A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Project No. WW-000007-007 February 21, 2017 Churchill Rd between Dead Run Dr and Dolly Madison Blvd, McLean Dead Run Force Main Rehabilitation Dranesville District
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Project No. WW-000007-007
February 21, 2017
Churchill Rd between Dead Run Dr and Dolly Madison Blvd, McLean
Dead Run Force Main Rehabilitation
Dranesville District
Project DetailsDead Run Force Main Rehabilitation
Project Overview:• Construct a temporary 14” bypass piping in the VDOT right of way • Line the existing 14” cast iron force main with CIPP lining• Install new 12” CMP storm culverts under five existing driveways to improve drainage• Replace existing 15” concrete culvert at the intersection of Ingleside and Churchill Roads to improve drainage• Restore ditch lines so drainage is improved along Churchill Road• Remove two existing trees in the VDOT right of way that were structurally weak • Add a railing along the trail on Churchill Road near Ingleside for additional safety • Restore pavement along Churchill Road per VDOT requirementsProject Team:• Wastewater Design and Construction Division – Michael A. Gallo, Project Manager• Ken Giles, Senior Engineering Inspector, WDCD• Randall Flowers and Jerry Brede, Wastewater Collections Division
Description:The Dead Run Force Main Rehabilitation Project consists of the lining of 2,700 linear feet of existing 60-year old 14” diameter sanitary sewer force main that runs from the intersection of Dead Run Drive and Churchill Road to Dolly Madison Blvd. This project was substantially completed in September, 2016.
Capital Facilities/Wastewater Design and Construction Division/Wastewater Construction Branch
Dead Run Force Main RehabilitationChurchill Road between Dead Run Drive and Dolly Madison BlvdDranesville District, Tax Map No. 30-2
Capital Facilities/Wastewater Design and Construction Division/Wastewater Construction Branch
Vicinity Map
Before After
Dead Run Force Main Rehabilitation
Capital Facilities/Wastewater Design and Construction Division/Wastewater Construction Branch
Bypass Line Construction in VDOT Right of Way
Before After
Dead Run Force Main Rehabilitation
Capital Facilities/Wastewater Design and Construction Division/Wastewater Construction Branch
CIPP Lining Operation
Before After
Dead Run Force Main Rehabilitation
Capital Facilities/Wastewater Design and Construction Division/Wastewater Construction Branch
Underground Pipe Connections (typical)
Culvert Replacement
Before After
Dead Run Force Main Rehabilitation
Capital Facilities/Wastewater Design and Construction Division/Wastewater Construction Branch