Date V. No. Sr. No. Name of the
DepartmentDescription of the bridge, culvert, flyover, causeway or subway
Cost of construction
/ acquisition (Rs.) Total Cost (Rs.) From whom acquired
31.03.2011 25871
1
ELECTRICAL HO
ELECTRICAL
WIDENING AND ASPHALTING WORK OF MUMBAI PUNE HIGHWAY
INFRONT OF PCMC BUILDING WITH CONSTRUCTION OF
RETAINING WALL.TWO WHEELER PARKING COMPOUND WALL
FOOT PAT ETC
613,800.00 613,800.00 MS EAGLE
CONSTRUCTION
05.03.2012 230642 ENGG HEAD SP
SCHEME
ESCALATION BILL FOR CONSTRUCTION OF GRADE SEPARATOR
AT MAHAVIR CHOWK, MUMBAI PUNE ROAD 3,334,699.00 3,334,699.00 J KUMAR INFRA PROJECTS
31.03.2012 27634
3WATER SUPPLY SP
SCHEME
1ST AND FINAL ESCALLATION BILL FOR IMPROVEMENT &
WINDENING TO MDR 31 FROM THERGAON BRIDGE TO GANESH
NAGAR VIA DANGE CHOWK
3,274,868.00 3,274,868.00 C.P. BAGAL & COMPANY
17.03.2012 24588
4
ENGG D HO
CONSTRUCTION OF BRIDGE WITH APPROACH ROAD AT S NO 6 TO
70 FOR ROAD FROM S NO 70 TO 26 AT PIMPLE NILAKH GAON
FINAL ESCALATION BILL
1,775,998.00 1,775,998.00 ARCH INFRA PROJECTS
NIRMAN P LTD
10.02.2012 21750
5
ENGG PROJECTS
CONSTRUCTION OF GRADE SEPARATOR AT MAHAVIR CHOWK
AND SHIVAJI CHOWK ON MUMBAI PUNE ROAD ATCHINCHWAD
FINAL ESCALATION BILL
104,162,502.00 104,162,502.00 J KUMAR INFRA PROJECTS
25.11.2011 16063
6
ENGG PROJECTS
CONSTRUCTION OF R.O.B. AT AUTO JEMS DAPODI RAILWAY KM
182/12-13 ON MUMBAI PUNE SECTION NEAR DAPODI RLY STATION
FINAL ESCALATION BILL
18,923,446.00 18,923,446.00 M/S MANOJA STHAPATYA
25.05.2011 2857
7
ENGG. PROJECT CONSTRUCTION OF APPROVIALS FOR BRIDGE ACROSS RIVER
PAWANA JOINTING & RAHATANI AT MAHADEV MANDIR
6,627,675.00 6,627,675.00 H.C.KATARIA
BRIDGES
Satish Nagre Associates
Chartered Accountants BRIDGES, etc Page 1
V.N. Date Sr. No. Description of Building Name of Department
Cost of
acquisition /
construction
(Rs.)
Total Cost
(Rs.) From whom acquired
25745 27.03.2012 1REPARING OF CIVIL WORK IN GAOTHAN AND PIMPARI SCHOOL
AT THERGAON WARD NO 82 CIVIL D WARD 1,467,652.00 1,467,652.00 B K KHOSE
25746 27.03.2012 2SHIFTING OF HT/LT LINE AT VARISE PLADCES AT NIGADI
PRDHIKARNENG A WARD 157,998.00 157,998.00 MIKIR ENTERPRISES
24883 20.03.2012 3PAINTING & PROVIDING CIVIL MAINTENANCE WORKS TO WC
BLOCKS AND URINALS WARDS NO 37 CHINCHWAD STATIONENGINEERING A HEAD OFFIC 400,000.00 400,000.00 M/S AVISHKAR CONSTRUCTION
25778 27.03.2012 4CONSTRUCTION OF SI OFFICIER AND ALLIED WORK IN WARD
NO 21ENGINEERING C HEAD OFFIC 647,185.00 647,185.00 ZUNJAR CONSTRUCTION
25810 27.03.2012 5CONSTRUCTION OF KAMAN AT DISHAKRIYA GHAT & OTHER
ALLIED CIVIL WORK WNO 64ENG B WARD 435,087.00 435,087.00 OMKAR ASSOCIATES
25752 27.03.2012 6RENOVATION OF GHAT 1 & 2 WAGHERE GARDEN AT
PIMPRIGOANENGG GARDEN 12,157,469.00 12,157,469.00 SAMARTH INFRA
24399 16.03.2012 7CONSTRUCTION OF A GYMNASIUM HALL IN THE PREMISES OF
KALBHORNAGAR SCHOOL AT WARD NO 41ENGG WARD A 825,280.00 825,280.00 H M CONSTRUCTION
24450 16.03.2012 8 DEVELOPMENT OF PARKING PLOT SECT NO 20 WARD NO 4 ENGG A HO 1,274,485.00 1,274,485.00 OMKAR CONSTRUCTION
24465 16.03.2012 9CONTSTRUCTION OF A SHED FOR GARBAGE SEPARATION FOR
HEALTH DEPT WARD NO 39ENGG A WARD 687,000.00 687,000.00 MAHENDRA BHALERAO
24467 16.03.2012 10DEVELOPMENT OF GARDEN ON OPEN SPACE AT VASTUDYOG
AJMERA COLONY AT PIMPRI ESCALATION BILLENGG GARDERN 98,860.00 98,860.00 BARKHA ENTERPRISES
24303 01.03.2012 11
CONSTRUCTION OF SANITARY INSPECTOR OFFICE AND
PROVIDING ALLIED CIVIL WORK IN WARD NO 95
KAWADENAGAR
ENGG WARD D 501,487.00 501,487.00 BARKHA ENTERPRISES
27064 31.03.2012 12CONSTRUCTION OF SANITARY INSPECTOR CABIN IN WARD NO
8ENGG A WARD 697,000.00 697,000.00 R.V.UMAP
27065 31.03.2012 13CONSTRUCTION OF SANITARY INSPECTOR CABIN IN WARD NO
7ENGG A WARD 697,000.00 697,000.00 R.V.UMAP
27111 31.03.2012 14CONSTRUCTION OF 26 SEATED TOILET BLOCK BACK SIDE OF
GYMNASIUM HALLENGG MAIN OTHER SP SCHEME 2,692,360.00 2,692,360.00 DEEPAK JADHAV
27112 31.03.2012 15DEVELOPMENT OF GARDEN AT OPEN SPACE NEAR
KALBHAIRAV SOCIETY AT SEC NO 26 AT PRADHIKARANENGG GARDEN 47,502,977.00 47,502,977.00 B.V.G. INDIA LTD
27609 31.03.2012 16
CONSTRUCTION OF A WAITING SHED AND PROVIDING TWO
CREMINATION BEADS AND OTHER CIVILS IN WARD NO 97
PIMPLE GUVRAV
ENGG D HO 846,601.00 846,601.00 KRISHNA CONSTRUCTION
27632 31.03.2012 17EXTENSION OF 2ND FLOOR OVER EXISTING SCHOOL BUILDING
AT WALHEKARWADI CHICHWADENGG B HO 422,226.00
422,226.00 UDAY CONSTRUCTION
27410 31.03.2012 18CONSTRUCTION OF INDOOR HALL FOR WOMEN AND ALLIED
COST WORK ON S.NO.200 OPEN SPACE NO.407 IN WARD NO 5ENGG C HO 3,134,712.00
3,134,712.00
R.D.KATE
27410 31.03.2012 19
CONSTRUCTION OF INDOOR HALL FOR WOMEN AND ALLIED
COST WORK ON S.NO.200 OPEN SPACE NO.407 IN WARD NO 5 1ST
& FINAL ESCALATION BILL
ENGG C HO 440,933.00
440,933.00
R.D.KATE
BUILDING
Satish Nagre Associates
Chartered Accountants BUILDING Page 1
V.N. Date Sr. No. Description of Building Name of Department
Cost of
acquisition /
construction
(Rs.)
Total Cost
(Rs.) From whom acquired
23520 07.03.2012 20PROVIDING VARIOUS TYPES OF CIVILWORK IN BADMINTON
BUILDING IN YAMUNAGAR WARD NO 44ENGG A HO 2,120,094.00
2,120,094.00 SHIVAM ENTERPRISES
25532 26.03.2012 21CONSTRUCTION OF COMPOUND WALL AT RESERVATION NO 275
AT AKRUDIENGG B HO 774,643.00
774,643.00 TANMAY ENTERPRISES
24143 14.03.2012 22ADDITIONAL CONSTRUCTION OF PUMP HOUSE AT WTP PHASE -
IIIENGG WATER SUPPLY 6,881,448.00
6,881,448.00 UNIQUE TRADERS
24144 14.03.2012 23
CONSTRUCTION OF A RECREATION CENTER FOR SENIOR
CITIZEN AT SAVARKAR GARDEN AT PREMLOK PARK WARD NO
62 CHINCHWAD
ENGG B WARD GARDEN 1,434,115.00
1,434,115.00
S.B. ENTERPRISES
13226 17.10.2011 24CONSTRUCTION OF AUDITORIUM AND ALLIED WORK AT
BHOSARI PCMC FINAL ESCALATION BILLENGG HEAD SP SCHEME 9,461,340.00
9,461,340.00
SHASHI PRABHU &
ASSOCIATES\
13227 17.10.2011 25CONSTRUCTION OF AUDITORIUM AND ALLIED WORK AT
BHOSARI PCMC ENGG HEAD SP SCHEME 53,464,445.00
53,464,445.00
SHASHI PRABHU &
ASSOCIATES\
16304 30.11.2011 26 UPGRADATION OF TOWER LIFTS AT YCM HOSPITAL ELECT HO 4,650,000.00 4,650,000.00 OTIS ELEVATOR
24624 17.03.2012 27PROPOSED HALL RENOVATION OF COMPOUND WALL AND
OTHER CIVIL WORK FOR SAVITRIBAI PHULE SCHOOLENGG C HO 3,451,053.00
3,451,053.00
V.D. BHOIR
24626 17.03.2012 28CONSTRUCTION OF ANGANWADI BUILDING IN RAMNAGAR
SLUM IN WARD NO 41ENGG MAIN OTHER SP SCHEME 1,465,768.00
1,465,768.00 MANISHA CONSTRUCTION
24628 17.03.2012 29
PROVIDING ELECTRICAL FENCING AND INTERLOCKING
PAVEMENT AND CIVIL WORK FOR VARIOUS PCMC BUILDING AT
WARD NO 94 KIRTI NAGAR
ENGG D WARD 612,091.00
612,091.00
CHOTELAL CHOUHAN
24637 17.03.2012 30CONSTUCTION OF A COMPOUND WALL AND OTHER CIVIL WORK
FOR MUSLIM DAPHANBUMI IN WARD NO 12 CHARHOLIENGG C HO 769,000.00
769,000.00
B.N. NANEKAR
24671 17.03.2012 31CONSTRUCTION OF COMPUTER ROOM AND OTHER ALLIED
WORK AT NEWALE VASTI SCHOOL IN WARD NO 7ENGG A WARD 933,727.00
933,727.00
SHAIKH MUSSA SHAIKH
MUNEER
24680 17.03.2012 32PROPOSED INTERIOR WORKS FOR TAX COLLECTION OFFICE OF
TALAWADE AT SECTOR NO 21 NIGDIENGG A WARD 1,636,240.00
1,636,240.00 NIRMITI ENGG CORPORATION
22224 22.02.2012 33
PROVIDING PROFLEX SYSTEM ROOFING FOR SKTTING GROUND
AT PRABHODHANKAR THAKARE GROUND IN YAMUNANAGAR
WARD NO 44.
ENGG A WARD 5,629,580.00
5,629,580.00
S.S. SATHE
21754 10.02.2012 34CONSTRUCTION OF 6 CLASSROOMS NEAR BUILDING NO 15 AT
BHATNAGAR FOR PCMCENGG SLUM 4,626,012.00
4,626,012.00
VENKATESHWARA
CONSTRUCTION
22693 29.02.2012 35CONSTRUCTION OF CIVIL WORKS FOR SANITARY CABIN AT
THERGOAN WARD NO 83ENGG D WARD 728,023.00
728,023.00 SOHAM ENTERPRISES
18355 28.12.2011 36PROPOSED WORK FOR TAX COLLECTION OFFICE OF TALAWADE
AT SECTOR NO 21 NIGDIENGG A WARD 1,070,000.00
1,070,000.00 NIRMITI ENGG CORPORATION
21440 07.02.2012 37CONSTRUCTION OF GROUND FOR SCHOOL AT SECTOR NO 20
WARD NO 4 IN FRONT OF MOREWASTIENGG A WARD 778,332.00
778,332.00 SHRINATH CONSTRUCTION
21454 07.02.2012 38DEVELOPING GARDEN AT OPEN SPACE IN ST NO 227/1 NEAR
RADHANAGARI SOCIETY BHOSARIENGG GARDEN 1,827,961.00
1,827,961.00 V.A. ZOMBADE
21671 09.02.2012 39CONSTRUCTION OF POLICE STATION IN SECTOR NO 20 IN FORNT
OF MORE WASTI WARD NO 5ENGG A WARD 938,061.00
938,061.00 VEDARTH ASSOCIATES
Satish Nagre Associates
Chartered Accountants BUILDING Page 2
V.N. Date Sr. No. Description of Building Name of Department
Cost of
acquisition /
construction
(Rs.)
Total Cost
(Rs.) From whom acquired
21673 09.02.2012 40CONSTRUCTION OF COMPOUND WALL AT S.NO 28 RESERVASION
NO 653 AT RAHATANIENGG GARDEN 1,433,055.00
1,433,055.00 BARKHA ENTERPRISES
22096 18.02.2012 41
CONSTRUCTION OF COMPOUND WALL AND DEVELOPMENT OF
PLAYGROUND AT RESERVATION NO 362 AT WARD NO 75 PIMPLE
SAUDAGAR
ENGG D WARD 3,413,685.00
3,413,685.00
SAI PRABHA CONSTRUCTION
21559 08.02.2012 42CONSTRUCTION OF SHED FOR GARBAGE SR PARATHION OFFICE
FOR HEALTH DEPARTMENT WORKERS AT WARD NO 42ENGG A WARD 962,030.00
962,030.00
ARSHAD S SHAIKH
22423 24.02.2012 43CONSTRUCTION OF SANITARY INSPECTORS CABIN AND
VARIOUS CIVIL WORKS AT TALAWADE WARD NO 1ENGG A WARD 806,615.00
806,615.00 S.M. CONSTRUCTION
20505 23.01.2012 44DEVELOPMENT OF GARDEN ON OPEN SPACE AT VASTUDYOG
AJMERA COLONY AT PIMPRI ENGG GARDEN 1,095,217.00
1,095,217.00 BARKHA ENTERPRISES
20531 23.01.2012 45DEVELOPMENT OF KALEWADI GARDEN AR S NO 88 RES NO 639
AT KALEWADI - FINAL ESCALATION BILLENGG GARDEN 186,287.00
186,287.00 H.N. BHUJBAL
20531 23.01.2012 46DEVELOPMENT OF KALEWADI GARDEN AR S NO 88 RES NO 639
AT KALEWADI - FINAL ESCALATION BILLENGG GARDEN 3,047,829.00
3,047,829.00 H.N. BHUJBAL
21899 13.02.2012 47CONSTRIUCTION OF CULTURAL CENTER IN KALAKHADAK SLUM
IN WARD NO 88ENGG SLUM 604,860.00
604,860.00 DEV CONSTRUCTION
26019 28.03.2012 48PROVIDING MAINTENANCE DEVELOPMENT WORK OF
GYMNASSIUM HALL BUILDING IN WARD NO 33 ENGG B HO1,369,268.00
1,369,268.00 GANESH SAVATA BHUJBAL
26020 28.03.2012 49
PROVIDING MAINTENANCE DEVELOPMENT WORK OF
GYMNASSIUM HALL BUILDING IN WARD NO 33 FINAL
ESCALATION BILL
ENGG B WARD 152,639.00
152,639.00
GANESH SAVATA BHUJBAL
25641 27.03.2012 50CONSTRUCTIONOF WAITING SHED AT DASHKRIYA GHAT W NO
17 PUNA WALAENGG B WARD 2,464,399.00
2,464,399.00 P.N.NAGANE
25642 27.03.2012 51CONSTRUCTIONOF WAITING SHED AT DASHKRIYA GHAT W NO
17 PUNA WALA FINAL ESCALATION BILLENGG B WARD 228,755.00
228,755.00 P.N.NAGANE
25366 26.03.2012 52CONSTRUCTION OF CD WORK AT MATEVASTI IN WARD NO 12
CHARLIENGG C HO 1,233,751.00
1,233,751.00 DHANESHWAR CONSTRUCTION
25367 26.03.2012 53CONSTRUCTION OF CD WORK AT MATEVASTI IN WARD NO 12
CHARLI 1ST AND FINAL ESCALLATION BILLENGG C HO 45,168.00
45,168.00 DHANESHWAR CONSTRUCTION
25423 26.03.2012 54DEVELOPMENT OF GARDEN IN SR.NO. 258 R.N. 653 RAHATANI
AKASHGANGAELECT GARDEN 655,482.00
655,482.00 N.C.Y. ENTERPRISES
25467 26.03.2012 55CONSTRUCTION OF SCHOOL BUILDING AT THERGAON S NO 9 R
NO 625 FOR PCMCENGG D WARD 41,740,674.00
41,740,674.00 B.K.KHOSE
25470 26.03.2012 56CONSTRUCTION OF SCHOOL BUILDING AT THERGAON S NO 9 R
NO 625 FOR PCMC FINAL ESCALATION BILLENGG D HO 9,487,701.00
9,487,701.00 B.K.KHOSE
26545 31.03.2012 57PROVIDING AND DEVELOPMENT OF NEW GARDEN AT RES NO 25
KASARWADI PUNEENGG GARDEN 19,793,449.00
19,793,449.00 N.G. PADWAL
26580 31.03.2012 58
CONSTRUCTION OF TOILET BLOCK AND OTHER ALLIED CIVIL
WORK IN MUSLIM DAFAN BHUMI WARD NO 30 FINAL
ESCALLATION BILL
ENGG C WARD 39,539.00
39,539.00
SHRINATH CONSTRUCTION
26595 31.03.2012 59PROVIDING AND FIXING CONCRETE PAVING PAVER
BLOCKSRASTRABHUSHAN &AJINKYATARA TO RUPEENAGARENGG A WARD 766,731.00
766,731.00
P.S.GUJAR
Satish Nagre Associates
Chartered Accountants BUILDING Page 3
V.N. Date Sr. No. Description of Building Name of Department
Cost of
acquisition /
construction
(Rs.)
Total Cost
(Rs.) From whom acquired
26642 31.03.2012 60
CONSTRUCTION OF COMPOUND WALL AND OTHER WORKS ON
OPEN SPACE NO 2 IN DISTRICT CENTRE ATSECT NO 18 FINAL
ESCALLATION BILL
ENGG GARDEN 485,687.00
485,687.00
GANESH CONSTRUCTION
26646 31.03.2012 61 DEVELOPMENT OF GARDEN IN SR.NO. 27 RNO.3/1 DAPODI ELECT GARDEN
1,287,441.00 1,287,441.00
N.C.Y. ENTERPRISES
26647 31.03.2012 62CONSTRUCTION OF COMPOUND WALL WATCHEMEN QUARTER
& OTHER CIVIL WORK IN KASARWADI ZONE ESRENGG C WARD WATER SUPPLR 3,268,129.00
3,268,129.00
H.C.LUNKAD
26648 31.03.2012 63
CONSTRUCTION OF COMPOUND WALL WATCHEMEN QUARTER
& OTHER CIVIL WORK IN KASARWADI ZONE ESR - FINAL
ESCALLATION BILL
ENGG B WARD 443,278.00
443,278.00
H.C.LUNKAD
26706 31.03.2012 64 SAMSHANBHUMI IN PIMPRINAGAR WARD NO 68 PIMPRI ENGG B WARD 2,779,945.00 2,779,945.00 R.M. ENTERPRISES
26724 31.03.2012 65CONSTRUCTION OF COMPOUND WALL AND FIXING ENTRANCE
GATE IN MULIN CREMATORIUM IN W NO 102 DAPODIENGG C WARD 3,541,814.00
3,541,814.00
N.C.CONSTRUCTION
5900 11.07.2011 66CONSTRUCTION OF SCHOOL BUILDING AT SECTOR NO 20 AT
CHIKHALIENGG A WARD 5,431,850.00
5,431,850.00 YASHAK ASSOCIATES
12111 03.10.2011 67CONSTRUCTION OF PUBLIC URNINAL BLOCK AT MAHATMA
PHULE NAGAR IN WARD NO 40 AT MOHONNAGARENGG A WARD 470,958.00
470,958.00
ARSHAD S SHAIKH
12140 03.10.2011 68 CONSTRUCTION OF CD AT SHINDEWASTI W NO 58 ENGG B HO 3,835,453.00 3,835,453.00 GANESH CONSTRUCTION
11280 22.09.2011 69DEVELOPMENT OF JUBLIEE GROUND AT SEC NO 21
YAMUNANAGAR NEAR PLOT NO 93 TO 109ENGG A WARD 3,083,609.00
3,083,609.00 BHAGWANT CONSTRUCTION
13771 24.10.2011 70DESIGN AND CONSTRUCTION OF RXX SIMPWELL OF 500000 LTRS
CAPACITY AT YCMHENGG B HO 1,554,287.00
1,554,287.00 OMEGA ENTERPRISES
13799 24.10.2011 71CONSTRUCTION OF KAMAN AT CRENA TO RIUM AT MOSHI
WARD NO 10ENGG C WARD 795,900.00
795,900.00 H.M. CONSTRUCTION
13811 24.10.2011 72CONSTRUCTION OF VEGETABLE MARKET AR PIMPLE
SAUDAGAR WARD NO 75ENGG D WARD 3,144,811.00
3,144,811.00 KRISHNA CONSTRUCTION
5501 04.07.2011 73DISMENTLING OLD SCHOOL BUILDING & CONSTRUCTION OF
SCHOOL BUILDING AT SONAWANE WASTI WARD NO.6.ENGG A WARD 4,435,765.00
4,435,765.00
H.M. CONSTRUCTION
13679 21.10.2011 74CONSTRUCTION OF PARKING SHED FOR AMBULANCE IN YCM
HOSPITAL WARD NO.31.ENGG B HO 1,311,886.00
1,311,886.00
Y.M.MATERE
INFRASTRUCTURE (I) PVT LTD.
13680 21.10.2011 75CONSTRUCTION OF WATING ROOM IN YCM HOSPITAL WARD
NO.31.ENGG B HO 990,116.00
990,116.00 SAKSHI ENGINEERS.
14172 25.10.2011 76PROVIDING AND PAINTING VARIOUS PCMC BUILDING AND
OTHER CIVIL WORKS AT WARD NO.95.KAWADE NAGAR.ENGG D WARD 539,986.00
539,986.00
SAI PRABHA CONSTRUCTION
4037 09.06.2011 77
EXXECUTING VARIOUS CIVIL RELATED MAINTAINCE WORKS OF
ACHOOL BUILDING & GROUNDS AT PIMPLE NILAKH WARD NO.
16
ENGG D WARD 414,526.00
414,526.00
ADITYA ENTERPRISES.
Satish Nagre Associates
Chartered Accountants BUILDING Page 4
V.N. Date Sr. No. Description of Building Name of Department
Cost of
acquisition /
construction
(Rs.)
Total Cost
(Rs.) From whom acquired
8964 23.08.2011 78MAINTENANCE AND MINOR CIVIL REPAIR WORKS OF BLDG NEW
B WARD OFFICE IN CHINCHWAD WARD NO.67ENGG B HO 2,884,397.00
2,884,397.00
BHALERAO CONSTRUCTION.
7148 27.07.2011 79CONSTRUCTION OF BALANCE WORK IN ECOLOGICAL GARDEN
AT RES NO.302, MIDC G BLOCK.ENGG 4,785,956.00
4,785,956.00 B.V.G.INDIA LTD.
9332 29.08.2011 80CONSTRUCTION OF CD WORK NEAR SCHOOL AT RUPEE NAGAR
IN WARD NO 2ENGG A HO 1,426,385.00
1,426,385.00 PANDURANG CONSTRUCTION
10284 09.09.2011 81 CONSTRUCTION OF A MULTI PURPOSE HALL IN WARD NO 7 ENGG A WARD 743,179.00 743,179.00
GAYATRI CONSTRUCTION
26235 29.03.2012 82 DEVELOPMENT OF GARDEN IN OPEN SPACE S NO 227/1 BHOSARI ELECT GARDEN 175,922.00 175,922.00
SACHIN ELECTRICALS
6572 19.07.2011 83PROPOSED REMAINING WORK DEVELOPMENT OF GARDEN AT
MIDC G BLOCK S 60, AKURDIENGG GARDEN 12,348,480.00
12,348,480.00 B.V.G. INDIA LTD
26215 29.03.2012 84CONSTRUCTION OF COMPOUND WALL FOR DAFANBHUMI W NO
101 IN C ZONEENGG C WARD 742,400.00
742,400.00 S.B. ENTERPRISES
26248 29.03.2012 85CONSTRUCTION OF COMPOUND WALL TO GARDEN AT SNO 28
AT RAHATANI FINAL ESCALLATION BILLENGG GARDEN 93,749.00
93,749.00 BARKHA ENTERPRISES
26262 03.12.2011 86MAKING OF BRONZE STATUE OF CHHATRAPATI SAMBHAJI
MAHARAJ WITH LION OF 12 FEET AT WARD NO 42 PIMPRINAGARENGG A HO 3,800,000.00
3,800,000.00
GARGE ART STUDIO
16055 25.11.2011 87CONSTRUCTION OF SANITARY OFFICE AT WAKAD GAOTHAN IN
WARD NO 87ENGG D WARD 778,326.00
778,326.00 USHA ENTERPRISES
19446 10.01.2012 88CONSTRUCTION OF COMPUTER ROOM AND TOILET BLOCKS
AND ARRANGEMENT FOR DRINKING WATERENGG A WARD 763,281.00
763,281.00 SHRINATH CONSTRUCTION
19444 10.01.2012 89CONSTRUCTION OF SCHOOL BUILDING IN RESERVATION NO 2/3
CTS 622/1 CHINCHWAD FOR PCMCENGG B WARD 2,817,245.00
2,817,245.00 YASHAK ASSOCIATES
19391 10.01.2012 90CONSTRUCTION OF TOILET BLOCK AND OTHER ALLIED CIVIL
WORK IN MUSLIM DAFAN BHUMI WARD NO 30ENGG C WARD 903,618.00
903,618.00 SHRINATH CONSTRUCTION
23520 07.03.2012 91PROVIDING VARIOUS TYPES OF CIVIL WORK IN BADMINTON
BULDING IN YAMUNANAGAR WARD NO 44ENGG A WARD 2,120,094.00
2,120,094.00 SHIVAM ENTERPRISES
10803 16.09.2011 92CONSTRUCTION OF PEDOSTAL FOR SAMBHAJINAGAR & LION
STATE & OTHER BUATIFICATION WORK AT WARD NO 42ENGG A WARD 1,772,921.00
1,772,921.00
VEDARTH ASSOCIATES
2081 13.05.2011 93PROVIDING REMANING INTEROIOR WORK IN C WARD OFFICE
BUILDING AT WARD NO 26ENGG C WARD 3,338,677.00
3,338,677.00 SAKSHI ENGINEERS.
13019 15.10.2011 94CONSTRUCTION OF WAITING SHED AND WATHCHMAN CABIN
NEAR CRIMINATION GROUND SHED AT TALAWADECIVIL A WARD 2,381,194.00
2,381,194.00
MAYURESH CONST.
17779 20.12.2011 95CONST.OF REMAINING COMPUND WALL IN DAPHANBHUMI IN
WARD NO 99ENGG C WARD 740,900.00
740,900.00 A.R.NAIDU
Satish Nagre Associates
Chartered Accountants BUILDING Page 5
V.NO.Sr.
No. Description of the drain, specifying whether it is open or underground drain
Name of the
department
Date of
acquisition /
construction
Cost of
construction /
acquisition
(Rs.)
Total Cost
(Rs.) From whom acquired
24884 1
CONSTRUCTION AND REPAIRING CONCRETE PAVING AND GUUTERS IN
DAPODI WARD NO 104
ENGINEERING C
HEADOFFICE20.03.2012 499,011.00 499,011.00
M/S PANDURANG
CONSTRUCTION
24914 2
PROVIDING VARIOUS CIVIL WORKS AND ITS ALLIED WORK AT
NANASMRUTI MANGAL KARYALAYA AREA WARD NO 52 TULJAI VASTI
ENGINEERING A
HEADOFFICE20.03.2012 1,491,664.00 1,491,664.00 MAYURESH CONSTRUCTION
25769 3
CONSTRUCTION OF STORM WATER GUTTER NEAR RENTED QUARTER W NO
71 PIMPRI NAGAR
ENGINEERING B
HEADOFFICE 27.03.2012 199,598.00 199,598.00 R.M. ENTERPRISES
25779 4 CONSTRUCTION OF STORM WATER GUTTER NEAR D BLOCK W NO 71
ENGINEERING B
HEADOFFICE 27.03.2012 141,044.00 141,044.00 R.M. ENTERPRISES
25780 5 CONSTRUCTION OF STORM WATER GUTTER NEAR C BLOCK W NO 71
ENGINEERING B
HEADOFFICE 27.03.2012 307,559.00 307,559.00 R.M. ENTERPRISES
25824 6 IMPROVEMENT OF CIVIL WORK BORHADEWADI, WARD NO, 9.
ENGINEERING C
HEADOFFICE 27.03.2012 2,090,032.00 2,090,032.00 JEETESH ENTERPRISES
25754 7 PROVIDING NALLA TRAINING WORK AT WARD 51 AKURDI
ENGINEERING A
HEADOFFICE 27.03.2012 1,669,814.00 1,669,814.00 ZUNJAR CONSTRUCTION
25756 8
CONSTRUCTION OF STROMWATER GUTTER NEAR SADHU WASAVANI
GARDEN AREA AT WARD 70
ENGINEERING B
HEADOFFICE 27.03.2012 3,846,310.00 3,846,310.00 BARKHA ENTERPRISES
25757 9 CONSTRUCTIONOF V-SHAPE NALLA IN NIGDIENG A WARD
27.03.2012 748,038.00 748,038.00 SHUBHASHREE CONSTRUCTION
22823 10
PROVIDING CLOSED PIPE GUTTER TO JOIN ROAD SIDE AREA TO STROM
WATER AT BELTHINAGAR WARD NO 84 THERGAON
ENGINEERING D
HEADOFFICE 01.03.2012 2,090,142.00 2,090,142.00 K KAMLESH
22831 11
PROVIDING CLOSED PIPE GUTTER TO INTERNAL ROAD AT BELTHINAGAR
WARD NO 84 THERGAON
ENGINEERING D
HEADOFFICE 01.03.2012 1,267,980.00 1,267,980.00 K KAMLESH
22842 12
PROVIDING GUTTER & OTHER CIVIL WORKS AT WAKAD AREA W NO 87
WAKAD GAOTHANENG D WARD
01.03.2012 471,254.00 471,254.00 VIDYA ENTERPRISES
24439 13
CONSTRUCTION OF A CROSS DRAINAGE & ALLIED WORK AT S NO 1
BHOSARI ENGG C HO 16.03.2012 11,268,609.00 11,268,609.00 GANESH CONSTRUCTION
24451 14
PROVIDING LOWERING LAYING AND JOINING SWEREAGE LINES IN
REMAINING PART IN WARD NO 5 & CHIKHALI
UNDER GROUND
GUTTER FUND 16.03.2012
355,799.00 355,799.00 SURAJ CONTRACTOR
24453 15
CONSTRUCTION OF VARIOUS CD WORK ON NALLS AND VARIOUS NALA
TRAINING WORK AT WARD NO 52 ENGG A HO 16.03.2012 900,000.00 900,000.00 ROSHANI CONSTRUCTION
24456 16
PROVIDING CLOSED PIPE GUTTER AND PAVING BLOCK AT VALCAN
SOCIETY KRANTINAGAR WARD 90 PIMPLE NILAKH ENGG D HO 16.03.2012 495,000.00 495,000.00 A R NAIDU
24463 17
CONSTRUCTION OF C.D. WORK ON NALLA AND VARIOUS NALA TRAINING
WORK AT WARD NO 52 ENGG A HO 16.03.2012 1,268,322.00 1,268,322.00 VEDARTH ASSOCIATES
27552 18 PROVIDING LAYING DI PIPE LINES AT VARIOUS PLACES IN C WARD AREA
WATER SUPPLY
SPECIAL SCHEME 31.03.2012
4,161,469.00 4,161,469.00 VIJAY SALUNKE
24195 19
PROVIDING AND LAYING RCC FULL PIPE (STORM WATER LINE) GANESH
MANDIR TO BNACHODHA BHOSARI ENGG C HO 15.03.2012 1,833,213.00 1,833,213.00 R.M. ENTERPRISES
DRAINAGE SYSTEM
Satish Nagre Associates
Chartered Accountants DRAINS Page 1
V.NO.Sr.
No. Description of the drain, specifying whether it is open or underground drain
Name of the
department
Date of
acquisition /
construction
Cost of
construction /
acquisition
(Rs.)
Total Cost
(Rs.) From whom acquired
26972 20
CONSTRUCTION OF SLAB CULVET SHIVAJI CHOWK TO BOPKEL ROAD &
CONSTRUCTION OF NALLAS AT 85 - 3RD ANF FINAL ESCALLATION BILL
ENGG WARD C 31.03.2012
412,917.00 412,917.00 BARKHA ENTERPRISES
27061 21
PROVIDING STROM WATER GUTTER AND PROVIDING PAVING BLOCK IN
WARD NO 63 ENGG WARD B 31.03.2012 722,102.00 722,102.00 SHRINATH CONSTRUCTION
27114 22
CONSTRUCTION OF NALLA IN ANANDAVAN AT DAPODI WARD NO 102
ENGG C HO 31.03.2012 1,821,450.00 1,821,450.00 SHUBSHREE CONSTRUCTION
27583 23
PROVIDING , LOWERING, ;LAYING AND JOINING WATER SUPPLY LINES IN
NEW DEVELOPED PART AT WARD NO 80 WATER SUPPLY
SPECIAL SCHEME 31.03.2012
1,821,347.00 1,821,347.00 P.V.DESHMUKH
27599 24
LOWERING, LAYING AND JOINING D.I. PIPELINE AT HIGHWAY FROM NEW
MAHARASHTRA TO EMPIRE ESTATE CHINCHWAD 1ST AND FINAL
ESCALATION BILL
WATER SUPPLY
ENGG HO 31.03.2012
192,686.00 192,686.00 SANJAY CONTRACTOR
27600 25
PROV. INTERNAL AND MAIN SEWER LINE AT REMAINING AREA & NEW
DEVELOPMENT AREA OF W.NO.99 KASARWADI
UNDER GROUND
GUTTER FUND HO 31.03.2012
774,536.00 774,536.00 K.F.CHHAJED
27610 26
PROVIDING SEWERAGE MAIN LINE IN KASARWADI FOR KASARWADI STP WATER SUPPLY
(MINOR WORKS)
HO 31.03.2012
6,638,971.00 6,638,971.00 S.P.DEVKAR
27619 27
CONSTRUCTION OF STORMWATER GUTTER ALONG ROAD SIDE OF MAIN
BAJAR AT WARD NO 69 PIMPRINAGAR ENGG B HO 31.03.2012 4,498,819.00 4,498,819.00 BARKHA ENTERPRISES
27636 28
CONSTRUCTION OF STORMWATER GUTTER NEAR B BLOCK AREA AT WARD
NO 69 PIMPRINAGAR ENGG B HO 31.03.2012 4,290,475.00 4,290,475.00 BARKHA ENTERPRISES
27637 29
CONSTRUCTION OF STROM GUTTER NEAR BHAJI MANDAI AREA WARD NO
69 PIMPRINAGAR FINAL ESCALLATION BILL ENGG B HO 31.03.2012 464,020.00 464,020.00 DEV CONSTRUCTION
27638 30
CONSTRUCTION OF STROM GUTTER NEAR BHAJI MANDAI AREA WARD NO
69 PIMPRINAGAR ENGG B HO 31.03.2012 4,205,797.00 4,205,797.00 DEV CONSTRUCTION
28346 31 CONSTRUCTION OF NALL AT DALAVINAGAR IN WARD NO 62 ENGG B HO 31.03.2012 75,311.00 75,311.00 S.B.SAWAI
28347 32
LAYING AND RISING MAIN FROM RAVET HEADWORKS TO WTP NIGDI
PHASE III WATER SUPPLY SCHEME FINAL ESCALLATION BILL
UNDER GROUND 31.03.2012
135,367.00 135,367.00 GOODWILL CONSTRUCTION
27362 33
PROVIDING LOWERING LAYING JOINTING WATERSUPPLY PIPE LINE IN NEW
DEVELOPED PART OF WARD NO 85 AT BETHIKA THERGAON WATER SUPPLY
SPECIAL SCHEME 31.03.2012
1,388,162.00 1,388,162.00 SANJAY CONTRACTOR
27366 34
CONSTRUCTION OF STORMWATER GUTTER NEAR SUBHASHNAGAR AREA
AT WARD NO 70ENGG B HO
31.03.2012 3,868,623.00 3,868,623.00 VIJAY CONSTRUCTION
27373 35
PROVIDING AND LAYING VALVE M.S. PIPELINE AND OTHER WORK AT
BHOSARI
WATER SUPPLY
(MINOR WORKS)
HO 31.03.2012
4,855,533.00 4,855,533.00 DEEPAK APTE AND ASSO
23863 36
PROVIDING STROM WATER GUTTER AND OTHER WORKS IN SECTOR NO 29
RAWET WARD NO 58 ENGG B HO 12.03.2012 2,018,236.00 2,018,236.00 V.T. CONTRUCTION
23523 37
CONSTRUCTION OF NALLA FROM VADACHAMALA TO ALHAT VASTI IN
WARD NO 8 ENGG A HO 07.03.2012 1,173,333.00 1,173,333.00 M.A. KUSALKAR
Satish Nagre Associates
Chartered Accountants DRAINS Page 2
V.NO.Sr.
No. Description of the drain, specifying whether it is open or underground drain
Name of the
department
Date of
acquisition /
construction
Cost of
construction /
acquisition
(Rs.)
Total Cost
(Rs.) From whom acquired
23530 38
PROVIDING STORM WATER DRAIN AT VARIOUS PLACES AT
SAHAYOGNAGAR IN WARD NO 3 ENGG A HO 07.03.2012 2,044,474.00 2,044,474.00 M.G.MANE
23537 39
CONSTRUCTION OF BADMINTON HALL AT S NO 45, 46 R.NO. 344 PIMPLE
GURAV FOR PCMC ENGG D HO 07.03.2012 21,832,331.00 21,832,331.00 S.S.SATHE
15194 40
CONSTRUCTION OF V SHAPE NALLA WALL IN SAINATHNAGAR IN NIGADI
GAOTHAN IN WARD NO 48 ENGG A WARD 14.11.2011 396,094.00 396,094.00 SBHUBHSHREE CONSTRUCTION
25585 41
PROVIDING STORMWATER DRAIN 900MM NP3 PIPES NEAR SCHOOL &
RUPEE HSG SOC @ RUPEENAGAR IN WARD NO 2 ENGG A HO 26.03.2012 2,129,392.00 2,129,392.00 M.G.MANE
24501 42
PROVIDING CLOSED PIPE GUTTER TO ROAD SIDE FOR STORM WATER AT
VARIOUS PLACES IN WARD NO 77 SHRINAGAR ENGG D WARD 17.03.2012 1,950,294.00 1,950,294.00 DANESHWAR CONSTRUCTION
24577 43
CONSTRUCTION OF NALLA FROM DEHU ALNDI ROAD TO INDRAYANI
NAGAR RIVER AT GANESH NAGAR W NO 6 ENGG A HO 17.03.2012 1,591,765.00 1,591,765.00 OMKAR GROUPS
24103 44
PROV. LOWERING AND JOINING OF SEWER LINES IN W NO 53, 54 AND WARD
A FINAL ESCALLATION BILL
UNDER GROUND
GUTTER FUND 14.03.2012
638,671.00 638,671.00 K.F.CHHAJED
24104 45
P/L RCC PIPE FOR STROM WATER AT ASTVINAYAK AREA IN
YAMUNANAGAR WARD NO 44 ENGG A HP 14.03.2012 2,050,955.00 2,050,955.00 R.M. ENTERPRISES
24142 46
PROVIDING, LOWERING LAYING SEWERAGE LINE IN 12.5% DELETED AREA
OF SECTOR NO 4 PCNDTA UNDER CHAROLI STP
UNDER GROUND
GUTTER FUND 14.03.2012
919,592.00 919,592.00 DESHMUKH & COMPANY
24655 47 CONSTRUCTION OF C.D. WORK AND NALLA AT SHANKARWADI ENGG C WARD 17.03.2012 700,657.00 700,657.00 SUNIL A SURYAWANSHI
22695 48
CONSTRUCTION OF NALL IN SR NO 209 GAVALI NAGAR WARD NO 18 AT
BHOSARI ENGG C.HO. 29.02.2012 1,765,695.00 1,765,695.00 SHUBHASHREE CONSTRUCTION
18358 49
PROVIDING AND CONSTRUCTION OF NEW SURFACE GUTTER AT VARIOUS
PLACES IN MOHANNAGAR AND RAMNAGAR ENGG A HO 28.12.2011 1,761,683.00 1,761,683.00 M.A. KUSALKAR
21647 50
PROVIDING STORMWATER CHAIN AT VARIOUS PLACES AT AKURDI WARD
NO 53 ENGG A WARD 09.02.2012 879,706.00 879,706.00 TECKSON BUILDERS
22016 51 CONSTRUCTION OF NALLA IN ANANDAVAN AT DAPODI WARD NO 102 ENGG C WARD 15.02.2012 1,490,000.00 1,490,000.00 SBHUBHSHREE CONSTRUCTION
20629 52
PROVIDING LAYING STORM WATER PIPE ALONG THE ROAD SIDE FOOTPATH
AT WARD NO 41 KALBHOR NAGAR ENGG A WARD 24.01.2012 1,416,067.00 1,416,067.00 ARSHAD S SHAIKH
21239 53
PROVIDING INTERNAL AND MAIN LINES AT REMAINING AREA AND NEW
DEVELOPED AREA OF WARD NO 100 KASARWADI
ENGG SEWERAGE
DEPARTMENT 04.02.2012
365,148.00 365,148.00 SURAJ CONTRACTOR
21248 54
PROVIDING AND LAYING STROM WATER PIPE GUTTER AT W NO 64,65 & 66
IN CHINCHWAD ENGG B HO 04.02.2012 609,881.00 609,881.00 DEV CONSTRUCTION
21274 55 PROVIDING AND LAYING STROM WATER PIPE LINE IN WARD NO 28 ENGG C WARD
04.02.2012 667,045.00 667,045.00 BARKHA ENTERPRISES
14540 56
CONSTRUCTION OF NALLA IN ANANDNAGAR CHINCHWAD WARD NO 36
ENGG C HO
01.11.2011 2,570,052.00 2,570,052.00 SAMEER ENTERPRISE
14540 57
CONSTRUCTION OF NALLA IN ANANDNAGAR CHINCHWAD WARD NO 36 -
FINAL ESCALATION BILL ENGG C HO
01.11.2011 108,065.00 108,065.00 SAMEER ENTERPRISE
19651 58 CONSTRUCTION OF NALL NEAR VILAS BHALEKAR HOUSE IN WARD NO 1 ENGG A HO13.01.2012 662,188.00 662,188.00 M.G.MANGALWEDHEKAR
Satish Nagre Associates
Chartered Accountants DRAINS Page 3
V.NO.Sr.
No. Description of the drain, specifying whether it is open or underground drain
Name of the
department
Date of
acquisition /
construction
Cost of
construction /
acquisition
(Rs.)
Total Cost
(Rs.) From whom acquired
26009 59
CONSTRUCTION OF NP3 CLASS STORMWATER PIPELINE DRAINAGE AT
VARIOUS PLACES AT BANTHE VASTI IN WARD NO 1 TALAWADE ENGG A HO 28.03.2012 1,205,549.00 1,205,549.00 RAJNANDA ENTERPRISES
5351 60
PROV AND LAYING R.C.C. PIPE FOR STROM WATER LINE AT SCHEME NO 40
FROM BUILDING NO 1 TO 11 IN NIGADI ENGG A WARD 01.07.2011 1,167,193.00 1,167,193.00 ARYAN CONSTRUCTION
25646 61
CONSTRUCTION OF NALLA OPP SANVIK COMPANY (NEAR PCMC OCTROI
NAKA) PHUGEWADI ENGG C WARD 26.03.2012 1,884,271.00 1,884,271.00 BARKHA ENTERPRISES
26600 62
PROVIDING WIDENING & NALLA BEDDING OF NALLA OFBEHIND
DAHANBHOOMI WARD NO 30 NEHARUNAGARENGG C HO 31.03.2012 2,091,305.00 2,091,305.00 DHANESHWAR CONSTRUCTION
26601 63
PROVIDING CLOSED PIPE GUTTER ON THE ROAD SIDE FOR STORM WATER
AT VARIOUS PLACES IN WARDNO 77 SHRINAGAR FINAL ESCALLATION BILL
ENGG D WARD 31.03.2012 57,440.00 57,440.00 DHANESHWAR CONSTRUCTION
26567 64 CONSTRUCTION OF NALLA AT DALAVINAGAR IN WARD NO 62 ENGG B HO 31.03.2012 1,574,716.00 1,574,716.00 S.B.SAWAI
26644 65 PROVIDING OF SEWERAGE DISPOSAL SYSTEM FOR CHAPHEKAR CHOWK
WATER SUPPLY &
SEWERAGE
DEPARTMENT
31.03.2012 539,979.00 539,979.00 S.P.DEVKAR
26651 66
PROVIDING, LAYING AND JOINING MAIN SEWER LINE IN THE DELETED
AREA OF PCNTDA SNO 3&7 FINAL ESCALLATION BILLENGG B WARD 31.03.2012 287,936.00 287,936.00 H.C.LUNKAD
26727 67
CONSTRUCTION OF NALLA BEHIND SWARGANGA SOCIETY IN W NO 32
SANT TUKARAM NAGARENGG B HO 31.03.2012 2,987,205.00 2,987,205.00 G.R.MANGODEKAR
3116 68
CONSTRUCTION OF CD WORK ON NALLA ROAD TOWARDS AJMERA
COLONYENGG C WARD 30.05.2011 1,033,343.00 1,033,343.00 CHAITANIYA ENTERPRISES\
19162 69
CONSTRUCTION OF GUTTER & INTERLOCKING BLOCK ALONG ROAD TO
TALERA HOSPITAL IN CHINCHWAD AREA WARD NO 65ENGG B WARD 07.01.2012 368,248.00 368,248.00 ADITYA ENTERPRISES
19189 70
PROVIDING ENCLOSED RCC GUTTERS IN S NO 135 IN WARD NO 40 AT
MOHANNAGARENGG A WARD 07.01.2012 373,973.00 373,973.00 DEV CONSTRUCTION
11533 71
PROVIDING ENCLOSED RCC PIPE FOR STORM WATER DRAIN AT VARIOUS
PLACES IN RAMNAGAR WARD NO 40 AT MOHONNAGARENGG A WARD 26.09.2011 745,985.00 745,985.00 DEV CONSTRUCTION
12248 72
CONSTRUCTION OF GUTTER AT SIDHIVINAYAK COLONY AREA IN WARD NO
56ENGG B WARD 05.10.2011 606,937.00 606,937.00 BIPIN N NANEKAR
11319 73
PROVIDING AND LAYING STORM WATER PIPE LINE AND PAVING BLOCK AT
VARIOUS PLACE PATHWAY IN KALBHORNAGAR AND RAMNAGAR AT
WARD NO 41
ENGG A WARD 22.09.2011 570,000.00 570,000.00 OMKAR ENTERPRISES
13744 74
CONSTRUCTION OF NALLA GAWADE WADA TO NACHIKET BALGRAM IN
GURUDWARA W NO 59ENGG B HO 24.10.2011 4,925,343.00 4,925,343.00 V.D. BHOIR
23691 75
CONSTRAUCTION OF CLOSED PIPE GUTTER FROM BANKERVASTI TO
SANTOSH HOTEL MOSHI ALONG NH50 AT BORADWADI IN WARD NO.9
ENGG C HO /09/03/12 179,979.00 179,979.00 DEV CONSTRUCTION
5515 76
CONSTRUCTION OF NALLAN NEAR MIDC PLOT NO.B1 IN WARD NO.26.
MAHATMAPHULE NAGAR.ENGG C HO /04/07/11 1,365,770.00 1,365,770.00 R.M. ENTERPRISES
4883 77
CONSTRUCTION OF NALLA NEAR DATIR PATIL FARM AT WARD NO.40. AT
MOHANNAGAR.ENGG A WARD 23.06.2011 516,755.00 516,755.00 DEV CONSTRUCTION
8421 78
P AND L STORM WATER PIPE GUTTER & INTERLOCKING BLOCK ALONG
ROAD IN WARD NO.66. CHINCHWADE.ENGG B HO 16.08.2011 1,468,654.00 1,468,654.00 DEV CONSTRUCTION
Satish Nagre Associates
Chartered Accountants DRAINS Page 4
V.NO.Sr.
No. Description of the drain, specifying whether it is open or underground drain
Name of the
department
Date of
acquisition /
construction
Cost of
construction /
acquisition
(Rs.)
Total Cost
(Rs.) From whom acquired
13662 79
CONSTRUCTION OF WC BLOCK NEAR KAWALE VAKHER IN WARD NO.40. AT
MOHANNAGAR.ENGG A WARD 21.10.2011 927,152.00 927,152.00 ARSHAD S SHAIKH
13691 80
PROVIDING AND LAYING AND FIXING GUTTER CONCRETE PAVING AND
OTHER RELATED CIVIL WORK IN PHUGEWADI WARD NO.101
ENGG C HO 21.10.2011 730,704.00 730,704.00 BHAGWANT CONSTRUCTION.
1434 81
CONSTRUCTION OF STORM WATER GUTTER NEAR RENTED QUARTER
AREA AT WARD NO,71.PIMPRI NAGAR.ENGG B HO 25.10.2011 2,564,675.00 2,564,675.00 R.M. ENTERPRISES
7724 82
PROVIDING AND LAYING RCC STORM WATER PIPE FROM THE LOKMANYA
HOSPITAL TO VIGHNAHAR GANESH TEMPLE.NALLA.ENGG A WARD
04.08.2011 5,159,672.00 5,159,672.00
M/S.SHREE SAI KRIPA
CONSTRUCTION.
7717 83
PROVIDING AND LAYING R.C.C.PIPE TO DRAIN OUT STORM WATER FROM
HDFC BANK TO MAYURNAGARI IN WARD NO.95 KAWADE NAGAR.
ENGG D WARD 04.08.2011 564,082.00 564,082.00 CHOTELAL CHOUHAN.
8964 84
PROVIDING AND LAYING STORM WATER PIPE GUTTER AND INTERLOCKING
BLOCK ALONG ROAD IN WARD NO.65.ENGG B HO 23.08.2011 1,378,386.00 1,378,386.00 BHALERAO CONSTRUCTION.
9329 85 PROVIDING AND LAYING STORM WATER LINE IN WARD NO.30. ENGG C WARD 29.08.2011 507,907.00 507,907.00 SHRINATH CONSTRUCTION
9335 86
PROVIDING CLOSED LINE GUTTER AND PAVING IN PRABHAG NO 88 WAKAD
VENUNAGARENGG D WARD 29.08.2011 1,852,350.00 1,852,350.00 K.KAMLESH
26278 87 PROVIDING SEWERAGE LINES IN WARD NO 19, GHAWANE WASTI BHOSARI
WATER SUPPLY &
SEWERAGE
DEPARTMENT
29.03.2012 2,315,068.00 2,315,068.00 BARKHA ENTERPRISES
26244 88
PROVIDING AND LAYING STROMWATER PIPE ALOG THE ROAD SIDE WITH
WBM AND PAVING BLOCK FOR FOOTHPATH AT JAY GANESH VISION ROAD
W NO 41 KALBHORNAGER
ENGG A HO 29.03.2012 1,324,094.00 1,324,094.00 R.M. ENTERPRISES
26262 89
PROVIDING STROM WATER GUTTER IN DANGE CHAL AREA IN PIMPRI WARD
NO 72
WATER SUPPLY D
WARD29.03.2012 2,115,363.00 2,115,363.00 SAI ENTERPRISES
19446 90 PROVIDING STROM WATER GUTTER AT WARD NO 67 IN CHINCHWADENGG B WARD 10.01.2012 491,211.00 491,211.00 SHRINATH CONSTRUCTION
19388 91
CONSTRUCTION OF GUTTER AT VIKASNAGAR AREA IN W NO 56 FINAL
ESCALATION BILLENGG B HO 09.01.2012 6,517.00 6,517.00 D.A. SHINDE CONSTRUCTION
26086 92 CONSTRUCTION OF NALA NEAR T C COLONY AT KIWALE W.NO.57ENGG B WARD 29.03.2012 1,297,694.00 1,297,694.00 J R BHALERAO & CO.
26116 93 CONST.OF GUTTERS IN INTERNAL AREA OF .TATHAWADE GAONTHANENGG B WARD 29.03.2012 328,880.00 328,880.00 K.KAMLESH
26110 94
CONST.OF GUTTERS TO THE ROAD SIDE FROM TATHWADE GAONTHAN TO
BYPASSENGG B WARD 29.03.2012 543,224.00 543,224.00 K.KAMLESH
26095 95
CONST. OF GUTTERS VARIOUS PLACES IN GAJANAN COLANY AT
TATHWADEENGG B WARD 29.03.2012 397,451.00 397,451.00 K.KAMLESH
26167 96
CONST. V SHAPE NALLA BED FROM RAMNAGAR SLUM TO SWASTIC CO
COMPOUND W NO 41 AKURDIENGG A WARD 29.03.2012 4,728,416.00 4,728,416.00 DEV CONSTRUCTION
23530 97
PROVIDING STROM WATER DRAIN AT VARIOUS PLACES AT SAHAYONAGAR
IN W. NO 3ENGG A WARD 07.03.2012 2,044,474.00 2,044,474.00 M.G.MANE
11709 98
CONST.OF SLAB CULVERT SHIVAJI CHOWK TO BHOPKHELROAD &
CONST.OF NALLS AT 85 OF DAPODI ENGG 29.09.2011 322,407.00 322,407.00 BARKHA ENTERPRISES
Satish Nagre Associates
Chartered Accountants DRAINS Page 5
V.NO.Sr.
No. Description of the drain, specifying whether it is open or underground drain
Name of the
department
Date of
acquisition /
construction
Cost of
construction /
acquisition
(Rs.)
Total Cost
(Rs.) From whom acquired
2036 99
PROVIDING & LAYING CLOSE PIPE STORM WATER GUTTER FOOT PATH AND
RELATED CIVIL WORK IN W. NO. 105 BOPKHELENGG C WARD 13.05.2011 666,874.00 666,874.00 N.C.CONSTRUCTION
100
CONSTRUCTION OF GRADE SEPARATOR AT KHANDOBA CHOWK AKURDI
ON MUMBAI PAUN ROAD
DRAINAGE A
WARD
31.12.2011 2,784,000.00 2,784,000.00 AUTAR INDIA PVT.LTD
101
CONSTRUCTION OF STORM WATER GUTTER NEAR C BLOCK ARE AT W.NO
71 PIMPRE NAGARENGG B WARD 19.11.2011 3,337,583.00 3,337,583.00 R.M. ENTERPRISES
2455 102 CONST. OF GUTTER AT BAPDEVNAGAR AREA VIKASNAGAR AREA W.NO 56ENGG B WARD 21.11.2011 213,730.00 213,730.00 SHREE SAIKRUPA CONST.
5679 103
constructing of v shape nalla from spm schoolto runal society in nagadi GAOTHAN
WARD NO 48ENGG A WARD 07.07.2011 1,137,451.00 1,137,451.00 BIPIN N NANEKAR
23243 104 CONSTRUCTION OF HALF ROUND GUTTER IN VIKASNAGAR W.NO 57ENGG B WARD 31.03.2011 407,672.00 407,672.00 SHREE CONSTRUCTION
13391 105
PROVIDING STROM WATER GUTTER IN DANGE CHAL AREA IN PIMPRI WARD
NO 72
WATER SUPPLY D
WARD19.10.2011 1,556,064.00 1,556,064.00 SAI ENTERPRISES
6604 106
CONSTRUCTION OF NALLA BEDDING AT AKURDI MAIN ROAD TO GANGA
NAGAR MAIN ROAD AT WARD NO 54ENGG A WARD 20.07.2011 2,315,970.00 2,315,970.00 S.M. CONSTRUCTION
Satish Nagre Associates
Chartered Accountants DRAINS Page 6
Counter No. Sr. No. Name
of the
Project
Name
of the
depart
ment
Work Order number and
Year in which sanctioned
Location
of the
Project
Estimate
d cost of
the
project
(Rs.)
Cost
already
incurred
on the
project
(Rs.)
Specify the
source of
finance from
which project
is being
funded
Estimated
date of
completion
of the
project
Remarks
1 2 3 4 5 6 7 8 9
LAKES & PONDS
Form 12 Furniture
V.No.Sr.
No.
Description of the asset specifying whether it is table, chair, cupboard, partition, safes vaults,
cabinets, etc.
Name of
Department
Date of
Acquisition
Cost of
acquisition /
construction
(Rs.)
From whom Acquired
2 3 5 6 9
26127 1 MAKING FURNITURE FOR NEW B WARD OF OFFICE IN WARD NO 67 CHINCHWAD ENG B WARD 29.03.2012 4,164,840.00 MS RT SABARWAL
24399 2
FIBER CHAIRS FOR SKETING GROUND AND RCC SEATING FOR VOLLY BALL GROUNG IN
THAKRE GROUND YAMUNANAGAR WARD NO 44ENGG WARD A
16.03.2012 610,061.00
H. M.
CONSTRUCTION
24425 3P&F 3 SEATER PERFORATED METAL CHAIRS ENGG H O A
16.03.2012 1,817,041.00
REKHA ENGG
WORKS
24442 4 PROVIDING AND FIXING BENCHES IN WARD NO 58 RAWET AND PUNAWALE ENGG WARD B 16.03.2012 357,153.00 J.A PATEL
25161 5PROVIDING AND FIXING BENCHES IN WARD 72 TO 80 IN D WARD AREA GARDEN DEPT
22.03.2012 678,056.00
REKHA ENGG
WORKS
23515 6
PROVIDING AND FIXING BENCHES AND OTHER ALLIED WORK AT JADHAVWADI WARD
NO 8ENGG WARD A
07.03.2012 543,102.00
PANDURANG
CONSTRUCTION
25526 7PROVIDING AND FIXING BENCHES IN WARD 90 TO 98 IN D WARD AREA ENGG WARD D
26.03.2012 585,654.00
REKHA ENGG
WORKS
24080 8PROVIDING AND FIXING BENCHES IN WARD 66 CHINCHWAD ENGG B WARD
14.03.2012 227,560.00
SHAIKH MUSA
SHAIKH MUNIR
16286 9FURNITURE - PRINCIPAL ITI PCMC
TECHNICAL
SCHOOL ITI 30.11.2011 41,000.00
PRINCIPAL (I.T.I.)
PCMC
16287 10PROVIDING AND FIXING BENCHES & SIGN BOARDS IN WARD NO 12 CHARHOLI
ENGINEERING C
WARD 30.11.2011 794,906.00 SAKSHI ENGG
18357 11FURNITURE AND CABIN WORKS FOR BUS DEPARTMENT AT RES NO 40A FOR PCMC ENGG B WARD
28.12.2011 2,234,357.00 P.V. KHULE
22371 12
PROVIDING SUPPLYING AND FIXING STEEL BENCHES & FRP VACHNALAYA IN SLUM
AREA IN WARD NO 34 AND D WARDENGG SLUM
23.02.2012 849,385.00
SUVARANA
FIBROTECH PVT
LTD
26018 13PROVIDING AND FIXING VACHANALAY & OTHER ALLIED WORKS IN WARD NO 1 ENGG A WARD
28.03.2012 731,998.00
S.M.
CONSTRUCTION
26063 14PROVIDING AND FIXING VACHANALAY BENCHES AT WARD NO 11 WADMUKHWADI ENGG C HO
28.03.2012 68,684.00 S.B.SAWAL
5555 15BAJAJ FANS
CENTRAL
STORES 05.07.2011 94,500.00
SURAJ
SWITCHGEAR CO
5557 16HPSV LAMPS
CENTRAL
STORES 05.07.2011 1,071,600.00
SURAJ
SWITCHGEAR CO
11436 17
INTERIOR WORK FOR ADMINISTRATION OFFICE OF SLO-1 SLO-2 IN BALAJI MANDAI
BUILDING WARD NO 31WNGG B WARD
23.09.2011 1,527,556.00 H.R.GAIKWAD
4482 18FURNITURE PURCHASE,SHUBHAM UDYOG
CENTRAL
STORES 17.06.2011 82,180.00 SHUBHAM UDYOG
FURNITURE AND FIXTURE
FUR&FIX Page 1
Date V. No. Sr. No. Name of the Road/ LocationName of the
department
Date of
acquisition /
construction
Total Cost (Rs.) WDV - TOTAL Name of Contractor
09.06.2012 4636 1
PROVIDING ELECTRIFICATION WORK AT NEW BUILDING IN ITI
MORWADI
ELECTRICAL B
WARD
15.04.2011
329,274.00 329,274.00
MS OM RENUKA
ENTERPRISES
27.03.2012 25802 2PROVIDING STREET LIGHTS ON NEW ROADS IN WARD NO 59
ELECTRICAL HEAD
OFFICE
27.03.2012
918,395.00 918,395.00
N.K. ELECTRICAL
WORK
27.03.2012 25836 3
PROVIDING SODIUM VAPOUR FITTINGS ON ROAD FROM
THERGAON BRIDGE TO LOKMANYA HOSPITAL MDR 31 VISION
2005 ELECTRICAL B HO
27.03.2012
4,028,947.00 4,028,947.00
ANMAKE
ELECTRICALS PVT LTD
27.03.2012 25838 4PROVIDING STREET LIGHTS ON NEW ROADS IN WARD NO 58
ELECTRICAL HEAD
OFFICE
27.03.2012
866,628.00 866,628.00
N.K. ELECTRICAL
WORK
27.03.2012 25839 5PROVIDING STREET LIGHTS ON NEW ROADS IN WARD NO 56
ELECTRICAL HEAD
OFFICE
27.03.2012 869,843.00
869,843.00
N.K. ELECTRICAL
WORK
01.03.2012 22845 6
PROVIDING AND ERECTING STREET LIGHT ON INTERNAL ROAD
AT SECT NO 3 NIRMAL NEST BHOSARI INDRAYANINAGARELECTRICAL C
WARD
01.03.2012
735,000.00 735,000.00
M.B. ELECTRIC & CO.
PIMPRI
15.03.2012 24197 7PROVIDING STREET LIGHTS ON NEW ROADS IN WARD NO 59
ELECT B HO
15.03.2012
846,485.00 846,485.00
RISHIKESH
ENTERPRISES
31.03.2012 27046 8
PROVIDING ERECTING NEW STREETLIGHT POLE & FITTING IN
WARD NO 38 ANAND NAGAR SLUM AREA
ENGG MAIN OTHER
SP SCH
31.03.2012
3,765,243.00 3,765,243.00 R N ENTERPRISES
31.03.2012 27049 9
PROVIDING LIGHTING ARRANGEMENT AND ELECTRIFICATION
WORK AT WARD NO 69 ELECT B HO
31.03.2012
823,785.00 823,785.00
SHIV FOUNDATION
AND ELECTRICALS
31.03.2012 27053 10
CONVERSION OF LT/HT OH TO UNDERGROUND CABLE UNDER
VISION 2005 PROGRAMME AT SANGVI SUB DIVISIONENGG D HO
31.03.2012
8,669,414.00 8,669,414.00
BEST ELECTRICALS
31.03.2012 27162 11
PROVIDING TRANSFORMER FOR STREET LIGHT ON GROUND OF
P.C.M.C. IN WARD NO 38 SHAHUNAGAR
ELECTRICAL A
WARD
31.03.2012
346,779.00 346,779.00 REAL ELECTRICALS
31.03.2012 27077 12
PROVIDING LIGHTING ARRANGEMENT AND ELECTRIFICATION
WORK AT WARD NO 31 ELECT B HO
31.03.2012
865,208.00 865,208.00
K.P. ELECTRICAL
CORP.
31.03.2012 27122 13
PROVIDING AND ERECTION OF ENERGY SAVING FITTING IN SLUM
AREA OF NIGADI GOANTHAN SUB DIVISION OF A WARDELECTRICAL A
WARD
31.03.2012
1,638,984.00 1,638,984.00
PRAKASH
ELECTRICAL ENGG
CORPORATION
31.03.2012 27614 14PROV. E.I. TO SCHOOL BUILDING IN NIGADI GAONTHAN A WARD
ENGG C WARD
31.03.2012
266,324.00 266,324.00 G.P. ELECTRIC CO
26.03.2012 25567 15
PROVIDING LIGHTING ARRANGEMENT & ELECTRIFICATION WORK
AT WARD NO 33 ELECT B HO
26.03.2012
853,338.00 853,338.00 REAL ELECTRICALS
26.03.2012 25575 16
PROVIDING ELECTRIFICATION IN HOSPITALS AT PIMPRI IN POOR
URBAN AREA ECLECT HO
26.03.2012
246,299.00 246,299.00
OM RENUKA
ENTERPRISES
26.03.2012 25581 17
PROVIDING STREET LIGHTS ON NEW ROADS IN WARD NO 60
BIJALINAGAR ECLECT HO
26.03.2012
912,895.00 912,895.00
OM EKDANTAY
ELECTRICALS
26.03.2012 25594 18
PROVIDING LIGHTING ARRANGEMENT AT HEGADEVAR KREDA
SANKUL ELECT B HO
26.03.2012
121,544.00 121,544.00 SACHIN ELECTRICALS
26.03.2012 25604 19
PROVIDING ELECTRIFICATION WORK AT VARIOUS SCHOOLS AND
BUILDINGS AT MHP ZONE IN 'B' WARD AREAELECT B HO
26.03.2012
384,017.00 384,017.00
SWAMIKRIPA
ELECTRICALS
LIGHTING SYSTEM
LIGHTING, SYS Page 1
Date V. No. Sr. No. Name of the Road/ LocationName of the
department
Date of
acquisition /
construction
Total Cost (Rs.) WDV - TOTAL Name of Contractor
26.03.2012 25589 20
SHIFTING OF OVERHEAD LINES POLES AND FEEDER PILLERS OF
MSEDCL LINE DUE TO ROAD WIDENING AT NIGADI GOANTHAN
ZONE OF AWARD ELECT A WARD
26.03.2012
1,787,382.00 1,787,382.00
MIHIR ENTERPRISES
17.03.2012 24644 21
PROVIDING ELECTRIFICATION WORK AND UPS SYSTEM AT
TALERA AND JIJAMATA HOSPITAL ELECT B WARD
17.03.2012
875,846.00 875,846.00 YASH ELECTRO LINE
22.02.2012 22200 22
PROVIDING AND ERECTING S.V. LAMP AND DECORETIVE POLE
AND FITTING AS PER REQ OF VARIOUS GARDEN AT A WARD AREAELECT GARDEN
22.02.2012
3,193,554.00 3,193,554.00 OMKAR ENGINEERING
22.02.2012 22307 23PROVIDING AND FIXING LED NEON SIGN BOARD ON PCMC BLDG
ELECT HO
22.02.2012
848,742.00 848,742.00
SANDEEP
ENGINEERING
30.01.2012 20828 24
CONVERSION OF LT/HT OH TO UNDERGROUND CABLE AT
CHINCHWAD TO KALEWADI BRIDGE ELECT B WARD
30.01.2012
4,110,873.00 4,110,873.00
SIDDHIVINAYAK
ENGG SERVICES
24.01.2012 20613 25
CONVERSION OF LT/HT OH TO UNDERGROUND CABLE AT 11
SANGVI ZONE DUE TO ROAD WIDENING & ENROCHMENT ELECT D WARD
24.01.2012
16,345,841.00 16,345,841.00
S.T. ELECTRICALS PVT
LTD
16.01.2012 19897 26
REPLACING OF RUSTED POLE AND FITTINGS IN WARD NO 31
YCMH AT SANT TUKARAM NAGARELECT B WARD
16.01.2012
2,904,268.00 2,904,268.00
PRAVIN ELECTRICAL
SERVICES
03.02.2012 21198 27
PROVIDING AND ERECTING STREET LIGHT ON INTERNAL ROAD
AT DYANESHWAR PARK SHRIRAM COLONY & KRISHNANAGAR AT
DIGHI ELECT C WARD
03.02.2012
734,995.00 734,995.00
DIGVIJAY
ELECTRICALS
31.01.2012 21010 28
CONVERSION OF LT/HT OH TO UNDERGROUND AT GAVATHAN
AREA PIMPALE GURAV WARD NO 97 ELECT D WARD
01.02.2012
15,126,612.00 15,126,612.00
S.T. ELECTRICALS PVT
LTD
13.01.2012 19655 29
CONVERSION OF LT/HT OH TO UNDERGROUND AT WARD NO 12
SANGAVI ZONE DUE TO ROAD WIDENING & ENCROCHMENT AR
NETAJINAGAR ELECT D WARD
13.01.2012
3,873,534.00 3,873,534.00
S.T. ELECTRICALS PVT
LTD
28.03.2012 26014 30
PROVIDING LIGHTING ARRANGEMENTS ON NEW SPORTS GROUND
OF A WARD ZONEELECT A HO
28.03.2012
1,357,242.00 1,357,242.00
ATHARV ELECTRICAL
SERVICES
01.07.2011 5356 31
PROVIDING & ERECTING ELECTRICAL INSTALATION WORK IN
SCHOOL AND HOSPITAL AT RAVET DIVISION ELECT B WARD
01.07.2011
498,172.00 498,172.00 YASH ELECTRO LINE
27.03.2012 25644 32
PROVIDING AND ERECTING STREETLIGHT ARRANGEMENT ON
INTERNAL ROADS AT LAXMINAGAR SOUTH SR NO 626ELECT C WARD
27.03.2012
731,779.00 731,779.00
UNDARE ELECTRICAL
WORKS
26.03.2012 25420 33
CONVERSION OF LT/HT OH TO UNDERGROUND CABLE FROM
KAKDE PARK CORNER TO KUNAL ESTATE CORNER IN WARD NO
65 CHINCHWAD ELECT B WARD
26.03.2012
2,819,680.00 2,819,680.00 BEST ELECTRICALS
26.03.2012 25427 34
PROVIDING & ELECTRIFICATION WORK & FRP POLE AS PER
REQUIREMENT AT MNP B, C & D WARD AREA ELECT GARDEN
26.03.2012
1,364,719.00 1,364,719.00 OMKAR ENGINEERING
26.03.2012 25431 35
PROVIDING & ERECTING FLOOD LIGHT ARRANGEMENT FOR
PHASE 3 & 4 SUBSTATION & PUMP HUOSE AT RAW WATER WORKS
RAWET WTP ELECT RAVET
26.03.2012
337,856.00 337,856.00
N.K. ELECTRICAL
WORK
26.03.2012 25433 36
PROVIDING HPSV LAMPS ON INTERNAL ROADS IN KASARWADI
WARD NO 100 ELECT C WARD
26.03.2012
245,622.00 245,622.00
ABAN ELECTRIC
WORKS CHIKHALI
LIGHTING, SYS Page 2
Date V. No. Sr. No. Name of the Road/ LocationName of the
department
Date of
acquisition /
construction
Total Cost (Rs.) WDV - TOTAL Name of Contractor
26.03.2012 25445 37
PROVIDING ELECTRIFICATION WORK AT SHIVAJI MAHARAJ
STATUE DANGE CHOWK GARDEN AT THERAGONELECT GARDEN
26.03.2012
579,707.00 579,707.00 OMKAR ENGINEERING
31.03.2012 26709 38
ELECTRICAL INSTALLATION IN NEW SCHOOL BUILDING & LAIDES
ITI AT KASARWADI WARD NO 99 ELECT C WARD
31.03.2012
268,856.00 268,856.00
BAGYASHRI
ENTERPRISES
31.03.2012 26723 39
PROVIDING OF STREET LIGHT ILLUMNINATION AT ROAD AT
WARD NO 71 KAKADE ANGAN ELECT B WARD
31.03.2012
614,421.00 614,421.00
S.T. ELECTRICALS PVT
LTD
03.10.2011 12134 40
SHIFTING OF HT POLES AND LINES OBSTRUCTING ROAD AT OM
CHOWK TO BIJALINGER NR NALAWADE VASTI IN WARD NO 60ELECT B WARD
03.10.2011
2,848,622.00 2,848,622.00
PRAVIN ELECTRICAL
SERVICES
/09/03/12 23726 41
PROVIDING ELECTRICAL WORKS AT NEW B WARD OFFICE &
OTHER ANCILLARY WORKS.ELECT B WARD
/09/03/12
827,397.00 827,397.00
AVDHOOT
ELECTRICAL LIFES &
SERVISES
21.07.2011 4721 42
PROVIDING ELECTRIFICATION WORK AT PIMPRI BHAJI MARKET,
SHOPPING CENTRE & PCMC BULD AT VARIOUS PLACES IN MNP
ZONE ELECT B WARD
21.06.2011
1,097,626.00 1,097,626.00
VIMAL ELECTRIC
CORPORATION
21.10.2011 13613 43
IMPROVEMENT AND WIDENING OF REMAINING STRETCH OF
TELCO ROAD .(UNDER VISION 2005) ELECT C WARD
21.10.2011
181,767,762.00 181,767,762.00
THAKUR
INFRAPROJECTS.
21.10.2011 13693 44
PROVIDING LIGHT ARRENGEMENT AND ALLIED WORK FOR YCM
HOSPITAL. ELECT HO
21.10.2011
3,460,732.00 3,460,732.00 N.C.Y. ENTERPRISES.
25.10.2011 14096 45
PROVIDING AND ERCTING STREET LIGHT FACILITY AT VARIOUS
PLACES IN B WARD ELECT B WARD
25.10.2011
224,971.00 224,971.00
SWAMIKRIPA
ELECTRICALS
04.08.2011 7738 46
RENOVATION OF WIRING WORK AT WTP SEC.NO.23 FILTER HOUSE
PHASE1,2 & 3WTP ELECT
04.08.2011
100,000.00 100,000.00
HASAN ELECTRICAL
ENGINEERING.
30.12.2011 18484 47
MODERNIZATION OF LIFT NO.1 IN PCMC MAIN ADMINISTRATIVE
BUILDING. ELECT HO
30.12.2011
910,000.00 910,000.00
OTIS ELEVATORS
INDIA PVT LTD.
30.12.2011 18543 48
RENOVATION OF ELECTRICAL INSTALLATION IN ACCOUNT DEPT
AT PCMC MAIN ADMINISTRATIVE BUILDING.ELECT HO
30.12.2011
517,399.00 517,399.00 P.L.PARDIKAR PUNE.
12.07.2011 5955 49ANNUAL OPREATION & MAINT OF SANGVI S NO.6 PUMP HOUSE.
ELECT HO
12.07.2011
1,409,774.00 1,409,774.00 EXCEL ELECTRICALS.
29.03.2012 26214 50SHIFTING OF FEEDER PILLAR IN WARD NO 17 & 32
ELECT B WARD
29.03.2012
3,964,481.00 3,964,481.00
KULKARNI
ELECTRICALS
25.11.2011 16062 51
RENOVATION OF ELECTRICAL INSTALLATION IN ELECTION
DEPARTMENT IN PIMPRI CHINCHWAD MUNICIPAL CORPORATION
AT MAIN BUILDING FINAL ESCALATION BILLENGG B HO
25.11.2011
82,769.00 82,769.00 P.L.PARDIKAR
25.11.2011 16062 52
RENOVATION OF ELECTRICAL INSTALLATION IN ELECTION
DEPARTMENT IN PIMPRI CHINCHWAD MUNICIPAL CORPORATION
AT MAIN BUILDING ENGG B HO
25.11.2011
4,003,563.00 4,003,563.00 P.L.PARDIKAR
29.03.2012 26083 53
PROVIDING & ERECTING STREET LIGHT AT NEW ROAD &
NECESSARY PLACE IN WARD NO 65 ELECT B WARD
29.03.2012
849,875.00 849,875.00
K.P. ELECTRICAL
CORP.
29.03.2012 29082 54
PROVIDING STREET LIGHTS ON NEW ROAD IN WARD NO 60
CHINCHAWDENAGER ELECT B WARD
29.03.2012
842,414.00 842,414.00
K.P. ELECTRICAL
CORP.
LIGHTING, SYS Page 3
Date V. No. Sr. No. Name of the Road/ LocationName of the
department
Date of
acquisition /
construction
Total Cost (Rs.) WDV - TOTAL Name of Contractor
29.03.2012 26080 55
PROVIDING STREET LIGHTS ON NEW ROADS IN WARD NO 57
KIWALE MAMURDI ELECT B WARD
29.03.2012
866,156.00 866,156.00
K.P. ELECTRICAL
CORP.
29.03.2012 26158 56
SHIFTING OF HT/LT POLES OF MSEDCL ABSTRACTING IN ROAD AT
BHOIR & GAWADE COLONY ELECT B WARD 29.03.2012 843,571.00 843,571.00 SHRIYA ELECTRIALS
02.09.2012 9722 57
PROVIDING &ERECTING UG CABLE FOR REMOVING LT OH LINES
AT WALHEKARWADI IN WARD NO.59 IN RAVET ZONEELECT B WARD
02.09.2012
661,404.00 661,404.00 ONKAR ELECTRIALS
LIGHTING, SYS Page 4
LAND 1
Sr. Cost of acquiring Total Cost (Rs.)
LAND
V. No. Sr.
No.Name Of Department Location
Cost of acquiring
the land (Rs.)
Total Cost (Rs.)
Actual cost
24233 1 TOWN PLANNING DEPARTMENT NH-4 MEGAMART TO CME GATE 173,851,863.00 173,851,863.00
22332 2 TOWN PLANNING DEPARTMENT PUNE MOZE RAHTNI TAL HAVELI J 18 MTR 230,000.00 230,000.00
6166 3 TOWN PLANNING DEPARTMENT SANGVI SRNO 316 EXP TOWARDS LAND ACQ RELATED TO LAND 185,521.00 185,521.00
7465 4 PUBLIC RELATION DEPT BHUMI SAMPADAN NIDHI SHIRGAV TAL MAVADH 972,806.00 972,806.00
16013 5 TOWN PLANNING DEPARTMENT MUZE TALVADE TAL HAVELI ZILHA PUNE 90 MTR FOR ROAD 396,000.00 396,000.00
2088 6 TOWN PLANNING DEPARTMENT DEPARTMENT MUZE PAMPLE SAUDAGAR 20 MTR FOR ROAD 848,000.00 848,000.00 2088 6 TOWN PLANNING DEPARTMENT DEPARTMENT MUZE PAMPLE SAUDAGAR 20 MTR FOR ROAD 848,000.00 848,000.00
Satish Nagre Associates