date
NETWORK RAIL STANDARDS
NR/L3/SIG/10661 Signal Maintenance Task Intervals 19 03/2020
NR/L3/SIG/10661 Signal Maintenance Task Intervals 20 12/2020
NR/L3/SIG/10663 Signal Maintenance Specifications 11 03/2020
NR/L3/SIG/10663 Signal Maintenance Specifications 12 12/2020
NR/L3/SIG/11231 Signal Maintenance Testing Handbook 14
03/2020
NR/L3/SIG/11231 Signal Maintenance Testing Handbook 15
03/2020
NR/L3/SIG/MG0110 Imposition & Removal of Temporary Speed
Restrictions 3 06/2012
NR/L2/SIGELP/50000 Safe working and maintenance on or near
Signalling Power Distribution Equipment above 175 volts
3 03/2017
NR/L3/SIGELP/50001 Signalling Power Distribution Equipment above
175 Volts 3 03/2017
NR/L3/SIGELP/50002 Safe Working Practices When Working on or
Near Signalling Power Distribution Equipment Above 175 Volts
1 12/2016
NR/L3/SIGELP/50003 Safe Working Practices When Working on or
Near Signalling Equipment
1 03/2018
NR/L2/TEL/30067 The Transmission of Safety Related Information 2
12/2011
NR/L2/TEL/30156 Functional Requirements for Safety Related
Communications Equipment for On Track Plant Working
1 12/2011
NR/GN/TRK/7001 Index of Track Work Information Sheets (TWI) 16
09/2019
NR/L1/TRK/100 Management of Track Assets 1 03/2020
NR/L2/TRK/001 Inspection and Maintenance of Permanent Way 15
03/2020
NR/L2/TRK/001 Inspection and Maintenance of Permanent Way 16
12/2020
NR/L2/TRK/4239 Track Bed Investigation, Design and Installation
2 09/2020
NR/L3/TRK/003 Index of Track Engineering Forms 33 03/2020
NR/L3/TRK/003 Index of Track Engineering Forms 34 12/2020
NR/L3/TRK/3530 Track Lubricants 1 06/2012
NR/L3/TRK/7006 Creation and Application of Initial ESR Design 1
03/2019
-
Controlled Documents
December 2020 ACS Rail Updates Page 16 of 40
Ref. / Title Reference
OTHER STANDARDS & GUIDANCE
BS EN ISO 14001:2015 2015
BS EN ISO 9001:2015 2015
BS EN ISO 45001:2018 2018
BS OHSAS 18001:2007 BS OHSAS 18001 has been replaced by ISO
45001 the new international standard for occupational health and
safety. Organizations who are already certified to BS OHSAS 18001
will need to upgrade to ISO 45001 by March 2021.
2007
Investigating Accidents and Incidents – HS(G)245 ISBN
9780717628278
Management of Health and Safety at Work Regulations 1999
Approved Code of Practice and guidance
ISBN 9780717624881
Managing health and safety in construction Construction (Design
and Management) Regulations 2015. Guidance on Regulations
ISBN 9780717666263
Successful Health and Safety Management – HS(G)65 ISBN
9780717612765
Sentinel Scheme Rules
https://info.railsentinel.co.uk/about/rules/ V4 26 March 2020
Compliance Date 26 March 2020
Ref. / Title Reference
LEGISLATION
Bribery Act 2010 2010 c. 23
Control of Asbestos at Work Regulations 2002 2002 No. 2675
Control of Pollution (Amendment) Act 1989 1989 c. 14
Control of Pollution Act 1974 1974 c. 40
Corporate Manslaughter and Corporate Homicide Act 2007 2007 c.
19
Data Protection Act 2018 2018 c. 12
Environmental Protection Act 1990 1990 c. 43
Health & Safety at Work etc. Act 1974 1974 c. 37
Modern Slavery Act 2015 2015 c. 30
Pollution Prevention and Control Act 1999 1999 c. 24
The Confined Spaces Regulations 1997 1997 No. 1713
The Construction (Design and Management) Regulations 2015 2015
No. 51
The Control of Asbestos at Work (Amendment) Regulations 1992
1992 No. 3068
The Control of Asbestos at Work (Amendment) Regulations 1998
1998 No. 3235
The Control of Asbestos at Work Regulations 1987 1987 No.
2115
The Control of Asbestos in the Air Regulations 1990 1990 No.
556
The Control of Asbestos Regulations 2006 2006 No. 2739
The Control of Asbestos Regulations 2012 2012 No. 632
The Control of Lead at Work Regulations 1980 1980 No. 1248
The Control of Lead at Work Regulations 1998 1998 No. 543
The Control of Lead at Work Regulations 2002 2002 No. 2676
The Control of Noise at Work Regulations 2005 2005 No. 1643
The Control of Substances Hazardous to Health (Amendment)
Regulations 2004 2004 No. 3386
https://info.railsentinel.co.uk/about/rules/
-
Controlled Documents
December 2020 ACS Rail Updates Page 17 of 40
Ref. / Title Reference
LEGISLATION
The Control of Substances Hazardous to Health Regulations 2002
2002 No. 2677
The Environmental Noise, Site Waste Management Plans and
Spreadable Fats etc. (Revocations and Amendments) Regulations
2013
2013 No. 2854
The Fire Precautions (Workplace) Regulations 1997 1997 No.
1840
The Hazardous Waste (England and Wales) (Amendment) Regulations
2009 2009 No. 507
The Hazardous Waste (England and Wales) Regulations 2005 2005
No. 894
The Health and Safety (Consultation with Employees) Regulations
1996 1996 No. 1513
The Health and Safety (Display Screen Equipment) Regulations
1992 1992 No. 2792
The Health and Safety (First-Aid) Regulations 1981 1981 No.
917
The Lifting Operations and Lifting Equipment Regulations 1998
1998 No. 2307
The Manual Handling Operations Regulations 1992 1992 No.
2793
The Personal Protective Equipment (EC Directive) Regulations
1992 1992 No. 3139
The Personal Protective Equipment at Work Regulations 1992 1992
No. 2966
The Personal Protective Equipment Regulations 2002 2002 No.
1144
The Provision and Use of Work Equipment Regulations 1992 1992
No. 2932
The Provision and Use of Work Equipment Regulations 1998 1998
No. 2306
The Railways and Other Guided Transport Systems (Safety)
Regulations 2006 2006 No. 599
The Regulatory Reform (Fire Safety) Order 2005 2005 No. 1541
The Reporting of Injuries, Diseases and Dangerous Occurrences
Regulations 2013 2013 No. 1471
The Safety Representatives and Safety Committees Regulations
1977 1977 No. 500
The Waste Management (England and Wales) Regulations 2006 2006
No. 937
The Work in Compressed Air Regulations 1996 1996 No. 1656
The Workplace (Health, Safety and Welfare) Regulations 1992 1992
No. 3004
Transport and Works Act 1992 1992 c. 42
Water Resources Act 1991 1991 c. 57
Wildlife and Countryside (Amendment) Act 1991 1991 c. 39
Wildlife and Countryside Act 1981 1981 c. 69
-
Controlled Documents
December 2020 ACS Rail Updates Page 18 of 40
Modular Rulebook GE/RT8000 PTS Only In most cases only PTS
handbook is required, unless one of the following applies:
1. Index, amendment module and Module G1 to be issued to the
following;
Supervisors and managers who issue publications Staff who
operate signal post replacement switches Staff who place protection
for Line Blockage or T3 Staff who secure points Those who use tents
on or near the line
2. Index and amendment module to be issued to the following;
Lookouts People who take charge of cranes and equipment which
could foul an open line People who take charge of work on or near
points People who carry out patrolling/inspecting duties
Other competencies (IWA, COSS, PC, ES, MC, CC)
Name & Issue Issue Date
Title Synopsis
GERT8000-Issue Iss 31.pdf
Sep 2020
Rule Book Module Issue History
This document contains updates to align with changes to Rule
Book Module issues (GERT8000).This document has been updated to
incorporate changes to modules published in September 2020.
GERT8000-RBBL Iss 34.pdf
Sep 2020
Rule Book Briefing Leaflet
This Leaflet contains details of changes being published in
September 2020 and in-force December 2020. Each issue of the Rule
Book Briefing Leaflet contains a summary of the changes being
introduced to GERT8000.
GERT8000-RBBL Iss 34.1
Dec 2020
Rule Book Briefing Leaflet
This Leaflet contains details of changes being published in the
December 2020 Periodical Operating Notice. Each issue of the Rule
Book Briefing Leaflet contains a summary of the changes being
introduced to GERT8000.
GERT8000-Gloss Iss 5
Sep 2018
Glossary of Railway Terminology
The Glossary has been updated to reflect changes in terminology
within TW5 which removes 'entering service' and replaces it with
'starting a journey'.
GERT8000-AC Iss 5
Sep 2018
AC electrified lines
You will need this module if you carry out the duties of a train
driver, guard, shunter, designated person (DP), signaller, crossing
keeper or person in charge of sidings in AC electrified areas.
GERT8000-AC Iss 6.pdf
Sep 2020
AC electrified lines
You will need this module if you carry out the duties of a train
driver, guard, shunter, designated person (DP), signaller, crossing
keeper or person in charge of sidings in AC electrified areas.
"Sections 12 and 13 have been revised in two main areas. The first
is avoiding a need for a driver to leave the cab for inspection
purposes, or circumstances in which a driver might be allowed to
leave the cab for inspection purposes before the traction current
has been removed. The second is managing the removal of traction
current in a way that reduces the extent of reactionary delay. The
changes are intended to reduce the electrical and non-electrical
safety risk overall and to reduce the adverse operational impacts
caused by stranded trains. A minor amendment has been made to
Section 3.3 to recognise that not all frontline staff are able to
speak directly to the ECO, in which case they should inform the
signaller when reporting objects and defects. An incorrect
reference to red bonds has also been revised in the same
section.
https://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-Issue%20Iss%2031.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-Issue%20Iss%2031.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-Issue%20Iss%2031.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-RBBL%20Iss%2034.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-RBBL%20Iss%2034.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-RBBL%20Iss%2034.pdfhttps://www.rssb.co.uk/standards-catalogue/catalogueitem/gert8000-rbbl%20iss%2034-1https://www.rssb.co.uk/standards-catalogue/catalogueitem/gert8000-rbbl%20iss%2034-1https://www.rssb.co.uk/rgs/rulebooks/GERT8000-Gloss%20Iss%205.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-Gloss%20Iss%205.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-AC%20Iss%205.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-AC%20Iss%205.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-AC%20Iss%206.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-AC%20Iss%206.pdf
-
Controlled Documents
December 2020 ACS Rail Updates Page 19 of 40
Name & Issue Issue Date
Title Synopsis
GERT8000-DC Iss 4
Sep 2015
DC electrified lines
You will need this module if you carry out the duties of a train
driver, guard, shunter, designated person (DP), signaller, crossing
keeper and person in charge of sidings in DC electrified areas.
This document has been updated as part of the December 2015 Rule
Book Programme.
GERT8000-G1 Iss 6
Sep 2015
General safety responsibilities and personal track safety for
non-track workers
You will need this module if you carry out the duties of a train
driver, guard, shunter, designated person (DP) and a signaller or
crossing keeper in General safety responsibilities and personal
track safety for non-track workers. This document has been updated
as part of the December 2015 Rule Book Programme.
GERT8000-G1 Iss 7.pdf
Sep 2020
General safety responsibilities and personal track safety for
non-track workers
You will need this module if you carry out the duties of a train
driver, guard, shunter, designated person (DP), signaller, crossing
keeper, or platform staff. Section 1.4 has been revised to support
the implementation of RIS-3783-TOM, ‘Issue and Management of Cab
Passes’. The intent is to provide transport operators with the
opportunity to access the benefits associated with standardisation,
through the definition of a common approach to managing access to
driving cab.
GERT8000-G1 Iss 7.1
Dec 2020
General safety responsibilities and personal track safety for
non-track workers
You will need this module if you carry out the duties of a train
driver, guard, shunter, designated person (DP), signaller, crossing
keeper, or platform staff. A new section 1.8 has been introduced
that requires any unusual flows or pools of water that cause damage
to be reported immediately to the signaller or Operations
Control.
GERT8000-Issue HB Iss 12.pdf
Sep 2020
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule
Book Handbook issues (GERT8000). This document has been updated to
incorporate changes to handbooks published in September 2020.
GERT8000-HB1 Iss 4
Sep 2015
General duties and track safety for track workers
This handbook is for those personnel who need to go on the
operational railway to carry out their duties, with the exception
of a train driver, guard, shunter, signaller, crossing keeper or
designated person (DP). This handbook has been updated as part of
the December 2015 Rule Book Programme.
GERT8000-HB1 Iss 5.pdf
Sep 2020
General duties and track safety for track workers
This handbook is for those personnel who need to go on the
operational railway to carry out their duties, with the exception
of a train driver, guard, shunter, signaller, crossing keeper or
designated person (DP). Section 2.4 has been revised to support the
implementation of RIS-3783-TOM, ‘Issue and Management of Cab
Passes’. The intent is to provide transport operators with the
opportunity to access the benefits associated with standardisation,
through the definition of a common approach to managing access to
driving cab.
GERT8000-HB1 Iss 5.1
Dec 2020
General duties and track safety for track workers
This handbook is for those personnel who need to go on the
operational railway to carry out their duties, with the exception
of a train driver, guard, shunter, signaller, crossing keeper or
designated person (DP). A new section 7.5 has been introduced that
requires any unusual flows or pools of water that cause damage to
be reported immediately to the signaller or Operations Control.
GERT8000-HB2 Iss 2
Sep 2015
Instructions for track workers who use emergency protection
equipment
This handbook is for those personnel who need to go on the
operational railway to carry out their duties and have been trained
to carry out emergency protection. It does not apply to: train
drivers, guards, shunters, signallers, crossing keepers and those
who act as a designated person (DP). This document has been updated
as part of the December 2015 Rule Book Programme.
GERT8000-HB3 Iss 3
Sep 2014
Duties of the lookout and site warden
This handbook is for those personnel who have duties of the
lookout and site warden. Information on changes to this issue
http://www.rssb.co.uk/rgs/rulebooks/GERT8000-DC%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-DC%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-G1%20Iss%206.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-G1%20Iss%206.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-G1%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-G1%20Iss%207.pdfhttps://www.rssb.co.uk/standards-catalogue/catalogueitem/gert8000-g1%20iss%207-1https://www.rssb.co.uk/standards-catalogue/catalogueitem/gert8000-g1%20iss%207-1https://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-Issue%20HB%20Iss%2012.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-Issue%20HB%20Iss%2012.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-Issue%20HB%20Iss%2012.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB1%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB1%20Iss%204.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB1%20Iss%205.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB1%20Iss%205.pdfhttps://www.rssb.co.uk/standards-catalogue/catalogueitem/gert8000-hb1%20iss%205-1https://www.rssb.co.uk/standards-catalogue/catalogueitem/gert8000-hb1%20iss%205-1http://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB2%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB2%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB2%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB3%20Iss%203.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB3%20Iss%203.pdf
-
Controlled Documents
December 2020 ACS Rail Updates Page 20 of 40
Name & Issue Issue Date
Title Synopsis
can be found in the Rule Book Briefing Leaflet (GERT8000-RBBL
Iss 27).
GERT8000-HB4 Iss 2
Sep 2014
Duties of a points operator and route-setting agent - moving and
securing points by hand
This handbook is for those personnel who has duties of a points
operator and route-setting agent - moving and securing points by
hand. Information on changes to this issue can be found in the Rule
Book Briefing Leaflet (GERT8000-RBBL Iss 27).
GERT8000-HB5 Iss 2
Sep 2011
Handsignalling duties This handbook is for those who carry out
handsignalling duties.
GERT8000-HB6 Iss 5
Sep 2015
General duties of an individual working alone
This handbook is for those personnel with general duties of an
individual working alone (IWA). This handbook has been updated as
part of the December 2015 Rule Book Programme.
GERT8000-HB6 Iss 6.pdf
Sep 2020
General duties of an individual working alone
This handbook is for those personnel with general duties of an
individual working alone (IWA). New instructions have been added at
section 2.5 to facilitate the introduction of the crossing the line
procedure into the Rule Book. The changes are intended to
streamline the procedure for crossing the line leading to reduced
workload for signaller/SWL/COSS/IWA, reduced need for staff to be
waiting unproductively trackside ,and crossing the line at
locations that have already been assessed as suitable. Section 3.2
has been revised to facilitate the introduction of high output
protection zones into the Rule Book. The introduction of high
output protection zones into the Rule Book is intended to improve
track worker safety by removing the need for possession support
staff to go trackside to place standard possession protection, and
to result in improved productivity on each occasion that a high
output train is used.
GERT8000-HB7 Iss 6
Sep 2019
General duties of a controller of site safety (COSS)
This handbook is for those personnel who have the general duties
of a controller of site safety (COSS).
GERT8000-HB7 Iss 7.pdf
Sep 2020
General duties of a controller of site safety (COSS)
This handbook is for those personnel who have the general duties
of a controller of site safety (COSS).
GERT8000-HB8 Iss 7
Sep 2017
IWA, COSS or PC blocking a line
You will need this handbook if you carry out the duties of a
IWA, COSS or PC blocking a line.
GERT8000-HB9 Iss 7
Sep 2019
IWA or COSS setting up safe systems of work within
possessions
You will need this handbook if you carry out the duties of an
IWA or COSS setting up safe systems of work within possessions.
GERT8000-HB10 Iss 4
Sep 2015
Duties of the COSS or SWL and person in charge when using a hand
trolley
You will need this handbook if you are the COSS or SWL and
person in charge when using a hand trolley. This document has been
updated as part of the December 2015 Rule Book Programme.
GERT8000-HB11 Iss 7
Sep 2019
Duties of the person in charge of a possession (PICOP)
You will need this handbook if you carry out the duties of the
PICOP.
GERT8000-HB11 Iss 8.pdf
Sep 2020
Duties of the person in charge of a possession (PICOP)
You will need this handbook if you carry out the duties of the
PICOP. Section 4.2 has been revised to facilitate the introduction
of the flexible train arrival point (FTAP) into the Rule Book.
Section 12.1 has been revised to include arrangements for giving up
a work site with an engineering train or on-track machine standing
within it. The changes are intended to allow work to be undertaken
for a greater proportion of the available time within a
possession.
GERT8000-HB12 Iss 7
Sep 2019
Duties of the engineering supervisor (ES) or safe work leader
(SWL) in a possession
You will need this handbook if you carry out the duties of the
ES or SWL in a possession.
GERT8000-HB12 Iss 8.pdf
Sep 2020
Duties of the engineering supervisor (ES) or safe work leader
(SWL) in a possession
You will need this handbook if you carry out the duties of the
ES or SWL in a possession. Section 3.2 has been revised to
facilitate the introduction of the flexible train arrival point
(FTAP) into the Rule Book.
http://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB4%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB4%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB5%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB5%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB5%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB6%20Iss%205.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB6%20Iss%205.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB6%20Iss%205.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB6%20Iss%206.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB6%20Iss%206.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB7%20Iss%206.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB7%20Iss%206.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB7%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB7%20Iss%207.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB8%20Iss%207.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB8%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB9%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB9%20Iss%207.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB10%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB10%20Iss%204.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB11%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB11%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB11%20Iss%208.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB11%20Iss%208.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB12%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB12%20Iss%207.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB12%20Iss%208.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB12%20Iss%208.pdf
-
Controlled Documents
December 2020 ACS Rail Updates Page 21 of 40
Name & Issue Issue Date
Title Synopsis
Section 10.3 has been revised to include arrangements for giving
up a work site with an engineering train or on-track machine
standing within it. The changes are intended to allow work to be
undertaken for a greater proportion of the available time within a
possession. A new section 11 has been added to facilitate the
introduction of high output protection zones into the Rule Book.
The introduction of high output protection zones into the Rule Book
is intended to improve track worker safety by removing the need for
possession support staff to go trackside to place standard
possession protection, and to result in improved productivity on
each occasion that a high output train is used.
GERT8000-HB13 Iss 2
Sep 2014
Duties of the person in charge of the siding possession
(PICOS)
You will need this handbook if you carry out the duties of a
PICOS. Information on changes to this issue can be found in the
Rule Book Briefing Leaflet (GERT8000-RBBL Iss 27)
GERT8000-HB14 Iss 2
Mar 2014
Duties of the person in charge of loading and unloading rail
vehicles during engineering work
You will need this handbook if you carry out the duties of the
person in charge of loading and unloading rail vehicles during
engineering work.
GERT8000-HB15 Iss 5
Sep 2017
Duties of the machine controller (MC) and on-track plant
operator
You will need this handbook if you carry out the duties of the
machine controller (MC) and on-track plant operator. This document
has been updated as part of the December 2015 Rule Book
Programme.
GERT8000-HB16 Iss 4
Sep 2018
AC electrified lines This handbook is for those personnel who
need to go on the operational railway in an AC electrified area to
carry out their duties.
GERT8000-HB17 Iss 3
Sep 2015
DC electrified lines
This handbook is for those personnel who need to go on the
operational railway in a DC electrified area to carry out their
duties. This document has been updated as part of the December 2015
Rule Book Programme.
GERT8000-HB18 Iss 4
Sep 2015
Duties of a Level Crossing Attendant
You will need this handbook if you carry out the duties of a
level crossing attendant. This document has been updated as part of
the December 2015 Rule Book Programme.
GERT8000-HB19 Iss 3
Sep 2015
Work on signalling equipment - duties of the signalling
technician
You will need this handbook if you carry out the duties of a
signalling technician. This document has been updated as part of
the December 2015 Rule Book Programme
GERT8000-HB19 Iss 4.pdf
Sep 2020
Work on signalling equipment - duties of the signalling
technician
You will need this handbook if you carry out the duties of a
signalling technician. Section 1.5 has been revised to facilitate
the introduction of high output protection zones into the Rule
Book. The introduction of high output protection zones into the
Rule Book is intended to improve track worker safety by removing
the need for possession support staff to go trackside to place
standard possession protection, and to result in improved
productivity on each occasion that a high output train is used.
GERT8000-HB20 Iss 2
Sep 2015
General duties of a safe work leader (SWL) working outside a
possession
You will need this handbook if you have the general duties of a
safe work leader working outside a possession. This document has be
updated as part of the December 2015 Rule Book Programme.
GERT8000-HB20 Iss 3.pdf
Sep 2020
General duties of a safe work leader (SWL) working outside a
possession
You will need this handbook if you have the general duties of a
safe work leader working outside a possession. New instructions
have been added at section 2.3 to facilitate the introduction of
the crossing the line procedure into the Rule Book. The changes are
intended to streamline the procedure for crossing the line leading
to reduced workload for signaller/SWL/COSS/IWA, reduced need for
staff to be waiting unproductively trackside ,and crossing the line
at locations that have already been assessed as suitable.
GERT8000-HB21 Iss 4
Sep 2018
Safe work leader (SWL) blocking a line
You will need this handbook if you are a safe work leader (SWL)
blocking a line.
http://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB13%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB13%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB13%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB14%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB14%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB15%20Iss%205.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB15%20Iss%205.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB15%20Iss%205.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB16%20Iss%204.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB16%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB17%20Iss%203.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB17%20Iss%203.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB18%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB18%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB19%20Iss%203.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB19%20Iss%203.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB19%20Iss%204.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB19%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB20%20Iss%202.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB20%20Iss%202.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB20%20Iss%203.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-HB20%20Iss%203.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB21%20Iss%204.pdfhttps://www.rssb.co.uk/rgs/rulebooks/GERT8000-HB21%20Iss%204.pdf
-
Controlled Documents
December 2020 ACS Rail Updates Page 22 of 40
Name & Issue Issue Date
Title Synopsis
GERT8000-OTM Iss 8
Sep 2017
Working of on-track machines (OTM)
You will need this module if you carry out the duties of a
driver of an on-track machine, operator of an on-track machine or
signaller. This document has be updated as part of the December
2015 Rule Book Programme.
GERT8000-OTM Iss 9.pdf
Sep 2020
Working of on-track machines (OTM)
You will need this module if you carry out the duties of a
driver of an on-track machine, an operator of an on-track machine,
or a signaller. Sections 4.1 and 4.3 have been revised to
facilitate the introduction of high output protection zones into
the Rule Book. The introduction of high output protection zones
into the Rule Book is intended to improve track worker safety by
removing the need for possession support staff to go trackside to
place standard possession protection, and to result in improved
productivity on each occasion that a high output train is used.
GERT8000-T10 Iss 4
Sep 2014
Duties of a designated person (DP) and people working on rail
vehicles
You will need this module if you carry out the duties of a
designated person and people working on a rail vehicle. Information
on changes to this issue can be found in the Rule Book Briefing
Leaflet (GERT8000-RBBL Iss 27).
GERT8000-T3 Iss 9.pdf
Sep 2020
Possession of a running line for engineering work
You will need this module if you carry out the duties of a
driver or signaller. Sections 2.2 and 9.7 have been revised to
facilitate the introduction of the flexible train arrival point
(FTAP) into the Rule Book. Section 9.8 has been revised to include
arrangements for giving up a work site with an engineering train or
on-track machine standing within it. The changes are intended to
allow work to be undertaken for a greater proportion of the
available time within a possession. A new section 10 has been added
to facilitate the introduction of high output protection zones into
the Rule Book. The introduction of high output protection zones
into the Rule Book is intended to improve track worker safety by
removing the need for possession support staff to go trackside to
place standard possession protection, and to result in improved
productivity on each occasion that a high output train is used
http://www.rssb.co.uk/rgs/rulebooks/GERT8000-OTM%20Iss%208.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-OTM%20Iss%208.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-OTM%20Iss%209.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-OTM%20Iss%209.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-T10%20Iss%204.pdfhttp://www.rssb.co.uk/rgs/rulebooks/GERT8000-T10%20Iss%204.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-T3%20Iss%209.pdfhttps://catalogues.rssb.co.uk/rgs/rulebooks/GERT8000-T3%20Iss%209.pdf
-
Network Rail Safety Central
December 2020 ACS Rail Updates Page 23 of 40
Network Rail Safety Central – Information Section Code of
Conduct The Code of Conduct establishes some minimum standards that
Network Rail expects in their supply chain. It has been developed
by Network Rail's National Supply Chain, Industry bodies, and the
Unions. It will be reviewed and updated by members of these same
groups bi-annually. Please email queries to
[email protected] Code of Business Ethics (web page)
Modern Slavery (web page) Network Rail Safety Bulletins In this
section you’ll find copies of the Network Rail safety bulletins
regularly sent out to staff working on the Network Rail
infrastructure. These cover a range of different safety issues and
are often issued in response to a specific incident.
https://safety.networkrail.co.uk/tools-resources/safety-bulletins/
The following link contains a list of Network Rail Safety Bulletins
: Safety Bulletin List June 05 You can refine your search by:
Bulletin type
• Archive - Lessons Learnt
• Archive - Safety Bulletins
• Safety Advice
• Safety Alert
• Safety Bulletin
• Shared Learning There will also be an archive of past
bulletins, so you can download any that you missed, or want to read
again. Please download them for the FULL TEXT OF THE BULLETINS.
Safety Bulletins
• Safety Bulletin NRB20-10 – Failure of a tree with symptoms of
ash die back disease September 29, 2020
Safety Advice
• Safety Advice NRA20-12 – Serious injury to an operative
October 28, 2020
•
Safety-Advice-NRA20-11-Restricted-access-to-25KV-ABB-FSKII-SMOS-sites-1(revised)
September 15, 2020
Other documents
•
Safety-Alert-NRX20-07-Serious-incident-at-Trewern-Mill-user-worked-crossing-1
October 7, 2020 Lessons Learnt / Shared Learning Network Rail are
now producing ‘Lessons Learnt’ publications following events which
have led to Formal investigations or local investigations where
significant points of learning have resulted. Network Rail believes
that these lessons will be of value for all involved in the
industry and not just safety professionals, they are ultimately
designed to aid prevention of events of a similar nature happening
again elsewhere. Shared Learning
mailto:[email protected]://safety.networkrail.co.uk/safety/code-of-business-ethics/https://safety.networkrail.co.uk/safety/code-of-business-ethics/modern-slavery/https://safety.networkrail.co.uk/tools-resources/safety-bulletins/https://safety.networkrail.co.uk/wp-content/uploads/2020/06/Safety-Bulletin-List-June-05.pdfhttps://safety.networkrail.co.uk/safety-bulletin-nrb20-10-failure-of-a-tree-with-symptoms-of-ash-die-back-disease/https://safety.networkrail.co.uk/safety-advice-nra20-12-serious-injury-to-an-operative/https://safety.networkrail.co.uk/safety-advice-nra20-11-restricted-access-to-25kv-abb-fskii-smos-sites-1/https://safety.networkrail.co.uk/safety-alert-nrx20-07-serious-incident-at-trewern-mill-user-worked-crossing-1/https://safety.networkrail.co.uk/tools-resources/safety-bulletins/?fwp_bulletin_type=shared-learning&fwp_sort=date_desc
-
Network Rail Safety Central
December 2020 ACS Rail Updates Page 24 of 40
Health & Wellbeing
Health and wellbeing (web page)
Risk Management
Think RISK (web page) Safety Films
http://safety.networkrail.co.uk/Alerts-and-Campaign/Safety-Films In
this section you will find all the safety films which are also
listed in the relevant subject areas with supporting materials.
Please note some of these films contain strong language and scenes
which viewers might find upsetting. As such we recommend that these
films are only viewed by people over the age of 16. Have you got a
good idea for a film? If you have, write into
[email protected] to let us know. Resource Library
https://safety.networkrail.co.uk/tools-resources/resource-library/
The Resource Library holds a wealth of information. SCO 24:7
(Supply Chain – Operations) Telephone SCO 24:7 (formally the NSC247
and NDS24:7): call 01908 723500 or 085 65500 (internal) SCO 24:7
operates 24 hours a day, 365 days of the year from the Quadrant in
Milton Keynes. Our remit is to manage the real-time delivery of SCO
products & services to our customers. This includes engineering
haulage, materials, on track machines, infrastructure monitoring,
seasonal treatment, HSEA reporting, site access services and lone
worker monitoring. Emergency If there's a safety threat to you or
to others such as:
• Animals, objects or people on or near the track
• Damage or fault at a level crossing
• A vehicle has hit a bridge
• A broken fence or open gate allowing access to the track
Please call Network Rail Emergency 24-hour helpline immediately:
03457 11 41 41 To report a crime Please contact the British
Transport Police: 0800 40 50 40, 999 or Text 61016
https://safety.networkrail.co.uk/healthandwellbeing/https://safety.networkrail.co.uk/risk-management/http://safety.networkrail.co.uk/Alerts-and-Campaign/Safety-Filmsmailto:[email protected]://safety.networkrail.co.uk/tools-resources/resource-library/
-
Network Rail Safety Central
December 2020 ACS Rail Updates Page 25 of 40
Coronavirus (COVID -19)
You will find many resources on this page:
https://safety.networkrail.co.uk/coronavirus-covid-19/ Network Rail
is working very closely with government, industry partners and
health bodies to have the latest advice and messages available. In
order to have the latest updates with this fast-changing situation
we will be linking into. Network Rail’ corporate website for
industry information COVID Guidance for BAME colleagues If you’re
feeling unwell, please follow public health advice immediately.
More information is available on the NHS website. Please Note:
Covid-19 mitigation Network Rail is continually reviewing our
controls. As a result, we can confirm that the use of TVP’s will
not be subject to any additional restrictions beyond those required
under the Network Rail TVP Standard NR/L2/OHS/020 and Sentinel
Scheme Rules. However, it should be reminded that the use of TVP’s
should only be issued within accordance to the TVP standard. 01 May
2020 this short film on social distancing on work sites was
produced. All information correct at time of publication Watch Here
Attachments
• Sentinel Comp and Medical Extension Updat 230620 PDF / 23 Jun
2020
• Information and Advice for Managers and BAME Colleagues During
COVID-19 – Final
12052020 PDF / 27 May 2020
• Masks and Face Shields in Stations (Subs) MP4 / 19 May
2020
• Safety-Advice-NRA20-03-Social-distancing PDF / 18 May 2020
• COVID-19 Masks & Face Shield Visors (Subs) MP4 / 29 Apr
2020
• COVID-19-working on site_ print_3-04-2020_Final PDF / 6 Apr
2020
• COVID-19-working-at-operating-locations_print_3-4-2020_Final
PDF / 6 Apr 2020
• COVID-19-working-at-operating-locations_3-4-2020_Final PDF / 6
Apr 2020
• COVID-19-working on site_3-4-2020_Final PDF / 6 Apr 2020
• NWR Vita Health Virtual
Physiotherapy-1080p-b9ddde8a-c350-4610-ab60-5cc6c2ad0431
MP4 / 2 Apr 2020
• Good practice guide for site working during Covid 19 V1 PDF /
31 Mar 2020
• Guidelines_on_Social_Distancing_for_Key_workers Covid 19 PDF /
31 Mar 2020
• Guidelines for working from home – social distancing and
shielding the vulnerable Covid 19
PDF / 31 Mar 2020
• DSE Guidance v2 MC Final3 COVID 19 PDF / 31 Mar 2020
https://safety.networkrail.co.uk/coronavirus-covid-19/https://www.networkrail.co.uk/coronavirushttps://safety.networkrail.co.uk/covid-guidance-for-bame-colleagues/https://www.nhs.uk/conditions/coronavirus-covid-19/https://safety.networkrail.co.uk/jargon-buster/tvp/https://safety.networkrail.co.uk/jargon-buster/nr/https://safety.networkrail.co.uk/jargon-buster/sentinel/https://network-rail.wistia.com/medias/p2d2yf2bcihttps://safety.networkrail.co.uk/wp-content/uploads/2020/06/Sentinel-Comp-and-Medical-Extension-Updat-230620.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/05/Information-and-Advice-for-Managers-and-BAME-Colleagues-During-COVID-19-Final-12052020.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/05/Information-and-Advice-for-Managers-and-BAME-Colleagues-During-COVID-19-Final-12052020.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/05/Masks-and-Face-Shields-in-Stations-Subs.mp4https://safety.networkrail.co.uk/wp-content/uploads/2020/04/Safety-Advice-NRA20-03-Social-distancing.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/04/COVID-19-Masks-Face-Shield-Visors-Subs.mp4https://safety.networkrail.co.uk/wp-content/uploads/2020/04/COVID-19-working-on-site_-print_3-04-2020_Final.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/04/COVID-19-working-at-operating-locations_print_3-4-2020_Final.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/04/COVID-19-working-at-operating-locations_3-4-2020_Final.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/04/COVID-19-working-on-site_3-4-2020_Final.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/04/NWR-Vita-Health-Virtual-Physiotherapy-1080p-b9ddde8a-c350-4610-ab60-5cc6c2ad0431.mp4https://safety.networkrail.co.uk/wp-content/uploads/2020/04/NWR-Vita-Health-Virtual-Physiotherapy-1080p-b9ddde8a-c350-4610-ab60-5cc6c2ad0431.mp4https://safety.networkrail.co.uk/wp-content/uploads/2020/03/Good-practice-guide-for-site-working-during-Covid-19-V1.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/03/Guidelines_on_Social_Distancing_for_Key_workers-Covid-19.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/03/Guidelines-for-working-from-home-social-distancing-and-shielding-the-vulnerable-Covid-19.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/03/Guidelines-for-working-from-home-social-distancing-and-shielding-the-vulnerable-Covid-19.pdfhttps://safety.networkrail.co.uk/wp-content/uploads/2020/03/DSE-Guidance-v2-MC-Final3-COVID-19.pdf
-
Useful Links
December 2020 ACS Rail Updates Page 26 of 40
Useful Links The following pages contain other useful links and
safety information from various sources which may be relevant to
you.
Item Details
Health and Safety Executive http://www.hse.gov.uk – Website
Government agency responsible for regulating risks to health and
safety arising from work. HSE publications can be downloaded free
in Adobe PDF format.
CIRAS Online http://www.ciras.org.uk – free access
The Confidential Incident Reporting and Analysis System
Freephone number 0800 4 101 101.
Network Rail http://www.networkrail.co.uk – Website
Owner and operator of Britain's railway infrastructure.
Network Rail Standards http://www.ihserc.com/ – subscription
required Network Rail Standards Subscriptions IHS Global Ltd Phone:
01344 328000 Network Rail Standards Management Publications Manager
Nicole Lockwood Phone: 01908 782 481 Network Rail Standards Hard
Copy Document Centre IHS Retail Phone: 01344 328039 Fax: 01344
328005 or email: [email protected] Networ