FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5 th St. Vancouver, Washington 98661 FP-03 109.01 Date Stamp (a) Project Name: Project Number: (b) Item Number: Item Description: (c) Date work performed: Copy Stamp Daily Record Of Miscellaneous Items (f) Calculations*: (g) Supporting sketch and details*: Summary of Quantities (d) Location: (e) Measured quantity: *Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work: FHWA Use Only (i) Interim Measurement Final Measurement Verified By: Construction Inspector I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record Checked By: (j) Contractor Representative FHWA Representative Date: 40101 Superpave Hot Asphalt Concrete Pavement 35+840 to 34+338 (plus 3 loads for turnouts): 1187.47 t Lot 2 See the following attachments: (a) daily mass record WFLHD 422M (b) street delivery report, spread report WFLHD 434 (c) ticket check MS Excel spreadsheet see above stations 1187.47 t 1187.5 t Page 77 of 134
12
Embed
Date Stamp U.S. DEPARTMENT OF … FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01
Date Stamp
(a) Project Name: Project Number:
(b) Item Number: Item Description:
(c) Date work performed:
Copy Stamp
Daily Record Of Miscellaneous Items (f) Calculations*:
(g) Supporting sketch and details*:
Summary of Quantities (d) Location: (e) Measured quantity:
*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:
FHWA Use Only(i) Interim Measurement Final Measurement Verified By:
Construction Inspector
I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record
35+840 to 34+338 (plus 3 loads for turnouts): 1187.47 t
Lot 2
See the following attachments:(a) daily mass record WFLHD 422M(b) street delivery report, spread report WFLHD 434(c) ticket check MS Excel spreadsheet
see above stations 1187.47 t
1187.5
t
Page 77 of 134
Page 78 of 134
Page 79 of 134
Page 80 of 134
FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01
Date Stamp
(a) Project Name: Project Number:
(b) Item Number: Item Description:
(c) Date work performed:
Copy Stamp
Daily Record Of Miscellaneous Items (f) Calculations*:
(g) Supporting sketch and details*:
Summary of Quantities (d) Location: (e) Measured quantity:
*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:
FHWA Use Only(i) Interim Measurement Final Measurement Verified By:
Construction Inspector
I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record
8,700.97 tons of Superpave Pavement Placed, @ 5.5% AC mix design = 8,222.41 tons of rockAntistrip Additive added at 1% per weight of rock = 82.2 tons
Invoice totals verified by weight of total tons placed
See attachments
82.3
82.3
t
Page 81 of 134
Page 82 of 134
Page 83 of 134
Page 84 of 134
FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01
Date Stamp
(a) Project Name: Project Number:
(b) Item Number: Item Description:
(c) Date work performed:
Copy Stamp
Daily Record Of Miscellaneous Items (f) Calculations*:
(g) Supporting sketch and details*:
Summary of Quantities (d) Location: (e) Measured quantity:
*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:
FHWA Use Only(i) Interim Measurement Final Measurement Verified By:
Construction Inspector
I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record