DC Field User Program Statistics
Dec 30, 2015
DC Users
• 2007 – 404 Total users• 2008 – 313 Total users
• 2007 – 185 Distinct Projects • 2008 – 123 Distinct Projects• 2009 – already ~ 180 (unofficial)
User Committee Meeting 2008November 5, 2008 Slide 3
2008 New PIs• 96 Distinct PIs• 16 new (17%)
Bartkowiak, MarekBonn, DougBozovic, IvanColdea, AmaliaGervais, GuillaumeHu, QingKawamoto, TadashiLuke, Graeme
Mammadov, Eldar Rodrigues Jr, DurvalSirtori, CarloSoffa, WilliamSutherland, MichaelWessles, BruceZheludev, Andrey Zudov, Michael
23 New Users in 2009 (17 in 2008)Affronte, Marco CNR, stituto Nazionale
di fisica della materialAshoori, Ray Massachusetts Institute of
TechnologyDickerson, James Vanderbilt UniversityDressel, Martin University of StuttgartFerdeghini, Carlo University of Genova
CNR/INFM-LAMIAGanapathy, Sambandamurthy University at Buffalo-State University of New
YorkGedik, Nuh MITGeibel, Christoph Max Planck InstituteKarpinski, Janusz ETH-ZurichKnappenberger, Kenneth Florida State UniversityKoyama, Keiichi Tohoku UniversityLevy, Jeremy University of PittsburghNewman, Nathan Arizona State UniversityOpeil, Cyril Boston CollegeSeehra, Mohindar West Virginia UniversitySuchalkin, Sergey SUNY at Stony BrookTerashima, Taichi National Institute for
Materials ScienceTesanovic, Zlatko Johns Hopkins
UniversityTsujii, Hiroyuki Kanazawa UniversityTutuc, Emanuel The University of Texas at AustinValla, Tonica Brookhaven National LaboratoryVasanelli, Angela University Paris
Diderot
Success rate for magnet time
• 2007 – Requests – 374–Accepted – 293 – 78%–Rejected - 81 – 23%
• 2008 – Requests – 339–Accepted – 245 - 72%–Rejected – 94 – 28%
• 2009 last quarter – Hybrid: 14 requests for 4 weeks of timeResistive: 58 requests for 28 weeks of time
Energy BudgetSitters
⅓ × 20MW × 31 Hr ~ 200 MWHr
Sweepers¾ × 20MW × 31 HR ~ 450 MWHr
Sitters⅓ × 30MW × 31 Hr ~ 300 MWHr
Sweepers¾ × 30MW × 31 HR ~ 675 MWHr