211,559$ STONE CIRCLE 222,694$ SC-00025 MECHANICAL JOHN J. KIRLIN 39,458,025$ 51,361,939$ 100% 21.0% 10,808,020$ 25.7% 10,921,344$ SUPERIOR MECHANICAL SYSTEMS, INC. 10,940,563$
739A - 739C HVAC Plumbing & Fire Sprinklers ADD WORK ORDERS 12 008 736$ 2 113 302$ PGC MECHANICAL 2 198 185$
MU
R0FIN
AL M
UR
PER
IOD
03/07FIN
AL M
UR
PER
IOD
12/12U
R PER
IOD
/28/10
FINA
L MU
R
PERIO
D
05/31/11
739A - 739C HVAC, Plumbing & Fire Sprinklers ADD WORK ORDERS 12,008,736$ 2,113,302$ PGC MECHANICAL 2,198,185$ 739I - 740A 51,466,761$ 13,246,205$ 13,361,443$ 746A - 756E
NTP 3/16/2007
SC-00026 FIRE ALARM & BMS HONEYWELL 14,644,931$ 12,739,099$ 69% 7.4% 1,368,841$ 9.3% 21,415$ D C ELECTRIC, INC. 79,852$ 739A - 739C ADD WORK ORDERS 3,852,918$ 808,364$ DATO ELECTRIC 827,890$ 739I - 740A 18,497,849$ 63,680$ FLORIDA ELECTRIC 66,180$ 746A - 756E 830,462$ ACCURA ELECTRIC 860,858$
NTP 3/23/2007 1,723,921$ 1,834,780$
SC-00028 GENERAL TRADES MCM CORP. 11,188,000$ 12,383,957$ 100% 21.0% 2,609,046$ 23.70% 21.9% 2,722,957$ TITAN CONSTRUCTION 2,722,957$ 739A - 739I ADD WORK ORDERS 1,236,028$ 746A - 756E 12,424,028$
C-D SC-00034 BYPASS CORRIDOR LOTSPEICH COMPANY INC. 486,574$ 486,534$ 100% 9.0% 43,792$ 9% 9.1% 44,119$ COMMERCIAL INTERIOR CONTRACTORS 44,119$
745 B
FINA
L MU
R PER
IOD
04/30/11 rev. 03/31/13
R PER
IOD
3/31/13
FINA
L MPER
IOD
0
FINA
L MU
R
PERIO
D
01/31/09
NTP 04/12/2006
3,097,769$ D C ELECTRIC, INC. 3,097,769$ SC-00036 ELECTRICAL FISK ELECTRIC CO. 38,354,220$ 57,288,424$ 105% 21.0% 11,945,501$ 13.0% 2,809,476$ ENERGETIC ELECTRIC 2,809,476$
184,556$ MARVELOUS ELECTRIC 184,556$ 747B ADD WORK ORDERS 16,148,166$ 465,905$ TROPICAL ELECTRIC 465,905$
SC-00053 ELECTRICAL DYNALECTRIC COMPANY 5,255,548$ 6,923,006$ 100% 21.0% 1,453,831$ 10.0% 13,633$ D C ELECTRIC, INC. 13,633$ 739A C-D INFILL ADD WORK ORDERS 1,667,458$ 380,250$ GLOBAL ELEC. & LIGHT SUPPL. 380,250$
301,611$ OUTLOOK INTERNATIONAL, INC. 301,611$ NTP 07/20/2007 6,923,006$ 695,494$ 695,494$
SC-00054 ELECTRICAL DYNALECTRIC COMPANY 6,623,755$ 9,203,378$ 100% 21.0% 1,932,709$ 48.0% 4,414,748$ D C ELECTRIC, INC. 4,414,748$ 739C ADD WORK ORDERS 2,579,623$
NTP 07/20/2007 9,203,378$
SC-00055 ELECTRICAL DYNALECTRIC COMPANY 872,893$ 978,241$ 100% 21.0% 205,431$ 61.1% 597,274$ D C ELECTRIC, INC. 597,274$ 739I ADD WORK ORDERS 105,348$
SC-00065 DOORS AND HARDWARE NR WINDOWS 5,092,000$ 7,648,347$ 100% 21.0% 1,606,153$ 22.6% 1,379,325$ MCO CONSTRUCTION 1,379,325$ 747B ADD WORK ORDERS 2,556,347$
SC-00075 LANDSIDE WORKSITE THORNTON CONSTRUCTION CO. 1,436,919$ 1,440,248$ 100% 21.0% 302,452$ 43.7% 628,754$ THORNTON CONSTRUCTION 628,754$ 779J/779F.1 ADD WORK ORDERS 3,329$ NTP 04/13/08 1,440,248$
SC-00076 TOILET INSTALLATION ACME ORGANIZATION, INC. 1,699,000$ 1,789,701$ 97% 21.0% 389,330$ 96.5% 1,789,701$ ACME ORGANIZATION, INC. 1,853,954$ 739A, 739C ADD WORK ORDERS 154,954$ 740A, 746A 1,853,954$
NTP 03/17/2008
SC-00080 STUCCO REPAIRS ALLIED CONTRACTORS, INC. 755,587$ 952,417$ 100% 29.0% 276,201$ 100.0% 952,417$ ALLIED CONTRACTORS, INC. 952,417$
FINA
L MU
R
PERIO
D
9/30/12
FINA
L MU
R
PERIO
D
05/31/09
F IPER
IFIN
AL M
UR
PER
IOD
03/10 M
UR
PERIO
D
03/31/13
SC 00080 S UCCO S CO C O S, C 55,58$ 95 ,$ 00% 9 0% 6, 0$ 00 0% 95 ,$ CO C O S, C 95 ,$737G3 ADD WORK ORDERS 196,830$
952,417$
SC-00083 Electrical NATIONAL FIRE PROTECTION, LLC 291,285$ 850,960$ 94% 31.0% 280,612$ 25.2% 199,151$ ACCURA ELECTRIC 423,047$ ADD WORK ORDERS 613,914$ 29,000$ ABC CONSTRUCTION 29,000$
Final MUR reported amount equal to DBE subcontractor reported amountFinal MUR reported amount is not equal to DBE subcontractor reported amountFinal Waiver and Release submitted
INA
L MU
R
IOD
12/31/10
SUMMARY
MU
R PER
IOD
03/31/13
03/2013 DBE PARTICIPATION CONSTRUCTION SERVICES EXHIBIT I 8
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
732A-2 REGIONAL COMMUTER CENTRAL FLORIDA $15,913,960 21% $3,341,932 25% $4,015,044 KT CONSTRUCTION SERVICES $111,159FACILITY APRON ROBERTS TRAFFIC CORP. $240,864PACKAGE 2 HIGH TECH CONCRETE, INC. $1,802,809
MAYTIN ENGINEERING CORP. $1,860,212
732M CONCOURSE A-B MARKS BROTHERS, INC. $1,082,894 29% $314,039 31% $331,457 BCL CONSTRUCTION 22.50% $248,604APRON COMPLETION R&D ELECTRIC INC. 5.80% $67,734
ROBERTS TRAFFIC MARKING 2.00% $15,119
B741F D-EXTENSION COMPLETION ALLIED CONTRACTORS, INC. $7,100,532 24% $1,704,128 28.78% $2,043,203 ALLIED CONTRACTORS, INC. 12.00% $852,064YOSEFVAR ELECTRIC CORP. 4.78% $557,306
761A2 REGIONAL COMMUTER BEAUCHAMP CONSTRUCTION CO., INC. $41,485,060 25.4% $10,537,205 31.98% $13,267,594 BEST FIRE SPRINKLER 3.21% $1,081,870FACILITY CHELLE CONSTRUCTION 13.35% $4,859,893
INFINITY CONSTRUCTION 0.77% $305,619MAVERICK CONSTRUCTORS 4.86% $1,514,114
MERKURY DEVELOPMENT 7.25% $3,128,726ELITE SHEET METAL 1.59% $511,867
DILEMAN CORPORATION 4.23% $1,865,505
763C PCA 7 400 HZ COMPLETION INET AIRPORT SYSTEMS $7,942,753 14.00% $1,111,985 14.11% $1,120,355 CLEARVIEW ELECTRIC 14.00% $1,120,355
B702B A.P.M. SYSTEM SUMITOMO CORPORATION $130,321,411 4.85% $6,320,588 11.46% $14,931,095 HIGH TECH CONCRETE, INC. 1.06% $2,050,031OF AMERICA DKG & ASSOCIATES 0.21% $251,695
D C ELECTRIC, INC. 1.35% $5,396,526
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 1
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
J.V. ELECTRICAL SERVICES, INC. 0.30% $7,232,844RJR CONSTRUCTION, INC. 0.70%
SANDERS /MARVELOUS ELECTRIC, INC. 1.78%MIA ELECTRIC /D C ELECTRIC, INC. 1.70%
MIAMI-DADE ENGINEERINGCONTRACTOR, INC. 0.88%
703A AUTOMATED BAGGAGE $40,765,033 2% $815,301 6.24% $2,543,077 JORDIM INTERNATIONAL 2% $1,281,320SYSTEM This contract became DBE as of 09/30/07 D C ELECTRIC, INC. $1,261,757
703A1 BAGGAGE BELT POWER H & D ELECTRIC $44,798 100% $44,798 100% $44,798 H & D ELECTRIC $44,798
703C INTERIM BAGGAGE SYSTEM BAE AUTOMATED SYSTEMS $4,826,962 9% $434,427 34% $1,644,089 MIAMI MILLWRIGHTS 29% $1,644,089B-C INFILL AREA
703D BAGGAGE SYSTEM TRINTEC CONSTRUCTION $1,086,492 27.4% $297,699 100% $1,086,492 TRINTEC CONSTRUCTION 17% $831,628BYPASS SHED DKG & ASSOCIATES 14% $162 000BYPASS SHED DKG & ASSOCIATES 14% $162,000
H & D ELECTRIC 8% $92,864
726A AIRCRAFT FUELING SYSTEM UNDERGROUND CONST. CO. $20,181,281 5.70% $1,150,333 8.27% $1,668,383 R & D CONSTRUCTION CO., INC. (Defaulted) 6.70% $668,992R J R CONSTRUCTION, INC. 0.45% $96,608ROBERTS TRAFFIC CORP. 0.14% $189,380
BCL CONSTRUCTION 3.78% $713,403
727A/ EMERGENCY FENCING WARREN FENCE COMPANY $25,268 100% $25,268 100% $25,268 WARREN FENCE COMPANY $25,268
8465E AIRSIDE
727A/ ELECTRICAL CONDUIT D C ELECTRIC, INC. $1,890 100% $1,890 100% $1,890 D C ELECTRIC, INC. $1,8908465E INSTALLATION
727A/ LOGISTICS TRAILER RAMPS E.L.C.I. CONSTRUCTION $18,708 100% $18,708 100% $18,708 E.L.C.I. CONSTRUCTION $18,7088465E & HOOK-UP GROUP, INC. GROUP, INC.
727A/ COMMUNICATIONS CONDUIT CLEARVIEW ELECTRIC, INC. $2,900 100% $2,900 100% $2,900 CLEARVIEW ELECTRIC, INC. $2,9008465E
727A/ WEST CARGO LOTS ACE CONSTRUCTION $66,750 100% $66,750 100% $66,750 ACE CONSTRUCTION $66,7508465E
727A/ SERVICE FOR ADDITIONAL D C ELECTRIC, INC. $18,133 100% $18,133 100% $18,133 D C ELECTRIC, INC. $18,1338465E TRAILERS
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 2
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
727A/ WOOD DECK FOR CM AVENTURA ENGINEERING $27,740 100% $27,740 100% $27,740 AVENTURA ENGINEERING $27,7408465E STAGING AREA
727A ELECTRICAL D C ELECTRIC, INC. $12,704 100% $12,704 100% $12,704 D C ELECTRIC, INC. $12,704INSTALLATION
727A HVAC INSTALLATION SEFORD INDUSTRIES, INC. $893 100% $893 100% $893 SEFORD INDUSTRIES, INC. $893
728A M&N TAXIWAY CONNECTORS APAC-FLORIDA, INC. $5,910,271 24% $1,418,465 26% $1,564,852 RONALD M. GIBBONS 0.40% $22,695& TAXIWAY N STORM DRAIN ROBERTS TRAFFIC CORP. 0.70% $109,878
CLINTON ENGINEERING/S&S CONTRACTING 18.80% $910,924RAY'S ELECTRICAL SUPPLY, INC. 4.50% $270,000
APAC GROUP, INC. $251,356
732B A-B APRON & INFILL MARKS BROTHERS, INC. $9,659,809 29.83% $2,881,521 27.20% $2,627,687 ROBERTS TRAFFIC CORP. 1.00% $59,228UTILITIES PHASES I & II FENCE CONNECTION, INC. 0.50% $43,120
BCL CONSTRUCTION 1.00% $289,958CLINTON ENGINEERING 0.50% $1,649,810
HALLGREN ENTERPRISE 2.50% $467,375RUBEN ELECTRIC TECHNOLOGY 1.18% $118,197
732D B-C APRON MARKS BROTHERS, INC. $35,918,142 20.7% $7,435,055 23.03% $8,272,716 ROBERTS TRAFFIC CORP. 1.0% $375,260FENCE CONNECTION, INC. 0.50% $115,311
BCL CONSTRUCTION 11.0% $3,808,451CHEROKEE ENTERPRISES, INC. $3,401,336
RUBEN ELECTRIC TECHNOLOGY 2.5% $572,358
732 I INTERIM EAGLE REMOTE MARKS BROTHERS, INC. $1,266,826 15% $190,024 16% $205,617 ROBERTS TRAFFIC CORP. 5.80% $50,113APRON H & D ELECTRIC 10.50% $155,504
732J PLB FOUNDATIONS - PKG. 1 H. F. CONTRACTORS, INC. $762,677 100% $762,677 100% $762,677 H. F. CONTRACTORS, INC. 100% $592,117GATES 30-42 D.K.G. & ASSOCIATES, LTD. $170,560
737A C-D UNDERGROUND CENTRAL FLORIDA $10,227,029 10% $1,022,703 9% $885,022 BCL CONSTRUCTION 6.76% $561,188
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 3
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
737A WS.# 2 KALEX CONSTRUCTION $657,341 4% $26,294 6% $40,880 PGC MECHANICAL $40,880
737B C-D INFILL FOUNDATION MCM CORPORATION $18,022,673 12% $2,162,721 16% $2,970,812 COMMERCIAL CONSTRUCTION SERVICES $2,970,812& ELEVATED SLAB
737B OFFICE BUILD-OUT ACE CONSTRUCTION $10,668 100% $10,668 100% $10,668 ACE CONSTRUCTION $10,668
737C DEMO & TEMPORARY GRAY CONSTRUCTION $6,676,081 13% $867,891 100% $6,676,081 H & D ELECTRIC $1,092,710WALLS AT C-D INFILL GRAY CONSTRUCTION $5,583,371
737E C D INFILL BUILDING BAKER CONCRETE $22 392 427 19% $4 254 561 22% $4 996 181 DALECOM CONSTRUCTION INC 10 90% $2 895 974737E C-D INFILL BUILDING BAKER CONCRETE $22,392,427 19% $4,254,561 22% $4,996,181 DALECOM CONSTRUCTION, INC. 10.90% $2,895,974SHELL CONSTRUCTION, INC. FSH GENERAL CONSTRUCTION 8.30% $2,100,207
737G WS 4.1 MASONRY TALMAC, INC. $1,668,474 22% $367,064 100% $1,668,474 TALMAC, INC. 11% $1,465,799C-D INFILL REMAINING LAW CONSTRUCTION 11% $112,675SHELL & MEP E.L.C.I. CONSTRUCTION GROUP $90,000
739A WS 8.1 WINDOWS N. R. WINDOWS $344,027 0% $0 0% $0 N/A $0C-D INFILL INTERIOR FINISH
739A WS 8.1 WINDOWS N. R. WINDOWS $161,000 0% $0 0% $0 N/A $0C-D INFILL INTERIOR FINISH
739A WS 9.1 FINISHES ACOSTI ENGINEERING $1,089,392 21.7% $236,398 24% $256,276 MIAMI DESIGN BUILDERS, INC. $37,170C-D INFILL INTERIOR COMPANY OF FLORIDA JORRIN CONSTRUCTION MANAGEMENT CO. $219,106FINISH (Terminated) DR. MARBLE, INC.
CREATIVE HOME BY DESIGNEVERETT PAINTING
739A WS 9.3 FINISHES ACOSTI ENGINEERING $13,678 32.0% $4,377 0% $0 DR. MARBLE, INC. 32% $0C-D INFILL INTERIOR COMPANY OF FLORIDAFINISH (Terminated)
739A WS 15.1 MECHANICAL JOHN J. KIRLIN $485,559 30% $145,668 38% $184,231 APEX A/C CONTRACTORS 30% $55,399C-D INFILL INTERIOR BEST FIRE SPRINKLER CORP. $17,700FINISH (Terminated) PGC MECHANICAL $111,132
739A WS 16.1 ELECTRICAL DYNALECTRIC COMPANY $230,899 30% $69,270 50% $114,934 DC ELECTRIC $114,934C-D INFILL INTERIOR FINISH (Terminated)
739C-1 CONCOURSE D REMODEL - DODEC, INC. $256,509 100% $256,509 100% $256,509 DODEC, INC. $256,509& 2 THIRD LEVEL CEILING
SELECTIVE DEMOLITION &TEMPORARY EGRESS STAIR
739C-3 WS 9.1 CONCOURSE D LOTSPEICH COMPANY, INC. $311,631 17% $52,977 20% $63,688 COMMERCIAL INTERIOR CONTRACTOR $53,081REMODEL-PARTIAL THIRD EMMAN ENTERPRISES $10,607LEVEL REMODEL
739C-3 WS 15.1 CONCOURSE D WEATHERTROL $552,751 17% $93,968 42% $229,500 GOMEZ QUALITY INSULATION $48,000REMODEL-PARTIAL THIRD MAINTENANCE CORP. DODEC, INC. $20,000LEVEL REMODEL TASCO INSULATION, INC. $161,500
739C-3 WS 16.1 CONCOURSE D FISK ELECTRIC CO. $271,645 19% $51,613 0% $0 F. L. P. ENTERPRISES, INC. $0REMODEL-PARTIAL THIRD LEVEL REMODEL
739F WS 3.1 CONCRETE THORNTON CONSTRUCTION $2,505,813 100% $2,505,813 96% $2,395,813 THORNTON CONSTRUCTION 100% $2,363,101D-EXTENSION INTERIOR COMPANY, INC. CREATIVE HOME BY DESIGN $32,712FINISH
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 6
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
739F WS 5.1 METALS MAC GREGOR USA $754,219 0% $0 0% $0 N/A $0D-EXTENSION INTERIOR FINISH
739F WS 6.1 MILLWORK NKI, INC. $737,451 15% $110,618 17% $125,228 CREATIVE HOME BY DESIGN 8.79% $125,228D-EXTENSION INTERIOR TLMC ENTERPRISES, INC (WITHDREW) 8.39% $0FINISH
739F WS 8.1 WINDOWS N. R. WINDOWS $1,593,573 0% $0 0% $0 N/A $0D-EXTENSION INTERIOR FINISH
739F WS 8.1 WINDOWS N. R. WINDOWS $5,566 0% $0 0% $0 N/A $0D-EXTENSION INTERIOR FINISH
739F WS 9.1 FINISHES LOTSPEICH COMPANY, INC. $9,119,088 17% $1,550,245 19.9% $1,817,621 MCO CONSTRUCTION & SERVICES, INC. 4.30% $248,065D-EXTENSION INTERIOR B C L CONSTRUCTION, INC. 11% $1,218,277FINISH EMMAN ENTERPRISES, INC. 1.70% $351,279
739F WS 9.1 FINISHES E.L.C.I. CONSTRUCTION $195,196 100% $195,196 100% $195,196 E.L.C.I. CONSTRUCTION GROUP, INC. $195,196D-EXTENSION INTERIOR GROUP, INC.FINISH
739F WS 9.1 FINISHES THORNTON CONSTRUCTION $62,726 100% $62,726 100% $62,726 THORNTON CONSTRUCTION $62,726D-EXTENSION INTERIOR COMPANY, INC.FINISH
745B WS 9.1 FINISHES MERKURY DEVELOPMENT $1,840,337 17.3% $318,378 100% $1,840,337 MERKURY DEVELOPMENT 9% $1,840,337B-C INFILL BUILDING SHELL PRESIDENTIAL BUILDERS, INC. 10% $0
745B WS 9.1 FINISHES DOZIER & DOZIER $199,952 100% $199,952 100% $199,952 DOZIER & DOZIER $199,952B-C INFILL BUILDING SHELL CONSTRUCTION, INC. CONSTRUCTION, INC.
745B WS 9.1 FINISHES GOLDEN SANDS $194,486 100% $194,486 100% $194,486 GOLDEN SANDS $172,130B-C INFILL BUILDING SHELL GENERAL CONTRACTORS LAW CONSTRUCTION $12,316
SUPREME CEILING & $10,040INTERIOR, INC.
745B WS 9.2 FINISHES THORNTON CONSTRUCTION $227,930 100% $227,930 100% $227,930 THORNTON CONSTRUCTION 81% $139,062B-C INFILL BUILDING SHELL COMPANY, INC. J & Q GARAGE & INDUSTRIAL DOORS 19% $88,868
745B WS 16.1 ELECTRICAL DYNALECTRIC COMPANY $6,834,145 22% $1,503,512 0% $9,923 DC ELECTRIC / WITHDREW 22% $0B-C INFILL BUILDING SHELL DKG & ASSOCIATES $9,923
745C GENERAL CONSTRUCTION ACE CONSTRUCTION $448,996 100% $448,996 100% $448,996 ACE CONSTRUCTION $234,895EAL BAGGAGE ROOM PRESIDENTIAL BUILDERS $12,500
A C & E PROPERTY $6,760AMERICAN CONTRACTING $7,372
745E WS 15.1 MECHANICAL B-C JOHN J. KIRLIN $4,418,515 26% $1,148,814 4% $195,000 AL HILL ENTERPRISES CORP. 29% $195,000INFILL DEMO C THROATCONNECTOR CORRIDOR
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 12
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
745E WS 15.1 MECHANICAL B-C SANTA ROSA ALL- $24,000 0% $0 0% $0 N/A $0INFILL DEMO C THROAT WEATHER INSULATIONCONNECTOR CORRIDOR
745E WS 16.1 ELECTRICAL B-C DYNALECTRIC COMPANY $4,953,889 22% $1,089,856 25% $1,257,000 DC ELECTRIC 22% $1,257,000INFILL DEMO C THROATCONNECTOR CORRIDOR
745E/ TEMPORARY WALLS MJG BUILDERS, INC. $5,123 100% $5,123 100% $5,123 MJG BUILDERS, INC. $5,1238465E
746A WS 6.1 MILLWORK NKI, INC. $32,240 20% $6,448 0% $0 CREATIVE HOME BY DESIGN 20% $0B-C INFILL INTERIOR FINISH
746B B-C 4th LEVEL STATION MJG BUILDERS, INC. $673,990 100% $673,990 100% $673,990 MJG BUILDERS, INC. $411,450ADMINISTRATION COMMERCIAL INTERIOR CONTRACTOR $21,770
747A A-B INFILL SELECTIVE CARIVON CONSTRUCTION $5,457,941 33.72% $1,840,418 41% $2,258,029 CARIVON CONSTRUCTION 16.86% $815,855DEMOLITION & UTILITIES COMPANY QUEEN CONTRACT INTERIORS, INC. 2.06% $77,050RELOCATION ARFRAN II, INC. 4.00% $190,152
COMFORT TECH A/C/ CITY AIR 5.00% $321,238POWER PRO 15.90% $853,734
MIAMI DESIGN BUILDERS, INC.CITY AIR
747D A-B PRE-DEMOLITION CROMPTON CONSTRUCTION $12,703,500 21.30% $2,705,846 22.0% $2,794,978 AVENTURA ENGINEERING 10.30% $1,069,622ALLIED CONTRACTORS, INC. 15.30% $1,725,356
747F CONCOURSE "A" A/A DYNALECTRIC COMPANY $192,490 0% $0 0% $0 N/A $0RELOCATION INFRA-STRUCTURE
754A A-B OTHER AIRLINES M C CONSTRUCTION $5,652,585 21% $1,187,043 32% $1,786,717 H & D ELECTRIC $1,659,808ATO SUPPORT TASCO PLUMBING $57,909
EVERETT PAINTING $69,000
754B CREDIT UNION & DALECOM CONSTRUCTION $269,797 16% $43,168 100% $269,797 DALECOM CONSTRUCTION $138,732MISCELLANEOUS SPACES UNITECH MECHANICAL SYSTEMS $27,500
COMMERCIAL INTERIOR CONTRACTOR $21,700SOLARES ELECTRIC $81,865
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 13
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
756B A-C CONCESSIONS & C. TARAFA CONTRACTING $1,351,741 100% $1,351,741 100% $1,351,741 C. TARAFA CONTRACTING $1,124,933RESTROOMS ESSENTIAL ELECTRIC $226,808
762A PASSENGER LOADING AMERIBRIDGE SERVICES $945,053 7% $66,154 13% $122,714 COOPER CONTRACTING $57,158BRIDGES A C & E PROPERTY $23,625
COMMERCIAL INTERIOR CONTRACTOR $41,931
763A PRECONDITIONED AIR JOHN J. KIRLIN $15,673,109 5.37% $841,646 4.7% $738,386 DODEC, INC. 4.80% $694,396&763B SYSTEMS & 400 HZ SYSTEM AL HILL ENTERPRISES CORP. 0.65% $43,990
766B TEMPORARY BAGGAGE GRAY CONSTRUCTION $653,270 27% $176,383 43% $283,257 THE SANDY CORPORATION $49,500SYSTEM GRAY CONSTRUCTION $109,436
RANDAZZO ELECTRICAL SERVICES $121,390H & D ELECTRIC $2,931
767A CONCOURSE A & B KALEX CONSTRUCTION $1,040,409 23% $239,294 47% $491,438 CORAL GABLES GLASS $23,000GATE REWIRE COMMERCIAL INTERIOR CONTRACTOR $15,617
PGC MECHANICAL $10,810CLEARVIEW ELECTRICAL $429,463
768A INTERIOR RELOCATIONS GRAY CONSTRUCTION $4,842,002 15% $726,300 23% $1,134,893 H & D ELECTRIC $1,134,893AT CONCOURSE D
768B EAGLE BUS DRIVE T.G.S.V. $862,146 7% $60,350 8% $69,827 PGC MECHANICAL $9,300RANDAZZO ELECTRICAL SERVICES $60,527
768C REMODEL / RELOCATION M C CONSTRUCTION $1,543,182 13% $200,614 33% $510,264 PRESIDENTIAL BUILDERS $17,487OF AIRCRAFT MAIN - PGC MECHANICAL $71,779TENANCE & CONCOURSE H & D ELECTRIC $420,998LEVEL
768C/ POINT OF SALE MJG BUILDERS $154,519 100% $154,519 100% $154,519 MJG BUILDERS $113,7948465E COMMERCIAL INTERIOR CONTRACTOR $3,225
COMFORT TECH $2,500DC ELECTRIC, INC. $35,000
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 14
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
773B-5 EMERGENCY PROJECT ACE CONSTRUCTION $39,000 100% $39,000 100% $39,000 ACE CONSTRUCTION $39,000CONCOURSE E
773C ROOF TOP COMMUNICATIONS DYNALECTRIC COMPANY $3,124,464 11% $343,691 12% $363,255 DKG & ASSOCIATES 13.40% $270,813CONDUIT C. L. ELIAS CONSTRUCTION 1.60% $92,442
773E AMERICAN AIRLINES AVENTURA ENGINEERING $1,133,285 100% $1,133,285 100% $1,133,285 AVENTURA ENGINEERING $705,116STORES RELOCATION R.B.S. ENTERPRISES, INC. $4,556
SUPREME CEILING & INTERIOR, INC. $4,642PEOPLE'S PLUMBING, INC. $10,211
CITY AIR A/C $79,280H & D ELECTRIC $294,067
773F SKY CHEFS STORAGE THORNTON CONSTRUCTION $150,127 100% $150,127 93% $140,198 THORNTON CONSTRUCTION CO., INC. $129,028FACILITY COMPANY, INC. SUPREME CEILING & INTERIOR, INC. $1,241
S I PLUMBING, INC. $7,447CARIBBEAN AIR CONDITIONING $2,482
F. L. P. ENTERPRISES, INC. $0
773G AIRCRAFT MAINTENANCE THORNTON CONSTRUCTION $610,650 100% $610,650 100% $610,650 THORNTON CONSTRUCTION CO., INC. $436,804RELOCATION COMPANY, INC. SUPREME CEILING & INTERIOR, INC. $9,186
MIKE DESIGN MARBLE & TILE $6,835SEWELL'S PROFESSIONAL PAINTING $21,080
S I PLUMBING, INC. $12,744UNITECH MECHANICAL SYSTEMS $30,557SURE ELECTRIC CONTRACTORS $93,443
773H TICKET LIFT AGENTS CROMPTON CONSTRUCTION $1,192,045 27% $321,852 30% $363,162 PGC MECHANICAL $3,200BREAKROOM DC ELECTRIC, INC. $359,962
773 I PHYSICAL THERAPY C.TARAFA CONTRACTING $326,861 100% $326,861 89% $292,239 C.TARAFA CONTRACTING $292,239F. L. P. ENTERPRISES, INC. $0
773J EMPLOYEE SERVICE CENTER BMA CONSTRUCTION, INC. $1,093,388 31% $338,950 85% $931,388 BMA CONSTRUCTION, INC. $931,388& CSM OFFICES F. L. P. ENTERPRISES, INC. $0
775A D-EXTENSION PREMISE DYNALECTRIC COMPANY $3,895,974 19% $740,235 11% $433,375 DC ELECTRIC, INC. 19.00% $433,375DISTRIBUTION SYSTEM
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 16
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
775B C-D PREMISES DYNALECTRIC COMPANY $6,931,958 21% $1,455,711 18% $1,226,770 DC ELECTRIC, INC. 21.00% $1,226,770DISTRIBUTION SYSTEM
SUPREME CEILING & INTERIOR, INC. 1.10% $6,128LISMARC, INC. 2.50% $13,400ARFRAN II, INC. 4.20% $21,800
PLUMBERS ENTERPRISE CORP. 0.08% $4,500CITY AIR A/C 8.70% $45,520
STATEWIDE / SOLARES ELECTRIC, INC. 14.50% $74,310ALEX FIRE PROTECTION 4.40%
776A-2 CLUB AMERICA STORAGE / CUESTA CONSTRUCTION $660,376 100% $660,376 50% $331,598 CUESTA CONSTRUCTION $113,667WORLDWIDE / EMERGENCY CORP. ALEX FIRE PROTECTION, INC. $10,550BUS STATION CARLOS GUILLEN PAINTING & DRYWALL $64,100
UNITECH MECHANICAL SYSTEMS $22,438$SOLARES ELECTRIC $120,843
776A-3 IN-TRANSIT WAITING ROOM CUESTA CONSTRUCTION $648,113 100% $648,113 100% $648,113 CUESTA CONSTRUCTION $453,555CORP. ALEX FIRE PROTECTION, INC. $7,500
PLUMBERS ENTERPRISE CORP. $42,418UNITECH MECHANICAL SYSTEMS $19,100
SOLARES ELECTRIC $125,540
776B-1/ LAB TICKET COUNTER & E.L.C.I. CONSTRUCTION $606,565 100% $606,565 100% $606,565 E.L.C.I. CONSTRUCTION GROUP, INC. $401,263OFFICES GROUP, INC. ARFRAN II, INC. $11,929
CERTIFIED HVAC SERVICES, INC $41,215H & D ELECTRIC $152,158
776B-3/ MARTINAIR ACE CONSTRUCTION $161,498 100% $161,498 100% $161,498 ACE CONSTRUCTION $112,4198465E SUPREME CEILING & INTERIOR, INC. $3,646
ARFRAN II, INC. $4,212JACARANDA AIR OF MIAMI $15,616
776B-7/ AIR FRANCE OFFICE & TICKET C.L. ELIAS CONSTRUCTION $688,638 100% $688,638 96% $662,413 C.L. ELIAS CONSTRUCTION $295,2538465E COUNTER RELOCATION FENCE CONNECTION $4,500
SUPREME CEILING & INTERIOR, INC. $15,656FRANKLIN FLOORING $35,592
CREATIVE HOME BY DESIGN $49,680ARFRAN II, INC. $13,400
COMFORT TECH A/C $25,576DC ELECTRIC, INC. $172,106
776B-8/ AIRPORT SERVICE INTER- TRINTEC CONSTRUCTION $309,371 100% $309,371 100% $309,371 TRINTEC CONSTRUCTION $184,1268465E NATIONAL GROUP RE PRADERE MANUFACTURING CORP $27 8438465E NATIONAL GROUP RE- PRADERE MANUFACTURING CORP. $27,843
LOCATION SUPREME CEILING & INTERIOR, INC. $8,109QUEEN CONTRACT INTERIORS, INC. $5,103
ARFRAN II, INC. $14,279PEOPLE'S PLUMBING, INC. $8,737
COMFORT TECH A/C $21,300H & D ELECTRIC $39,874
776B-9/ AA MAINTENANCE & FUEL E.L.C.I. CONSTRUCTION $229,835 100% $229,835 100% $229,835 E.L.C.I. CONSTRUCTION GROUP, INC. $229,8358465E VENDOR RELOCATION GROUP, INC.
776C-1 BAGGAGE CONCESSION E.L.C.I. CONSTRUCTION $219,883 100% $219,883 100% $219,883 E.L.C.I. CONSTRUCTION GROUP, INC. $121,7888465E CONCOURSE 'E' GROUP, INC. BEST GARAGE DOORS $2,943
FRANKLIN FLOORING $5,228ARFRAN II, INC. $4,950
COMFORT TECH A/C $26,975ACCURA ELECTRIC CONTRACTOR $58,000
776C-6 DECISION ONE OFFICES ALLIED CONTRACTORS, INC. $228,502 100% $228,502 100% $228,502 ALLIED CONTRACTORS, INC. 62.00% $142,453& RELOCATION / AA FRANKLIN FLOORING 2.80% $6,617
776H PASSENGER SERVICES ARFRAN II, INC. 3.50% $7,700OFFICES RELOCATION SOLO AIR CONDITIONING 1.70% $3,360
776J A B M JANITORIAL E.L.C.I. CONSTRUCTION $135,667 100% $135,667 100% $135,667 E.L.C.I. CONSTRUCTION GROUP, INC. $72,2038465E GROUP, INC. WARREN FENCE $2,400
FRANKLIN FLOORING $3,612SUPREME CEILINGS $5,760
ARFRAN II, INC. $4,702COMFORT TECH A/C $4,870DC ELECTRIC INC $42 120DC ELECTRIC, INC. $42,120
776L INS OFFICES ABC CONSTRUCTION $62,421 100% $62,421 100% $62,421 ABC CONSTRUCTION $35,3918465E ARFRAN II, INC. $1,600
PGC MECHANICAL $1,095COMFORT TECH A/C $9,690DC ELECTRIC, INC. $14,645
776M INS PASS AND POST OFFICE HF CONTRACTORS $247,893 100% $247,893 100% $247,893 HF CONTRACTORS 62.87% $162,9688465E MAIL DROP OFF CREATIVE HOME BY DESIGN 6.88% $15,650
ARFRAN II, INC. 1.76% $4,450COMFORT TECH A/C 12.92% $29,400
POWER PRO 15.57% $35,425
776N-1 MDAD SPECIAL PROJECTS DODEC, INC. $449,801 100% $449,801 100% $449,801 DODEC, INC. 66.00% $294,552TENANT RELOCATIONS BEST FIRE SPRINKLER CORP. 3.50% $14,840
PGC MECHANICAL 5.50% $25,400POWER PRO 25.00% $115,009
776N-2 AA CABIN SERVICE ABC CONSTRUCTION $416,926 100% $416,926 100% $416,926 ABC CONSTRUCTION 65.50% $284,188RELOCATION CREATIVE HOME BY DESIGN 4.50% $14,188
ARFRAN II, INC. 1.20% $4,750PGC MECHANICAL 1.40% $5,400
COMFORT TECH A/C 9.10% $36,000SOLARES ELECTRIC 18.30% $72,400
776N-3 MDAD RAMP CONTROL AVENTURA ENGINEERING $292,128 100% $292,128 100% $292,128 AVENTURA ENGINEERING 53.96% $162,923TOWER RELOCATION CREATIVE HOME BY DESIGN 14.00% $39,265
ARFRAN II, INC. 1.57% $4,400
03/2013COMMUNITY SMALL BUSINESS ENTERPRISE (CSBE) PARTICIPATION
EXHIBIT II 19
CSBE PARTICIPATION REPORTCONSTRUCTION PROJECTS Exhibit II
PROJ DESCRIPTION GENERAL CONTRACTOR CONTRACT SBD SBD GOAL ACTUAL GOAL VALUE CSBE - SUBCONTRACTORS CSBE % CSBE CONTRACTVALUE GOAL % VALUE GOAL -% BREAKDOWN SOIA VALUE
COMFORT TECH A/C 4.39% $12,300POWER PRO 24.98% $73,240
776N-4 MDAD LOCKSMITH/PAINT- TRINTEC CONSTRUCTION $495,824 100% $495,824 100% $495,824 TRINTEC CONSTRUCTION 69.00% $316,143SHOP/U.S. CUSTOMS BORDER QUEEN CONTRACT INTERIORS, INC. 2.00% $6,400PROTECTION PATROL ARFRAN II, INC. 4.00% $19,800TENANT RELOCATION PGC MECHANICAL $23,535
COMFORT TECH A/C 9.00% $45,409POWER PRO 16.00% $84,537
776N-5 LGS SKY CHEFS & AA UNION DODEC, INC. $200,458 100% $200,458 100% $200,458 DODEC, INC. 80% $160,1138465E OFFICE RELOCATION BEST FIRE SPRINKLER CORP. 3% $7,200
PGC MECHANICAL 4% $8,700POWER PRO 13% $24,445
776N-6 AIRCRAFT MAINTENANCE AVENTURA ENGINEERING $154,293 100% $154,293 100% $154,293 AVENTURA ENGINEERING 65.60% $102,465FACILITY TENANT CREATIVE HOME BY DESIGN 17.40% $26,530RELOCATION RUBEN ELECTRIC TECH INC 17 00% $25 298RELOCATION RUBEN ELECTRIC TECH INC. 17.00% $25,298
MIA ELECTRICAL CONTRACTOR $563,767H & D ELECTRIC $65,392H & D ELECTRIC $93,809
P & A CONSTRUCTION $15,100AVENTURA ENGINEERING $103,971
IMPACT CONSTRUCTION CO. $169,263
790B CM TRAILER COMPOUND BCL CONSTRUCTION, INC. $1,814,997 100% $1,814,997 100% $1,814,997 BCL CONSTRUCTION, INC. $682,476FENCE CONNECTION, INC. $52,605
ALL FLORIDA ENGINEERING, INC. $385,726MJG BUILDERS, INC. $147,327
$98,026,586 Total 0.0% $0 $44,751,775 37.4% $41,299,831 31.7% 35.7% $34,993,124
NOTE:
These contracts represent voluntary Minority / Women Business enterprises (M/WBE) utilization because they were advertised after the October 2, 2000 injunction, imposed by the courts, that resulted in the suspension of the M/WBE program for design services.
Type C=D/A D
40.5%
F G=H/AE=F/A
0.0%
$270,585 84.0%
Paid to Date B
3.9%30.6%6.1%
DESIGN PROFESSIONAL CONSULTANT SERVICES (voluntary utilization) - Post-Injunction
Current Contract Value
A
Overview of M/WBE Utilization/ParticipationGoals Per Agreement Voluntary Contract Goals Work Contracted Paid to Date
$230,906,615 Total 30.4% $76,696,653 $57,709,989 26.2% $66,035,054 23.7% 25.8% 59,676,864
NOTE:
Value A Type C=D/A D
Paid to Date B
6.9%6.6%6.0%3.4%22.9%
1. B701D contract for S & G has an 8% SBE goal following the injunction and suspension of the M/WBE program, while old contracts still have to meet the M/WBE goals