Page 1: Dawlish Warren

Dawlish Warren

CASE STUDY

ProcessErosion

Management

Page 2: Dawlish Warren

The Process and location

Dawlish Warren

Page 3: Dawlish Warren

•The source of material – Langstone Rock

Can you identify joints, lines of weakness, wave cut platform, notch?

Page 4: Dawlish Warren

Can you see Langstone rock in the distance?

Page 5: Dawlish Warren

The line of the spit on the offshore side towards the River Exe

Page 6: Dawlish Warren

Along the crest

Page 7: Dawlish Warren

Different size beach material gradually builds up to consolidate the feature

Page 8: Dawlish Warren

Inshore, vegetation plays an important role to stabilise the sand

Page 9: Dawlish Warren

Small meres appear with brackish water

Page 10: Dawlish Warren

The town of Exmouth across the estuary

Page 11: Dawlish Warren

Modification by Humans

Dawlish Warren

Page 12: Dawlish Warren

At the proximal end buildings occupy the crest line [car park]

Page 13: Dawlish Warren

From the car park to the spit visitors are ‘led’ by boardwalk

Page 14: Dawlish Warren

Foot erosion is evident aroung picnic benches …

Page 15: Dawlish Warren

… or where corners have been cut off

Page 16: Dawlish Warren

Railway sleepers used on the onshore side to direct tourists

Page 17: Dawlish Warren

In some places even vehicles have contributed

Page 18: Dawlish Warren

The key to conservation is to re-establish Marram grass that binds together the sand

and promotes soil development.

Page 19: Dawlish Warren

Left alone a thick mat builds up

Page 20: Dawlish Warren

Beside the path, experimental plots have been fenced off at different ages

Page 21: Dawlish Warren

The contrast between the areas is evident

Page 22: Dawlish Warren

Other uses – golf course

Page 23: Dawlish Warren

Dog Walking - note the barrier to stop ‘ridge walking’

Page 24: Dawlish Warren

Management

Dawlish Warren

Page 25: Dawlish Warren

Revetment process at the proximal end

Page 26: Dawlish Warren

Lifeboat ramp for rescue users

Page 27: Dawlish Warren

Promenade opened in 1993

Page 28: Dawlish Warren

Promenade, sea wall and rock armour

Page 29: Dawlish Warren

Rock armour used to protect the old sea wall, can you identify any other ‘important’ users?

Page 30: Dawlish Warren

Good view from the

railway bridge of wall, rock armour and supply of material

Page 31: Dawlish Warren

Sea wall with re-curve

Page 32: Dawlish Warren

Built in sections, the toe is protected with granite blocks

Page 33: Dawlish Warren

Groynes toward the distal end

Page 34: Dawlish Warren

Below the sand gabions

have been used to

encourage the sand to

stabilise

Page 35: Dawlish Warren

These have been eroded away particularly at path corner

Page 36: Dawlish Warren

Soft Engineering – reused Christmas trees

Page 37: Dawlish Warren

The wind blows through sand pitching and building up to bury them. Eventually they should bio-degrade

Page 38: Dawlish Warren

Dawlish Warren

Page 39: Dawlish Warren
Page 40: Dawlish Warren
Page 41: Dawlish Warren
Page 42: Dawlish Warren