Introduction. DC over current protection.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 2 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 3 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 4 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 5 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 6 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Calculation is continued on the next page.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 7 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Calculation is continued on the next page.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 8 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 9 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
DC Traction rectifier short circuit modeling The block diagram
for a traction system is given below.
AC Side impedances. -Short circuit power Sm (ex1 or Lo1 for the
AC system reactance.) -Short circuit power of the transformer (ext
or Lot for transformer reactance, ert or Rot for transformer
resistance.) -Cable impedance (exc or Loc for cable reactance, erc
or Roc for cable resistance.) DC side impedances. - Rectifier. L
rect & R rect. Generally L rect = 10E-6H, R rect =1 E-3 ohm,
-Cable impedance (Lc for cable reactance, Rc for cable resistance.)
The European Standard EN50327 provides a graphical method for
approximating the Short circuit current response on a traction
system. An extract is provided on the next page of the method used
for the calculation. The full method is provided on J drive in,
J:\E-Gate\Power\Staff Working Folders\Stuart creations\Sub SLD's
& PROT DOT\DOT Prot settings & Calcs. A calculation has
been performed on Sy3 feeder. See, J:\E-Gate\Power\Staff Working
Folders\Stuart creations\South Yarra fdr settings.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 10 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
The curve above varies depending on the configuration of the sub
station. For accurate modeling the following quantities need to be
provided in order to get the model correct. Several companies are
available to do this modeling. Secheron (Imtram), Mot Macdonald
(Melbourne), URS(Melbourne)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 11 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
1. 12 pulse sub or 6 pulse sub. Single or Parallel rectifiers.
Inter phase
transformers. Usually the Single Line Diagram will cover this.
2. Rectifier transformer full load copper loss 3. Rectifier
transformer no load core loss 4. Coupling factor (K). Derived from
Transformer Short circuit reactances and
losses. 5. Tappings applied on the transformer when the sub is
put on load.
The transformer test certificate from the manufacture should
state many of these factors. If newly designed, it must be
specified in the build of the transformer. We can continue with the
graphical solution demonstrated in EN50237/A1 or allow the
consultants to model the system with MATLAB or there own
software.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 12 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
DC over load and full load rating factors. Cabling design help
for DC systems. Type 76 DC, SEPCOS I, SEPCOS NG, MITRE and DDL
protection relays are used extensively through out the tram
network. A need has arisen for checking that the protection profile
used in these relay matches the thermal heating characteristics of
the 400mm2 screened V90 PVC cable & 185mm2 trolley wire used to
feed the over head system. Many feeders exit the sub stations
buried in conduit for a certain distance then run up to aerial
connection points. Some subs such as Northcote go direct to O/H
lines from the building. Tables will be presented here that give de
rating factors for single core DC cables which are either
direct buried as a single core or a group run over head in air
as a single core or as a group.
For under ground cabling de rating factors will be referenced
back to AS3008 to ensure calculations are done to locally specified
conditions. See clause 3.4.5 below of AS 3008.
These values must be used in selecting de rating factors for
cables from tables used further on in this document.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 13 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Consideration may need to be given to conditions in clause 3.4.6
of AS 3008 also.
Permissible conductor temperatures for normal use (not under
short circuit condition) and maximum permissible use are given in
Table 1 of AS3008. This gives the maximum operating temperature of
the cable conductor. (Not the outer sheath, screen etc)
Notes from the table are attached on the next page.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 14 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Given on the next page is an example of calculating how long
(time) a conductor can run for with a current that exceeds the
nominal rating of the cable. The cable time constant is required
along with a rating factor a, that normalizes the over load current
rating to the cable nominal rating. See on next page. This may be
handy for calculations.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 15 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 16 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Direct buried cabling. (Current Rating) You may only use
conductor ratings from column 2 and 7 in Table 13-44 below. These
are applicable to DC systems with remote return conductors. The top
of the table provides ratings for Copper. The bottom section for,
Aluminum.
Conversion factors are given, f1 and f2. f1 is for ground
temperature de rating. Table 13-54. (Attached) f2 is a de rating
for cables grouped in multiples. Table 13-59. (Attached) Final
rating = Table 13-44 rating x f1 x f2
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 17 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Direct buried cabling. (De Rating under ground, f1) From AS 3000
clause 3.4.5 above the ambient conditions are stated.
Soil ambient specified at 25 Deg C. Depth of laying 0.5m. See
definition given above. Thermal resistivity of soil taken as 1.2
Deg C.m/W. Load factor. Definition given below.
AS 3008 table 27(2), table 28 (1), table 28(2) and table 29 give
optional de rating factors if any of these parameters are changed.
See Appendix A. Load Factor Load factor is defined as follows.
A load factor of 0.7 will be used here.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 18 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
From Table 13-54 conversion factor f1 is derived. By selecting
the cable permissible operating temp (V90 cable), soil temp (25 Deg
C) and using the 1 K.m/W value for thermal resistivity should meet
AS 3008 requirements. K is for Kelvin in this table. AS 3008 uses
Deg C which is identical.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 19 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Direct buried cabling. (De Rating for buried cables grouped in
multiples, f2) Here the de rating factor takes into account the
number of cables buried, load factor and soil thermal resistivity
under which the cables operate. From Table 13-59 conversion factor
f2 is derived. By selecting the number of cables used, (soil temp
25 Deg C and using the 1 K.m/W) one should easily meet AS 3008
requirements.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 20 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Layed or supported over head cabling. (Current Rating) You may
only use conductor ratings from column 2 and 7 in Table 13-45
below. These are applicable to DC systems with remote return
conductors. The top of the table provides ratings for Copper. The
bottom section for, Aluminum.
Conversion factors are given, f1 and f2. f1 is for air
temperature de rating. Table 13-51. (Attached) f2 is a de rating
for cables grouped in multiples. Table 13-53. (Attached) Final
rating = Table 13-45 rating x f1 x f2
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 21 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
From Table 13-51 conversion factor f1 is derived. By selecting
the cable permissible operating temp (V90 cable) and air temp (40
Deg C), which should meet AS 3008 requirements. K is for Kelvin in
this table. AS 3008 uses Deg C which are identical
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 22 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Layed or supported over head cabling. (De Rating for cables
grouped in air, f2) Here the de rating factor takes into account
the number of cables grouped in air. From Table 13-53 conversion
factor f2 is derived. By selecting the number of cables used, and
their arrangement one should easily meet AS 3008 requirements.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 23 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Feeder cable time constant A guide to cable time constants is
given here. Due to the variables involved it is best to test the
relevant conductors in a test rig to determine cable time
constants. Design guides are given below.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 24 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Test currents have been applied with a 3000A test rig (1000A
applied) to 400mm2 cable buried in conduit enclosed in gravel.
Heating results are shown here. A cable temperature rise of 60 deg
C was attained over 4 hours. The time constant worked out to
56min.
Test currents have been applied with a 3000A test rig (600A
applied) to 185mm2 trolley wire. Heating results measured show the
trolley wire reaching 115 Deg C before interrupting the test. Lower
test currents must be applied. See next page. The next test was set
to 300A applied load with the Schwartz relay set to begin the trip
timed sequence at 500A (14mV). Cable temperature rise matched the
profile of the relay to within a few degrees. Once the cable
temperature had stabilized at the 300A mark, 500 plus Amps were
applied to see if the relay and cable would track once the trip
timed sequence had begun. The relays temp rise trip sequence was
observed to be double the rise of the cable. Tripping occurred
within 5 min.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 25 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 26 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
Appendix A. AS 3008 table 27(2), table 28 (1), table 28(2) and
table 29 give optional de rating factors if any of the given design
parameters from Clause 3.4.5 are changed.
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 27 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
-
Yarra Trams Power and Communications
DC protection relay settings
\\corp.tramco.com\fs\users\stuart.orr\My Documents\Word\DC prot
relay calcs\DC protection relay calcs.doc Page 28 of 28 Created on
2/02/2012 8:58:00 AM ( tables from ABB Switch Gear Manual 10th rev
edition)
The ABB switch gear manual 10th edition gives formulas for
calculating the DC resistance of a cable from the Cross Sectional
Area of the cable.