DESIGN-BUILD DESIGN BUILD
86

DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

DESIGN-BUILDDESIGN BUILD

Page 2: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Design-BuildAuthorizationProject SelectionProject SelectionCriteriaSelection/Award ProcessWarrantiesWarrantiesDesign-Build Construction

Engineering and InspectionMaterials AcceptanceMaterials Acceptance

Page 3: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

DESIGN-BUILD AUTHORIZATIONAUTHORIZATION

Page 4: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

AuthorizationAuthorization

Design Build (D-B) Contracting AuthorizationDesign Build (D-B) Contracting Authorization –FLORIDA STATUTES

D B Major Projects Authorization 337 11(7) F SD-B Major Projects Authorization – 337.11(7) F.S.BuildingsM j B idMajor BridgeLimited Access FacilitiesRail Corridor

Estimated cost exceeds $10M

Page 5: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

AuthorizationAuthorization

Design Build (D-B) Contracting AuthorizationDesign Build (D-B) Contracting Authorization FLORIDA STATUTES

Minor D B Projects Authorization 337 025 F SMinor D-B Projects Authorization –337.025 F.S.Innovative Contracting Statute – Annual Cap of $120M$

Minor BridgeResurfacing (no widening/shoulder work)Resurfacing (no widening/shoulder work)Projects not covered by 337.11(7) F.S.

Estimated Cost less than $10MEstimated Cost less than $10M

Page 6: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

DESIGN-BUILD PROJECT SELECTIONSELECTION

Page 7: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Project SelectionProject SelectionDesign Build (D-B) contracting should be considered on

the following types of projects:the following types of projects:Demand an expedited schedule and can be completed earlier Require minimal Right of Way acquisition and utility relocationWell defined scopeWell defined scopeAllow for innovation in the design and/or construction effortLow risk of unforeseen conditionsLow possibility of significant changes

Page 8: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Project SelectionExamples of projects which may be good D-B

contracting candidates:Major BridgesMinor BridgesMinor BridgesITS (computer signalized traffic)Intersection improvement (with known utilities)B ildi ffi b ildi tBuildings-office building, rest areas, welcome stations, etc.

Page 9: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Project SelectionExamples of projects which may be good D-B

contracting candidates (continued):Interstate wideningRural WideningFencingLandscapingLandscapingLightingSi iSigningSignalizationGuardrail

Page 10: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Project Selectionoject Se ect oExamples of projects which may not be good j y gD-B contracting candidates are:

Major bridge rehab/repair with significant j g p gunknowns

Rehab of movable bridges

Urban construction/reconstruction with major utilities, major subsoil, R/W or other major unknowns

Page 11: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

DESIGN-BUILD CRITERIADESIGN BUILD CRITERIA

Page 12: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Developing Design-Build p g gCriteria

Adjusted Score or Low Bid?Adjusted Score or Low Bid?Adjusted Score

W t ( d) t h i t b l ti th D B• Want (or need) to have input by evaluating the D-B firm and Technical Proposal (prior to bid time)

• Innovation or potential alternatives existp• Scope is more versatile

Page 13: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Developing Design-Build p g gCriteria

Low BidSt i ht f d j t• Straight forward projects

–(guardrail, noise walls, milling and resurfacing etc )resurfacing, etc.)

• Scope is well defined

Page 14: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Developing D B CriteriaDeveloping D-B CriteriaAll aspects of the project for which there is aAll aspects of the project for which there is a Department preference must be set.

Do we want it?Do we not want it?

Includes multiple disciplines: StructuresIncludes multiple disciplines: Structures, Drainage, Traffic Operations, Permitting, Utilities, Roadway, Striping, Pavement Design, Estimates, FHWA, etc.

Page 15: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Developing the CriteriaDeveloping the Criteria

Information typically gathered before theadvertisement: (Department Concept)

Typical SectionSurveySurveyGeotechnicalUtilitiesPavement Design

Page 16: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Writing the CriteriaWriting the Criteria

Department and Consultant AuthorsExpectations should be clearExpectations should be clearBe specific where appropriateD ’t k f thi d ’tDon’t ask for things we don’t want/need

Page 17: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Pre qualification RequirementsPre-qualification Requirements

Unless specifically stated otherwise in the Advertisement standard prein the Advertisement, standard pre-qualification requirements apply for the designer and contractorthe designer and contractor

Page 18: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Request for ProposalsRequest for ProposalsMuch of the language is standard fromMuch of the language is standard from SCO website

Grading CriteriaGrading CriteriaDecide what is important

InnovationInnovationMaintenance of TrafficAestheticsAestheticsEnvironmentalScheduleSchedule

Assign Points Accordingly

Page 19: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

AdvertisementAdvertisement List only the pre-qualifications necessary forList only the pre qualifications necessary for the major items of work.

List consultant work groups that are requiredList consultant work groups that are required.

List the criteria that will be used for evaluating the letters of interestevaluating the letters of interest.

FDOT Ads can be found at the following link: http://www2 dot state fl us/procurement/ads/ahttp://www2.dot.state.fl.us/procurement/ads/advdbld.htm

Page 20: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

L tt f I t tLetters of InterestDesign/Build ExperienceDesign/Build Experience

Joint Project Experience

Similar Project Experience

Past Performance (both team members)

Key Personnel and their experienceKey Personnel and their experience

Any applicable commitments (DBE, Ti W ti t )Time, Warranties, etc.)

Page 21: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Issue Escalation &Issue Escalation & Resolution

RFP sets a hierarchy for design issues d t ti i t band construction issues to be

resolved through a defined chain of commandcommand

D-B Firm will be required to set a similar escalation process for both design and construction

Page 22: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Issue Escalation & ResolutionIssue Escalation & Resolution

Design Project Manager Construction Project Mgr

District Design Engineer District Const. Engineer

Director of Development Director of Operationsecto o e e op e t Director of Operations

District Secretary District SecretaryDistrict Secretary District Secretary

Page 23: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

STIPENDS

Only on ASDB ProjectsOnly on ASDB Projects

Page 24: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Stipends for unsuccessfulStipends for unsuccessful firms

The Department intends to compensate the unsuccessful short-listed Firms for submitting a proposalTh f l h t li t d Fi iThe unsuccessful short-listed Firms may receive compensation (lump sum) for their efforts in preparing a proposal if the proposal is determined to be responsive Th i d h fThe intent to compensate and the amount of compensation will be noted in the RFPThis decision will be at the discretion of the contracting gDistrict or Central Office.

Page 25: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Stipends for unsuccessfulStipends for unsuccessful firms

Federal funds MAY be used. A Stipend is not intended to compensate the Firms for the total cost of preparing the proposal package.In return, the Department reserves the right to use any of the concepts or ideas within the technical proposals, as the Department deems appropriate.

Page 26: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Stipends for unsuccessful firmsStipends for unsuccessful firmsGUIDELINES FOR ESTIMATING STIPEND AMOUNTS FOR DESIGN

BUILD PROJECTSContract Value Complex Urban and

Rehab. New Construction

ProjectsRange of Stipend

< $5M 0.0050 * Estimate 0.0040 * Estimate $15K - $25K$5M $20M 0 0030 * Estimate 0 0025 * Estimate $15K $60K$5M - $20M 0.0030 * Estimate 0.0025 * Estimate $15K - $60K

$20M - $50M 0.0020 * Estimate 0.0018 * Estimate $36K - $100K$50M - $100M 0.0015 * Estimate 0.0012 * Estimate $60K - $150K

> $100M 0.0012 * Estimate 0.0010 * Estimate $100K +> $100M 0.0012 Estimate 0.0010 Estimate $100K +

Examples:A $4M rehabilitation project would have a recommended stipend of $4,000,000 (0.0050) = $ 20,000.A $30M complex urban project would have a recommended stipend of $30,000,000 (0.0020) = $ 60,000.A $175M new bridge project would have a recommended stipend of $175,000,000 (0.0010) = $175,000.

Page 27: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical Concepts

ATC Process allows:

Innovation

Flexibilityy

Time/Cost Savings

Best Value for publicBest Value for public

Page 28: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical Concepts

Used at District discretion on adjusted score D B projects when probability of innovationD-B projects when probability of innovation or alternatives exist

ATC Meetings must comply with Sunshine Law

Page 29: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical Concepts

ATC Meetings:

2 (Max) per D-B Firm

Meeting schedule accounted for as part of g pProject Schedule identified in the RFP

Occur prior to RFP established due date forOccur prior to RFP established due date for ATC formalized submittal

Page 30: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical ConceptsATC Submittal must include:ATC Submittal must include:

Description (concept drawings, product details, traffic operational analysis as appropriate)traffic operational analysis, as appropriate)

Usage (where/how will it be used on project)

Deviations from RFPExplanation of DeviationR t f A lRequest for Approval

Page 31: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical ConceptsATC Submittal must include:ATC Submittal must include:

Analysis justifying deviations from RFP if applicableapplicable

Impacts (during and after construction)V hi lVehicularEnvironmentalCommunityCommunitySafetyLifecycleyMaintenance/operation

Page 32: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical ConceptsATC Submittal must include:ATC Submittal must include:

Risks (added for Dept. or 3rd Party)

Quality – how is the ATC equal or better in quality or performance

Anticipated Life enhanced or compromised by ATC

Page 33: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical Concepts

Department reviews the ATC and advises:

Concept is acceptablep p

Concept is unacceptable

Concept requires additional informationConcept requires additional information

Department responds within 2 weeks of ATC meeting or submittal of formal ATC.

Correspondence maintained in project file

Page 34: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical Concepts

If an approved ATC deviates from RFP, the department will:

Update RFP Criteria

Issue Addendum

Approved Design Exceptions/Design Variances require an update to the RFPq p

FHWA must approve such changes

Page 35: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical Concepts

Department reserves right to disclose to all D-BDepartment reserves right to disclose to all D B firms any issues identified in ATC meetings or ATC submittals except those determined to reveal confidential or proprietary information

Page 36: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Alt ti T h i l C tAlternative Technical Concepts

Incorporation of ATC into Proposal:D-B firm can opt to include approved ATC’s as part of proposal

Bid should reflect any approved/incorporated ATC’s

If not selected, D-B agrees to disclose work products associated w/ATC after receipt of Stipend or Contract Award, whichever occurs first

Page 37: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Professional Liability Insurance

Per D-B SpecificationspD-B Contract Amount Minimum Coverage

Up to $30M $1 000 000Up to $30M $1,000,000$30M - $75M $2,000,000> $ 75M $5,000,000

Page 38: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

CContract Bonding

Department requires a bid bond and performance bond regardless of the p gdelivery method.

Page 39: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Department Requirements

Currently the Department accepts The Prime Designers Professional LiabilityThe Prime Designers Professional Liability Insurance for the amount stated in the contract andThe Contractors Performance Bond for 100% of the contract amount.

Page 40: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

C fli t f I t t P liConflict of Interest Policy

Any Consultant or its affiliate developing theAny Consultant or its affiliate developing the Request for Proposals for a project will not be eligible to compete for that project.

Page 41: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Conflict of Interest PolicyConflict of Interest Policy DESIGN BUILDDESIGN BUILD

The contractor or design professional cannot team, as a Prime, with other firms to submit more than one bid per projectbid per project. The secondary member (i.e. designer or contractor) of the design-build team cannot change, after g g ,award, without the written approval of the District Secretary.

Page 42: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Conflict of Interest PolicyConflict of Interest Policy DESIGN BUILD (continued)

A consultant firm, its affiliate, or sub-consultant, that is under contract with the Department to

Cprovide Construction Engineering and Inspection (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or sub consultanton that contract as a prime or sub-consultant.

Page 43: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

SELECTION AND AWARD PROCESSAWARD PROCESS

Page 44: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Adjusted Score Design Build Projectsojects

O G DEVELOPING THE LONG-LIST

Page 45: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

In response to the Design BuildIn response to the Design-BuildAdvertisement, Letters of Interestare received from Design Buildare received from Design-BuildFirms.

Page 46: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Evaluation of the LOIs is done by the Technical Review Committee (TRC)

Th TRC ll i t fThe TRC normally consists of:

Project Managerj g

Design Office Representative

Construction Office Representative

District Contracting Unit Representati eDistrict Contracting Unit Representative (Non-Voting Member)

Page 47: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

THE TRC WILL REVIEW AND EVALUATE THE LOI'S

The TRC will review and discuss each letter and other data

The TRC will develop a Long-List

The TRC will recommend a Short-List of atThe TRC will recommend a Short-List of at least 3 Firms but no more than 6 Firms to the Selection Committee.

Page 48: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

DEVELOPING THE SHORT-LIST

Page 49: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Selection/Selection/Awards Comprised of:

Committee Comprised of:

District Secretary

(SAC) Appropriate Directors

y

Page 50: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

The SAC shall consider th f ll ithe following:

HISTORY

QUALIFICATIONS

TRC RECOMMENDATIONS

Page 51: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

http://www2.dot.state.fl.us/procurement/results/desreslt.htm

Page 52: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

CONDUCTING THEPRE-BID MEETING

Page 53: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

At the Pre-Bid Meeting theAt the Pre Bid Meeting, the Department will:

Provide Copies of Proposal Instructions

Copies of Specifications

C i f St di S tiCopies of Studies or Supporting Documentation

Answer Questions

Page 54: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

RECEIVING THE TECHNICALRECEIVING THE TECHNICAL PROPOSALS (ASDB Projects)

At the time and place specified in the project advertisement, Technical p j ,

Proposals are received.

Page 55: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

REVIEW OF THE TECHNICAL PROPOSALS BY THE TRC

The TRC independently reviews all areas ofThe TRC independently reviews all areas of each Responsive Firms Technical Proposal

If necessary, the TRC may requisition assistance from other Technical Advisors

Each TRC member assigns a numerical score to each Responsive Firms Technicalscore to each Responsive Firms Technical Proposal

Page 56: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

RECEIVING THERECEIVING THEBID PROPOSALS

At the time and place set forth in the j d i Bid P lproject advertisement, Bid Proposals are

received.

Page 57: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

A Bid Proposal consist of both a Sealed T h i l P l d S l d P iTechnical Proposal and a Sealed Price

Proposal.

On ASDB Projects, Th Di t i t

On LBDB Projects, Th Di t i t C t tiThe District

Contracting Unit publicly announces

The District Contracting Unit publicly opens the

Price Proposals and thepublicly announces the TRC scores and publicly opens the

Price Proposals and the Technical Proposal for the low bid. The TRC

sealed Price Proposals.

then determines if proposal is responsive.

Page 58: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

On ASDB Projects

Bid Prices are Divided by the Technical Scores.

If a Value-of-Time Factor is included in the RFP, this adjustment is applied to each bid , j ppto determine the Final Adjusted Score.

The Firm having the Lowest Adjusted Score is the apparent winner

Page 59: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

On LBDB Projects

BIDS OPENED AND THE TECHNICAL PROPOSAL

IS REVIEWED & DECLAREDIS REVIEWED & DECLARED

RESPONSIVE NON-RESPONSIVE

ORThe Responsive Firm submitting the Lowest Bid is the apparent winner

Page 60: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Low-Bid Technical Proposal Non-Responsive?Non-Responsive?

The TRC reviews the next Lowest-BidTechnical Proposal (and so forth) until aTechnical Proposal (and so forth) until aTechnical Proposal is found to beResponsive or until all of the TechnicalResponsive or until all of the TechnicalProposals have been Declared Non-Responsive.espo s e

Page 61: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

The District Contracting Unit

The Technical Review Committee‘sReports

The Technical Review Committee s Findings To

The Selection/Award Committee

The SAC Confirms

Selection Of

/ Award Of

Adjust Score Projects

Low BidProjects

Page 62: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

The District Contracts Office Posts the Intended SELECTION/AWARD

And on

On ASDB ProjectsjThe Short-listed Firms Are Individually Notified

Page 63: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

THE CONTRACT IS AWARDED TO THE WINNING FIRM

THE CONTRACTTHE CONTRACT DOCUMENTS ARE EXECUTEDEXECUTED.

Page 64: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

DESIGN-BUILD WARRANTIESWARRANTIES

Page 65: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Why WarrantiesAligns the DB Firm’s interests with the Department’s

Key to reducing Department riskL t f (lif l )Long-term performance (life-cycle)

Importance: 10% to 20% of Technical pScore

Page 66: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Warranties / Value Added Spec’sWarranties / Value Added Spec s

338 Asphalt Pavement* 3 years338 - Asphalt Pavement 3 years

355 - Concrete Pavement* 5 years

475 - Bridge Component** 5 years

645 - Signalization** 3 years645 - Signalization 3 years

725 - Highway Lighting** 3 years*Standard Specifications

**Developmental Specifications

Page 67: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Warranty ParametersWarranty ParametersDepartment defined minimump

Points awarded for “extent” of warranty above minimumabove minimum

Extent has 4 basic componentsLengthBreadth (components)Breadth (components)Distress Type & ThresholdsC ti MCorrective Measures

Page 68: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

W t P t ( t’d)Warranty Parameters (cont’d)

Breadth (what components covered)

S ifi it t id i dSpecific items outside required coverage

“Bumper to bumper”

Page 69: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

W t P t ( t’d)Warranty Parameters (cont’d)

Distress type & thresholds

Established for all major items warranteedj

Meaningful evaluation of performance

M bl bj tiMeasurable, objective

Threshold appropriate for time in service

Corrective Measures

Adequate to meet life spanAdequate to meet life span

Page 70: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Backing of WarrantyW t t b b k dWarranty must be backed

Two methodsPerformance Bond Contractor Guarantee (Failure to meetContractor Guarantee (Failure to meet the requirements of the Specification will result in the suspension, revocation, orresult in the suspension, revocation, or denial of the Contractor’s Certification of Qualification for a minimum of 6 months.)

Page 71: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Oth W t A tOther Warranty Aspects

Contractor expected to perform remedial work timely, pay cost (MOB, MOT, etc.) and y, p y ( , , )follow lane closure restrictions

Di t t th St t id Di t R iDisputes to the Statewide Disputes Review Board for binding decision

Page 72: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

D-B CEID B CEI

Page 73: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Design Build ConstructionDesign Build ConstructionDesign Build Construction Engineering InspectionDesign Build Construction Engineering Inspection

The inspection is the same for a D-B project as a Design-Bid-Build project.

CEI by In-house FDOT, or

CEI by Consultant hired by FDOTCEI by Consultant hired by FDOT

Page 74: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

MATERIAL ACCEPTANCEMATERIAL ACCEPTANCE

Page 75: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

M t i l A tMaterial Acceptance

Material Acceptance is the same for a D-B project as on a Design-Bid-Build Project

Page 76: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Applicable RequirementsApplicable RequirementsApplicable RequirementsApplicable Requirements

Laboratory Qualification Program

Technician QualificationsTechnician Qualifications

Independent Assurance Programp g

Quality Control Program

Page 77: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Material Acceptance ProcessesMaterial Acceptance ProcessesMaterial Acceptance ProcessesMaterial Acceptance Processes

Field Sampling & Testing

Manufactured ProductsManufactured Products

Incidental Materials

Unapproved or New Materials

Page 78: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Field Sampling & TestingField Sampling & TestingField Sampling & TestingField Sampling & TestingMinimum sampling/testing frequency available from LIMS

QC Testing by D-B Firm

Verification & Independent Verification Testing by the Department (or Consultants)

Resolution Process when non-comparisons occur

Quality Control Plan Required before constructionQuality Control Plan Required before construction begins

Lab Qualification Program applicableLab Qualification Program applicable

Page 79: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Manufactured Products (QPL/APL)( )Accepted Based on Manufacturer’s Certification

Listed in Qualified Product List (QPL) or Approved Product List (APL)

Certification Complies with Department Guidelines

Material must meet Specification requirementsMaterial must meet Specification requirements

Subject to random Verification Testing

Page 80: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Incidental Material Acceptance

Requires Manufacturer’s Certification Each Product

Certification must include test results

Contractor’s Certification for Installation

Page 81: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

N M t i l A tNew Materials Acceptance

Submit Request to the District Materials E iEngineer.

Provide Supporting Documents.Provide Supporting Documents.

Propose the Acceptance Criteria.

If not Accepted, Use Material Referenced in Documents.

Page 82: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

L L dL L dLessons LearnedLessons Learned

Page 83: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Lessons LearnedLessons LearnedLessons LearnedLessons LearnedProjects $100 million or greater will be Design

Build

Greater opportunity for scope alternatives and pp y pinnovation

Establish/use a maximum budget amount (MBA)Establish/use a maximum budget amount (MBA) as appropriate

S l t b d lifi ti litSelect based on scope, qualifications, quality, schedule, but cost not to exceed MBA

A+B/Technical Proposal Score when using I/D’s

Page 84: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Lessons LearnedLessons LearnedThe proposal is the commitment. Deviations may require a credit.

Don’t include “non-descriptive” commitments in the proposal.

FDOT should clarify such during the Q & A.

I ti d t i l d i i t FDOTInnovation does not include revisions to FDOT specifications or department policies.

Innovation should be limited to the D/B Firm’s means and methods, approach to project, etc.

Page 85: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

Lessons LearnedLessons Learned

“Project Selection Guidelines” are important

Independent “Peer Review” on Major Projects

Use of Bid OptionsUse of Bid Options

Expect what is put in the RFP

Share all available information

Page 86: DB Presentation 2010 Const Conf v 2-16-2010.ppt · (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subon

QUESTIONS?QUESTIONS?