Top Banner
DDMS ORBITER TURNAROUND BRIEFING
28
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

DDMSORBITER

TURNAROUND BRIEFING

DDMSORBITER

TURNAROUND BRIEFING

Page 2: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

04/18/23 For Official Use Only

OVERVIEW

• DOD Mission• Turnaround Plan

– Command Relationships

– Plan Execution

– Support Forces and Resources

• Turnaround Layout

Page 3: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

04/18/23 For Official Use Only

- JSCP/Charter Documents

S3005 - Support transfer of equipment from KSC/ DFRC to ELS

S3003 - Equipment and material record

S5044 - Post landing deservicing / mate toSCA - CLS

3611 - DOD turnaround plan 3611

36007 - DOD TPFDD

- Force Module Menu

- JSCP/Charter Documents

S3005 - Support transfer of equipment from KSC/ DFRC to ELS

S3003 - Equipment and material record

S5044 - Post landing deservicing / mate toSCA - CLS

3611 - DOD turnaround plan 3611

36007 - DOD TPFDD

- Force Module Menu

DELIBERATE PLANNING DOCUMENTS

DELIBERATE PLANNING DOCUMENTS

Page 4: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

DOD MISSION

Support a NASA Led Orbiter Recovery from a Contingency Landing Site

(also Called a “Turnaround Operation”)• Provide Airlift and Sealift • Provide Bare Base Assets and Services

– Latrines, GP Shelters (9), Aircraft hangars (2), AM-2 matting– Power, GSE, vehicles, Air conditioning, communications

• Personnel and Equipment provided as available and without adversely impacting primary mission• All logistics support provided on a reimbursable basis

Page 5: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

KEY ASSUMPTIONS

• Permissive Environment• No Competing Military Actions• NASA Equipment Readily Deployable• Int’l Agreements Remain Valid• Landing Site Ready to Receive Deployment Flow• NASA will make maximum use of host nation

support, local contracts, and commercial services

Page 6: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

DDMS SPACE SHUTTLE OPERATIONS

• Initial Response (3610)– Locate/Search

– Rescue

– Deploy RRT/MIT

– Safe Orbiter/Secure Scene

• Recovery Operations (3611)– Requirements (PRD, RMT, MMT)

– Determine COA/Plan (FuncPlan 3611)

– Execute

Page 7: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.
Page 8: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.
Page 9: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

HISTORY

• STS-3 Turnaround at WSSH in 1982– Stateside Operation Utilizing Rail and road

Transportation

– Augmented Site with In-Place Cool/Purge Units and Fixed Crane for Mating

• An Overseas Turnaround has Never Been Tested!• Renewed Interest within NASA, USA, and DDMS

Page 10: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

• The DOD Manager (COMSTRAT), Manned Space Flight Support Operations, is the Supported Commander

• JTF-DDMS has TACON of Deployed DOD Forces

COMMAND RELATIONS

Page 11: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

ASSET PROVIDER MISSION

JTF DDMS/Supported CC JTF Commander and staff

Strategic Airlift Elements AMC Strategic airlift

Fast Sealift Vessel MSC Strategic sealift

Tanker/Airlift Control Element AMC Airlift support / coordination

Bare Base (Large Facilities) 49 MMG, Holloman AFB Tech teams, hangars, A/C package, shelters

Bare Base Geographic CC Billeting, messing, hygiene

Red Horse/CE Geographic CC Site preparation

Prime Beef Geographic CC Construct Bare Base

Prime Rib Geographic CC Provide Bare Base services

Tactical Airlift Geographic CC Intratheater airlift

Communications Team Geographic CC JTF communications support

Security Forces Team Geographic CC Force protection (if required)

Airport Handlers Team AMC Airlift material processing

Longshore Team MSC Sealift material processing

Land Transportation Team MTMC Land transportation

SNAPSHOT OF DOD RESOURCES REQUIRED

Page 12: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

COCOM/Direct Authority

OPCON

TACON

DIRLAUTH

CHAIN-OF-COMMAND

CINCsStaffs/CATs

USSTRATCOMStaff/CATDDMS

NASARMT

US AmbassadorTo Host Nation

JTF CC(DDMS)

SupportingDOD Units

JTF Staff

NASA DOTLeader

NASAMIT

Host NationLiaison Officer

DeputyDOD Mgr

NASAMMT

Secretary of State

NASADirector

SupportingCINCs

NCA

DOD Manager(USSTRATCOM)

Page 13: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

JOINT TASK FORCE (JTF-DDMS)

OVERSEAS

JTF(DDMS-CC)

DEP JTF(BASE)

HOST NATIONLIAISON

COUNTRYTEAM REP

(DOS)

US BASECOMMANDER

(LOCAL)

AOR CCCAT

J-3(DDMS)

J-4(Geo CC)

J-6(Geo CC)

SECURITY(Geo CC)

CIVIL ENG(Geo CC)

MEDICAL(Geo CC)

PAO(USSTRATCOM)

SERVICES(Geo CC)

ADMIN(Geo CC)

Page 14: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

TURNAROUND PHASES

Deployment Schedule

Days

20 10040 80600

SAFING

DEPLOYMENT

TURNAROUND

REDEPLOY32

30

24

5

Phase IV

Phase III

Phase II

Phase I

Page 15: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

PERSONNEL PLAN

85 89

# Of Days After Landing

1 5 9

13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81

DODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDODDOD0

100

200

300

400

500

600

533364

Total

DOD

NASA

PHASE 1 SAFING

PHASE 3 TURNAROUND

PHASE 2 DEPLOYMENT

PHASE 4 REDEPLOY

# o

f P

erso

nn

el

Page 16: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

PHASE I - ORBITER SAFING(C+0 THRU C+4)

• JTF Staff Forms and Deploys• TPFDD Scrubbed and Executed• RRT & MIT Airlifted• Deploy Critical Safing Equipment• TALCE/Prime BEEF Teams Deploy• Comm Teams Deploy• MSC Ship Mobilized• Stage Sealift Items

Page 17: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

TRANSPORT SAFING EQUIPMENT

• Time Critical--Required 2-5 Days After a Contingency Landing– Equipment is bulky

– TALCE required to support airlift

– Airlift required to support OCONUS delivery

Page 18: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

AIRCRAFT FLOW CONTINGENCY SITE

Day Support C-130 C-17 C-5 Total

C+0 RRT, Other TAL 2 1 3

C+1 Theater 1 1

C+2 TALCE 1 2 3

C+3 NASA Safing equip 1 1 4 6

C+4 NASA Safing equip, Bare Base 1 1 4 6

C+5 NASA Safing equip, Bare Base 1 1 1 3

C+6 Logistics, Bare base 3 3

Page 19: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

PHASE II-DEPLOYMENT(C+5 THRU C+25)

• Bare Base Construction (As Required) • Prime RIB Deploys• Augment Security, Medical, and Weather• MSC Vessel Loads-Sails from POE• Sealift Vessel Arrives at POD Airlift NASA GSE

and Ops Team • TALCE and Prime BEEF Main Body Redeploys

Page 20: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

CRANE REQUIREMENTS

• 800-ton Lattice-boom Truck Crane– DEMAG TC 4000 or equivalent– Crane-body is self-propelled

• Width approx 16’5”• Height approx 12’ 11”• 30+ flat-bed trailer loads accompany crane-body

• 250-ton lifting crane– American model 9520 or equivalent– Carrier width 13’– Carrier height 13’ 6 ½”

Page 21: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

• NASA Begins 24-hour Turnaround Operations• JTF Staff Sustains Deployed Force• Pathfinder and Shuttle Carrier Aircraft (SCA)

Arrive• Orbiter Mated to SCA

PHASE III-TURNAROUND OPS(C+26 THRU C+56)

Page 22: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

ORBITER MATING

Page 23: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

PHASE IV-FERRY FLIGHT & REDEPLOYMENT (C+57 THRU C+89)

• Pathfinder And SCA Depart On Ferry Flight to KSC

• Tear Down Bare Base Facilities• Redeploy NASA, DOD Personnel and

Equipment• Disestablish JTF

Page 24: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

DOD SITE SUPPORT REQUIREMENTS

• Safing/Deservicing Area – 200 ft by 200 ft , taxiway access, 315 psi capable

• Mate/Demate Area– 200x200 ft, taxiway access, grounding system, 315 psi

capable

• Staging/Assembly Area– Hard surface, lighted, access to above areas

Page 25: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

TEMPORARY FACILITIES SUPPORT

• Operational Support Facilities– Located near mate/demate area and servicing areas

– Total 12,000 square feet

• Equipment Storage/Processing Facilities– 8,000 sq ft for non-hazardous equipment storage

– 2,000 sq ft requires temperature control and will be used for HAZMAT processing

• Locate 1,250 ft from other facilities

• Supervisors Facility - Accommodate 6 personnel• Hangar Access (32h x 30w x 35l) for tailcone assembly

Page 26: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

04/18/23 For Official Use Only

“Power Check Pad”

Orbiter Deservice Area

Operational Parking Apron

Taxiway D

Ball Bar

Taxiway C

Water

12345

6789GP

Shelters

GP Shelters

MobileLatrine

MobileKitchen

1

2Hangars

Power

Runway 02 / 20

MLMK

PrevailingWind

MateArea

TYPICAL TURNAROUND AREA

Page 27: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

OTHER FORCES AND EQUIPMENT

• TALCE (C2, Aerial Port, Maintenance)• Bare Base Support

– Work Site Facilities • 2 Hangars; 9 General Purpose Shelters with Power

• On-Site Messing and Latrines

– Harvest Eagle Billeting if Required

– RED HORSE, Prime BEEF, Prime RIB

– Communications

• Medical (Joint DOD/NASA team)• Also: Fire, Security, Transportation

Page 28: DDMS ORBITER TURNAROUND BRIEFING DDMS ORBITER TURNAROUND BRIEFING.

QUESTIONS ?