Top Banner
DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) 27 February 2007
12

DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Jan 03, 2016

Download

Documents

Eugenia Hodge
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

DAU PANEL

17 April 2007

DAU PANEL

17 April 2007

MG(P) Jeff A. SorensonDeputy for Acquisition & Systems ManagementOffice of the Assistant Secretary of the Army (Acquisition, Logistics and Technology)27 February 2007

Page 2: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Agenda

• “Big A – little a” of Acquisition

• Army Budget Status

• Industrial Base

• Rapid Acquisition Process

• Summary

2

Page 3: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

CAPABILITYNEED

ACQUIREDEVELOP

CONTRACTTEST

PRODUCEFIELD

aacquisition

OPERATE/SUSTAIN

UPGRADE/MODERNIZE

FMS

RETIREDEMIL

AACQUISITION

D O T L M P F?

RESOURCES

Doctrine, Organizations, Training, Leader Development, Materiel, Personnel, Facilities

“Big A – Little a”One Process – One Team

3

Page 4: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Army Base + GWOT Funding – FY03-09 ($B)

0

30

60

90

120

150

180

210

240

GWOT 24.6 38.3 58.5 65.6 90.5 83.4 TBD

Base Appn 90.6 95.9 101.0 105.8 110.1 130.0 140.7

Total Army

FY03 FY04 FY05 FY06 FY07 FY08 FY09

• Army FY03-08 Supp Funding = ~ $360B• Army FY03-08 GWOT Growth = $58.8B * Note: FY 07/08 Supp requests pending

?

115.1 159.5 171.4134.2 200.6 213.4

* *

Actuals RequestNote: Figures do not include JIEDDO, ISFF, ASFF

6

Page 5: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Industrial Base – Family Tree

Source: SDC, DACIS DM&A

199019881980 1982 1984 1986 1992 1994 1996 1997 1998 1999

First Wave Second Wave

2000 2001 2002 2003 2004

Fairchild Weston Systems Inc.Loral

Honeywell-Electro-Optics

Ford AerospaceBDM International Inc.

Librascope

IBM–Federal SystemsUnisys Defense

General Dynamics–Ft. WorthMEL

Lockheed

General Electric–Aerospace

Martin Marietta

LTV–Missile Business

Gould Ocean System Division

COMSAT Corp.

Affiliated Computer Services Inc. (ACS)

Loral

BDM (Carlyle)

Aerospace Electronic Systems

Lockheed Martin

Teledyne Ryan Aeronautical

General Dynamics Space Business

LTV–Aircraft OperationsGrumman Corp.

Ryan AeronauticalKistler Aerospace Corp.

Alvis Logistics–EDD Business

Northrop

Logicon

Westinghouse El. Defense

TASC (Primark)PRC (Black & Decker)

General Instruments–DefenseVarian–Solid State Devices

Taratin

Litton IndustriesAvandale Industries

Newport News ShipbuildingTRW

Commercial Aerostructures

Northrop Grumman

Northrop – West Virginia

Federal Data Corp.

Lockheed Martin Defense Sys, Armament Sys

GM DefenseVeridian Corp

Primex Technologies

Computing Devices International, Inc

GTE Government Systems Corp. Units

Motorola Integrated Info Sys

Gulfstream Aerospace

General Dynamics

Lucent Advanced Technology Systems

NASSCO Holdings, Inc.

Galaxy Aerospace

Bath Iron Works Chrysler Defense, Inc

Santa Barbara

General Dynamics

Space PropulsionsSpace SystemsFort

Worth Div.

Electronics Division

Missile Operations

Rockwell

Argo Systems

Litton Precision Gear

Hughes Electronics Satellite

Boeing

McDonnell Douglas

Jeppesen Sanderson Boeing

HughesGeneral Motors

BET PLC's Rediffusion Simulation

MagnavoxREMCO SA

STC PLC–Navigation SystemsTRW-LSI Products Inc.

Corporate JetsE-Systems

Chrysler Techn. AirborneTexas Instr. El. Defense

Raytheon

General Dynamics Missile Division

Eng & Const.

Int’l

Aircraft Integration

Systems Segment

Vertex Aerospace

Hughes ElectronicsRaytheon

Raytheon – Flight Simulation Raython Co-Plant, Quincy

7

Page 6: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Big DoD Contractors Dwarf FieldLo

ckhe

ed M

artin

Boe

ing

Nor

thro

p G

rum

man

Gen

eral

Dyn

amic

s

Ray

theo

n

Hal

libur

ton

Source: DoD Directorate for Information Operations and Reports Procurement Statistics

6 Companies receive50% of payments

to top 100 contractorsFor 2006

$0

$7

$14

$21

$28

$35

1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97

20

06 D

ire

ct

Do

D C

on

tra

cts

($

B)

8

Page 7: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Spiral Development Balancing Act

11

Page 8: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

0

10

20

30

40

50

60

70

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Month

Nu

mb

er o

f R

ebas

elin

es o

ver

tim

e p

erio

d f

rom

198

8-20

05

Group A

Group B

Group C

Cumulative

PBDsPDMsAuth. ActApprop. ActDoD Budget

Data over 17 years serves as a heads up!

Is this known occurrence factored into OSDand Joint Staff processes and planning?DoD Budget

OMB

President’sBudget toCongress

ACAT 1 Programs - Cumulative Rebaselines by Month

(Period over 1988-2005)

ACAT 1 Programs - Cumulative Rebaselines by Month

(Period over 1988-2005)

12

Page 9: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Current Process

ONS AR2B DEVELOPMENT/PROCUREMENT

SAFETYRELEASERELIABILITY

FIELDOIF / OEF

Accelerated Process

DoD 5000

13

Page 10: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

# of Approved Operation Needs Statements (ONS)

0

200

400

600

800

1000

1200

1400

1600

1800

FY03 FY04 FY05 FY06

Communicate

Shoot

Support

Protect

Move

Other

14

Page 11: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Way Ahead

• “Big A – little a” Acquisition

• Health of Industrial Base Critical to Success

• Rapid Acquisition – Team Sport!

19

Page 12: DAU PANEL 17 April 2007 DAU PANEL 17 April 2007 MG(P) Jeff A. Sorenson Deputy for Acquisition & Systems Management Office of the Assistant Secretary of.

Bottom LineBottom Line

Program Manager’s Ultimate Decision Tool:

When All Factors Are About Equal,What Is Best For The Soldier?

20