Skanska USA Building Inc. 4030 West Boy Scout Blvd, Suite 200 Tampa, Fl 33607 Phone 813-282-7100 Fax 813-433-7148
Web www.skanska.com
Dear Dr. Murray:
Skanska USA Building Inc. has prepared a Guaranteed Maximum Price for the above referenced
project. The results of our efforts are enclosed.
Included for your review and consideration are the following:
Section One - 50% GMP Proposal Summary
Section Two - Basis of Proposal
Appendix One – Document Log
Appendix Two – Project Schedules
Appendix Three – Site Logistics Plans
Please review the information provided and contact us at your earliest convenience to arrange a
meeting to review the contents of this proposal.
Best regards,
Fred Hames
Executive Vice President/General Manager
cc: John White, USF - Polytechnic
Chuck Jablon, Skanska USA Building
Date: Reference:
December 22, 2011 USF Polytechnic Building 555 – Innovation Science and Technology
Building – Lakeland, Florida
GMP Proposal – 50% Construction Documents
University of South Florida – Polytechnic
3433 Winter Lake Road
Lakeland, Florida 33803-9764
Page 2
Table of Contents
USF Polytechnic Building 555 – Innovation Science and Technology GMP Proposal – 50% Construction Documents Lakeland, Florida December 22, 2011
Executive Summary
Cost Summary
Introduction
Cost Basis of GMP
Contingency
Coordination with other Contractors
Start of Work
General Qualifications
Package Specific Assumptions and Clarifications
Appendix One – Document Log
Appendix Two – Project Schedules
o Part 1 Site Schedule: Site Mass Clearing, Grading, Force Main &
Potable Water
o Part 2 Site Schedule: Site Infrastructure
o Part 3 Site Schedule: Hardscape/Paving, Irrigation and Landscaping
o Building 555 Core, Shell & Envelope Schedule
o Building 555 Interior Buildout, Rough-in & Finishes Schedule
Appendix Three – Site Logistics Plans
o Part 1
o Part 2
Page 3
Project Name GMP Proposal
Client Name Location, North Carolina
Month, Year
Section One – GMP Proposal Summary
USF Polytechnic Building 555 – Innovation Science and Technology GMP Proposal – 50% Construction Documents Lakeland, Florida December 22, 2011
This Guaranteed Maximum Price (GMP) Proposal is based upon the documents prepared by Santiago Calatrava
/ Festina Lente LLP is association with Alfonso Architects, and their consultants as well as other documents
prepared by University of South Florida – Polytechnic, which are itemized in the Document List of this
proposal. Further project scope definition has been developed by Skanska USA Building Inc., and various
assumptions that are attached to this proposal.
From this data, which is summarized in the “Basis of GMP” section of this proposal, and our current
understanding of the schedule and logistics issues involved with the project, we hereby propose a price of Fifty
Nine Million, Nine Hundred Ninety One Thousand, Nine Hundred Thirty Eight Dollars and 00/100
($59,991,938.00) to complete this project.
This proposal incorporates the value of all construction work purchased as of this date and reflects the decision
on scope and quality as they have been decided by the client and A/E team. This proposal also incorporates
approved Preconstruction Cost Events [PCE’s].
Both the detailed GMP cost estimate and project schedule are presented later in this document.
We have developed and enclosed a Project Schedule, which indicates the agreed upon schedule objectives for
the project.
GMP Approval 03/16/2012
Bldg. 555 Notice to Proceed 03/19/2012
Central Utility Plant Completion (by others) 06/02/2013
Initial Owner Occupancy 04/21/2014
Skanska USA Building Inc. recommends that the attached documents be carefully reviewed; questions and
comments be referred back to us for resolution; and the overall project be approved for further progress.
Page 5
SKANSKA USA BUILDING INC.
PROJECT: USF Polytechnic Building 555 – Innovation Science and Technology
EST. TYPE: GMP Proposal – 50% Construction Documents
DATE: December 22, 2011
00 Survey/Layout 175,000$
01A Soil and Concrete Testing 70,000$
01B Commissioning 38,000$
01C Testing and Balancing 32,500$
01D Weekly Cleanup, Trash Removal, Final Cleaning 364,000$
01E Field Toilets 52,000$
02A Sitework for Building 555 345,000$
02B Vibro-Replacement Stone Columns 615,000$
03A Structural Concrete 8,070,000$
03B Concrete Fascias (Deleted in lieu of Metal Panel Facia Systems) -$
04A Masonry 140,000$
05A Cupola Steel and Miscellaneous Steel 4,625,000$
05B Aluminum Pergola, Aluminum Rails and Miscellaneous Aluminum 5,660,000$
05C Handrails - Glass and Decorative Stainless Steel 565,000$
05D Metal Panel Fascia Systems 850,000$
06A Architectural Woodwork and Millwork 700,000$
07A Waterproofing 75,000$
07B Fluid Applied Roofing 1,400,000$
08A Doors/Frames/Hardware 743,000$
08B 1st and 2nd Floor Interior and Exterior Glazing Systems 1,880,000$
08C Sloped Glazing and Skylight Systems 1,990,000$
09A Metal Studs, Drywall and Stucco 1,534,428$
09B Acoustical Ceilings and Sound Panels 385,271$
09C Hard Tile 140,000$
09D Carpet and Vinyl 90,000$
09E Polished Concrete Floors 390,000$
09F Resinous Flooring 50,000$
09G Access Flooring 40,000$
09H Painting & Coatings 325,000$
10A Visual Display Surfaces 56,926$
10B Toilet Compartments and Accessories 80,000$
10C Building Signage 40,000$
10D Operable Partitions 57,000$
10E Fire Extinguishers and Cabinets 6,000$
10F Wire Mesh Partitions 6,000$
10G Sliding Metal Fire Doors 50,000$
SCHEDULE OF VALUES
Cost Item NO. DESCRIPTION Cost
Page 6
12A Window Treatment 60,000$
12B Laboratory Casework 575,000$
12C Entrance Mats 10,000$
13A Operable Louver Structural and Metal Panels 5,500,000$
14A Elevators 180,000$
21A Fire Protection System 275,000$
22A Plumbing 950,000$
23A HVAC 3,700,000$
26A Electrical 3,109,200$
27A Technology 2,750,000$
A TOTAL ALL COST ITEMS $ 48,749,325
B Builders Risk Insurance LS 448,507$
C Building Permit Costs LS 207,000$
D General Conditions LS 3,295,366$
E Owner Contingency 0% -$
F CM Contingency 6% 2,924,960$
G Subcontractor Bond/Sub Guard 1.35% 697,603$
H General Liability Insurance 1.15% 689,907$
I Payment & Performance Bond 0.95% 569,923$
J TOTAL COST OF WORK (A+B+C+D+E+F+G+H+I) 57,582,591$
K CM Fee 2.50% 1,439,565$
L Corporate Overhead Fee 1.25% 719,782$
M Flood & Wind Damage Deductible (Allowance) LS 250,000$
N TOTAL PROPOSED DESIGN DELIVERABLE (K+L+M) 59,991,938$
Page 7
Section Two – Basis of Proposal USF Polytechnic Building 555 – Innovation Science and Technology GMP Proposal – 50% Construction Documents Lakeland, Florida December 22, 2011
This section of Guaranteed Maximum Price (GMP) Proposal describes exclusions, assumptions, and
clarifications.
For those items that are identified as excluded, no cost or time has been accounted for in the GMP Proposal to
address the issue. For those items that are clarified, qualified or based on an assumption, the GMP proposal
reflects only the cost and time of the element as assumed or clarified.
Any differences to the following exclusions, clarifications and/or assumptions will result in a change to the
GMP and the Project Schedule.
Skanska USA’s Guaranteed Maximum Price (GMP) Proposal is based upon the following:
1. Drawings, Specifications, and Addendums (1-3) and other attachments per the Document Log
(Appendix One).
2. Skanska USA’s Project Schedules (Appendix Two)
3. Site Logistics Plans (Appendix Three)
4. Mutually agreed upon Cost Saving Items (see project specific assumptions and qualifications)
5. Exclusions, Qualifications, and Assumptions as noted in this section
6. The executed Project CM Agreement
Changes or revisions to the foregoing information will result in a modification to the GMP price and require
modifications to the Project Schedule. Documents, communications and information not included in the
foregoing list, including for instance, any Third Party agreements are not accounted for in the GMP Proposal.
As such, the Owner must carefully review all of the criteria used to develop this GMP Proposal and request any
revisions to the same, so that a modified GMP Proposal can be prepared.
Page 8
The GMP estimate includes contingencies including:
A. Construction Contingency:
The Construction Contingency shall be available to the Construction Manager exclusively to provide funds to
address items such as, by way of example: work items inadvertently omitted during the estimating and bidding
process, schedule recovery costs associated with weather and other causes of delay that are not otherwise
compensable, interfacing omissions between and from the various categories of work, additional costs incurred
due to the withdrawal or disqualification of a subcontractor bid forming the basis for the GMP prior to
execution of a written subcontract, general conditions over-runs where the cause of the over-run is not a Change
to the Agreement or otherwise not caused or contributed to by the Owner, Architect or their separate contractors
or consultants, costs associated with subcontractor default, cost increases due to unanticipated local labor and
material market conditions, selective overtime, or the like. Construction Contingency is not intended to provide
for costs associated with Owner Changes, unknown, or unrevealed physical conditions of the site or adjacent
areas or other items for which the Construction Manager may be entitled to a Change Order in accordance with
the Agreement.
The Construction Contingency is not intended to provide for changes to the scope of work, Owner required
acceleration / compression of the schedule, the correction of design errors and omissions, nor revisions to the
Work due to design errors considered within the design professional’s standard of care.
These contingencies are be applied at the sole discretion of Skanska USA and reported to University of South
Florida - Polytechnic as part of the Construction Manager’s cost reporting activities. Contingencies shall be
available to the Construction Manager for any costs reasonably required to perform or manage the Work. In the
event that actual prices exceed estimated prices, contingency funds will be allocated to the specific cost item.
When a given cost item’s actual price is less than the estimated amount, the difference will be assigned to the
contingency account. Construction Contingency will be 4% at 100% CDs.
It has been agreed upon that the saving from the Owner Direct Purchase Order program will be included as a
line item in the GMP for the Owner’s use. No other Owner Scope Growth, Project Contingency) nor any other
Owner Contingency has been included in the GMP Proposal.
This GMP is based on the assumption that the Owner’s architect, its contractors and all other parties performing
work at the Project site NOT under direct contract with Skanska USA will:
1. Comply with Skanska USA’s site specific safety program and maintain an injury free environment.
2. Perform work according to Skanska USA’s project schedule, and achieve system and area completion
dates according to that schedule
3. Perform work so as to not impact Skanska USA’s ability to perform its work in accordance with its
project logistics plan
4. Perform work so as to not impact Skanska USA’s ability to maintain or accelerate its project schedule
Page 9
5. Provide detailed schedule, logistics, and technical information, when and as requested by Skanska USA
so as to enable Skanska USA to maintain or accelerate elements of its schedule so as to maintain its
overall schedule and achieve necessary milestone completion dates.
Due to present economic market conditions on the cost of good and services, if Owner does not accept this
proposal within 90 days (on or before 3/16/2012), Skanska USA reserves the right to adjust the GMP based on
market conditions in effect at the time of final acceptance.
The GMP Proposal and Project Schedule assumes a notice to proceed (with all conditions precedent met) to be
issued on 3/19/2012 (“Notice to Proceed Date”) and that Substantial Completion will be achieved by or before
3/21/2014 as may be modified in accordance with the Agreement, providing the Owner furnishes Skanska all
necessary design documentation for the: (i) Civil Package by 01/27/2012 (ii) the Structural and Building
Envelope Package by 01/27/2012 and (iii) the Final Package for Remaining Scopes by 01/27/2012 and further
providing all applicable permits have been obtained to allow Construction Manager to commence work upon
receipt of the Notice to Proceed. Current subcontractor bids and accepted proposals reflect an anticipated start
date in accordance with the time periods set forth in this proposal. Any delay in the issuance of the Notice to
Proceed Date will result in an increase to the GMP and impact the Project Schedule.
1. The only price guarantee within this GMP Proposal is that of the proposed GMP Amount. There are no
individual line item guarantees within the GMP. Individual line item savings within the GMP shall be
addressed in accordance with the Agreement.
2. We included commissioning services as shown on the GMP proposal.
3. Upon completion of the final design, Skanska will develop a set of Assumptions and Qualifications,
which specifically address the scope that will be constructed for the GMP. Once the Owner reviews and
approves the Construction Manager’s Assumptions and Qualifications, as may be modified by mutual
agreement, the approved Assumptions and Qualifications will be incorporated into the Agreement
through a GMP Amendment. In the event Skanska and Owner cannot agree upon acceptable
Assumptions and Qualifications, the Agreement can be terminated in accordance with its terms and
Skanska shall recover all uncompensated pre-construction and construction costs incurred prior to the
termination.
4. Skanska and Owner recognize that the design scope for the Project is not completely defined and
developed at this time, and as such, the GMP set forth in this GMP Amendment No. 1 is a design to
budget GMP. Accordingly, Skanska and Owner understand that the final design scope will be
developed consistent with the GMP in accordance with the pre-construction process set forth in the
Agreement. The Construction Team will continue to define and develop the scope and Owner
acknowledges and agrees that it will take all necessary steps to ensure that the design scope as finally
defined and developed will not exceed the GMP. This includes, but is not limited to, ensuring that
Santiago Calatrava / Festina Lente LLP and its design team members will develop a scope that is
Page 10
consistent with the GMP. If any scope causes the GMP to be exceeded, the Owner will direct Santiago
Calatrava / Festina Lente LLP to modify the scope to bring it within the GMP. It is understood that
since the documents are not yet complete, the Owner, Architect and Skanska will work together to
monitor completion of the design, in accordance with the intent and scope of the documents that form
the basis of the GMP. Should an increase in the GMP be indicated due to deviations from such intent
and scope during document completion, Skanska will recommend possible economies in order to
protect the GMP from increasing. If these economies are not accepted, the GMP shall be increased to
cover the increased cost and the associated General Conditions, Insurances, Bonds and Fee.
5. The GMP Proposal assumes unfettered, legal access to the Project Site at all times. The GMP Proposal
does not anticipate any stoppage or interruption of Work as a result of present University of South
Florida – Polytechnic operations or other Site restrictions or interferences.
6. The only spare parts, maintenance training and manufacture service support included in the GMP
Proposal is that which is specified by the Technical Construction Specifications.
7. The GMP Proposal description for an item will take precedence over conflicting information in the
plans, specifications or other contract documents.
8. All costs associated with moving/relocation and start-up of any furniture and equipment from other sites
are excluded.
9. Public Agency reviews or approvals and associated fees are excluded with the exception of Building
Permit Fees described in Item 10.
10. A fee of $207,000 in accordance with the University of South Florida permit fee schedule has been
included in this GMP for the building permit. No other permits or fees have been accounted for.
11. All Work associated with hazardous materials including, but not limited to asbestos, lead,
petrochemicals, arsenic (beyond what has been explicitly identified on the design documents), or any
other hazardous material abatement, handling and/or remediation is excluded.
12. All sales tax on material and labor is included.
13. Performance/Aesthetic Mock ups and prototypes that will not be incorporated into the permanent Work
are included per the Specifications and scopes of work.
14. Off site improvements and charges for same have not been included.
15. All Owner Supplied materials and equipment not shown on the Contract Documents as Contractor
installed are excluded.
16. All extended warranties included in the specifications, including the material/labor warranties, shall be
assigned to Owner following the Construction Manager’s one year repair/replacement obligation under
the Contract. Thereafter, the Construction Manager shall only be responsible for assisting reasonably
the Owner in enforcing those warranties provided by the manufacturers, suppliers and subcontractors.
Page 11
17. Unless specifically mentioned to the contrary in this GMP Proposal, the removal of Rock or unsuitable
soils is excluded from this estimate.
18. Where Contact Documents require that design information be provided by the Construction Manager,
Design information (including calculations and certifications) will be provided by specialized trade
subcontractors. The Construction Manager relies on the trade contractor’s in so doing. The Guaranteed
Maximum Price does not include any costs and expenses to conduct an independent review of such
design information, and does not include costs and expenses resulting from any deficiencies or
inaccuracies in these calculations or certifications. The Construction Manager submits the engineered
design information to the design team for final approval.
19. Skanska assumes that all Contract Documents are in accordance with applicable laws, statutes,
ordinances, building codes, ADA requirements, rules and regulations and has provided this GMP based
on the Contract Documents provided.
Page 12
The following definition represents the basis of our estimate, and serves as the GMP for the project. The
estimated costs were developed based upon the project documents listed in Section Six and schedule data
described elsewhere in this report, and the assumptions, clarifications and design criteria presented under this
section.
The revisions indicated below are all items mutually agreed upon between Skanska and the Calatrava design
team to be included in the 100% Construction Documents. The cost implications of the noted items have been
accounted for in the 50% GMP.
Bid Package - 03A: Structural Concrete
1. Skanska has provided the specified 15-mil vapor retarder for the building slab of grade and assumes that
this product is adequate and meets any and all requirements for any potential radon requirements for this
zoned area.
1. The 100% CDs are to be revised to simplify the cast in place concrete structure at the building entry
portal structures by way of eliminating the third portal rib opening as shown on the “2011-12-22
Revised Progress Set.”
2. The 100% design is to eliminate epoxy coated rebar requirements at the exterior perimeter retaining
wall. The design team has also agreed to eliminate the lenton couplers for reinforcing steel in its
entirety.
3. In the 100% CDs, the Aula Magna Room concrete is to be simplified in accordance with the “2011-12-
22 Revised Progress Set” including, but not limited to the elimination of the center concrete steps in lieu
of adding a walkway and exit doors (relocated from behind the speaker), the elimination of the sitting
area and cutback stairs at the top of the Aula Magna Room, the reduction of handrail requirements due
to the redesign and the overall simplification and reduction of the concrete in the Aula Magna Room.
4. The simplification and redesign of the four sets of egress stairs to run straight in the building with no
ninety degree turns to split the stairs at the second level as shown on the “2011-12-22 Revised Progress
Set” stair redesign, the ceiling above the stairs has also been eliminated to leave the stairs open to the
elements. In addition, the waterproofing provisions have also been reduced due to the smaller area of
stairs shown over occupied space. Last, the precast treads have been eliminated in lieu of cast-in-place
stairs.
5. The reduction and redesign of the entry stairs at the north and south ends of the building to make each
set of stairs narrower in width to reduce the amount of concrete needed as shown on the “2011-12-22
Revised Progress Set.”
6. The 100% documents are to eliminate the concrete plaza benches.
7. The water retention vaults are to be simplified and reduced due to the egress stair redesign to align with
the “2011-12-22 Revised Progress Set.”
8. A ¾” industry standard chamfer is to be incorporated into all exposed concrete design in lieu of the 2”
radius edges shown on the current design.
9. In lieu of architectural uniform-colored exposed concrete, all exposed concrete is now to be painted;
therefore the need for uniformity in color and the strict requirements for joint locations has been
simplified.
10. All stair nosing and/or tread inserts are to be excluded from all final cast in place stair designs.
Page 13
11. The final design is to include a concrete curb at all wall conditions where there is a requirement for
recessed base.
Bid Package - 03A: Cast-In-Place Concrete Fascias
1. The three continuous concrete fascias are to be eliminated in the 100% CDs and are to be replaced with
metal fascias as indicated in the New Bid Package 05D – Metal Panel Fascia Systems and the “2011-12-
22 Revised Progress Set.”
Bid Package - 05A: Cupola Steel and Miscellaneous Steel
1. The cupola steel ribs are to be simplified from the current trapezoidal boxed steel section with the
requirement for grinded welds to the new design with the extended steel tabs which will not require the
grinding of hidden welds per proposed sketch INT-00025.
2. The 100% design is to revise the structural documents to eliminate the expansion joint detail at the
second level slab and column/beam connections, including all embeds, bearing plates, etc.
3. At the sixteen (16) intake louvers as detailed on 3/A6.03, the final design is to remove the steel tubing
and angle steel shown and to be replaced with a C.I.P. concrete structure to accept the louvers.
4. The stainless steel cupola grating to be detailed as aluminum in the final design. In addition, the size is
to be reduced to 3’-0” wide on each side.
5. At the terraces, aluminum grating is to be incorporated into the design in lieu of stainless steel grating.
Bid Package – 05C: Handrails – Glass and Decorative Stainless Steel
1. The final design is to add an aluminum 1.5” diameter guardrail (1/2” thick) that is 360 degrees around
the perimeter of the terrace due to the elimination of the concrete fascias.
Bid Package – 05D: Metal Panel Fascia Systems
2. The three continuous concrete fascias as shown on the 50% CD design are to be eliminated in the 100%
CDs and metal panel fascias systems are to be added as indicated on the “2011-12-22 Revised Progress
Set.”
3. This GMP price includes the use of engineered light gauge structural stud framing with a tube steel
header as shown on the “2011-12-22 Revised Progress Set.”
4. A complete metal panel fascia system has been accounted for in this GMP; however the final building
design is to include specifications and details for all components of the new metal fascia panel system.
Bid Package – 06A: Architectural Woodwork and Millwork
1. This GMP does not reflect any additional woodwork or millwork as shown on the “2011-12-22 Revised
Progress Set.”
Page 14
Bid Package – 07A: Waterproofing
1. The concrete fascia systems have been eliminated; therefore there is no longer a requirement for
Specifications 072713 – Modified Bituminous Sheet Air Barrier and 072726 – Fluid-Applied Membrane
Air Barriers.
Bid Package – 08A: Doors, Frames and Hardware
1. The final design is to incorporate a simplified classroom door and frame design as shown on the “2011-
12-22 Revised Progress Set.”
Bid Package – 08B: 1st and 2
nd Floor Interior and Exterior Glazing Systems
1. With the revisions and simplifications of the four sets of egress stairs, there is no longer a need for four
(4) sets of glass double doors and hardware at these first level stair locations as shown on the “2011-12-
22 Revised Progress Set.”
2. The glazing entries are to be simplified and squared-off in the 100% CDs as opposed to the curved
glazing as shown on the 50% CDs, which are reflected on the “2011-12-22 Revised Progress Set.”
3. The two sets of Curved Sliding Automatic Entrance Doors are to be eliminated from the 100% CD’s
and two pairs of typical glass entrance doors and hardware are to be added in their place on each end as
shown on the “2011-12-22 Revised Progress Set.”.
4. It is understood that (76) OC-12 glass partitions are to be deleted in the 2nd
level offices and to be
replaced with framed drywall and acoustical panels as shown on the “2011-12-22 Revised Progress
Set.”.
Bid Package – 08C: Sloped Glazing and Skylight Systems
1. This GMP reflects the reduction in skylight glazing size as shown on the “2011-12-22 Revised Progress
Set.”
Bid Package – 09B: Acoustical Ceilings and Sound Panels
1. It is understood that the 100% CDs are to lower the typical ceiling height from 11’-0” to 10’-0”.
2. The 100% CDs are to specify a less expensive acoustical material than currently shown on the 50% CDs
at the cupola steel locations.
3. The ceiling in the Dean’s Office and the Aula Magna Room are to be simplified as shown on the “2011-
12-22 Revised Progress Set.”
Bid Package – 09D: Carpet and Vinyl
1. Carpet has been included in lieu of polished concrete in this GMP at 2nd
level offices as indicated in the
specifications and sketches included with Skanska Addendum #1 dated 11.28.11.
Page 15
Bid Package – 09E: Polished Concrete
1. Carpet has been included in lieu of polished concrete in this GMP at 2nd
level offices as indicated in the
specifications and sketches included with Skanska Addendum #1 dated 11.28.11.
Bid Package – 09H: Painting and Coatings
1. All interior exposed concrete is now to be painted and therefore specifications and details are to be
incorporated into the final CD’s.
Bid Package – 10D: Operable Partitions
1. It is understood that a typical operable partition is to be used in Meeting Rooms 1046 and 1047 as
opposed to the currently specified Sliding Metal Fire Door.
Bid Package – 10G: Sliding Metal Fire Door
1. It is understood that a typical operable partition is to be used in Meeting Rooms 1046 and 1047 as
opposed to the currently specified Sliding Metal Fire Door.
Bid Package – 26A: Electrical
1. The final building design is to eliminate all fire alarm pull stations except for one (1), which is required
by code.
2. The final building design is to eliminate approximately 50 light fixtures from the 50% CD’s.
3. The 100% CD’s are to make the lighting packages non-proprietary and more competitive by opening the
specs to allow three or more manufacturers who can provide an equal for all lighting fixtures.
4. This GMP reflects the deductive alternate as designed and incorporated into the Contract Documents
and indicated on sheet E5.02 to accept the use aluminum conductors in lieu of copper feeder size
conductors.
5. This GMP reflects the relocation of the Building 555 generator as shown on the 50% documents to a
location north of the Building 555 axis on the far side of the ring road. In addition, aluminum
conductors are to be used for the generator.
6. This GMP reflects a deductive alternate as accepted by TLC to use aluminum conductors in lieu of
copper for the lighting protection system.
7. This GMP reflects the Vesda system as shown on the 2nd
Floor Fire Protection plans, but has not
allowed for any other smoke evacuation system provisions of any kind.
Bid Package – 27A: Technology
Page 16
1. Skanska has provided an allowance of $2,750,000 as part of this GMP for the 50% Construction
Documents.
Page 17
Appendix One – Document Log
USF Polytechnic Building 555 – Innovation Science and Technology GMP Proposal – 50% Construction Documents Lakeland, Florida December 22, 2011
Project Name GMP Proposal
Client Name Location, North Carolina
Month, Year
The documents listed on the attached log represent the information made available to Skanska at the time of this
GMP Proposal and from the Basis of the GMP Proposal and associated clarifications defined herein.
Page 18
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
DRAWINGS AND SKETCHES, SPECIFICATIONS, ADDENDA & OTHER
DOCUMENTS
The contract documents include the following documents:
DRAWINGS AND SKETCHES:
DRAWING
OR SKETCH
NUMBER
DESCRIPITION REV.
NUMBER DATE
GENERAL
G-0.00 COVER TITLE SHEET 0 10/28/2011
G-0.01 DRAWING INDEX 0 10/28/2011
G-0.02 LOCATION PLAN 0 10/28/2011
G-0.03 CAMPUS PLAN 0 10/28/2011
LIFE SAFETY
LS-0.10 LIFE SAFETY NOTES, LEGEND, SYMBOLS 0 10/28/2011
LS-0.11 1ST FLOOR LIFE SAFETY PLAN 0 10/28/2011
LS-0.12 2ND FLOOR LIFE SAFETY PLAN 0 10/28/2011
LS-0.13 LIFE SAFETY PLAN. HAZARDOUS CHEMICALS 0 10/28/2011
CIVIL
C-10.00 HORIZONTAL CONTROL PLAN 0 10/28/2011
C-11.00 PAVING AND GRADING PLAN 0 10/28/2011
C-12.00 DRAINAGE PLAN 0 10/28/2011
C-13.00 CIVIL UTILITY PLAN 0 10/28/2011
C-14.00 POND LINER DETAILS 0 10/28/2011
C-14.10 POND LINER DETAILS 0 10/28/2011
C-14.20 PAVING AND GRADING DETAILS 0 10/28/2011
C-14.30 DRAINAGE DETAILS 0 10/28/2011
C-14.40 DRAINAGE DETAILS 0 10/28/2011
C-14.50 SANITARY DETAILS 0 10/28/2011
C-14.60 WATER DETAILS 0 10/28/2011
ARCHITECTURAL
A-0.01 GENERAL NOTES 0 10/28/2011
A-0.02 ABBREVIATIONS & SYMBOLS 0 10/28/2011
A-0.11 GEOMETRY - COLUMN GRID 0 10/28/2011
A-0.12 GEOMETRY - PERGOLA GRID 0 10/28/2011
A-1.00 SITE PLAN 0 10/28/2011
A-1.01 1ST FLOOR PLAN 0 10/28/2011
A-1.02 2ND FLOOR PLAN 0 10/28/2011
A-1.03 2ND FLOOR CLERESTORY PLAN 0 10/28/2011
A-1.04 CUPOLA PLAN 0 10/28/2011
A-1.05 ROOF PLAN (WITH LOUVERS) 0 10/28/2011
A-1.06 ROOF PLAN (WITHOUT LOUVERS) 0 10/28/2011
A-1.10 1ST FLOOR PLAN - NORTH 0 10/28/2011
A-1.11 1ST FLOOR PLAN - EAST 0 10/28/2011
A-1.12 1ST FLOOR PLAN - SOUTH 0 10/28/2011
Page 19
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
A-1.13 1ST FLOOR PLAN - WEST 0 10/28/2011
A-1.14 2ND FLOOR PLAN - NORTH 0 10/28/2011
A-1.15 2ND FLOOR PLAN - EAST 0 10/28/2011
A-1.16 2ND FLOOR PLAN - SOUTH 0 10/28/2011
A-1.17 2ND FLOOR PLAN - WEST 0 10/28/2011
A-1.18 CUPOLA PLAN - NORTH 0 10/28/2011
A-1.19 CUPOLA PLAN - SOUTH 0 10/28/2011
A-2.01 1ST FLOOR REFLECTED CEILING PLAN 0 10/28/2011
A-2.02 2ND FLOOR REFLECTED CEILING PLAN 0 10/28/2011
A-2.03 2ND FLOOR CLERESTORY REFLECTED CEILING
PLAN 0 10/28/2011
A-2.10 1ST FLOOR RCP - NORTH 0 10/28/2011
A-2.11 1ST FLOOR RCP - EAST 0 10/28/2011
A-2.12 1ST FLOOR RCP - SOUTH 0 10/28/2011
A-2.13 1ST FLOOR RCP - WEST 0 10/28/2011
A-2.14 2ND FLOOR RCP - NORTH 0 10/28/2011
A-2.15 2ND FLOOR RCP - EAST 0 10/28/2011
A-2.16 2ND FLOOR RCP - SOUTH 0 10/28/2011
A-2.17 2ND FLOOR RCP - WEST 0 10/28/2011
A-3.01 BUILDING ELEVATION - EAST & WEST 0 10/28/2011
A-3.02 BUILDING ELEVATION - EAST & WEST W/O
PERGOLA 0 10/28/2011
A-3.03 BUILDING ELEVATION - NORTH & SOUTH 0 10/28/2011
A-3.04 LARGE BUILDING ELEVATION - SOUTH (ROOF
CLOSED) 0 10/28/2011
A-3.05 LARGE BUILDING ELEVATION - SOUTH (ROOF
OPEN) 0 10/28/2011
A-3.06 LARGE BUILDING ELEVATION - SOUTH (W/O
PERGOLA) 0 10/28/2011
A-3.07 LARGE BUILDING ELEVATION - EAST I 0 10/28/2011
A-3.08 LARGE BUILDING ELEVATION - EAST II 0 10/28/2011
A-3.09 LARGE BUILDING ELEVATION - EAST I (W/O
PERGOLA) 0 10/28/2011
A-3.10 LARGE BUILDING ELEVATION - EAST II (W/O
PERGOLA) 0 10/28/2011
A-3.11 BUILDING ELEVATION - EAST & WEST
(EXPLODED) 0 10/28/2011
A-4.00 LONGITUDINAL BUILDING SECTION- AXIS M 0 10/28/2011
A-4.01 LARGE LONGITUDINAL BUILDING SECTION-
AXIS M 0 10/28/2011
A-4.02 LARGE LONGITUDINAL BUILDING SECTION-
AXIS M II 0 10/28/2011
A-4.03 TRANSERSAL BUILDING SECTION- AXIS 0 0 10/28/2011
A-4.04 TRANSERSAL BUILDING SECTION- AXIS 10 0 10/28/2011
A-4.05 TRANSERSAL BUILDING SECTION- AXIS 18 0 10/28/2011
A-4.06 TRANSERSAL BUILDING SECTION- AXIS 20 0 10/28/2011
A-4.07 TRANSERSAL BUILDING SECTION- AXIS 22 0 10/28/2011
A-4.08 TRANSERSAL BUILDING SECTION- AXIS 29 0 10/28/2011
Page 20
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
A-4.10 PARTIAL SECTION - CUPOLA 0 10/28/2011
A-4.20 WALL SECTIONS - AXIS M 0 10/28/2011
A-4.21 WALL SECTIONS - AXIS 0 0 10/28/2011
A-4.22 WALL SECTIONS - AXIS 10 0 10/28/2011
A-4.23 WALL SECTIONS - AXIS 29 0 10/28/2011
A-5.01 ROOFING PLAN 0 10/28/2011
A-5.03 ROOFING DETAILS 0 10/28/2011
A-5.10 CUPOLA OVERVIEW 0 10/28/2011
A-5.11 CUPOLA GEOMETRY 0 10/28/2011
A-5.12 CUPOLA STEEL PROFILES OVERVIEW 0 10/28/2011
A-5.13 CUPOLA STEEL PROFILES (GRID 0 & 1) 0 10/28/2011
A-5.23 CUPOLA STEEL PROFILES (GRID 20 & 21) 0 10/28/2011
A-5.24 CUPOLA STEEL DETAILS I 0 10/28/2011
A-5.25 CUPOLA STEEL DETAILS II 0 10/28/2011
A-5.30 CUPOLA LOUVERS OVERVIEW 0 10/28/2011
A-5.31 CUPOLA LOUVERS GEOMETRY 0 10/28/2011
A-5.44 LOUVER SYSTEM DETAILS I 0 10/28/2011
A-5.45 LOUVER SYSTEM DETAILS II 0 10/28/2011
A-5.47 CUPOLA ABUTTMENT 0 10/28/2011
A-5.61 PERGOLA OVERVIEW 0 10/28/2011
A-5.62 PERGOLA GEOMETRY 1 0 10/28/2011
A-5.63 PERGOLA GEOMETRY 2 0 10/28/2011
A-5.64 PERGOLA PROFILES 0 10/28/2011
A-5.65 PERGOLA DETAILS 0 10/28/2011
A-5.66 PERGOLA DETAILS 0 10/28/2011
A-5.67 PERGOLA FOOT DETAILS 0 10/28/2011
A-5.68 PERGOLA DETAILS AT PLAZA 0 10/28/2011
A-6.01 EXTERIOR GLAZING DETAILS I 0 10/28/2011
A-6.02 EXTERIOR GLAZING DETAILS II 0 10/28/2011
A-6.03 CUPOLA GLAZING DETAILS 0 10/28/2011
A-6.06 INTERIOR GLAZED OPENINGS II 0 10/28/2011
A-6.08 SKYLIGHT I 0 10/28/2011
A-6.09 SKYLIGHT II 0 10/28/2011
A-6.10 EXTERIOR GLAZING PROFILES OVERVIEW 0 10/28/2011
A-6.11 EXTERIOR GLAZING GEOMETRIES 0 10/28/2011
A-6.12 CUPOLA GLAZING GEOMETRIES 0 10/28/2011
A-6.13 CUPOLA GLAZING DIMENSIONS I 0 10/28/2011
A-6.14 CUPOLA GLAZING DIMENSIONS II 0 10/28/2011
A-6.20 BUILDING ENTRY DETAILS I 0 10/28/2011
A-6.21 BUILDING ENTRY DETAILS II 0 10/28/2011
A-6.22 BUILDING ENTRY DETAILS III 0 10/28/2011
A-7.01 TERRACE STAIRS PLANS 0 10/28/2011
A-7.02 TERRACE STAIRS SECTIONS 0 10/28/2011
A-7.04 SOUTH STAIRS 0 10/28/2011
A-7.05 SOUTH STAIRS - SECTION / ELEVATIONS 0 10/28/2011
A-7.06 NORTH STAIRS 0 10/28/2011
A-7.07 NORTH STAIRS - SECTIONS / ELEVATIONS 0 10/28/2011
Page 21
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
A-7.10 AULA MAGNA - PLANS 0 10/28/2011
A-7.15 OC-3 MEETING ROOM 0 10/28/2011
A-7.20 DEAN'S SUITE OFFICES PLAN AND RCP 0 10/28/2011
A-7.30 CONCRETE GEOMETRIES - EXTERIOR FASCIAS 0 10/28/2011
A-7.32 CONCRETE GEOMETRIES - CORRIDOR LAYOUT 0 10/28/2011
A-7.34 CONCRETE GEOMETRIES - CORRIDOR PROFILES
I 0 10/28/2011
A-7.35 CONCRETE GEOMETRIES - CORRIDOR PROFILES
II 0 10/28/2011
A-7.36 CONCRETE GEOMETRIES - CORRIDOR PROFILES
III 0 10/28/2011
A-7.37 CONCRETE GEOMETRIES - DETAILS 0 10/28/2011
A-7.40 CONCRETE GEOMETRIES - 1ST FLOOR SLAB
EDGE 0 10/28/2011
A-7.41 CONCRETE GEOMETRIES - 2ND FLOOR SLAB
EDGE 0 10/28/2011
A-7.42 CONCRETE GEOMETRIES - ROOF SLAB EDGE 0 10/28/2011
A-8.01 TOILET PLANS 0 10/28/2011
A-8.02 TOILET INTERIOR ELEVATIONS 0 10/28/2011
A-8.03 TOILET INTERIOR ELEVATIONS 0 10/28/2011
A-8.11 1ST FLOOR INTERIOR ELEVATIONS - NORTH
CORRIDOR I 0 10/28/2011
A-8.12 1ST FLOOR INTERIOR ELEVATIONS - NORTH
CORRIDOR II 0 10/28/2011
A-8.13 1ST FLOOR INTERIOR ELEVATIONS - CORRIDOR
EAST I 0 10/28/2011
A-8.14 1ST FLOOR INTERIOR ELEVATIONS - CORRIDOR
EAST II 0 10/28/2011
A-8.15 1ST FLOOR INTERIOR ELEVATIONS - CENTRAL
CROSS CORRIDOR 0 10/28/2011
A-8.16 1ST FLOOR INTERIOR ELEVATIONS - LATERAL
CROSS CORRIDOR 0 10/28/2011
A-8.17 1ST FLOOR INTERIOR ELEVATIONS - ENTRY
ELEVATIONS 0 10/28/2011
A-8.18 2ND FLOOR INTERIOR ELEVATIONS - NORTH
QUADRANT I 0 10/28/2011
A-8.19 2ND FLOOR INTERIOR ELEVATIONS - NORTH
QUADRANT II 0 10/28/2011
A-8.20 2ND FLOOR INTERIOR ELEVATIONS - EAST
QUADRANT I 0 10/28/2011
A-8.21 2ND FLOOR INTERIOR ELEVATIONS - EAST
QUADRANT II 0 10/28/2011
A-8.22 2ND FLOOR INTERIOR ELEVATIONS - CORRIDOR
ELEVATIONS 0 10/28/2011
A-8.23 TYPICAL CORRIDOR BAY ELEVATIONS 0 10/28/2011
A-8.24 CORRIDOR BRIDGE 0 10/28/2011
A-8.30 OC-3 MEETING ROOM 0 10/28/2011
A-8.31 AULA MAGNA SECTIONS 0 10/28/2011
Page 22
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
A-8.32 AULA MAGNA ELEVATIONS 0 10/28/2011
A-8.33 AULA MAGNA STAIR DETAILS 0 10/28/2011
A-8.41 INTERIOR ELEVATIONS CR-1 0 10/28/2011
A-8.42 LAB ELEVATIONS 0 10/28/2011
A-8.43 LAB ELEVATIONS 0 10/28/2011
A-8.44 LAB EQUIPMENT ELEVATIONS 0 10/28/2011
A-8.45 LAB EQUIPMENT ELEVATIONS 0 10/28/2011
A-8.46 INTERIOR ELEVATIONS TL-6 0 10/28/2011
A-8.47 INTERIOR ELEVAITONS IM-7 0 10/28/2011
A-8.50 LAB CABINET ELEVATIONS 0 10/28/2011
A-8.51 LABORATORY DETAILS 0 10/28/2011
A-8.60 DEAN'S SUITE INTERIOR ELEVATIONS 0 10/28/2011
A-8.61 DEAN'S SUITE INTERIOR ELEVATIONS 0 10/28/2011
A-8.65 OC-5 INTERIOR ELEVATIONS 0 10/28/2011
A-8.70 OC-12 AND OC-14 OFFICES 0 10/28/2011
A-8.71 OC-12 SECTIONS 0 10/28/2011
A-8.72 OC-14 SECTIONS 0 10/28/2011
A-8.73 OC-12 DETAILS 0 10/28/2011
A-8.74 OC-14 DETAILS I 0 10/28/2011
A-8.75 OC-14 DETAILS II 0 10/28/2011
A-8.76 OC-14 DETAILS III 0 10/28/2011
A-9.00 ELEVATORS - PLANS AND SECTIONS 0 10/28/2011
A-9.02 ELEVATOR CABS 0 10/28/2011
A-10.01 1ST FLOOR FINISH SCHEDULE 0 10/28/2011
A-10.02 2ND FLOOR FINISH SCHEDULE 0 10/28/2011
A-10.11 1ST FLOOR DOOR AND FRAME SCHEDULE 0 10/28/2011
A-10.12 2ND FLOOR DOOR AND FRAME SCHEDULE 0 10/28/2011
A-10.13 DOOR AND FRAME DETAILS 0 10/28/2011
A-10.50 PARTITION TYPES - 6" METAL STUDS 0 10/28/2011
A-10.51 PARTITION TYPES - 3 5/8" METAL STUDS 0 10/28/2011
A-10.52 PARTITION TYPES - 6" AN D12" CMU 0 10/28/2011
A-10.60 EXTERIOR STAIR DETAILS 0 10/28/2011
A-10.70 PLAN DETAILS 0 10/28/2011
A-10.71 CEILING AND BASE DETAILS 0 10/28/2011
A-10.72 INTERIOR STAIR DETAILS 0 10/28/2011
A-11.01 1ST FL - FLOOR FINISH PLAN 0 10/28/2011
A-11.02 2ND FL - FLOOR FINISH PLAN 0 10/28/2011
A-12.00 SIGNAGE TYPES 0 10/28/2011
A-12.01 1ST FLOOR SIGNAGE PLAN 0 10/28/2011
A-12.02 2ND FLOOR SIGNAGE PLAN 0 10/28/2011
A-13.01 1ST FLOOR FURNITURE PLAN OVERVIEW 0 10/28/2011
A-13.02 2ND FLOOR FURNATURE PLAN OVERVIEW 0 10/28/2011
A-13.10 1ST FLOOR FURNITURE PLAN NORTH 0 10/28/2011
A-13.11 1ST FLOOR FURNITURE PLAN EAST 0 10/28/2011
A-13.12 1ST FLOOR FURNITURE PLAN SOUTH 0 10/28/2011
A-13.13 1ST FLOOR FURNITURE PLAN WEST 0 10/28/2011
A-13.14 2ND FLOOR FURNITURE PLAN NORTH 0 10/28/2011
Page 23
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
A-13.15 2ND FLOOR FURNITURE PLAN EAST 0 10/28/2011
A-13.16 2ND FLOOR FURNITURE PLAN SOUTH 0 10/28/2011
A-13.17 2ND FLOOR FURNITURE PLAN WEST 0 10/28/2011
A-13.18 BIOLOGY EQUIPMENT PLAN 0 10/28/2011
A-13.19 CHEMISTRY EQUIPMENT PLAN 0 10/28/2011
A-13.20 PHYSICS EQUIPMENT PLAN 0 10/28/2011
A-13.21 IT RESEARCH EQUIPMENT PLAN 0 10/28/2011
A-13.22 ENGINEERING DRY LAB I 0 10/28/2011
A-13.23 ENGINEERING DRY LAB II 0 10/28/2011
A-13.24 ENGINEERING WET LAB 0 10/28/2011
A-13.25 IT LAB EQUIIPMENT PLAN 0 10/28/2011
STRUCTURAL
S-0.01 COVER SHEET AND DRAWING LIST 0 10/28/2011
S-0.10 GENERAL NOTES I 0 10/28/2011
S-0.11 GENERAL NOTES II 0 10/28/2011
S-0.12 COMPONENTS AND CLADDING WIND PRESSURE
DIAGRAM 0 10/28/2011
S-0.13 3D-VIEWS 0 10/28/2011
S-1.01 FOUNDATION KEY PLAN 0 10/28/2011
S-1.02 LEVEL 1 KEY PLAN 0 10/28/2011
S-1.03 LEVEL 2 KEY PLAN 0 10/28/2011
S-1.04 CORRIDOR ROOF KEY PLAN 0 10/28/2011
S-1.05 LOW ROOF KEY PLAN 0 10/28/2011
S-1.06 CUPOLA KEY PLAN 0 10/28/2011
S-1.11 PARTIAL FOUNDATION PLAN – NORTH 0 10/28/2011
S-1.12 PARTIAL FOUNDATION PLAN – EAST 0 10/28/2011
S-1.13 PARTIAL FOUNDATION PLAN – SOUTH 0 10/28/2011
S-1.14 PARTIAL FOUNDATION PLAN – WEST 0 10/28/2011
S-1.21 PARTIAL LEVEL 1 PLAN – NORTH 0 10/28/2011
S-1.22 PARTIAL LEVEL 1 PLAN – EAST 0 10/28/2011
S-1.23 PARTIAL LEVEL 1 PLAN – SOUTH 0 10/28/2011
S-1.24 PARTIAL LEVEL 1 PLAN – WEST 0 10/28/2011
S-1.31 PARTIAL LEVEL 2 PLAN – NORTH 0 10/28/2011
S-1.32 PARTIAL LEVEL 2 PLAN – EAST 0 10/28/2011
S-1.33 PARTIAL LEVEL 2 PLAN – SOUTH 0 10/28/2011
S-1.34 PARTIAL LEVEL 2 PLAN – WEST 0 10/28/2011
S-1.41 PARTIAL CORRIDOR ROOF PLAN – NORTH 0 10/28/2011
S-1.42 PARTIAL CORRIDOR ROOF PLAN – EAST 0 10/28/2011
S-1.51 PARTIAL LOW ROOF PLAN – NORTH 0 10/28/2011
S-1.52 PARTIAL LOW ROOF PLAN – EAST 0 10/28/2011
S-2.00 TYPICAL FOOTING DETAILS AND SCHEDULE 0 10/28/2011
S-2.01 TYPICAL FOOTING DETAILS 0 10/28/2011
S-2.02 FOOTING DETAILS I 0 10/28/2011
S-2.03 FOOTING DETAILS II 0 10/28/2011
S-2.10 TYPICAL SLAB ON GRADE DETAILS 0 10/28/2011
S-2.20 LAP SPLICE SCHEDULES 0 10/28/2011
S-3.00 COLUMN SCHEDULE 0 10/28/2011
Page 24
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
S-3.01 TYPICAL CONCRETE COLUMN DETAILS 0 10/28/2011
S-3.02 CONCRETE COLUMN AND WALL DETAILS 0 10/28/2011
S-3.10 CONCRETE BEAM AND SLAB SCHEDULE 0 10/28/2011
S-3.11 TYPCIAL CONCRETE BEAM DETAILS I 0 10/28/2011
S-3.12 TYPCIAL CONCRETE BEAM DETAILS II 0 10/28/2011
S-3.13 CONCRETE BEAM DETAILS 0 10/28/2011
S-3.20 TYPICAL CONCRETE SLAB DETAILS I 0 10/28/2011
S-3.21 TYPICAL CONCRETE SLAB DETAILS II 0 10/28/2011
S-3.22 TYPICAL CONCRETE STAIR DETAILS 0 10/28/2011
S-4.00 CORRIDOR PORTAL ELEVATIONS 0 10/28/2011
S-4.01 LOBBY PORTAL ELEVATIONS I 0 10/28/2011
S-4.02 LOBBY PORTAL ELEVATIONS II 0 10/28/2011
S-4.03 PROTAL REINFORCING DETAIL KEY ELEVATION 0 10/28/2011
S-4.04 CORRIDOR PORTAL REINFORCING DETAILS I 0 10/28/2011
S-4.05 CORRIDOR PORTAL REINFORCING DETAILS II 0 10/28/2011
S-4.06 CORRIDOR PORTAL REINFORCING DETAILS III 0 10/28/2011
S-4.07 CORRIDOR PORTAL REINFORCING DETAILS IV 0 10/28/2011
S-4.08 LOBBY PORTAL REINFORCING 0 10/28/2011
S-4.09 CUPOLA ABUTTMENT AND SKYLIGHT 0 10/28/2011
S-4.10 TYPICAL EXPANSION JOINT DETAILS 0 10/28/2011
S-4.20 TYPCIAL CONCRETE STAIR DETAILS I 0 10/28/2011
S-4.21 TYPCIAL CONCRETE STAIR DETAILS II 0 10/28/2011
S-4.22 TYPCIAL CONCRETE STAIR DETAILS III 0 10/28/2011
S-4.30 CONCRETE FASCIA DETAILS 0 10/28/2011
S-5.00 CUPOLA RIB ELEVATIONS AND GEOMETRY
DETAILS I 0 10/28/2011
S-5.01 CUPOLA RIB ELEVATIONS AND GEOMETRY
DETAILS II 0 10/28/2011
S-5.02 CUPOLA RIB ELEVATIONS AND GEOMETRY
DETAILS III 0 10/28/2011
S-5.03 CUPOLA RIB ELEVATIONS AND GEOMETRY
DETAILS IV 0 10/28/2011
S-5.04 CUPOLA RIB ELEVATIONS AND GEOMETRY
DETAILS V 0 10/28/2011
S-5.05 CUPOLA RIB ELEVATIONS AND GEOMETRY
DETAILS VI 0 10/28/2011
S-5.10 TYPICAL STEEL DETAIL I 0 10/28/2011
S-5.11 TYPICAL STEEL DETAIL II 0 10/28/2011
S-6.00 TYPICAL MASONRY NON-BEARING WALL
DETAILS 0 10/28/2011
S-6.01 TYPICAL MASONRY NON-BEARING WALL
SCHEDULE 0 10/28/2011
S-6.02 TYPICAL MASONRY NON-BEARING WALL TO
CONCRETE DETAILS 0 10/28/2011
MECHANICAL
M-0.00 ABBREVIATIONS AND SYMBOLS 0 10/28/2011
M-1.10 1ST
FLOOR PLAN – OVERALL 0 10/28/2011
M-1.11 1ST
FLOOR PLAN – NORTH 0 10/28/2011
Page 25
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
M-1.12 1ST
FLOOR PLAN – EAST 0 10/28/2011
M-1.13 1ST
FLOOR PLAN – SOUTH 0 10/28/2011
M-1.14 1ST
FLOOR PLAN – WEST 0 10/28/2011
M-1.15 2ND
FLOOR PLAN – OVERALL 0 10/28/2011
M-1.16 2ND
FLOOR PLAN – NORTH 0 10/28/2011
M-1.17 2ND
FLOOR PLAN – EAST 0 10/28/2011
M-1.18 2ND
FLOOR PLAN – SOUTH 0 10/28/2011
M-1.19 2ND
FLOOR PLAN – WEST 0 10/28/2011
M-1.20 1ST
FLOOR PLAN – OVERALL 0 10/28/2011
M-1.21 1ST
FLOOR PLAN – NORTH 0 10/28/2011
M-1.22 1ST
FLOOR PLAN – EAST 0 10/28/2011
M-1.23 1ST
FLOOR PLAN – SOUTH 0 10/28/2011
M-1.24 1ST
FLOOR PLAN – WEST 0 10/28/2011
M-2.01 ROOF PLAN 0 10/28/2011
M-2.02 ROOF DETAILS 0 10/28/2011
M-3.01 SECTIONS 0 10/28/2011
M-4.01 ENLARGED PLANS 0 10/28/2011
M-4.02 ENLARGED PLANS 0 10/28/2011
M-5.01 MECHANICAL DETAILS 0 10/28/2011
M-5.02 MECHANICAL DETAILS 0 10/28/2011
M-5.03 MECHANICAL DETAILS 0 10/28/2011
M-6.01 SCHEDULES 0 10/28/2011
M-6.02 SCHEDULES 0 10/28/2011
M-6.03 SCHEDULES 0 10/28/2011
M-7.01 PIPING DIAGRAMS 0 10/28/2011
M-8.01 CONTROL DIAGRAMS 0 10/28/2011
M-8.02 CONTROL DIAGRAMS 0 10/28/2011
M-8.03 CONTROL DIAGRAMS 0 10/28/2011
M-8.04 CONTROL DIAGRAMS 0 10/28/2011
PLUMBING
P-0.00 PLUMBING ABBREV.S, LEGEND, AND GENERAL
NOTES 0 10/28/2011
P-1.10 UNDERGROUND PLAN – NORTH 0 10/28/2011
P-1.11 UNDERGROUND PLAN – EAST 0 10/28/2011
P-1.12 UNDERGROUND PLAN – SOUTH 0 10/28/2011
P-1.13 UNDERGROUND PLAN – WEST 0 10/28/2011
P-1.14 1ST
FLOOR GRAVITY PLAN – NORTH 0 10/28/2011
P-1.15 1ST
FLOOR GRAVITY PLAN – EAST 0 10/28/2011
P-1.16 1ST
FLOOR GRAVITY PLAN – SOUTH 0 10/28/2011
P-1.17 1ST
FLOOR GRAVITY PLAN – WEST 0 10/28/2011
P-1.18 1ST
FLOOR PRESSURE PLAN – NORTH 0 10/28/2011
P-1.19 1ST
FLOOR PRESSURE PLAN – EAST 0 10/28/2011
P-1.20 1ST
FLOOR PRESSURE PLAN – SOUTH 0 10/28/2011
P-1.21 1ST
FLOOR PRESSURE PLAN – WEST 0 10/28/2011
P-1.22 2ND
FLOOR GRAVITY PLAN – NORTH 0 10/28/2011
P-1.23 2ND
FLOOR GRAVITY PLAN – EAST 0 10/28/2011
P-1.24 2ND
FLOOR GRAVITY PLAN – SOUTH 0 10/28/2011
Page 26
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
P-1.25 2ND
FLOOR GRAVITY PLAN – WEST 0 10/28/2011
P-1.26 2ND
FLOOR PRESSURE PLAN – NORTH 0 10/28/2011
P-1.27 2ND
FLOOR PRESSURE PLAN – EAST 0 10/28/2011
P-1.28 2ND
FLOOR PRESSURE PLAN – SOUTH 0 10/28/2011
P-1.29 2ND
FLOOR PRESSURE PLAN – WEST 0 10/28/2011
P-1.30 PLUMBING DETAILS 0 10/28/2011
P-2.01 ROOF OVERALL PLAN 0 10/28/2011
P-2.02 ROOF PLAN – NORTH 0 10/28/2011
P-2.03 ROOF PLAN – EAST 0 10/28/2011
P-2.04 ROOF PLAN – SOUTH 0 10/28/2011
P-2.05 ROOF PLAN – WEST 0 10/28/2011
P-3.01 3D RISERS 0 10/28/2011
P-3.02 3D RISERS 0 10/28/2011
P-3.03 3D RISERS 0 10/28/2011
P-3.04 3D RISERS 0 10/28/2011
P-4.01 ENLARGED PLANS 0 10/28/2011
P-4.02 ENLARGED PLANS 0 10/28/2011
P-4.03 ENLARGED PLANS 0 10/28/2011
P-4.04 ENLARGED PLANS 0 10/28/2011
P-4.05 ENLARGED PLANS 0 10/28/2011
P-4.06 ENLARGED PLANS 0 10/28/2011
P-4.07 ENLARGED PLANS 0 10/28/2011
P-5.01 SECTIONS 0 10/28/2011
FIRE PROTECTION
F-0.00 FIRE PROTECTION ABBREV.S, LEGEND, AND
GENERAL NOTES 0 10/28/2011
F-1.00 FIRE PROTECTION SITE PLAN 0 10/28/2011
F-1.10 PARTIAL FIRE PROTECTION PLAN - LEVEL 1
NORTH 0 10/28/2011
F-1.11 PARTIAL FIRE PROTECTION PLAN - LEVEL 1
EAST 0 10/28/2011
F-1.12 PARTIAL FIRE PROTECTION PLAN - LEVEL 1
SOUTH 0 10/28/2011
F-1.13 PARTIAL FIRE PROTECTION PLAN - LEVEL 1
WEST 0 10/28/2011
F-1.14 PARTIAL FIRE PROTECTION PLAN - LEVEL 2
NORTH 0 10/28/2011
F-1.15 PARTIAL FIRE PROTECTION PLAN - LEVEL 2
EAST 0 10/28/2011
F-1.16 PARTIAL FIRE PROTECTION PLAN - LEVEL 2
SOUTH 0 10/28/2011
F-1.17 PARTIAL FIRE PROTECTION PLAN - LEVEL 2
WEST 0 10/28/2011
F-1.20 FIRE PROTECTION DETAILS 0 10/28/2011
F-3.01 SECTIONS 0 10/28/2011
ELECTRICAL
E-0.01 ELECTRICAL SYMBOLS LEGEND 0 10/28/2011
E-1.10 OVERALL PWER PLAN – LEVEL 1 0 10/28/2011
Page 27
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
E-1.11 PARTIAL POWER PLAN - LEVEL 1 NORTH 0 10/28/2011
E-1.12 PARTIAL POWER PLAN - LEVEL 1 EAST 0 10/28/2011
E-1.13 PARTIAL POWER PLAN - LEVEL 1 SOUTH 0 10/28/2011
E-1.14 PARTIAL POWER PLAN - LEVEL 1 WEST 0 10/28/2011
E-1.20 OVERALL POWER PLAN – LEVEL 2 0 10/28/2011
E-1.21 PARTIAL POWER PLAN - LEVEL 2 NORTH 0 10/28/2011
E-1.22 PARTIAL POWER PLAN - LEVEL 2 EAST 0 10/28/2011
E-1.23 PARTIAL POWER PLAN - LEVEL 2 SOUTH 0 10/28/2011
E-1.24 PARTIAL POWER PLAN - LEVEL 2 WEST 0 10/28/2011
E-2.10 OVERALL LIGHTING PLAN – LEVEL 1 0 10/28/2011
E-2.11 PARTIAL LIGHTING PLAN - LEVEL 1 NORTH 0 10/28/2011
E-2.12 PARTIAL LIGHTING PLAN - LEVEL 1 EAST 0 10/28/2011
E-2.13 PARTIAL LIGHTING PLAN - LEVEL 1 SOUTH 0 10/28/2011
E-2.14 PARTIAL LIGHTING PLAN - LEVEL 1 WEST 0 10/28/2011
E-2.20 OVERALL LIGHTING PLAN – LEVEL 2 0 10/28/2011
E-2.21 PARTIAL LIGHTING PLAN - LEVEL 2 NORTH 0 10/28/2011
E-2.22 PARTIAL LIGHTING PLAN - LEVEL 2 EAST 0 10/28/2011
E-2.23 PARTIAL LIGHTING PLAN - LEVEL 2 SOUTH 0 10/28/2011
E-2.24 PARTIAL LIGHTING PLAN - LEVEL 2 WEST 0 10/28/2011
E-3.10 OVERALL ELECTRICAL ROOF PLAN 0 10/28/2011
E-3.11 PARTIAL ELECTRICAL ROOF PLAN - NORTH 0 10/28/2011
E-3.12 PARTIAL ELECTRICAL ROOF PLAN - EAST 0 10/28/2011
E-3.13 PARTIAL ELECTRICAL ROOF PLAN - SOUTH 0 10/28/2011
E-3.14 PARTIAL ELECTRICAL ROOF PLAN - WEST 0 10/28/2011
E-4.10 FIRE ALARM PLAN - LEVEL 1 0 10/28/2011
E-4.20 FIRE ALARM PLAN - LEVEL 2 0 10/28/2011
E-5.01 ENLARGED ELECTRICAL PLANS 0 10/28/2011
E-5.02 ELECTRICAL RISER DIAGRAM 0 10/28/2011
E-5.03 LIGHTING CONTROL DETAILS 0 10/28/2011
E-5.04 PARTIAL ROOF LOUVER SYSTEM DETAL 0 10/28/2011
E-6.01 ELECTRICAL SCHEDULES 0 10/28/2011
E-6.02 ELECTRICAL PANEL SCHEDULES 0 10/28/2011
E-6.03 ELECTRICAL PANEL SCHEDULES 0 10/28/2011
E-6.04 ELECTRICAL PANEL SCHEDULES 0 10/28/2011
E-6.05 ELECTRICAL PANEL SCHEDULES 0 10/28/2011
E-7.01 ELECTRICAL DETAILS 0 10/28/2011
E-7.02 ELECTRICAL DETAILS 0 10/28/2011
E-7.03 ELECTRICAL DETAILS 0 10/28/2011
SPECIFICATIONS:
SPEC
SECTION DESCRIPITION
REV.
NUMBER DATE
INTRODUCTORY PAGES
000030 PROJECT TEAM 0 10/28/2011
000100 TABLE OF CONTENTS 0 10/28/2011
DIVISION 1 – GENERAL REQUIREMENTS
Page 28
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
011000 SUMMARY 0 10/28/2011
012500 SUBSTITUTION PROCEDURES 0 10/28/2011
012600 CONTRACT MODIFICATION PROCEDURES 0 10/28/2011
012900 PAYMENT PROCEDURES 0 10/28/2011
013100 PROJECT MANAGEMENT AND COORDINATION 0 10/28/2011
013200 CONSTRUCTION PROGRESS DOCUMENTATION 0 10/28/2011
013233 PHOTOGRAPHIC DOCUMENTATION 0 10/28/2011
013300 SUBMITTAL PROCEDURES 0 10/28/2011
013560 UNIVERSITY PROJECT PROCEDURES 0 10/28/2011
014000 QUALITY REQUIREMENTS 0 10/28/2011
014200 REFERENCES 0 10/28/2011
015000 TEMPORARY FACILITIES AND CONTROLS 0 10/28/2011
015639 TEMPORARY TREE AND PLANT PROTECTION 0 10/28/2011
016000 PRODUCT REQUIREMENTS 0 10/28/2011
017300 EXECUTION 0 10/28/2011
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
0 10/28/2011
017700 CLOSEOUT PROCEDURES 0 10/28/2011
017823 OPERATION AND MAINTENANCE DATA 0 10/28/2011
017839 PROJECT RECORD DOCUMENTS 0 10/28/2011
017900 DEMONSTRATION AND TRAINING 0 10/28/2011
DIVISION 2 – SITE CONSTRUCTION
Vibro Replacement Specification from Soils Report 0 10/28/2011
DIVISION 3 - CONCRETE
031000 CONCRETE FORMWORK 0 10/28/2011
032000 CONCRETE REINFORCEMENT 0 10/28/2011
033000 CAST-IN-PLACE CONCRETE 0 10/28/2011
033543 INTEGRALLY COLORED GROUND AND POLISHED CONCRETE
0 10/28/2011
035300 CONCRETE TOPPING 0 10/28/2011
DIVISION 4 - MASONRY
042030 REINFORCED UNIT MASONRY 0 10/28/2011
042200 CONCRETE UNIT MASONRY 0 10/28/2011
047200 CAST STONE MASONRY 0 10/28/2011
DIVISION 5 - METALS
051000 STRUCTURAL STEEL 0 10/28/2011
051213 ARCHITECTURALLY EXPOSED STRUCTURAL STEEL 0 10/28/2011
053000 STEEL DECK 0 10/28/2011
054000 COLD-FORMED METAL FRAMING 0 10/28/2011
055000 METAL FABRICATIONS 0 10/28/2011
055213 PIPE AND TUBE RAILINGS 0 10/28/2011
057000 DECORATIVE METAL 0 10/28/2011
057300 DECORATIVE GLASS AND METAL RAILINGS 0 10/28/2011
DIVISION 6 – WOODS AND PLASTICS
061000 ROUGH CARPENTRY 0 10/28/2011
064023 INTERIOR ARCHITECTURAL WOODWORK 0 10/28/2011
DIVISION 7 – THERMAL AND MOISTURE
PROTECTION
Page 29
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
071416 COLD FLUID-APPLIED ROOFING AND WATERPROOFING
0 10/28/2011
071700 BENTONITE WATERPROOFING 0 10/28/2011
071900 WATER REPELLENTS 0 10/28/2011
072100 THERMAL INSULATION 0 10/28/2011
072713 MODIFIED BITUMINOUS SHEET AIR BARRIER 0 10/28/2011
072726 FLUID-APPLIED MEMBRANE AIR BARRIERS 0 10/28/2011
074213-16 METAL PLATE WALL PANELS 0 10/28/2011
076200 SHEET METAL FLASHING AND TRIM 0 10/28/2011
077200 ROOF ACCESSORIES 0 10/28/2011
078413 PENETRATION FIRESTOPPING 0 10/28/2011
078446 FIRE-RESISTIVE JOINT SYSTEMS 0 10/28/2011
079200 JOINT SEALANTS 0 10/28/2011
079500 EXPANSION JOINT CONTROL 0 10/28/2011
DIVISION 8 – DOORS AND WINDOWS
081113 HOLLOW METAL DOORS AND FRAMES 0 10/28/2011
081173 SLIDING METAL DOORS 0 10/28/2011
081416 FLUSH WOOD DOORS 0 10/28/2011
083113 ACCESS DOORS AND FRAMES 0 10/28/2011
084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONT
0 10/28/2011
084123 FIRE RATED STEEL FRAMED WINDOWS 0 10/28/2011
084126 ALL-GLASS ENTRANCES AND STOREFRONTS 0 10/28/2011
084229-23 SLIDING AUTOMATIC ENTRANCES 0 10/28/2011
084423 STRUCTURAL-SEALANT-GLAZED CURTAIN WALL 0 10/28/2011
084433 SLOPED GLAZED ASSEMBLIES 0 10/28/2011
087100 DOOR HARDWARE - BASE 0 10/28/2011
087100-13 DOOR HARDWARE – ALTERNATE 0 10/28/2011
088000 GLAZING 0 10/28/2011
088300 MIRRORS 0 10/28/2011
089119 LOUVERS 0 10/28/2011
DIVISION 9 - FINISHES
090500 COLOR AND FINISH SCHEDULE 0 10/28/2011
092116-23 GYPSUM BOARD SHAFT-WALL ASSEMBLIES 0 10/28/2011
092216 NON-STRUCTURAL METAL FRAMING 0 10/28/2011
092400 CEMENT PLASTERING 0 10/28/2011
092713 GLASS-FIBER-REINFORCED PLASTER FABRICATIONS
0 10/28/2011
092900 GYPSUM BOARD 0 10/28/2011
093000 TILING 0 10/28/2011
095113 ACOUSTIC PANEL CEILINGS 0 10/28/2011
096513 RESILIENT BASE AND ACCESSORIES 0 10/28/2011
096723 RESINOUS FLOORING 0 10/28/2011
096900 ACCESS FLOORING 0 10/28/2011
099123 INTERIOR PAINTING 0 10/28/2011
099600 HIGH-PERFORMANCE COATINGS 0 10/28/2011
DIVISION 10 - SPECIALTIES
101100 VISUAL DISPLAY SURFACES 0 10/28/2011
Page 30
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
101419 DIMENSIONAL LETTER SIGNAGE 0 10/28/2011
101423 PANEL SIGNAGE 0 10/28/2011
102113 TOILET COMPARTMENTS 0 10/28/2011
102213 WIRE MESH PARTITIONS 0 10/28/2011
102238 OPERABLE PANEL PARTITIONS 0 10/28/2011
102800 TOILET, BATH, AND LAUNDRY ACCESSORIES 0 10/28/2011
104413 FIRE EXTINGUSHER CABINETS 0 10/28/2011
104416 FIRE EXTINGUSHERS 0 10/28/2011
DIVISION 11 - EQUIPMENT
115313 LABORATORY FUME HOODS 0 10/28/2011
DIVISION 12 - FURNISHINGS
122413 ROLLER WINDOW SHADES 0 10/28/2011
123553-13 METAL LABORATORY CASEWORK 0 10/28/2011
123623-13 PLASTIC-LAMINATE-CLAD COUNTERTOPS 0 10/28/2011
123661 SIMULATED STONE COUNTERTOPS 0 10/28/2011
124813 ENTRANCE FLOOR MATS AND FRAMES 0 10/28/2011
DIVISION 13 – SPECIAL CONSTRUCTION
130102 LOUVER STRUCTURAL PERFORMANCE
SPECIFICATION 0 10/28/2011
130103 LOUVER MECHANICAL PERFORMANCE
SPECIFICATION 0 10/28/2011
DIVISION 14 – CONVEYING EQUIPMENT
142113 ELECTRIC TRACTION FREIGHT ELEVATORS 0 10/28/2011
DIVISION 21 – FIRE PROTECTION
210500 COMMON WORK RESULTS FOR FIRE SUPPRESSION 0 10/28/2011
211313 WET-PIPE SPRINKLER SYSTEMS 0 10/28/2011
DIVISION 22 - PLUMBING
220500 COMMON REQUIREMENTS FOR PLUMBING 0 10/28/2011
220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
0 10/28/2011
220519 METERS AND GAGES FOR PLUMBING PIPING 0 10/28/2011
220523 GENERAL DUTY VALVES FOR PLUMBING PIPING 0 10/28/2011
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
0 10/28/2011
220700 PLUMBING INSULATION 0 10/28/2011
221116 DOMESTIC WATER PIPING SPECIALTIES 0 10/28/2011
221119 DOMESTIC WATER PIPING SPECIALITIES 0 10/28/2011
221316 SANITARY WASTE AND VENT PIPING 0 10/28/2011
221319 SANITARY WASTE PIPING SPECIALTIES 0 10/28/2011
221413 STORM DRAINAGE PIPING 0 10/28/2011
221423 STORM DRAINAGE PIPING SPECIALITES 0 10/28/2011
221429 SUMP PUMPS 0 10/28/2011
223400 FUEL FIRED DOMESTIC WATER HEATERS 0 10/28/2011
224000 PLUMBING FIXTURES 0 10/28/2011
226113 COMPRESSED AIR PIPING FOR LABORATORY AND HEALTHCARE FACILITIES
0 10/28/2011
226119 COMPRESSED AIR EQUIPMENT FOR LABORATORY AND HEALTHCARE FACILITIES
0 10/28/2011
226213 VACUUM PIPING FOR LABORATORY AND 0 10/28/2011
Page 31
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
HEALTHCARE FACILITIES
226219 VACUUM EQUIPMENT FOR LABORATORY AND HEALTHCARE FACILITIES
0 10/28/2011
226313 GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES
0 10/28/2011
226600 CHEMICAL WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
0 10/28/2011
226700 PROCESSED WATER SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
0 10/28/2011
DIVISION 23 – HEATING VENTILATON AND AIR
CONDITIONING
230010 COMMON REQUIREMENTS FOR HVAC 0 10/28/2011
230500 COMMON WORK RESULTS FOR HVAC 0 10/28/2011
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
0 10/28/2011
230519 METERS AND GAGES FOR HVAC PIPING 0 10/28/2011
230523 GENERAL-DUTY VALVES FOR HVAC PIPING 0 10/28/2011
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
0 10/28/2011
230548 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
0 10/28/2011
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
0 10/28/2011
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 0 10/28/2011
230700 HVAC INSULATION 0 10/28/2011
230900 INSTRUMENTATION AND CONTROLS FOR HVAC 0 10/28/2011
231123 FACILITY NATURAL-GAS PIPING 0 10/28/2011
232113 HYDRONIC PIPING 0 10/28/2011
232300 AIR DUCT ACCESSORIES 0 10/28/2011
233113 METAL DUCTS 0 10/28/2011
233300 REFRIGERANT PIPING 0 10/28/2011
233423 HVAC POWER VENTILATOR 0 10/28/2011
233450 LABORATORY EXHAUST FANS 0 10/28/2011
233600 AIR TERMINAL UNITS 0 10/28/2011
233650 LABORATORY AIR CONTROLS VALVES 0 10/28/2011
233655 FACILITY MONITORING SYSTEM 0 10/28/2011
233713 DIFFUSERS, REGISTERS, AND GRILLES 0 10/28/2011
235216 CONDENSING BOILERS 0 10/28/2011
237200 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT 0 10/28/2011
237313 MODULAR INDOOR CENTRAL STATION AIR HANDLING UNITS
0 10/28/2011
238126 SPLIT SYSTEM AIR CONDITIONERS 0 10/28/2011
238146 WATER SOURCE UNITARY HEAT PUMPS 0 10/28/2011
238219 FAN COIL UNIT 0 10/28/2011
DIVISION 26 - ELECTRICAL
260100 BASIC ELECTRICAL REQUIREMENTS 0 10/28/2011
260519 LOW VOLTAGE ELECTRICAL POWER CABLES 0 10/28/2011
260526 GROUNDING AND BONDING FOR ELECTICAL SYSTEMS
0 10/28/2011
260529 HANGERS AND SUPPORTS FOR ELECTRICAL 0 10/28/2011
Page 32
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
0 10/28/2011
260543 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
0 10/28/2011
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 0 10/28/2011
260923 LIGHTING CONTROL DEVICES 0 10/28/2011
260943 NETWORK LIGHTING CONTROLS 0 10/28/2011
262413 SWITCHBOARDS 0 10/28/2011
262416 PANELBOARDS 0 10/28/2011
262726 WIRING DEVICES 0 10/28/2011
262813 FUSES 0 10/28/2011
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 0 10/28/2011
263213 ENGINE GENERATORS 0 10/28/2011
263600 TRANSFER SWITCHES 0 10/28/2011
264113 LIGHTNING PROTECTION FOR STRUCTURES 0 10/28/2011
264313 TRANSIENT VOLTAGE SUPPRESSION FOR LOW VOLTAGE ELECTRICAL POWER CIRCUITS
0 10/28/2011
265100 INTERIOR LIGHTING 0 10/28/2011
265600 EXTERIOR LIGHTING 0 10/28/2011
DIVISION 28 – ELECTRONIC SAFETY AND
SECURITY
283111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM 0 10/28/2011
DIVISION 31 - EARTHWORK
313116 TERMITE CONTROL 0 10/28/2011
ADDENDA:
ADDENDUM
NUMBER DESCRIPITION
REV.
NUMBER DATE
1 USFP Addendum 1 – 11.28.2011
2 USFP Addendum 2 – 12.06.2011
3 USFP Addendum 3 – 12.06.2011
OTHER:
DOCUMENT DESCRIPITION REV.
NUMBER DATE
1 SOILS REPORT: KCI TECHNOLOGIES, INC. 06/22/2011
2 Updated KCI Soils Report 06/30/11
3 TEMP. ELECTRICAL ASBUILT: BORRELL 07/27/2011
4 TEMP. ELECTRICAL ASBUILT: CHASTAIN-
SKILLMAN, INC. 08/31/2011
5 STORM WATER POLLUTION PREVENTION PLAN 09/09/2011
6 “2011-12-22 Revised Progress Set”: These drawings
have been used for various cost exercises for the GMP 12/22/2011
Page 33
University of South Florida Polytechnic:
Science and Technology Building 555 BID MANUAL AND REQUIREMENTS
process and qualifications are noted as such. These
documents are a “progress set” that are not entirely
incorporated into the GMP because of the incomplete
nature of the drawings. As such, they have only been
used for reference on specific cost exercises.
Page 34
Appendix Two – Project Schedules
USF Polytechnic Building 555 – Innovation Science and Technology GMP Proposal – 50% Construction Documents Lakeland, Florida December 22, 2011
Project Name GMP Proposal
Client Name Location, North Carolina
Month, Year
The subsequent pages contain a detailed project schedule presented for review and comment. The schedule can
be summarized as:
Start Design: 11/22/2010
Anticipated Design Completion: 01/27/2012
Permitting and Approvals: 03/16/2012
Award of Trades: 03/19/2012
Start Construction (NTP): 03/19/2012
Substantial Completion of Construction: 03/21/2014
Certificate of Occupancy: 04/21/2014
Owner Acceptance and Move-In: 05/27/2014
Page 35
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
PR
EC
ON
ST
RU
CT
IO
N P
HA
SE
PA
RT
1:
SIT
E M
AS
S C
LE
AR
ING
/GR
AD
ING
/FM
& P
OT
. H
20
GM
P P
RO
CE
SS
P1-1
000
Early R
e-D
efined S
ite/C
ivil
CD
's C
om
ple
te0
009S
EP
11
P1-1
010
Bid
Early R
e-D
efined S
ite/C
ivil
Package
20
20
12S
EP
11
07O
CT
11
P1-1
020
Subm
it G
MP
for
Early R
e-D
efined S
ite/C
ivil
Pkg
00
07O
CT
11
P1-1
030
GM
P A
ppro
val fo
r E
arly R
e-D
efined S
ite/C
ivil
Pkg
55
10O
CT
11
14O
CT
11
MIL
ES
TO
NE
S
P1-1
040
NT
P f
or
Early R
e-D
efined S
ite/C
ivil
Pkg
00
17O
CT
11
CO
NS
TR
UC
TIO
N
PA
RT
1:
SIT
E M
AS
S C
LE
AR
ING
/GR
AD
ING
/FM
& P
OT
. H
20
MIL
ES
TO
NE
S
P1-1
059
Insta
ll &
Main
tain
Ero
sio
n S
ilt F
encin
g135*
135*
17O
CT
11
27A
PR
12
P1-2
039
Com
ple
te C
onstu
ction A
ccess R
oad
00
29N
OV
11
P1-2
050
Com
ple
te C
rane A
ccess R
oad A
round S
&T
Bld
g.
00
30D
EC
11
P1-2
099
Com
ple
te T
em
p P
ow
er
to S
&T
Build
ing P
ad
00
27JA
N12
P1-2
199
Com
ple
te T
em
p W
ate
r to
S&
T B
uild
ing P
ad
00
27JA
N12
P1-2
299
Substa
ntial C
om
ple
tion -
Part
10
027A
PR
12
SIT
E D
EV
EL
OP
ME
NT
P1-1
050
Mobili
ze f
or
Early R
e-D
efined S
ite/C
ivil
Pkg
55
17O
CT
11
21O
CT
11
P1-2
000
Mass C
learing &
Gra
din
g90
90
24O
CT
11
02M
AR
12
P1-2
010
Excavate
Pond #
5 f
or
Fill
@ C
onstr
. A
ccess R
d.
10
10
31O
CT
11
11N
OV
11
P1-2
020
Cle
ar
& F
ill C
onstr
uction A
ccess R
oad
10
10
31O
CT
11
11N
OV
11
P1-2
030
Insta
ll C
rushcre
te @
Constr
. A
ccess R
d.
10
10
14N
OV
11
29N
OV
11
P1-2
040
Fill
, G
rade &
Com
pact
All
Build
ing P
ads
26
26
21N
OV
11
30D
EC
11
P1-2
070
Fill
, G
rade &
Com
pact
Park
ing L
ots
(3)/
Laydow
ns
26
26
21N
OV
11
30D
EC
11
P1-2
060
Fill
, G
rade &
Com
pact
Rin
g R
oad
24
24
03JA
N12
03F
EB
12
SIT
E U
TIL
ITIE
S
P1-2
080
Off
Site F
orc
e M
ain
/ P
ota
ble
Wate
r P
ipin
g45
45
21N
OV
11
27JA
N12
P1-2
090
Pro
vid
e T
em
p.
Pow
er
to S
&T
Build
ing P
ad
45
45
21N
OV
11
27JA
N12
P1-2
100
Pro
vid
e T
em
p.
Wate
r to
S&
T B
uild
ing P
ad
45
45
21N
OV
11
27JA
N12
P1-2
110
Lift
Sta
tion C
onstr
uction
60
60
06F
EB
12
27A
PR
12
AS
EP
OC
TN
OV
DE
CJA
NF
EB
MA
RA
PR
MA
YJU
NJU
LA
UG
-11
23
45
67
89
10
11
Earl
y R
e-D
efi
ned
Sit
e/C
ivil C
D's
Co
mp
lete
Bid
Earl
y R
e-D
efi
ned
Sit
e/C
ivil P
ackag
e
Su
bm
it G
MP
fo
r E
arl
y R
e-D
efi
ned
Sit
e/C
ivil P
kg
GM
P A
pp
roval fo
r E
arl
y R
e-D
efi
ned
Sit
e/C
ivil P
kg
NT
P f
or
Earl
y R
e-D
efi
ned
Sit
e/C
ivil P
kg
Insta
ll &
Main
tain
Ero
sio
n S
ilt
Fen
cin
g
Co
mp
lete
Co
nstu
cti
on
Access R
oad
Co
mp
lete
Cra
ne A
ccess R
oad
Aro
un
d S
&T
Bld
g.
Co
mp
lete
Tem
p P
ow
er
to S
&T
Bu
ild
ing
Pad
Co
mp
lete
Tem
p W
ate
r to
S&
T B
uild
ing
Pad
Su
bsta
nti
al C
om
ple
tio
n -
Part
1
Mo
biliz
e f
or
Earl
y R
e-D
efi
ned
Sit
e/C
ivil P
kg
Mass C
leari
ng
& G
rad
ing
Excavate
Po
nd
# 5
fo
r F
ill @
Co
nstr
. A
ccess R
d.
Cle
ar
& F
ill C
on
str
ucti
on
Access R
oad
Insta
ll C
rush
cre
te @
Co
nstr
. A
ccess R
d.
Fill, G
rad
e &
Co
mp
act
All B
uild
ing
Pad
s
Fill, G
rad
e &
Co
mp
act
Park
ing
Lo
ts (
3)/
Layd
ow
ns
Fill, G
rad
e &
Co
mp
act
Rin
g R
oad
Off
Sit
e F
orc
e M
ain
/ P
ota
ble
Wate
r P
ipin
g
Pro
vid
e T
em
p. P
ow
er
to S
&T
Bu
ild
ing
Pad
Pro
vid
e T
em
p. W
ate
r to
S&
T B
uild
ing
Pad
Lif
t S
tati
on
Co
nstr
ucti
on
© P
rim
avera
Syste
ms,
Inc.
Data
Date
12S
EP
11
Run D
ate
26A
UG
11 1
2:5
7
PR
T1
US
F P
OL
YT
EC
HN
ICP
AR
T 1
SIT
E M
AS
S C
LE
AR
ING
, G
RA
DIN
G,
FO
RC
E M
AIN
& P
OT
AB
LE
WA
TE
R
Sh
ee
t 1
of
1
Page 36
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
PR
EC
ON
ST
RU
CT
IO
N P
HA
SE
PA
RT
2:
SIT
E IN
FR
AS
TR
UC
TU
RE
GM
P P
RO
CE
SS
P2-1
000
Part
2 S
ite I
nfr
astr
ucutu
re 9
5%
CD
's C
om
ple
te0
009N
OV
11A
P2-1
010
Bid
Part
2 S
ite I
nfr
astr
uctu
re 9
5%
& 1
00%
CD
's25
14
20D
EC
11A
02F
EB
12
P2-1
005
Part
2 S
ite I
nfr
astr
ucutu
re 1
00%
CD
's C
om
ple
te0
027JA
N12*
P2-1
020
Skanska G
MP
@ 1
00%
CD
's f
or
Part
2 S
ite I
nfr
stc
r11
11
03F
EB
12
17F
EB
12
P2-1
030
GM
P A
ppro
val fo
r P
art
2 S
ite I
nfr
astr
uctu
re P
kg.
15
15
20F
EB
12
09M
AR
12
MIL
ES
TO
NE
S
P2-1
040
NT
P f
or
Part
s 2
Site I
nfr
astr
uctu
re P
ackage
00
12M
AR
12
PR
OC
UR
EM
EN
T P
HA
SE
PA
RT
2:
SIT
E IN
FR
AS
TR
UC
TU
RE
SIT
E U
TIL
ITIE
S
P2-1
500
Subm
it &
Appro
ve /
Fab &
Deliv
er
Str
uctu
res
24
24
12M
AR
12
12A
PR
12
CO
NS
TR
UC
TIO
N
PA
RT
2:
SIT
E IN
FR
AS
TR
UC
TU
RE
MIL
ES
TO
NE
S
P2-1
059
Insta
ll &
Main
tain
Ero
sio
n S
ilt F
encin
g182*
182*
30M
AR
12
17D
EC
12
P2-2
299
Substa
ntial C
om
ple
tion -
Part
20
017D
EC
12
SIT
E U
TIL
ITIE
S
P2-2
070
Mobili
ze f
or
Site I
nfr
astr
uctu
re P
ackage
10
10
30M
AR
12
12A
PR
12
P2-2
080
Sanitary
Pip
ing
45
45
13A
PR
12
15JU
N12
P2-2
085
Excavate
/FR
P C
ausew
ay B
twn C
entr
al P
ond 3
00-4
00
45
45
13A
PR
12
15JU
N12
P2-2
089
Excavate
/FR
P C
ausew
ay B
twn C
entr
al P
ond 4
00-5
00
45
45
13A
PR
12
15JU
N12
P2-2
090
Sto
rm P
ipin
g &
Str
uctu
res
84
84
13A
PR
12
10A
UG
12
P2-2
100
Chill
ed W
ate
r S
& R
Pip
ing
90
90
15M
AY
12
20S
EP
12
P2-2
095
Dew
ate
r/E
xcavate
& L
ine C
entr
al P
onds:
300 &
400
106
106
15M
AY
12
12O
CT
12
P2-2
908
Dew
ate
r/ E
xcavate
Sw
ale
@ P
onds 5
00,
600A
& 6
00B
106
106
15M
AY
12
12O
CT
12
P2-2
087
Excavate
/FR
P C
ausew
ay B
twn C
entr
al P
ond 2
00-3
00
45
45
18JU
N12
20A
UG
12
P2-2
110
Pota
ble
Wate
r /
Fire M
ain
50
50
19JU
L12
27S
EP
12
P2-2
140
Recla
imed W
ate
r P
ipin
g &
Sle
eves
50
50
19JU
L12
27S
EP
12
P2-2
120
Data
/ C
om
munic
ation
50
50
09A
UG
12
18O
CT
12
P2-2
130
Prim
ary
Ele
ctr
ic S
erv
ice
50
50
09A
UG
12
18O
CT
12
P2-2
150
Gas P
ipin
g &
Valv
es
50
50
09A
UG
12
18O
CT
12
P2-2
129
Pull
Fib
er
& T
erm
inate
(V
erizo
n)
15
15
19O
CT
12
08N
OV
12
ON
OV
DE
CJA
NF
EB
MA
RA
PR
MA
YJU
NJU
LA
UG
SE
PO
CT
NO
VD
EC
J-6
-5-4
-3-2
-11
23
45
67
89
Part
2 S
ite In
frastr
ucu
ture
95%
CD
's C
om
ple
te
Bid
Part
2 S
ite In
frastr
uctu
re 9
5%
& 1
00%
CD
's
Part
2 S
ite In
frastr
ucu
ture
100%
CD
's C
om
ple
te
Skan
ska G
MP
@ 1
00%
CD
's f
or
Part
2 S
ite In
frstc
r
GM
P A
pp
roval fo
r P
art
2 S
ite In
frastr
uctu
re P
kg
.
NT
P f
or
Part
s 2
Sit
e In
frastr
uctu
re P
ackag
e
Su
bm
it &
Ap
pro
ve / F
ab
& D
eliver
Str
uctu
res
Insta
ll &
Main
tain
Ero
sio
n S
ilt
Fen
cin
g
Su
bsta
nti
al C
om
ple
tio
n -
Part
2
Mo
biliz
e f
or
Sit
e In
frastr
uctu
re P
ackag
e
San
itary
Pip
ing
Excavate
/FR
P C
au
sew
ay B
twn
Cen
tral P
on
d 3
00-4
00
Excavate
/FR
P C
au
sew
ay B
twn
Cen
tral P
on
d 4
00-5
00
Sto
rm P
ipin
g &
Str
uctu
res
Ch
ille
d W
ate
r S
& R
Pip
ing
Dew
ate
r/E
xcavate
& L
ine C
en
tral P
on
ds:
300 &
400
Dew
ate
r/ E
xcavate
Sw
ale
@ P
on
ds 5
00, 600A
& 6
00B
Excavate
/FR
P C
au
sew
ay B
twn
Cen
tral P
on
d 2
00-3
00
Po
tab
le W
ate
r / F
ire M
ain
Recla
imed
Wate
r P
ipin
g &
Sle
eves
Data
/ C
om
mu
nic
ati
on
Pri
mary
Ele
ctr
ic S
erv
ice
Gas P
ipin
g &
Valv
es
Pu
ll F
iber
& T
erm
inate
(V
eri
zon
)
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
12JA
N12 1
6:1
7
PT
2A
US
F P
OL
YT
EC
HN
IC
PA
RT
2S
ITE
IN
FR
AS
TR
UC
TU
RE
Sh
ee
t 1
of
2
Page 37
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
P2-2
139
Set
Sw
itches,
X-f
orm
ers
, P
ull
Wire &
Term
(T
EC
O)
15
15
19O
CT
12
08N
OV
12
P2-2
160
Site P
ow
er
Conduit t
o L
ighting/E
merg
ency S
tns.
40
40
19O
CT
12
17D
EC
12
P2-2
170
Irrigation M
ain
s40
40
19O
CT
12
17D
EC
12
ON
OV
DE
CJA
NF
EB
MA
RA
PR
MA
YJU
NJU
LA
UG
SE
PO
CT
NO
VD
EC
J-6
-5-4
-3-2
-11
23
45
67
89
Set
Sw
itch
es, X
-fo
rmers
, P
ull W
ire &
Term
(T
EC
O)
Sit
e P
ow
er
Co
nd
uit
to
Lig
hti
ng
/Em
erg
en
cy S
tns.
Irri
gati
on
Main
s
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
12JA
N12 1
6:1
7
PT
2A
US
F P
OL
YT
EC
HN
IC
PA
RT
2S
ITE
IN
FR
AS
TR
UC
TU
RE
Sh
ee
t 2
of
2
Page 38
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
PR
EC
ON
ST
RU
CT
IO
N P
HA
SE
PA
RT
3:
HA
RD
SC
AP
E/P
AV
ING
, IR
RIG
AT
ION
/LA
ND
SC
AP
ING
GM
P P
RO
CE
SS
P3-1
000
Part
3 H
ard
/Pave/I
rrig
/Land 9
5%
CD
's C
om
ple
te0
009N
OV
11A
P3-1
005
Part
3 H
ard
/Pave/I
rrig
/Land 1
00%
CD
's C
om
ple
te0
027JA
N12*
P3-1
010
Bid
Part
3 H
ard
/Pave/I
rrig
/Land @
100 C
D's
25
25
30JA
N12
02M
AR
12
P3-1
020
Subm
it G
MP
for
Part
3 H
ard
/Pave/I
rrig
/Land
11
11
05M
AR
12
19M
AR
12
P3-1
030
GM
P A
ppro
val fo
r P
art
3 H
ard
/Pave/I
rrig
/Land
15
15
20M
AR
12
09A
PR
12
MIL
ES
TO
NE
S
P3-1
040
NT
P f
or
Site H
ard
scape/P
avin
g/I
rrig
'n/L
andscap'g
00
10A
PR
12
PR
OC
UR
EM
EN
T P
HA
SE
PA
RT
3:
HA
RD
SC
AP
E/P
AV
ING
, IR
RIG
AT
ION
/LA
ND
SC
AP
ING
SIT
E U
TIL
ITIE
S
P3-1
500
Shop D
raw
ing S
ubm
it &
Appro
ve/F
ab &
Deliv
er
90
90
10A
PR
12
15A
UG
12
CO
NS
TR
UC
TIO
N
PA
RT
3:
HA
RD
SC
AP
E/P
AV
ING
, IR
RIG
AT
ION
/LA
ND
SC
AP
ING
MIL
ES
TO
NE
S
P3-1
059
Insta
ll &
Main
tain
Ero
sio
n S
ilt F
encin
g285*
285*
16A
UG
12
01O
CT
13
P3-2
299
Substa
ntial C
om
ple
tion -
Part
30
028N
OV
13
SIT
E U
TIL
ITIE
S
P3-2
070
Mobili
ze f
or
Hard
scape/P
avin
g/I
rrig
'n/L
andscp'g
20
20
16A
UG
12
13S
EP
12
P3-2
080
Insta
ll S
leeves f
or
Futu
re U
tilit
ies
20
20
14S
EP
12
11O
CT
12
P3-2
090
Fin
al G
rade/P
roof-
roll
Rin
g R
oad R
eady f
or
Curb
s20
20
12O
CT
12
08N
OV
12
P3-2
100
Insta
ll C
urb
s @
Rin
g &
Serv
ice R
oad/P
ark
ing L
ots
54
54
09N
OV
12
30JA
N13
P3-2
110
Insta
ll C
rushcre
te B
ase @
Roads &
Park
ing L
ots
50
50
04JA
N13
14M
AR
13
P3-2
065
Sheet
Pile
/Exc/F
RP
Causew
ay @
Ponds 5
00,
600A
&B
60
60
15M
AR
13
07JU
N13
P3-2
150
Rem
ove C
onstr
. A
ccess R
oads &
Cra
ne P
ath
15
15
15M
AR
13
04A
PR
13
P3-2
120
Insta
ll Lig
ht
Pole
Bases
30
30
15M
AR
13
25A
PR
13
P3-2
130
Insta
ll C
anopy T
rees
30
30
15M
AR
13
25A
PR
13
P3-2
160
Insta
ll E
xte
nded H
aul /
Futu
re S
erv
ice R
oad
15
15
22M
AR
13
11A
PR
13
P3-2
140
Insta
ll Lig
ht
Pole
s &
Conducto
rs/T
erm
inate
30
30
05A
PR
13
16M
AY
13
P3-2
170
Dew
ate
r/ E
xcavate
& L
ine P
onds 5
00,
600A
& 6
00B
60
60
12A
PR
13
08JU
L13
P3-2
180
Bra
nch I
rrig
ation,
Valv
es &
Heads
60
60
09JU
L13
01O
CT
13
P3-2
190
Insta
ll P
lants
, S
hru
bs &
Gra
ss
60
60
09JU
L13
01O
CT
13
OC
TN
DJ
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D-6
-5-4
-3-2
-11
23
45
67
89
10
11
12
13
14
15
16
17
18
19
20
21
Part
3 H
ard
/Pave/Irr
ig/L
an
d 9
5%
CD
's C
om
ple
te
Part
3 H
ard
/Pave/Irr
ig/L
an
d 1
00%
CD
's C
om
ple
te
Bid
Part
3 H
ard
/Pave/Irr
ig/L
an
d @
100 C
D's
Su
bm
it G
MP
fo
r P
art
3 H
ard
/Pave/Irr
ig/L
an
d
GM
P A
pp
roval fo
r P
art
3 H
ard
/Pave/Irr
ig/L
an
d
NT
P f
or
Sit
e H
ard
scap
e/P
avin
g/Irr
ig'n
/Lan
dscap
'g
Sh
op
Dra
win
g S
ub
mit
& A
pp
rove/F
ab
& D
eliver
Insta
ll &
Main
tain
Ero
sio
n S
ilt
Fen
cin
g
Su
bsta
nti
al C
om
ple
tio
n -
Part
3
Mo
biliz
e f
or
Hard
scap
e/P
avin
g/Irr
ig'n
/Lan
dscp
'g
Insta
ll S
leeves f
or
Fu
ture
Uti
liti
es
Fin
al G
rad
e/P
roo
f-ro
ll R
ing
Ro
ad
Read
y f
or
Cu
rbs
Insta
ll C
urb
s @
Rin
g &
Serv
ice R
oad
/Park
ing
Lo
ts
Insta
ll C
rush
cre
te B
ase @
Ro
ad
s &
Park
ing
Lo
ts
Sh
eet
Pile/E
xc/F
RP
Cau
sew
ay @
Po
nd
s 5
00, 600A
&B
Rem
ove C
on
str
. A
ccess R
oad
s &
Cra
ne P
ath
Insta
ll L
igh
t P
ole
Bases
Insta
ll C
an
op
y T
rees
Insta
ll E
xte
nd
ed
Hau
l / F
utu
re S
erv
ice R
oad
Insta
ll L
igh
t P
ole
s &
Co
nd
ucto
rs/T
erm
inate
Dew
ate
r/ E
xcavate
& L
ine P
on
ds 5
00, 600A
& 6
00B
Bra
nch
Irr
igati
on
, V
alv
es &
Head
s
Insta
ll P
lan
ts, S
hru
bs &
Gra
ss
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
12JA
N12 1
6:1
4
PT
3A
US
F P
OL
YT
EC
HN
IC
PA
RT
3H
AR
DS
CA
PE
/PA
VIN
G, IR
RIG
AT
ION
/LA
ND
SC
AP
ING
Sh
ee
t 1
of
2
Page 39
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
P3-2
200
Fin
al P
avin
g:
Rin
g &
Serv
ice R
oads/P
ark
ing L
ots
20
20
02O
CT
13
29O
CT
13
P3-2
300
Fin
al R
oadw
ay S
ignage &
Str
ipin
g20
20
30O
CT
13
28N
OV
13
OC
TN
DJ
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D-6
-5-4
-3-2
-11
23
45
67
89
10
11
12
13
14
15
16
17
18
19
20
21
Fin
al P
avin
g:
Rin
g &
Serv
ice R
oad
s/P
ark
ing
Lo
ts
Fin
al R
oad
way S
ign
ag
e &
Str
ipin
g
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
12JA
N12 1
6:1
4
PT
3A
US
F P
OL
YT
EC
HN
IC
PA
RT
3H
AR
DS
CA
PE
/PA
VIN
G, IR
RIG
AT
ION
/LA
ND
SC
AP
ING
Sh
ee
t 2
of
2
Page 40
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
PR
EC
ON
ST
RU
CT
IO
N P
HA
SE
# 5
55 S
CIE
NC
E &
TE
CH
NO
LO
GY
BU
ILD
ING
GM
P P
RO
CE
SS
ST
-1000
# 5
55 S
&T
Build
ing 5
0%
CD
's C
om
ple
te0
028O
CT
11A
ST
-1010
Bid
# 5
55 S
&T
Build
ing @
50%
CD
's33
031O
CT
11A
14D
EC
11A
ST
-1020
Verify
GM
P B
udget
@ 5
0%
CD
's f
or
# 5
55 S
&T
Bld
g.
30
15D
EC
11A
19D
EC
11A
ST
-1022
Receiv
e #
555 S
&T
Build
ing P
rogre
ss S
et
00
14D
EC
11A
ST
-1024
NO
Bid
# 5
55 B
ldg P
rogre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
16
019D
EC
11A
12JA
N12A
ST
-1026
NO
Subm
it G
MP
@ P
rogre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
00
13JA
N12A
ST
-1030
NO
GM
P A
pprv
l @
Pro
gre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
16
013JA
N12A
13JA
N12A
ST
-1035
# 5
55 S
&T
Build
ing 1
00%
CD
's C
om
ple
te0
027JA
N12
ST
-1036
Bid
# 5
55 S
&T
Build
ing @
100%
CD
's f
or
GM
P18
18
30JA
N12
22F
EB
12
ST
-1038
Skanska G
MP
@ 1
00%
CD
's f
or
# 5
55 S
&T
12
12
23F
EB
12
09M
AR
12
ST
-1050
GM
P A
pprv
l @
100%
CD
's f
or
# 5
55 S
&T
Bld
g6
609M
AR
12
16M
AR
12
PE
RM
ITT
ING
ST
-2010
SW
FW
MD
Perm
it30
12
15D
EC
11A
31JA
N12
ST
-2015
FE
DP
Perm
it30
19
15D
EC
11A
09F
EB
12
ST
-2020
Polk
Co.
Health P
erm
it30
19
15D
EC
11A
09F
EB
12
ST
-2000
US
F B
uild
ing P
erm
it20
20
30JA
N12
24F
EB
12
ST
-2005
Sta
te F
ire M
ars
hall
Perm
it30
30
30JA
N12
09M
AR
12
MIL
ES
TO
NE
S
ST
-1040
NT
P f
or
Constu
ction #
555 S
&T
Build
ing
00
19M
AR
12
PR
OC
UR
EM
EN
T P
HA
SE
# 5
55 S
CIE
NC
E &
TE
CH
NO
LO
GY
BU
ILD
ING
BU
ILD
ING
ST
RU
CT
UR
E
ST
-1500
Shop D
wg S
ubm
it &
Appro
ve -
Conc F
dns/S
tructu
re30
30
20M
AR
12
30A
PR
12
ST
-1540
Shop D
wg S
ubm
it &
Appro
ve -
ME
P/F
P C
oord
ination
30
30
20M
AR
12
30A
PR
12
ST
-1505
Shop D
wg S
ubm
it &
Appro
ve -
Cuplo
a S
teel/D
eckin
g45
45
20M
AR
12
21M
AY
12
ST
-1510
Shop D
wg S
ubm
it &
Appro
ve -
Cupola
Slo
ped G
laz'
g45
45
20M
AR
12
21M
AY
12
ST
-1515
Shop D
wg S
ubm
it &
Appro
ve -
Sky L
ights
45
45
20M
AR
12
21M
AY
12
ST
-1520
Shop D
wg S
ubm
it &
Appro
ve -
Perg
ola
s45
45
20M
AR
12
21M
AY
12
ST
-1525
Shop D
wg S
ubm
it &
Appro
ve -
Opera
ble
Shade L
vrs
45
45
20M
AR
12
21M
AY
12
ST
-1530
Shop D
wg S
ubm
it &
Appro
ve -
Perim
ete
r G
laz'
g S
ys
45
45
20M
AR
12
21M
AY
12
ST
-1535
Shop D
wg S
ubm
it &
Appro
ve -
Wate
rpro
ofing /
Roof
45
45
20M
AR
12
21M
AY
12
OC
TN
DJ
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
DJ
-4-3
-2-1
12
34
56
78
910
11
12
13
14
15
16
17
18
19
20
21
22
23
24
# 5
55 S
&T
Bu
ild
ing
50%
CD
's C
om
ple
te
Bid
# 5
55 S
&T
Bu
ild
ing
@ 5
0%
CD
's
Veri
fy G
MP
Bu
dg
et
@ 5
0%
CD
's f
or
# 5
55 S
&T
Bld
g.
Receiv
e #
555 S
&T
Bu
ild
ing
Pro
gre
ss S
et
NO
Bid
# 5
55 B
ldg
Pro
gre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
NO
Su
bm
it G
MP
@ P
rog
ress S
et
- IN
CO
MP
LE
TE
DW
GS
NO
GM
P A
pp
rvl @
Pro
gre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
# 5
55 S
&T
Bu
ild
ing
100%
CD
's C
om
ple
te
Bid
# 5
55 S
&T
Bu
ild
ing
@ 1
00%
CD
's f
or
GM
P
Skan
ska G
MP
@ 1
00%
CD
's f
or
# 5
55 S
&T
GM
P A
pp
rvl @
100%
CD
's f
or
# 5
55 S
&T
Bld
g
SW
FW
MD
Perm
it
FE
DP
Perm
it
Po
lk C
o. H
ealt
h P
erm
it
US
F B
uild
ing
Perm
it
Sta
te F
ire M
ars
hall P
erm
it
NT
P f
or
Co
nstu
cti
on
# 5
55 S
&T
Bu
ild
ing
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Co
nc F
dn
s/S
tru
ctu
re
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
ME
P/F
P C
oo
rdin
ati
on
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Cu
plo
a S
teel/D
eckin
g
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Cu
po
la S
lop
ed
Gla
z'g
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Sky L
igh
ts
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Perg
ola
s
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Op
era
ble
Sh
ad
e L
vrs
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Peri
mete
r G
laz'
g S
ys
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Wate
rpro
ofi
ng
/ R
oo
f
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
11JA
N12 1
4:1
3
SA
TC
US
F P
OL
YT
EC
HN
IC #
555
SC
IEN
CE
& T
EC
HN
OL
OG
Y B
UIL
DIN
GC
OR
E, S
HE
LL
& E
NV
EL
OP
E
Sh
ee
t 1
of
3
Page 41
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
CO
NS
TR
UC
TIO
N
# 5
55 S
CIE
NC
E &
TE
CH
NO
LO
GY
BU
ILD
ING
MIL
ES
TO
NE
S
ST
-2299
Substa
ntial C
om
ple
tion #
555 S
& T
BU
ILD
ING
00
06JA
N14*
UN
DE
RG
RO
UN
D
ST
-3000
ME
P/F
P S
OG
Rough-I
n -
Nort
h25
25
09O
CT
12
12N
OV
12
ST
-3010
ME
P/F
P S
OG
Rough-I
n -
South
25
25
20N
OV
12
28D
EC
12
SL
AB
ON
GR
AD
E
ST
-3020
Wate
r B
arr
ier,
F/R
/P S
OG
- N
ort
h25
25
06N
OV
12
12D
EC
12
ST
-3030
Wate
r B
arr
ier,
F/R
/P S
OG
- S
outh
25
25
20D
EC
12
28JA
N13
BU
ILD
ING
ST
RU
CT
UR
E
ST
-2070
Mobili
ze D
eep F
oundation S
ubcontr
acto
r5
520M
AR
12
26M
AR
12
ST
-2080
Surv
ey &
Insta
ll B
uild
ing C
ontr
ol P
oin
ts5
520M
AR
12
26M
AR
12
ST
-2090
Insta
ll D
eep F
oundation T
est
Rock C
olu
mns
55
27M
AR
12
02A
PR
12
ST
-2100
Sta
tnam
ic T
est
/ R
esults
55
03A
PR
12
09A
PR
12
ST
-2120
Form
& P
our
Concre
te M
ock-u
ps
15
15
10A
PR
12
30A
PR
12
ST
-2110
Insta
ll V
ibro
-Repla
cem
ent
Colu
mns
30
30
10A
PR
12
21M
AY
12
ST
-2130
Excavate
Nort
h B
uild
ing P
ad t
o B
ott
om
of
Ftg
s5
501M
AY
12
07M
AY
12
ST
-2140
F/R
/P N
ort
h B
uild
ing F
ootings /
1st
Lift
Cols
30
30
08M
AY
12
19JU
N12
ST
-2145
F/R
/P N
ort
h B
uild
ing F
tgs/E
levato
rs/S
tairs
30
30
08M
AY
12
19JU
N12
ST
-2180
Backfill
to S
ubgra
de &
Com
pact
- N
ort
h10
10
13JU
N12
26JU
N12
ST
-2190
Shore
&
F/R
/P -
2nd F
loor
Nort
h30
30
27JU
N12
08A
UG
12
ST
-2192
ME
P/F
P -
2nd F
loor
Rough-I
n N
ort
h17
17
12JU
L12
03A
UG
12
ST
-2310
F/R
/P -
2nd F
loor
Colu
mns N
ort
h15
15
06A
UG
12
24A
UG
12
ST
-2370
Str
ip 2
nd F
loor
Shoring -
Nort
h15
15
15A
UG
12
05S
EP
12
ST
-2330
Shore
&
F/R
/P -
Low
er
& U
pper
Apro
n/R
oof
Nort
h30
30
15A
UG
12
26S
EP
12
ST
-2390
Re-S
hore
2nd F
loor
Shoring -
Nort
h15
15
24A
UG
12
14S
EP
12
ST
-2350
ME
P/F
P R
ough-I
n -
Low
er
& U
pper
Apro
n/R
oof
Nort
h17
17
29A
UG
12
21S
EP
12
ST
-2410
Insta
ll M
eta
l P
anel S
yste
m -
Terr
ace F
acia
Nort
h20
20
06S
EP
12
03O
CT
12
ST
-2430
Rem
ove 2
nd F
loor
Re-S
horing -
Nort
h5
502O
CT
12
08O
CT
12
ST
-2450
Str
ip L
ow
er
& U
pper
Apro
n/R
oof
Shoring -
Nort
h15
15
09O
CT
12
29O
CT
12
ST
-2570
Ere
ct
Cupola
Ste
el/M
eta
l D
eck R
oof
- N
ort
h25
25
09O
CT
12
12N
OV
12
ST
-2470
Insta
ll M
eta
l P
anels
: Low
& U
p R
oof
Facia
s N
ort
h20
20
18O
CT
12
14N
OV
12
ST
-2590
Ere
ct
Roof
Cupola
Slo
ped G
lazi
ng S
yste
m -
Nort
h20
20
13N
OV
12
12D
EC
12
OC
TN
DJ
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
DJ
-4-3
-2-1
12
34
56
78
910
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Su
bsta
nti
al C
om
ple
tio
n #
555 S
& T
BU
ILD
ING
ME
P/F
P S
OG
Ro
ug
h-I
n -
No
rth
ME
P/F
P S
OG
Ro
ug
h-I
n -
So
uth
Wate
r B
arr
ier,
F/R
/P S
OG
- N
ort
h
Wate
r B
arr
ier,
F/R
/P S
OG
- S
ou
th
Mo
biliz
e D
eep
Fo
un
dati
on
Su
bco
ntr
acto
r
Su
rvey &
In
sta
ll B
uild
ing
Co
ntr
ol P
oin
ts
Insta
ll D
eep
Fo
un
dati
on
Test
Ro
ck C
olu
mn
s
Sta
tnam
ic T
est
/ R
esu
lts
Fo
rm &
Po
ur
Co
ncre
te M
ock-u
ps
Insta
ll V
ibro
-Rep
lacem
en
t C
olu
mn
s
Excavate
No
rth
Bu
ild
ing
Pad
to
Bo
tto
m o
f F
tgs
F/R
/P N
ort
h B
uild
ing
Fo
oti
ng
s / 1
st
Lif
t C
ols
F/R
/P N
ort
h B
uild
ing
Ftg
s/E
levato
rs/S
tair
s
Backfi
ll t
o S
ub
gra
de &
Co
mp
act
- N
ort
h
Sh
ore
& F
/R/P
- 2
nd
Flo
or
No
rth
ME
P/F
P -
2n
d F
loo
r R
ou
gh
-In
No
rth
F/R
/P -
2n
d F
loo
r C
olu
mn
s N
ort
h
Str
ip 2
nd
Flo
or
Sh
ori
ng
- N
ort
h
Sh
ore
& F
/R/P
- L
ow
er
& U
pp
er
Ap
ron
/Ro
of
No
rth
Re-S
ho
re 2
nd
Flo
or
Sh
ori
ng
- N
ort
h
ME
P/F
P R
ou
gh
-In
- L
ow
er
& U
pp
er
Ap
ron
/Ro
of
No
rth
Insta
ll M
eta
l P
an
el S
yste
m -
Terr
ace F
acia
No
rth
Rem
ove 2
nd
Flo
or
Re-S
ho
rin
g -
No
rth
Str
ip L
ow
er
& U
pp
er
Ap
ron
/Ro
of
Sh
ori
ng
- N
ort
h
Ere
ct
Cu
po
la S
teel/M
eta
l D
eck R
oo
f -
No
rth
Insta
ll M
eta
l P
an
els
: L
ow
& U
p R
oo
f F
acia
s N
ort
h
Ere
ct
Ro
of
Cu
po
la S
lop
ed
Gla
zin
g S
yste
m -
No
rth
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
11JA
N12 1
4:1
3
SA
TC
US
F P
OL
YT
EC
HN
IC #
555
SC
IEN
CE
& T
EC
HN
OL
OG
Y B
UIL
DIN
GC
OR
E, S
HE
LL
& E
NV
EL
OP
E
Sh
ee
t 2
of
3
Page 42
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
ST
-2595
Ere
ct
Sky L
ight
Gla
zing S
yste
m -
Nort
h20
20
13N
OV
12
12D
EC
12
ST
-2490
Ere
ct
Perg
ola
s -
Nort
h30
30
15N
OV
12
02JA
N13
ST
-2730
Perim
ete
r G
lazi
ng S
yste
m
Low
/Upper
Apro
ns N
ort
h30
30
15N
OV
12
02JA
N13
ST
-2710
Insta
ll 1st
Flo
or
Perim
ete
r G
lazi
ng S
yste
m N
ort
h30
30
13D
EC
12
28JA
N13
ST
-2610
Opera
ble
Roof
Shade L
ouvers
- N
ort
h40
40
13D
EC
12
11F
EB
13
ST
-2510
Wate
rpro
of/
Concre
te T
oppin
g @
Terr
ace -
Nort
h15
15
17D
EC
12
09JA
N13
ST
-2630
Cupola
Roof
/ U
pper
& L
ow
er
Apro
n R
oof
- N
ort
h30
30
29JA
N13
11M
AR
13
ST
-2150
Excavate
South
Build
ing P
ad t
o B
ott
om
of
Ftg
s5
522M
AY
12
29M
AY
12
ST
-2160
F/R
/P S
outh
Build
ing F
ootings /
1st
Lift
Cols
30
30
20JU
N12
01A
UG
12
ST
-2170
F/R
/P S
o.B
ldg F
tgs/E
levato
rs/S
tairs/A
ud.
Ris
ers
30
30
20JU
N12
01A
UG
12
ST
-2200
Backfill
to S
ubgra
de &
Com
pact
- S
outh
10
10
26JU
L12
08A
UG
12
ST
-2300
Shore
&
F/R
/P -
2nd F
loor
South
30
30
09A
UG
12
20S
EP
12
ST
-2302
ME
P/F
P -
2nd F
loor
Rough-I
n S
outh
17
17
23A
UG
12
17S
EP
12
ST
-2320
F/R
/P -
2nd F
loor
Colu
mns S
outh
15
15
18S
EP
12
08O
CT
12
ST
-2380
Str
ip 2
nd F
loor
Shoring -
South
15
15
27S
EP
12
17O
CT
12
ST
-2340
Shore
&
F/R
/P -
Low
er
& U
pper
Apro
n/R
oof
South
30
30
27S
EP
12
07N
OV
12
ST
-2400
Re-S
hore
2nd F
loor
Shoring -
South
15
15
08O
CT
12
26O
CT
12
ST
-2360
ME
P/F
P R
ough-I
n -
Low
er
& U
pper
Apro
n/R
oof
South
17
17
11O
CT
12
02N
OV
12
ST
-2420
Insta
ll M
eta
l P
anel S
yste
m -
Terr
ace F
acia
South
20
20
18O
CT
12
14N
OV
12
ST
-2440
Rem
ove 2
nd F
loor
Re-S
horing -
South
55
13N
OV
12
19N
OV
12
ST
-2460
Str
ip L
ow
er
& U
pper
Apro
n/R
oof
Shoring -
South
15
15
20N
OV
12
12D
EC
12
ST
-2580
Ere
ct
Cupola
Ste
el/M
eta
l D
eck R
oof
- S
outh
25
25
20N
OV
12
28D
EC
12
ST
-2480
Insta
ll M
eta
l P
anels
: Low
& U
p R
oof
Facia
s S
outh
20
20
03D
EC
12
02JA
N13
ST
-2600
Ere
ct
Roof
Cupola
Slo
ped G
lazi
ng S
yste
m -
South
20
20
31D
EC
12
28JA
N13
ST
-2605
Ere
ct
Sky L
ight
Gla
zing S
yste
m -
South
20
20
31D
EC
12
28JA
N13
ST
-2500
Ere
ct
Perg
ola
s -
South
30
30
03JA
N13
13F
EB
13
ST
-2740
Perim
ete
r G
lazi
ng S
yste
m
Low
/Upper
Apro
ns S
outh
30
30
03JA
N13
13F
EB
13
ST
-2720
Insta
ll 1st
Flo
or
Perim
ete
r G
lazi
ng S
yste
m S
outh
30
30
29JA
N13
11M
AR
13
ST
-2620
Opera
ble
Roof
Shade L
ouvers
- S
outh
40
40
29JA
N13
25M
AR
13
ST
-2520
Wate
rpro
of/
Concre
te T
oppin
g @
Terr
ace -
South
15
15
31JA
N13
20F
EB
13
ST
-2640
Cupola
Roof
/ U
pper
& L
ow
er
Apro
n R
oof
- S
outh
30
30
12M
AR
13
22A
PR
13
OC
TN
DJ
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
DJ
-4-3
-2-1
12
34
56
78
910
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Ere
ct
Sky L
igh
t G
lazi
ng
Syste
m -
No
rth
Ere
ct
Perg
ola
s -
No
rth
Peri
mete
r G
lazi
ng
Syste
m L
ow
/Up
per
Ap
ron
s N
ort
h
Insta
ll 1
st
Flo
or
Peri
mete
r G
lazi
ng
Syste
m N
ort
h
Op
era
ble
Ro
of
Sh
ad
e L
ou
vers
- N
ort
h
Wate
rpro
of/
Co
ncre
te T
op
pin
g @
Terr
ace -
No
rth
Cu
po
la R
oo
f / U
pp
er
& L
ow
er
Ap
ron
Ro
of
- N
ort
h
Excavate
So
uth
Bu
ild
ing
Pad
to
Bo
tto
m o
f F
tgs
F/R
/P S
ou
th B
uild
ing
Fo
oti
ng
s / 1
st
Lif
t C
ols
F/R
/P S
o.B
ldg
Ftg
s/E
levato
rs/S
tair
s/A
ud
. R
isers
Backfi
ll t
o S
ub
gra
de &
Co
mp
act
- S
ou
th
Sh
ore
& F
/R/P
- 2
nd
Flo
or
So
uth
ME
P/F
P -
2n
d F
loo
r R
ou
gh
-In
So
uth
F/R
/P -
2n
d F
loo
r C
olu
mn
s S
ou
th
Str
ip 2
nd
Flo
or
Sh
ori
ng
- S
ou
th
Sh
ore
& F
/R/P
- L
ow
er
& U
pp
er
Ap
ron
/Ro
of
So
uth
Re-S
ho
re 2
nd
Flo
or
Sh
ori
ng
- S
ou
th
ME
P/F
P R
ou
gh
-In
- L
ow
er
& U
pp
er
Ap
ron
/Ro
of
So
uth
Insta
ll M
eta
l P
an
el S
yste
m -
Terr
ace F
acia
So
uth
Rem
ove 2
nd
Flo
or
Re-S
ho
rin
g -
So
uth
Str
ip L
ow
er
& U
pp
er
Ap
ron
/Ro
of
Sh
ori
ng
- S
ou
th
Ere
ct
Cu
po
la S
teel/M
eta
l D
eck R
oo
f -
So
uth
Insta
ll M
eta
l P
an
els
: L
ow
& U
p R
oo
f F
acia
s S
ou
th
Ere
ct
Ro
of
Cu
po
la S
lop
ed
Gla
zin
g S
yste
m -
So
uth
Ere
ct
Sky L
igh
t G
lazi
ng
Syste
m -
So
uth
Ere
ct
Perg
ola
s -
So
uth
Peri
mete
r G
lazi
ng
Syste
m L
ow
/Up
per
Ap
ron
s S
ou
th
Insta
ll 1
st
Flo
or
Peri
mete
r G
lazi
ng
Syste
m S
ou
th
Op
era
ble
Ro
of
Sh
ad
e L
ou
vers
- S
ou
th
Wate
rpro
of/
Co
ncre
te T
op
pin
g @
Terr
ace -
So
uth
Cu
po
la R
oo
f / U
pp
er
& L
ow
er
Ap
ron
Ro
of
- S
ou
th
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
11JA
N12 1
4:1
3
SA
TC
US
F P
OL
YT
EC
HN
IC #
555
SC
IEN
CE
& T
EC
HN
OL
OG
Y B
UIL
DIN
GC
OR
E, S
HE
LL
& E
NV
EL
OP
E
Sh
ee
t 3
of
3
Page 43
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
PR
EC
ON
ST
RU
CT
IO
N P
HA
SE
# 5
55 S
CIE
NC
E &
TE
CH
NO
LO
GY
BU
ILD
ING
GM
P P
RO
CE
SS
ST
-1000
# 5
55 S
&T
Build
ing 5
0%
CD
's C
om
ple
te0
028O
CT
11A
ST
-1010
Bid
# 5
55 S
&T
Build
ing @
50%
CD
's33
031O
CT
11A
14D
EC
11A
ST
-1020
Verify
GM
P B
udget
@ 5
0%
CD
's f
or
# 5
55 S
&T
Bld
g.
30
15D
EC
11A
19D
EC
11A
ST
-1022
Receiv
e #
555 S
&T
Build
ing P
rogre
ss S
et
00
14D
EC
11A
ST
-1024
NO
Bid
# 5
55 B
ldg P
rogre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
16
019D
EC
11A
12JA
N12A
ST
-1026
NO
Subm
it G
MP
@ P
rogre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
00
13JA
N12A
ST
-1030
NO
GM
P A
pprv
l @
Pro
gre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
16
013JA
N12A
13JA
N12A
ST
-1035
# 5
55 S
&T
Build
ing 1
00%
CD
's C
om
ple
te0
027JA
N12
ST
-1036
Bid
# 5
55 S
&T
Build
ing @
100%
CD
's f
or
GM
P18
18
30JA
N12
22F
EB
12
ST
-1038
Skanska G
MP
@ 1
00%
CD
's f
or
# 5
55 S
&T
12
12
23F
EB
12
09M
AR
12
ST
-1050
GM
P A
pprv
l @
100%
CD
's f
or
# 5
55 S
&T
Bld
g6
609M
AR
12
16M
AR
12
PE
RM
ITT
ING
ST
-2010
SW
FW
MD
Perm
it30
12
15D
EC
11A
31JA
N12
ST
-2015
FE
DP
Perm
it30
19
15D
EC
11A
09F
EB
12
ST
-2020
Polk
Co.
Health P
erm
it30
19
15D
EC
11A
09F
EB
12
ST
-2000
US
F B
uild
ing P
erm
it20
20
30JA
N12
24F
EB
12
ST
-2005
Sta
te F
ire M
ars
hall
Perm
it30
30
30JA
N12
09M
AR
12
MIL
ES
TO
NE
S
ST
-1040
NT
P f
or
Constu
ction #
555 S
&T
Build
ing
00
19M
AR
12
PR
OC
UR
EM
EN
T P
HA
SE
# 5
55 S
CIE
NC
E &
TE
CH
NO
LO
GY
BU
ILD
ING
BU
ILD
ING
ST
RU
CT
UR
E
S2-1
500
Shop D
wg S
ubm
it &
Appro
ve -
Masonry
45
45
21M
AY
12
24JU
L12
S2-1
505
Shop D
wg S
ubm
it &
Appro
ve -
Mill
work
/ C
asew
ork
45
45
21M
AY
12
24JU
L12
S2-1
510
Shop D
wg S
ubm
it &
Appro
ve -
Lab C
asew
ork
45
45
21M
AY
12
24JU
L12
S2-1
515
Shop D
wg S
ubm
it &
Appro
ve -
Firesto
ppin
g45
45
21M
AY
12
24JU
L12
S2-1
520
Shop D
wg S
ubm
it &
Appro
ve -
Win
dow
Tre
atm
ent
45
45
21M
AY
12
24JU
L12
S2-1
525
Shop D
wg S
ubm
it &
Appro
ve -
Meta
l S
tuds/D
ryw
all
45
45
21M
AY
12
24JU
L12
S2-1
530
Shop D
wg S
ubm
it &
Appro
ve -
Acoustical G
rid
45
45
21M
AY
12
24JU
L12
S2-1
535
Shop D
wg S
ubm
it &
Appro
ve -
Hard
Tile
45
45
21M
AY
12
24JU
L12
S2-1
540
Shop D
wg S
ubm
it &
Appro
ve -
HM
Fra
me,
Door
& H
dw
45
45
21M
AY
12
24JU
L12
2011
2012
2013
2014
OC
TND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
M-4
-3-2
-11
23
45
67
89
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
# 5
55 S
&T
Bu
ild
ing
50%
CD
's C
om
ple
te
Bid
# 5
55 S
&T
Bu
ild
ing
@ 5
0%
CD
's
Veri
fy G
MP
Bu
dg
et
@ 5
0%
CD
's f
or
# 5
55 S
&T
Bld
g.
Receiv
e #
555 S
&T
Bu
ild
ing
Pro
gre
ss S
et
NO
Bid
# 5
55 B
ldg
Pro
gre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
NO
Su
bm
it G
MP
@ P
rog
ress S
et
- IN
CO
MP
LE
TE
DW
GS
NO
GM
P A
pp
rvl @
Pro
gre
ss S
et
- IN
CO
MP
LE
TE
DW
GS
# 5
55 S
&T
Bu
ild
ing
100%
CD
's C
om
ple
te
Bid
# 5
55 S
&T
Bu
ild
ing
@ 1
00%
CD
's f
or
GM
P
Skan
ska G
MP
@ 1
00%
CD
's f
or
# 5
55 S
&T
GM
P A
pp
rvl @
100%
CD
's f
or
# 5
55 S
&T
Bld
g
SW
FW
MD
Perm
it
FE
DP
Perm
it
Po
lk C
o. H
ealt
h P
erm
it
US
F B
uild
ing
Perm
it
Sta
te F
ire M
ars
hall P
erm
it
NT
P f
or
Co
nstu
cti
on
# 5
55 S
&T
Bu
ild
ing
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Maso
nry
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Millw
ork
/ C
asew
ork
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Lab
Casew
ork
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Fir
esto
pp
ing
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Win
do
w T
reatm
en
t
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Meta
l S
tud
s/D
ryw
all
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Aco
usti
cal G
rid
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Hard
Tile
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
HM
Fra
me, D
oo
r &
Hd
w
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
11JA
N12 1
4:1
8
SA
T3
US
F P
OL
YT
EC
HN
IC #
555
SC
IEN
CE
& T
EC
HN
OL
OG
Y B
UIL
DIN
GIN
TE
RIO
R B
UIL
D-O
UT
RO
UG
H-I
NS
& F
INIS
HE
SSh
ee
t 1
of
4
Page 44
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
S2-1
545
Shop D
wg S
ubm
it &
Appro
ve -
Carp
et
45
45
21M
AY
12
24JU
L12
S2-1
550
Shop D
wg S
ubm
it &
Appro
ve -
Pain
ting
45
45
21M
AY
12
24JU
L12
S2-1
555
Shop D
wg S
ubm
it &
Appro
ve -
Ele
vato
rs45
45
21M
AY
12
24JU
L12
S2-1
560
Shop D
wg S
ubm
it &
Appro
ve -
Sig
nage
45
45
21M
AY
12
24JU
L12
S2-1
565
Shop D
wg S
ubm
it &
Appro
ve -
HV
AC
Eqpt.
45
45
21M
AY
12
24JU
L12
S2-1
570
Shop D
wg S
ubm
it &
Appro
ve -
Plu
mbin
g F
ixtiure
s45
45
21M
AY
12
24JU
L12
S2-1
575
Shop D
wg S
ubm
it &
Appro
ve -
Fire P
rote
ction S
yst
45
45
21M
AY
12
24JU
L12
S2-1
580
Shop D
wg S
ubm
it &
Appro
ve -
Ele
ctr
ical S
yste
ms
45
45
21M
AY
12
24JU
L12
S2-1
590
Shop D
wg S
ubm
it &
Appro
ve -
Technolo
gy S
yste
ms
45
45
21M
AY
12
24JU
L12
CO
NS
TR
UC
TIO
N
# 5
55 S
CIE
NC
E &
TE
CH
NO
LO
GY
BU
ILD
ING
MIL
ES
TO
NE
S
ST
-2440
Com
ple
te R
em
oval 2nd F
loor
Re-S
horing -
South
00
12N
OV
12*
ST
-3030
Com
ple
te S
OG
- S
outh
00
21JA
N13*
S2-5
999
# 5
55 S
& T
BU
ILD
ING
- W
eath
er
Tig
ht
00
15A
PR
13*
S2-3
999
CE
P O
nlin
e f
or
# 5
55 S
& T
BU
ILD
ING
00
02JU
L13*
S2-4
999
Perm
anent
Pow
er
for
# 5
55 S
& T
BU
ILD
ING
00
03JU
L13*
S2-1
999
Main
Mech R
m A
HU
's O
nlin
e #
555 S
& T
BU
ILD
ING
00
10JU
L13
S2-9
000
Com
ple
te C
om
mis
sio
nin
g
# 5
55 S
& T
BU
ILD
ING
00
27D
EC
13
S2-9
010
Com
ple
te T
est
& B
ala
nce #
555 S
& T
BU
ILD
ING
00
27D
EC
13
ST
-2299
Substa
ntial C
om
ple
tion #
555 S
& T
BU
ILD
ING
00
06JA
N14
ST
-9098
Ow
ner
Move-I
n #
555 S
& T
BU
ILD
ING
00
07JA
N14
ST
-9999
Fin
al C
om
ple
tion #
555 S
& T
BU
ILD
ING
00
05F
EB
14
OT
-1000
Ow
ner
Tra
inin
g22
22
06F
EB
14
07M
AR
14
PC
-1000
Pro
ject
Clo
se-o
ut
32
32
06F
EB
14
21M
AR
14
DM
-1000
Pro
ject
Dem
obili
zation
21
21
24M
AR
14
21A
PR
14
EL
EV
AT
OR
S2-3
000
Insta
ll E
levato
rs 1
& 2
60
60
05JU
L13
27S
EP
13
INT
ER
IOR
BU
ILD
-OU
T R
OU
GH
-IN
S &
FIN
ISH
ES
S2-2
000
Insta
ll M
asnory
Walls
@ E
lev.
Shaft
- 1
st
Fl N
&S
10
10
13N
OV
12
28N
OV
12
S2-2
015
Insta
ll A
HU
's &
Boile
rs/P
rote
ct
- N
&S
20
20
22JA
N13
18F
EB
13
S2-2
020
Insta
ll C
MU
/HM
Fra
mes @
Mech R
oom
s -
1st
Fl N
&S
30
30
12F
EB
13
25M
AR
13
S2-2
050
Insta
ll O
/H M
EP
/FP
R/I
@ M
ech R
ms -
1st
Fl N
&S
45
45
05M
AR
13
06M
AY
13
S2-2
025
Stu
ds/H
M F
ram
e B
ath
Walls
- 1
st
Fl -
N&
S10
10
26M
AR
13
08A
PR
13
2011
2012
2013
2014
OC
TND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
M-4
-3-2
-11
23
45
67
89
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Carp
et
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Pain
tin
g
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Ele
vato
rs
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Sig
nag
e
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
HV
AC
Eq
pt.
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Plu
mb
ing
Fix
tiu
res
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Fir
e P
rote
cti
on
Syst
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Ele
ctr
ical S
yste
ms
Sh
op
Dw
g S
ub
mit
& A
pp
rove -
Tech
no
log
y S
yste
ms
Co
mp
lete
Rem
oval 2n
d F
loo
r R
e-S
ho
rin
g -
So
uth
Co
mp
lete
SO
G -
So
uth
# 5
55 S
& T
BU
ILD
ING
- W
eath
er
Tig
ht
CE
P O
nlin
e f
or
# 5
55 S
& T
BU
ILD
ING
Perm
an
en
t P
ow
er
for
# 5
55 S
& T
BU
ILD
ING
Main
Mech
Rm
AH
U's
On
lin
e #
555 S
& T
BU
ILD
ING
Co
mp
lete
Co
mm
issio
nin
g # 5
55 S
& T
BU
ILD
ING
Co
mp
lete
Test
& B
ala
nce #
555 S
& T
BU
ILD
ING
Su
bsta
nti
al C
om
ple
tio
n #
555 S
& T
BU
ILD
ING
Ow
ner
Mo
ve-I
n #
555 S
& T
BU
ILD
ING
Fin
al C
om
ple
tio
n #
555 S
& T
BU
ILD
ING
Ow
ner
Tra
inin
g
Pro
ject
Clo
se-o
ut
Pro
ject
Dem
ob
iliz
ati
on
Insta
ll E
levato
rs 1
& 2
Insta
ll M
asn
ory
Walls @
Ele
v. S
haft
- 1
st
Fl N
&S
Insta
ll A
HU
's &
Bo
ilers
/Pro
tect
- N
&S
Insta
ll C
MU
/HM
Fra
mes @
Mech
Ro
om
s -
1st
Fl N
&S
Insta
ll O
/H M
EP
/FP
R/I @
Mech
Rm
s -
1st
Fl N
&S
Stu
ds/H
M F
ram
e B
ath
Walls -
1st
Fl -
N&
S
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
11JA
N12 1
4:1
8
SA
T3
US
F P
OL
YT
EC
HN
IC #
555
SC
IEN
CE
& T
EC
HN
OL
OG
Y B
UIL
DIN
GIN
TE
RIO
R B
UIL
D-O
UT
RO
UG
H-I
NS
& F
INIS
HE
SSh
ee
t 2
of
4
Page 45
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
S2-2
030
Stu
ds/H
M F
ram
e E
lec.
& M
DF
Walls
- 1
st
Fl -
N&
S10
10
26M
AR
13
08A
PR
13
S2-2
035
Stu
ds/H
M F
ram
e C
ord
or/
CR
Walls
- 1
st
Fl -
N&
S20
20
09A
PR
13
06M
AY
13
S2-2
065
Insta
ll O
/H &
In-W
all
ME
P/F
P R
/I -
1st
Fl N
&S
50
50
09A
PR
13
18JU
N13
S2-2
027
Fra
me C
eili
ngs @
Bath
room
s -
1st
Fl -
N&
S10
10
19JU
N13
02JU
L13
S2-2
037
Fra
me C
eili
ngs @
Corr
idors
- 1
st
Fl -
N&
S30
30
19JU
N13
31JU
L13
S2-2
039
Fra
me C
eili
ngs @
Auditorium
- 1
st
Fl -
South
45
45
19JU
N13
21A
UG
13
S2-2
090
H&
F D
ryw
all
Walls
@ C
lassro
om
s -
1st
Fl N
&S
45
45
11JU
L13
12S
EP
13
S2-3
210
H&
F D
ryw
all
@ B
ath
s &
Corr
idors
- 1
st
Fl -
N&
S45
45
25JU
L13
26S
EP
13
S2-2
075
H&
F D
ryw
all
@ A
uditorium
- 1
st
Fl -
South
30
30
15A
UG
13
26S
EP
13
S2-2
095
Pain
t D
ryw
all
Walls
@ C
lassro
om
s -
1st
Fl N
&S
10
10
06S
EP
13
19S
EP
13
S2-2
080
Pain
t B
ath
s,
Corr
idors
& A
ud.
- 1st
Fl -
N&
S20
20
06S
EP
13
03O
CT
13
S2-4
010
Insta
ll A
CT
Grid @
Cla
ssro
om
s -
1st
Fl N
&S
20
20
13S
EP
13
10O
CT
13
S2-2
085
Cera
mic
Tile
Bath
room
s.
- 1st
Fl -
N&
S20
20
20S
EP
13
17O
CT
13
S2-4
015
ME
P/F
P T
rim
-Out
- 1st
Fl N
&S
30
30
20S
EP
13
31O
CT
13
S2-5
000
Dro
p C
eili
ng T
ile -
1st
Fl N
&S
30
30
20S
EP
13
31O
CT
13
S2-2
088
Plu
mbin
g F
ixtu
res -
1st
Fl -
N&
S20
20
04O
CT
13
31O
CT
13
S2-6
000
Flo
or
Polis
h T
reatm
ent
- 1st
Fl N
&S
35
35
11O
CT
13
02D
EC
13
S2-2
092
Bath
& M
isc.
Specia
ltie
s -
1st
Fl -
N&
S20
20
18O
CT
13
14N
OV
13
S2-6
020
Casew
ork
/Mill
work
- 1
st
Fl N
&S
35
35
18O
CT
13
09D
EC
13
S2-6
230
Lab C
asew
ork
- 1
st
Fl N
&S
35
35
18O
CT
13
09D
EC
13
S2-6
300
Insta
ll D
oors
& H
ard
ware
- 1
st
Fl N
&S
35
35
18O
CT
13
09D
EC
13
S2-6
400
Win
doow
Tre
atm
ents
- 1
st
Fl N
&S
10
10
03D
EC
13
16D
EC
13
S2-6
420
Fin
al P
ain
ting -
1st
Fl N
&S
15
15
10D
EC
13
02JA
N14
S2-6
440
Insta
ll S
ignage -
1st
Fl N
&S
15
15
10D
EC
13
02JA
N14
S2-6
460
Fin
al C
leanin
g -
1st
Fl N
&S
15
15
10D
EC
13
02JA
N14
S2-2
010
Insta
ll M
asnory
Walls
@ E
lev.
Shaft
- 2
nd F
l N
&S
10
10
29N
OV
12
12D
EC
12
S2-2
040
Stu
ds/H
M F
ram
e B
ath
Walls
- 2
nd F
l -
N&
S10
10
09A
PR
13
22A
PR
13
S2-2
045
Stu
ds/H
M F
ram
e E
lec.
& M
DF
Walls
- 2
nd F
l -
N&
S10
10
09A
PR
13
22A
PR
13
S2-2
235
Stu
ds/H
M F
ram
e P
art
itio
n W
alls
- 2
nd F
l -
N&
S20
20
23A
PR
13
20M
AY
13
S2-2
265
Insta
ll O
/H &
In-W
all
ME
P/F
P R
/I -
2nd F
l N
&S
50
50
23A
PR
13
02JU
L13
S2-2
047
Fra
me C
eili
ngs @
Bath
room
s -
2nd F
l -
N&
S10
10
03JU
L13
17JU
L13
S2-2
059
Fra
me C
upola
Hig
h C
eili
ngs -
2nd F
l -
N&
S30
30
03JU
L13
14A
UG
13
S2-2
057
Fra
me C
eili
ngs -
2nd F
l -
N&
S45
45
03JU
L13
05S
EP
13
S2-4
050
H&
F D
ryw
all
@ B
ath
room
s -
2nd F
l -
N&
S10
10
18JU
L13
31JU
L13
2011
2012
2013
2014
OC
TND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
M-4
-3-2
-11
23
45
67
89
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Stu
ds/H
M F
ram
e E
lec. &
MD
F W
alls -
1st
Fl -
N&
S
Stu
ds/H
M F
ram
e C
ord
or/
CR
Walls -
1st
Fl -
N&
S
Insta
ll O
/H &
In
-Wall M
EP
/FP
R/I -
1st
Fl N
&S
Fra
me C
eilin
gs @
Bath
roo
ms -
1st
Fl -
N&
S
Fra
me C
eilin
gs @
Co
rrid
ors
- 1
st
Fl -
N&
S
Fra
me C
eilin
gs @
Au
dit
ori
um
- 1
st
Fl -
So
uth
H&
F D
ryw
all W
alls @
Cla
ssro
om
s -
1st
Fl N
&S
H&
F D
ryw
all @
Bath
s &
Co
rrid
ors
- 1
st
Fl -
N&
S
H&
F D
ryw
all @
Au
dit
ori
um
- 1
st
Fl -
So
uth
Pain
t D
ryw
all W
alls @
Cla
ssro
om
s -
1st
Fl N
&S
Pain
t B
ath
s, C
orr
ido
rs &
Au
d. -
1st
Fl -
N&
S
Insta
ll A
CT
Gri
d @
Cla
ssro
om
s -
1st
Fl N
&S
Cera
mic
Tile B
ath
roo
ms. -
1st
Fl -
N&
S
ME
P/F
P T
rim
-Ou
t -
1st
Fl N
&S
Dro
p C
eilin
g T
ile -
1st
Fl N
&S
Plu
mb
ing
Fix
ture
s -
1st
Fl -
N&
S
Flo
or
Po
lish
Tre
atm
en
t -
1st
Fl N
&S
Bath
& M
isc. S
pecia
ltie
s -
1st
Fl -
N&
S
Casew
ork
/Millw
ork
- 1
st
Fl N
&S
Lab
Casew
ork
- 1
st
Fl N
&S
Insta
ll D
oo
rs &
Hard
ware
- 1
st
Fl N
&S
Win
do
ow
Tre
atm
en
ts -
1st
Fl N
&S
Fin
al P
ain
tin
g -
1st
Fl N
&S
Insta
ll S
ign
ag
e -
1st
Fl N
&S
Fin
al C
lean
ing
- 1
st
Fl N
&S
Insta
ll M
asn
ory
Walls @
Ele
v. S
haft
- 2
nd
Fl N
&S
Stu
ds/H
M F
ram
e B
ath
Walls -
2n
d F
l -
N&
S
Stu
ds/H
M F
ram
e E
lec. &
MD
F W
alls -
2n
d F
l -
N&
S
Stu
ds/H
M F
ram
e P
art
itio
n W
alls -
2n
d F
l -
N&
S
Insta
ll O
/H &
In
-Wall M
EP
/FP
R/I -
2n
d F
l N
&S
Fra
me C
eilin
gs @
Bath
roo
ms -
2n
d F
l -
N&
S
Fra
me C
up
ola
Hig
h C
eilin
gs -
2n
d F
l -
N&
S
Fra
me C
eilin
gs -
2n
d F
l -
N&
S
H&
F D
ryw
all @
Bath
roo
ms -
2n
d F
l -
N&
S
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
11JA
N12 1
4:1
8
SA
T3
US
F P
OL
YT
EC
HN
IC #
555
SC
IEN
CE
& T
EC
HN
OL
OG
Y B
UIL
DIN
GIN
TE
RIO
R B
UIL
D-O
UT
RO
UG
H-I
NS
& F
INIS
HE
SSh
ee
t 3
of
4
Page 46
Acti
vit
y
ID
Cal
ID
Acti
vit
y
Descri
pti
on
Ori
g
Du
r
Rem
Du
r
Earl
y
Sta
rt
Earl
y
Fin
ish
S2-4
060
H&
F D
ryw
all
@ C
upola
Hig
h C
lngs -
2nd F
l -
N&
S35
35
18JU
L13
05S
EP
13
S2-4
059
Pain
t B
ath
room
s -
2nd F
l -
N&
S10
10
25JU
L13
07A
UG
13
S2-4
070
H&
F D
ryw
all
- 2nd F
l -
N&
S45
45
25JU
L13
26S
EP
13
S2-4
069
Pain
t @
Cupola
Hig
h C
lngs -
2nd F
l -
N&
S10
10
29A
UG
13
12S
EP
13
S2-4
079
Pain
t D
ryw
all
- 2nd F
l -
N&
S20
20
06S
EP
13
03O
CT
13
S2-4
080
Acoustical P
anels
@ C
upola
- 2
nd F
l -
N&
S25
25
13S
EP
13
17O
CT
13
S2-2
087
Cera
mic
Tile
Bath
room
s.
- 2nd F
l -
N&
S20
20
20S
EP
13
17O
CT
13
S2-4
065
ME
P/F
P T
rim
-Out
- 2nd F
l N
&S
20
20
20S
EP
13
17O
CT
13
S2-2
097
Plu
mbin
g F
ixtu
res -
2nd F
l -
N&
S20
20
04O
CT
13
31O
CT
13
S2-2
099
Bath
& M
isc.
Specia
ltie
s -
2ndF
l -
N&
S20
20
18O
CT
13
14N
OV
13
S2-6
010
Flo
or
Polis
h T
reatm
ent
- 2nd F
l N
&S
20
20
18O
CT
13
14N
OV
13
S2-6
030
Casew
ork
/Mill
work
- 2
nd F
l N
&S
20
20
25O
CT
13
25N
OV
13
S2-6
310
Insta
ll D
oors
& H
ard
ware
- 2
nd F
l N
&S
20
20
25O
CT
13
25N
OV
13
S2-6
320
Carp
et
- 2nd F
l N
&S
20
20
25O
CT
13
25N
OV
13
S2-6
410
Insta
ll G
lass F
old
ing D
oors
- 2
nd F
l N
&S
20
20
08N
OV
13
09D
EC
13
S2-6
430
Win
doow
Tre
atm
ents
- 2
nd F
l N
&S
55
15N
OV
13
25N
OV
13
S2-6
500
Fin
al P
ain
ting -
2nd F
l N
&S
20
20
26N
OV
13
23D
EC
13
S2-6
510
Insta
ll S
ignage -
2nd F
l N
&S
20
20
26N
OV
13
23D
EC
13
S2-6
520
Fin
al C
leanin
g -
2nd F
l N
&S
27
27
26N
OV
13
06JA
N14
TE
ST
ING
& C
OM
PL
ET
ION
S2-7
000
Build
ing C
om
mis
sio
nin
g45
45
22O
CT
13
27D
EC
13
S2-7
010
Test
& B
ala
nce
22
22
26N
OV
13
27D
EC
13
2011
2012
2013
2014
OC
TND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
M-4
-3-2
-11
23
45
67
89
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
H&
F D
ryw
all @
Cu
po
la H
igh
Cln
gs -
2n
d F
l -
N&
S
Pain
t B
ath
roo
ms -
2n
d F
l -
N&
S
H&
F D
ryw
all -
2n
d F
l -
N&
S
Pain
t @
Cu
po
la H
igh
Cln
gs -
2n
d F
l -
N&
S
Pain
t D
ryw
all -
2n
d F
l -
N&
S
Aco
usti
cal P
an
els
@ C
up
ola
- 2
nd
Fl -
N&
S
Cera
mic
Tile B
ath
roo
ms. -
2n
d F
l -
N&
S
ME
P/F
P T
rim
-Ou
t -
2n
d F
l N
&S
Plu
mb
ing
Fix
ture
s -
2n
d F
l -
N&
S
Bath
& M
isc. S
pecia
ltie
s -
2n
dF
l -
N&
S
Flo
or
Po
lish
Tre
atm
en
t -
2n
d F
l N
&S
Casew
ork
/Millw
ork
- 2
nd
Fl N
&S
Insta
ll D
oo
rs &
Hard
ware
- 2
nd
Fl N
&S
Carp
et
- 2n
d F
l N
&S
Insta
ll G
lass F
old
ing
Do
ors
- 2
nd
Fl N
&S
Win
do
ow
Tre
atm
en
ts -
2n
d F
l N
&S
Fin
al P
ain
tin
g -
2n
d F
l N
&S
Insta
ll S
ign
ag
e -
2n
d F
l N
&S
Fin
al C
lean
ing
- 2
nd
Fl N
&S
Bu
ild
ing
Co
mm
issio
nin
g
Test
& B
ala
nce
© P
rim
avera
Syste
ms,
Inc.
Data
Date
16JA
N12
Run D
ate
11JA
N12 1
4:1
8
SA
T3
US
F P
OL
YT
EC
HN
IC #
555
SC
IEN
CE
& T
EC
HN
OL
OG
Y B
UIL
DIN
GIN
TE
RIO
R B
UIL
D-O
UT
RO
UG
H-I
NS
& F
INIS
HE
SSh
ee
t 4
of
4
Page 47
Appendix Three – Site Logistics Plans
USF Polytechnic Building 555 – Innovation Science and Technology GMP Proposal – 50% Construction Documents Lakeland, Florida December 22, 2011
Project Name GMP Proposal
Client Name Location, North Carolina
Month, Year
Page 48
CAMPUS PLANNING AND FACILITIES OPERATIONSPOLYTECHNIC
P:\9
019
USF
P In
fras
truc
ture
\CAD
\Exh
ibits
\Con
stru
ctio
n Ph
ases
\901
9-PL
N-I
LLU
STRAT
IVE.
dwg,
C1.
00, 6
/29/
2011
3:2
8:50
PM
, rriv
era,
1:1
, and
erso
nlan
e, in
c.
PART
1 S
ITE
LOG
ISTI
CS P
LAN
Oct
ober
201
1 - J
anua
ry 2
013
Scie
nce
& T
echn
olog
yBu
ildin
g
Futu
re R
esid
ence
Hal
lCent
ral E
nerg
y Pl
ant
Build
ing
Pads
Part
1 C
onst
ruct
ion
Entr
ance
Roa
dway
Unl
ined
Bor
row
Pits
& S
ettl
emen
t Pon
ds
Layd
own
Are
as
Part
1 C
onst
ruct
ion
Park
ing
Con
stru
ctio
n Tr
aile
rs &
Wel
l
Tem
pora
ry E
lect
ric
Serv
ice
Tem
pora
ry W
ater
Ser
vice
LEGEN
D
Layd
own
Are
a
Layd
own
Are
a
Stud
ent
Wel
lnes
sCe
nter
#3#6
#5
#2#1
#4#7
USF
Polytechnic-SkanskaProject#239016
4700ResearchWay
Lakeland,FL33815
RickLee-Sr.Superintendent-813-917-1839
DavidCalhoun-ProjectEngineer-863-412-8374
JakeKrehbiel-ProjectManager-813-477-6660
MeoiPlummer-ProjectManager-813-918-2616
MarkMcLaughlin-ProjectExecutive-813-267-3857
ChuckJablon-VPOperations-813-477-5874
SafetyKleen-SpillVendor-888-375-5336
SkanskaField
Office
AED/1stAidKit/
SpillKit
WeatherEmergency
Evacuationlocations
Fire/Explosion
Evacuation
Location
1/12/11Rev
Page 49
CAMPUS PLANNING AND FACILITIES OPERATIONSPOLYTECHNIC
P:\9
019
USF
P In
fras
truc
ture
\CAD
\Exh
ibits
\Con
stru
ctio
n Ph
ases
\901
9-PL
N-I
LLU
STRAT
IVE.
dwg,
C1.
00, 6
/29/
2011
3:2
8:50
PM
, rriv
era,
1:1
, and
erso
nlan
e, in
c.
PART
2 S
ITE
LOG
ISTI
CS P
LAN
Janu
ary
2013
- Ja
nuar
y 20
14
Scie
nce
& T
echn
olog
yBu
ildin
g
Stud
ent
Wel
lnes
sCe
nter
Futu
re R
esid
ence
Hal
lCent
ral E
nerg
y Pl
ant
Build
ing
Pads
Part
2 C
onst
ruct
ion
Entr
ance
Roa
dway
Unl
ined
Bor
row
Pits
& S
ettl
emen
t Pon
ds
Layd
own
Are
as
Part
1 C
onst
ruct
ion
Park
ing
Rel
ocat
ed C
onst
ruct
ion
Trai
lers
Tem
pora
ry E
lect
ric
Serv
ice
Tem
pora
ry W
ater
Ser
vice
LEGEN
D
Layd
own
Are
a
Tem
pora
ry P
orta
ble
Resi