December 2013 Monthly Update North Dakota Pipeline Authority Justin J. Kringstad December 13, 2013 - Bismarck, ND
13

December 2013 Monthly Update - ND Pipeline Authority

Feb 21, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: December 2013 Monthly Update - ND Pipeline Authority

December 2013 Monthly Update North Dakota Pipeline Authority

Justin J. Kringstad December 13, 2013 - Bismarck, ND

Page 2: December 2013 Monthly Update - ND Pipeline Authority

US Williston Basin Oil Production - 2013

2

2 JJ Kringstad - North Dakota Pipeline Authority 2

Page 3: December 2013 Monthly Update - ND Pipeline Authority

October 2013

Estimated Williston Basin Oil Transportation

3

3 JJ Kringstad - North Dakota Pipeline Authority 3

Page 4: December 2013 Monthly Update - ND Pipeline Authority

Estimated Williston Basin Oil Transportation

4

4 JJ Kringstad - North Dakota Pipeline Authority 4

Page 5: December 2013 Monthly Update - ND Pipeline Authority

Estimated ND Rail Export Volumes

5 JJ Kringstad - North Dakota Pipeline Authority 5

Page 6: December 2013 Monthly Update - ND Pipeline Authority

Cushing $96.36

Brent $108.06 WTI + $11.70

Crude Oil Prices – Dec. 13, 2013

6 JJ Kringstad - North Dakota Pipeline Authority

Page 7: December 2013 Monthly Update - ND Pipeline Authority

Simple Terms Orange – Challenges on existing infrastructure Blue – Lack of pipelines

GREEN – % of gas captured and sold Orange – % flared from wells with at least one mcf sold. Blue – % flared from zero sales wells

August 2013 Data – Non-Confidential Wells

Statewide

Solving the Flaring Challenge

7 JJ Kringstad - North Dakota Pipeline Authority

Page 8: December 2013 Monthly Update - ND Pipeline Authority

Capturing the 12% Faster Well Connections

8 8 JJ Kringstad - North Dakota Pipeline Authority

Page 9: December 2013 Monthly Update - ND Pipeline Authority

9

ND Gas Gathering Statistics

9 JJ Kringstad - North Dakota Pipeline Authority

Page 10: December 2013 Monthly Update - ND Pipeline Authority

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: [email protected]

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

10 JJ Kringstad - North Dakota Pipeline Authority

Contact Information

10

Page 11: December 2013 Monthly Update - ND Pipeline Authority

SUPPORTING DOCUMENTS

Page 12: December 2013 Monthly Update - ND Pipeline Authority
Page 13: December 2013 Monthly Update - ND Pipeline Authority

Oil Loading Rail Facilities

13