Top Banner
DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN REVIEW 26 JULY 2012
20

DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

Jan 05, 2016

Download

Documents

Damon Haynes
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

1

DCALDesign review

26 July 2012

Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie,

Arturo Tauro, Corrado Gargiulo

MECH

DCAL DESIGN REVIEW 26 JULY 2012

Page 2: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

2 DCAL DESIGN REVIEW 26 JULY 2012 NEW CYLINDRICAL ROLLERS

before

now

ROTATOR INTERFACES

VERIFICATION

LOAD TRANSFER BALLS

Page 3: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

3

SLIDING PLATFORM

2000 mm

DCAL DESIGN REVIEW 26 JULY 2012

Page 4: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

4

SLIDING PLATFORM DCAL DESIGN REVIEW 26 JULY 2012

Page 5: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

5 DCAL DESIGN REVIEW 26 JULY 2012

Sliding platform vs rotator i/f verification ok

Page 6: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

6 DCAL DESIGN REVIEW 26 JULY 2012

40°

20°

60°

0°Sliding platform & rotator @ (°) ok

Page 7: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

7 DCAL DESIGN REVIEW 26 JULY 2012

?

Rotator Rails interference with

miniframe: Rails cut not in the last 3D CAD model

Page 8: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

8 DCAL DESIGN REVIEW 26 JULY 2012

2000 mm150 mm

* Sliding platform vs services ok

Page 9: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

9 DCAL DESIGN REVIEW 26 JULY 2012

OK

? TO BE SHORTENED

OK

Page 10: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

10 DCAL DESIGN REVIEW 26 JULY 2012

1/3 SUPERMODULE PUSHING JIG

Page 11: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

11

Drawings approved for production at DCAL Design review 12 June 2012

DCAL DESIGN REVIEW 26 JULY 2012

Page 12: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

12 DCAL DESIGN REVIEW 26 JULY 2012

90% production done

…on going-rollers machining-welding (TBD)-painting1 week estimated working time to completion

Page 13: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

13 DCAL DESIGN REVIEW 26 JULY 2012

?

-welding TBD the cut in the bracket for services

Page 14: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

14 DCAL DESIGN REVIEW 26 JULY 2012

40°

20°

60°

Dcal bridge

Page 15: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

15 DCAL DESIGN REVIEW 26 JULY 2012

Bridge production drawing

final revision on going

Page 16: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

16 DCAL DESIGN REVIEW 26 JULY 2012

n.8 length ~3700mmMinimum number needed n.2+2 spare

n.2 length ~3300mm TBD

n.4 length ~3600mm TBD

n.8 length ~1600mm

TBD by Manoel

production drawings by whom?Bridge rails

Page 17: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

17 DCAL DESIGN REVIEW 26 JULY 2012

Constraints to define rails length for 60°

Page 18: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

18 DCAL DESIGN REVIEW 26 JULY 2012

DRILLING N.6 M20 HOLE X BEAM FOR BEAM HANDLINGNEED FORMAL APPROVAL

DCAL rails

Page 19: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

19 DCAL DESIGN REVIEW 26 JULY 2012

DCAL rails LOAD TEST

RAILS INSTALLATION IN SXL2 COMPLETED BY THE END OF THE WEEK

Page 20: DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

20 DCAL DESIGN REVIEW 26 JULY 2012

PROCEDURES

Needed soon

Load test in SXL2Survey in SXL2Survey in L3