Regd Off: 83/86, G.I.D.C Industrial Estate, Nadiad - 387 001, India. Tel.: +91 268 2551381/82 Fax: +91 268 2565068 Email: [email protected] CIN: L15400GJ1990PLC014265 Corp. Off: Marathon Innova, B2, G01, Ground Floor, G. K. Road, Lower Parel, Mumbai 400 013. INDIA. Tel.: +91 22 6141 5555, Fax: +91 22 6141 5577, Email: [email protected], Web: www.adf-foods.com August 17, 2020 DCS-CRD BSE Limited Phiroze Jeejeebhoy Towers, Dalal Street, Mumbai 400 001 Scrip Code: 519183 DCS-CRD National Stock Exchange of India Ltd. Exchange Plaza, Bandra - Kurla Complex, Bandra(E), Mumbai 400 051 Scrip Code/Symbol: ADFFOODS Dear Sir/Madam, Subject: Newspaper Publication - Financial Results of ADF Foods Limited. Pursuant to Regulation 47 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed copies of the Un-audited Financial Results of the Company for the First Quarter ended June 30, 2020 published in "Western Times" - Ahmedabad Edition (English & Gujarati) Newspapers on August 15, 2020. You are requested to kindly take the above disclosure on record. Yours faithfully, For ADF Foods Ltd. Shalaka Ovalekar Company Secretary Encl: A/a F O ODS LTD. 7eedi119 lite wodd ..
3
Embed
DCS-CRD€¦ · Chief Executive Authority, Surat Urban Development Authority, “SUDA Bhavan”, Vesu-Abhva Road, Vesu, Surat-395007, Invites on-line e-tender for works mentioned
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
DCS-CRD National Stock Exchange of India Ltd. Exchange Plaza, Bandra - Kurla Complex, Bandra(E), Mumbai 400 051 Scrip Code/Symbol: ADFFOODS
Dear Sir/Madam, Subject: Newspaper Publication - Financial Results of ADF Foods Limited. Pursuant to Regulation 47 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed copies of the Un-audited Financial Results of the Company for the First Quarter ended June 30, 2020 published in "Western Times" - Ahmedabad Edition (English & Gujarati) Newspapers on August 15, 2020. You are requested to kindly take the above disclosure on record. Yours faithfully, For ADF Foods Ltd. Shalaka Ovalekar Company Secretary Encl: A/a
NOTES :-01. The above is an extract of the detailed format of the Financial Results for the Quarter
ended 30th June, 2020, filed with the Stock Exchange under regulation 33 of the SEBI(Listing Obligation and Disclosure Requirements) Regulations, 2015. The full format of thesaid Financial Results are available on the website of the Company and stock exchangewebsite at www.bseindia.com.
Particulars
CIN : L65910GJ1993PLC019090
For Ceejay Finance LimitedSd/- Deepak PatelManaging DirectorDIN:00081100
(Rs. In Lakhs except per share data)Year
Ended31.03.2020
Audited30.06.2019Unaudited
30.06.2020Unaudited
Total income from operations (net) 383.82 420.50 1734.98Profit before exceptional and extraordinary item 162.32 195.46 637.62Profit before tax after exceptionaland extraordinary item 162.32 195.46 637.62Profit after tax after exceptionaland extraordinary item 123.00 143.41 482.03Total Comprehensive Income for the period[Comprising Profit / (Loss) for the period (after tax)and Other Comprehensive Income (after tax)] 126.79 144.02 469.60Equity Share Capital 345.00 345.00 345.00Reserves (excluding Revaluation Reserve) as shownin Audited Balance Sheet of previous year - - 4438.96Earnings Per Share (of Rs. 10/- each) (for continuingand discontinued operations) Basic and Diluted 3.57 4.16 13.97
LIPPI SYSTEMS LTD.CIN L22100GJ1993PLC020382
Reg.Off: 3rd Floor, Satya Complex,Opp.IOC Petrol Pump, Nr.Ashwamegh IV,132 ft Ring Road,Satellite,Ahmedabad-380015
Unaudited Standalone Financial Results For The Quarter Ended On June 30, 2020
NOTES:1 Investor can view the unaudited financial results of the company for the quarter
ended 30th June, 2020 on company's website: www.lippisystems.com or on thewebsite of the BSE www.bseindia.com.
Place : AhmedabadDate : 14/08/2020
(Rs. In Lacs)
By Order Of The BoardNandlal J.Agrawal(Managing Director)(DIN :- 00336556 )
1 Total Income From Operations 229.48 313.05 432.07 1,521.142 Profit /(loss) before exceptional items and tax (47.23) (31.61) 44.92 22.213 Profit / (loss) before tax
(after Execption and/or Extraordinary items) (47.23) (31.61) 44.92 22.214 Profit / (loss) for the period after tax
(after Execption and/or Extraordinary items) (44.27) (31.71) 33.37 18.195 Other Comprehensive income (OCI) (0.66) 3.08 (0.75) (2.63)6 Total Comprehensive Income for the period (7+8) (44.93) (28.63) 32.62 15.567 Paid - up equity share capital
(face value of share : Rs 10 each) 700.00 700.00 700.00 700.008 Earnings per share (EPS) of Rs 10 each ( Not annualised) :
PUBLIC NOTICEGUJARAT ENERGY TRANSMISSION CORPORATION (GETCO) is a state Transmission Utility U/S 39 ofThe Electricity Act 2003 (Hereinafter referred as the Act) as declared by Government of Gujarat VideNotification No. GHU-2004-31-GEB-1104-2946-K, dated 29.05.2004. It being so declared, Government ofGujarat in exercise of the powers U/S 164 of The Act, is further pleased to issue Notification No. GU-2007-5-ELA-1106-4884-K dated 05.01.2007, conferring powers of Telegraphic Authority, under Indian TelegraphAct, 1885, to GETCO and its Officers for laying Electricity Lines and erecting Towers for supply and transmissionof electricity in the state of Gujarat as deemed necessary subject to the conditions prescribed under the saidNotification.Through this public notice, it is hereby informed to the public that, in the public interest GETCO has decided,to install / lay Electricity Lines / Towers etc., for transmission of Electricity as under :Sr. Name & brief particulars of the Scheme Area of Work EstimateNo. Capital Cost
(Rs. Lakhs)01. Erection of 66KV S/C Karamsad - V.U. Nagar line on Vidyanagar, Gana, Sandesar, Mogari, 824.57
D/C Panther Tower with ACSR Panther conductor Karamsad & surrounding area, Ta &having length 0.5 RKM and partly with 630 sq.mm. Dist: Anand(3+1) underground cable having length 5 RKM underDinkar Yojna (Total Route Length: 05 + 5 = 5.5 RKM)
02. Erection of 400KV LILO of both circuit of 400KV D/C Dholera, Mahadevpura, Mundi, 861.90Fedra (Pachchham,) - Dholera SIR ‘AA’ line to Dholera Gandhipara, Panchi and surroundingSolar Park S/S - 9.666 KM with Twin AL-59 conductor area, Ta. Dholera, Dist: Ahmedabadon 400KV M/C Tower(Total Route Length: 9.666 RKM)
03. Erection of 66KV LILO Bamangam from 66KV Anklav- Bamangam, Gambhira, Dewapura, Chamara, 297.35Navakhal line on D/C tower with ACSR Panther Sankhyad, Narpura, Nawapura, Bilpad,conductor having route length 7.395 RKM and Fatehpura, Jilod, Manpura, Navakhal, Haripura,establishment of new 66KV Bamangam Sub-station Kinkhlod Moti Sherdi, Kothiyakhad(Total Route Length : 7.395 KM) & surrounding area Ta: Anklav, Dist: Anand
04. Erection of 66KV LILO Mahijada from 66KV Salejada - Adasar, Kathvada, Kodariyapura Dharoda, 113.79Navagam line on D/C tower with ACSR Panther Navagam, Muktipura, Mahijada, Vasai,conductor having route length 2.830 RKM and Timba, Saroda, Chandisar, Bareja, Navapura &establishment of new 66KV Mahijada Sub-station surrounding area Ta: Dholka, Dist: Ahmedabad.(Total Route Length : 2.830 RKM)
05. Erection of 66KV LILO Thavad from 66KV Relia - Thavad, Pathoda, Medhor na Muvada, Kashipura, 98.313Demai line on D/C tower with ACSR Panther Gokal na Muvada, Thavad Iat, Suki, Wanta, Borol,conductor having route length 2.445 RKM and Kawant, Karaji na Muvada, Vishnupura,establishment of new 66KV Thavad Sub-station Hathipura, Himmatji na muvada, Lalpura,(Total Route Length : 2.445 RKM) Shankarpura, Chaptia, Wardhara, Sultanpura,
06. Erection of 66KV LILO Bhutiya from 66KV Relia - Bhutiya, Virania, Laletra, Muvada, Kupaji 50.865Jorapura line on D/C tower with ACSR Panther na Muvada, Gotar na Lat, Chora Dungariconductor having route length 1.265 RKM and Muvada, Gamerji na Muvada Ts: Kapadwanj,establishment of new 66KV Bhutiya Sub-Station Dist: Kheda ,Bhathla na Kua & Mangalpura Lat(Total Route Length : 1.265 RKM) Ta:Balasinor, Dist: Mahisagar, And
surrounding area07. Erection of 66KV S/C Kuha-Dhamatwan line with Kuha, Dhamatvan and Surrounding 230.00
ACSR panther conductor on Tower, H-frame and 630 villages.mm2 XLPE U/G cable under Ranasan Transmissiondivision.(Total Route Length : 8 RKM)
And whereas, the above referred proposed work is approved by the competent authority under the Act.And whereas, for such purpose towers will be installed and overhead lines will be passing through villages/areas as above.Through this public notice, GETCO hereby intends to get co-operation during laying of transmission line.GETCO shall make provisions to give reasonable compensation towards loss or damage occurred to thestanding crops/trees, as per the Act. Sd/-
(R.K. Patel)Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd.Tr. Circle Office : Nadiad
NOTIFIED AREA AUTHORITYGIDC-VAPI
TENDER NOTICE NO. 07/2019-20Tender for nine (09) works having estimated cost
from Rs 4.67 lakhs to 334.89 lakhs are invited by theChief Officer, Notified Area, GIDC-Vapi.
For off-line tender Sr.No.1 to 2 the Intending bidder isrequested to kindly go through the details tendernotice thoroughly before obtaining blank tendercopies from the concerned offices.Date of issue : 18.08.2020 to 29.08.2020.Date of receipt : 05.09.2020 up to 16:00 Hrs. (onlythrough R.P.A.D./Speed Post/Courier)Date of opening : 10.09.2020 at 12:00 Hrs.For on-line tender Sr. No. 3 to 9 the procedure forbidding, relevant details viz. Last date of receipt,submission of documents and details, EMD, tender feeetc. & date of opening of Bid is given in the detailedtender notice on website www.nprocure.com. Theintending bidder is requested to kindly go through thedetailed tender notice thoroughly before bidding andwhich will form a part of tender agreement.Date of Downloading & Submission of TenderDocuments: 18.08.2020 to 05.09.2020Date of Submission in Physical Form : 07.09.2020 to09.09.2020Opening of Tender : 10.09.2020 at 12:00 hrs by CHIEFOFFICER, Notified Area, GIDC-VAPI.The detailed tender notice can be seen from the officeNotice Board. For any further details if desire, can beavailable in the office of the Chief Officer, Notified Area,GIDC-VAPI (Phone NO. 0260-2421596) during the officehours.
No. INF/Valsad/249/20
Sd/-CHIEF OFFICER (NA)
GIDC-VAPI
Chief Executive Authority, Surat Urban Development Authority, “SUDABhavan”, Vesu-Abhva Road, Vesu, Surat-395007, Invites on-line e-tenderfor works mentioned below from the eligible contractors registered inappropriate Class with State PWD/CPWD/Western Railway, S.M.C. andSUDA. The details of these works are available on Website https://suda.nprocure.com and https://www.nprocure.com up to dt. 29.08.2020
Surat Urban DevelopmentAuthority (SUDA) Surat
On line e-tendering Notice No: SUDA/CB/07/2020-21
No.: Mahiti/Surat/452/2020
Sr. Name of WorkNo.
1. Development of infrastructure work in Awas Campus at Final Plot No.384, T.P.S. No. 35 (Kumbharia - Saroli - Saniya Hemad - Devedh), atDevedh Dist. Surat.
Sd/-Chief Executive Authority
Surat Urban Development AuthoritySurat
CHANGE OF NAMEI have changed my name from
RAKESHKUMARCHANDUBHAI CHOKSHI to
new name RAKESHCHANDUBHAI CHOKSHI
Add.: C-102, Kala Tirth Flats,Satellite, Ahmedabad.
1016A
CHANGE OF NAMEI have changed my name from
CHAULABENRAKESHKUMAR CHOKSHI
to new name CHAULARAKESH CHOKSHI
Add.: C-102, Kala Tirth Flats,Satellite, Ahmedabad.
1016
CHANGE OF NAMEI have changed my name from
PATEL KANUBHAIBABALDASto new name
PATEL KANIYALALBABALDAS
Add.: 19, Adhunik ParkSociety, Bapunagar,
Ahmedabad. 1014
CHANGE OF NAMEI have changed my name from
PATEL RAJ SAMIRBHAI tonew name CHAUDHARI RAJ
SAMIRBHAIAdd.: AT & PO Kanpur, Ta.Idar, Dist. Sabarkantha -
383450 C073
CHANGE OF NAMEI have changed my name from
MOHAMMEDSAAADASLAMBHAI MANSURI to
new name SAHADASLAMBHAI MANSURIAdd.: 1061/1, Jivan Pole,
Panchpatti, Kalupur,Ahmedabad - 1
1015
CHANGE OF NAMEI have changed my name fromISPAK to new name ASHFAQ
CHAWKHAN SHAIKHAdd.: D-8, Al- Amin Society Nr,
Mubarak Masjid, Vejalpur,Ahmedabad.
1015A
DisclaimerA d v e r s t i s e m e n tappeared in this NewsPaper have not beenverified factually and“WESTERNTIMES” doesnot stand responsible forthe sales proposition.
Trump plans to accept Republican presidential nomination at WHWashington,
US President DonaldTrump said that he plans todeliver his conventionspeech while formally ac-cepting the Republicanpresidential nominationfrom the White House lawn,according to media reports.
“I’ll probably be givingmy speech at the WhiteHouse because it is a great
place. It’s a place that makesme feel good. It makes thecountry feel good,” Xinhuanews agency quoted Trumpas saying to the New YorkPost in an exclusive inter-view on Thursday. Earlierthis week, he had floated theidea of giving the speech ateither the White House orGettysburg, Pennsylvania,an American Civil War
battlefield. Trump told theNew York Post that he wouldvisit Gettysburg at a laterdate. “We’d do it possiblyoutside on one of the lawns.We have various lawns, sowe could have it outside,” hesaid, citing the ongoingcoronavirus pandemic as areason. Trump’s intent togive the speech at the WhiteHouse triggered criticismfrom the Democrats, whosaid it would be both illegaland unethical for the Presi-dent to do so.A federal law
known as the Hatch Actgenerally forbids the use ofgovernment property andemployees for political ac-tivities with some excep-tions “Whether it’s legallywrong or ethically out of thequestion, it shouldn’t evenhave been something thatwas expressed,” HouseSpeaker Nancy Pelosi said.“For the President of the USto degrade once again theWhite House, as he has doneover and over again by say-ing he’s going to completely
politicize it, is somethingthat should be rejected rightout of hand,” she added. Thepandemic, which has in-fected over 5 million peopleand killed more than160,000 in the US, has forcedthe Republican Party toscale back its national con-vention, scheduled for Au-gust 24-27, by moving mostof the activities to be heldonline, while only some in-person business meetingswill take place in Charlotte,North Carolina.
NOTES :-01. The above is an extract of the detailed format of the Financial Results for the Quarter
ended 30th June, 2020, filed with the Stock Exchange under regulation 33 of the SEBI(Listing Obligation and Disclosure Requirements) Regulations, 2015. The full format of thesaid Financial Results are available on the website of the Company and stock exchangewebsite at www.bseindia.com.
Particulars
CIN : L65910GJ1993PLC019090
For Ceejay Finance LimitedSd/- Deepak PatelManaging DirectorDIN:00081100
(Rs. In Lakhs except per share data)Year
Ended31.03.2020
Audited30.06.2019Unaudited
30.06.2020Unaudited
Total income from operations (net) 383.82 420.50 1734.98Profit before exceptional and extraordinary item 162.32 195.46 637.62Profit before tax after exceptionaland extraordinary item 162.32 195.46 637.62Profit after tax after exceptionaland extraordinary item 123.00 143.41 482.03Total Comprehensive Income for the period[Comprising Profit / (Loss) for the period (after tax)and Other Comprehensive Income (after tax)] 126.79 144.02 469.60Equity Share Capital 345.00 345.00 345.00Reserves (excluding Revaluation Reserve) as shownin Audited Balance Sheet of previous year - - 4438.96Earnings Per Share (of Rs. 10/- each) (for continuingand discontinued operations) Basic and Diluted 3.57 4.16 13.97
Total income from operations(net) 109.44 221.69 646.38 896.66Net Profit/(loss)(before Tax, Exceptional and/orExtraordinary items) 12.51 (34.78) 8.72 1.51Net Profit/(loss)before Tax(after Exceptional and/orExtraordinary items) 12.51 (34.78) 8.72 1.51Net Profit/(loss) after Tax(after Exceptional and/orExtraordinary items) 9.29 (23.47) 8.72 1.2Total Comprehensive Income (Comprisingprofit/(loss) for the period after tax 9.29 (23.47) 8.72Paid up equity share capital 550.20 550.20 550.20 550.20Reserve excluding Revaluation Reserves - - (316.57) (325.29)Earning per Share(Face value Rs 10)(Not annualized)(a) Basic 0.17 (0.43) 0.16 0.02(b) Diluted 0.17 (0.43) 0.16 0.02
Quarterended
on30.6.2020
Quarterended
on31.3.2020
Twelvemonthsended
31.3.2020
Twelvemonthsended
31.3.2019
Statement of Standalone Unaudited Results for the Quarter ENDED 30/06/2020
PARTICULARS
By order of Board of DirectorSHREE GANESH ELASTOPLAST LIMITED
Mihir Shah (Director)(DIN:02055933)
Place: AhmedabadDate : 13 August, 2020
Rs. in Lakhs
Notes: Notes: The above is an extract of detailed format of Financial Result filed with StockExchange under Regulation 33 of the SEBI(LODR)Regulations, 2015. The Full format of theresult is available on the website of Stock exchange www.bseindia.comand also on company’swebsite www.ganeshelastoplast.com.
Unaudited Standalone Financial Results For The Quarter Ended On June 30, 2020
NOTES:1 Investor can view the unaudited financial results of the company for the quarter
ended 30th June, 2020 on company's website: www.lippisystems.com or on thewebsite of the BSE www.bseindia.com.
Place : AhmedabadDate : 14/08/2020
(Rs. In Lacs)
By Order Of The BoardNandlal J.Agrawal(Managing Director)(DIN :- 00336556 )
1 Total Income From Operations 229.48 313.05 432.07 1,521.142 Profit /(loss) before exceptional items and tax (47.23) (31.61) 44.92 22.213 Profit / (loss) before tax
(after Execption and/or Extraordinary items) (47.23) (31.61) 44.92 22.214 Profit / (loss) for the period after tax
(after Execption and/or Extraordinary items) (44.27) (31.71) 33.37 18.195 Other Comprehensive income (OCI) (0.66) 3.08 (0.75) (2.63)6 Total Comprehensive Income for the period (7+8) (44.93) (28.63) 32.62 15.567 Paid - up equity share capital
(face value of share : Rs 10 each) 700.00 700.00 700.00 700.008 Earnings per share (EPS) of Rs 10 each ( Not annualised) :