Top Banner
CONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 – July 2014 DATE PROJECT CLIENT RESPONSIBILITIES Landscape Design 1999 Landscape design of House Goosen Dr. JJ Goosen – Emerentia Johannesburg Concept & Development Sketch Plan Design 1999 Landscape design and implementation of House Breedlove Prof. G. Breedlove Sketch Plan Design and landscape construction 1999 Landscape design and implementation of House K Metz & House J Metz Mrs K Metz & Ms’ J Metz Sketch Plan Design and landscape construction 2004 Development of Environmental Management Plans (EMP) with accompanying Master Development Plans for the proposed township establishments, Ga-Rankuwa X 17 and Botshabelo R 1 City of Tshwane Metropolitan Municipality Development of EMP report graphics and report compilation. Development of the Master Landscape Development Plan and associated technical specifications for the various order of township roads and parks 2006 House Jooste Landscape Sketch Plan Development Mr JJ Jooste Client liaison, sketch plan design with associated technical specifications, landscape contractor management 2006 Tijger Valley Residential Development Master Landscape Development Plan and Sketch Plan Beverley Developments (PTY) Ltd. Liaison with Town Planner and other Specialists, Development of a Master Landscape Development Plan and Sketch Plan Design for the Tijger Valley Residential Development in line with the conditions with the environmental authorization 2007 Feather Falls Residential Estate Master Development Plan and detail Sketch Plan Design Dolphin Trust Development of the Master Landscape Development Plan and associated technical specifications
19

DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

Sep 28, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

CONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 – July 2014

DATE PROJECT CLIENT RESPONSIBILITIES

Landscape Design

1999 Landscape design of House Goosen Dr. JJ Goosen – Emerentia Johannesburg

Concept & Development Sketch Plan Design

1999 Landscape design and implementation of House Breedlove Prof. G. Breedlove Sketch Plan Design and landscape construction

1999 Landscape design and implementation of House K Metz & House J Metz Mrs K Metz & Ms’ J Metz Sketch Plan Design and landscape construction

2004 Development of Environmental Management Plans (EMP) with accompanying Master Development Plans for the proposed township establishments, Ga-Rankuwa X 17 and Botshabelo R 1

City of Tshwane Metropolitan Municipality

Development of EMP report graphics and report compilation. Development of the Master Landscape Development Plan and associated technical specifications for the various order of township roads and parks

2006 House Jooste Landscape Sketch Plan Development Mr JJ Jooste

Client liaison, sketch plan design with associated technical specifications, landscape contractor management

2006 Tijger Valley Residential Development Master Landscape Development Plan and Sketch Plan

Beverley Developments (PTY) Ltd.

Liaison with Town Planner and other Specialists, Development of a Master Landscape Development Plan and Sketch Plan Design for the Tijger Valley Residential Development in line with the conditions with the environmental authorization

2007 Feather Falls Residential Estate Master Development Plan and detail Sketch Plan Design

Dolphin Trust

Development of the Master Landscape Development Plan and associated technical specifications

Page 2: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

2008 N4 Gateway Light Industrial Park Landscape Development Plan Uniqon Wonings (PTY) Ltd.

Development of a Master Landscape Development Plan for the Tijger Valley Residential Development in line with the conditions with the environmental authorization

2010 Development of Technical Design & Planting Specifications for the Landscaped Roofs at the 360˚ Kransberg Highlands International Green Estate

EcoZa PTY Ltd.

Development of the technical specifications for the planting of natural grass on the roofs of the entrance feature and other lodges at the estate

2011 Beyers Naude Square, Johannesburg Inner City Landscape Development Plan

MDCC Architects for Johannesburg Development Agency

Development of the Landscape Development Plan and associated technical specifications

2011 Detail Sketch Plan Design: House Badenhorst Val de Vie Polo Estate, Paarl

Mr AHB Badenhorst

Development of the Sketch Plan Design and associated technical specifications

2012 Development of Technical Planting Specifications for the new USAID Office Complex, Pretoria

BCK Land Planning & Design

Development of the Plant List Detail for inclusion in the technical detailing of the landscape designs

2012 Development of a Landscape Rehabilitation Plan for a Section of the Waterkloofspruit at the St Albans College, Pretoria

St Albans College

Environmental Status Quo Report, Development of the Landscape Development Plan and associated technical specifications for rehabilitation, Implementation supervision

2013 Steve Tshwete Local Municipality Open Space Management Classifications

BCK Land Planning & Design

Screening of local (Tshwane) open space examples against status quo framework , update of the framework and project administration

2014 Development of a Landscape Rehabilitation Plan for a Section of the Waterkloofspruit at the St Albans College, Pretoria

Riverbend Properties (Pty) Ltd.

Environmental Status Quo Report, Development of the Landscape Development Plan and associated technical specifications for rehabilitation

Landscape Construction Site Inspections

Various

Site inspections during the installation of various landscape construction projects, liaison with sub-contractors, quality control, site handovers etc.

Page 3: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

Tourism Developments

2000

Ecotourism Management Plan: Mkambati Nature Reserve

Project as Part of Master Degree Program at the Centre for Africa Tourism – University of Pretoria

Eastern Cape Provincial Department of Nature Conservation

Development of Practical Guidelines for Eco Tourism Development at the Mkambati Nature Reserve

2000 Maphelana Community Tourism Programme Uthungulu Resorts & Leisure

Development of a community based Eco Tourism venture

Field Research

2001

University of Pretoria & Dept. of Environmental Affairs & Tourism joint projects – Development of the Geographic Information Systems (GIS) based Environmental and Tourism Potential Atlas (ENPAT & TOURPAT)

University of Pretoria

Researching and developing a database of the major conflicts in South Africa since European settlement

2001 - 2002

University of Pretoria & Dept. of Environmental Affairs & Tourism joint projects – Development of the Geographic Information Systems (GIS) based Environmental Potential Atlas (ENPAT)

University of Pretoria

Field research and data collection in terms of the significant heritage resources in the Maputaland region

2002 - 2003

University of Pretoria & Dept. of Environmental Affairs & Tourism joint projects – Development of the Geographic Information Systems (GIS) based Environmental Potential Atlas (ENPAT)

University of Pretoria

Data capture for ENPAT Heritage resources database

Environmental Impact Assessment

2003 Part time position at @Land Landscape Architects & Environmental Consultants

@Land Landscape Architects & Environmental Consultants:

GIS Digitizing & Data Capture, General Impact Assessment administration (Preparation of materials for public participation, reporting, printing etc.)

2003 Environmental Impact Evaluations for the proposed township establishments Ga-Rankuwa X 17 and Botshabelo R1

City of Tshwane Metropolitan Municipality

Finalization of impact assessment and compilation of final report

2003 Applications for Exemption from EIA Regulations for various cellular masts and Infrastructure for Cell C, Gauteng

Siemens Telecommunications (Pty) Ltd.

Public participation process, development of report graphics, report compilation and management of GDACE authorization process

2003 Environmental Management Programme Report (EMPR) for the mining of Granite on several farms in the Brits/Rustenberg District, North West Province

Keeley Granite (Pty) Ltd.

Consultation with specialist consultants, support with the facilitation of the public participation process, development of report graphics, report compilation and management of the NW DME authorization process, development of rehabilitation mitigation measures for the waste rock dumps

Page 4: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

2003 Environmental Impact Management process for the proposed Maps Chromium Oxide Production Facility, Ekandustria, Mpumalanga

Tshwane Specialised Products

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation and management of the Mpumalanga DACE authorization process

2003

Environmental Impact Management process (Scoping Report) for a proposed tourism resort and silk farm development on Portion 21 of the farm Antioch 240 KT, Hoedspruit District, Limpopo Province

Spanish Ice Properties (Pty) Ltd.

Consultation with specialist consultants, support with the facilitation of the public participation, development of report graphics, report compilation and management of the NP DACE authorization process

2004 Applications for Exemption from the EIA Regulations for various cellular masts and infrastructure for Cell C, Eastern Cape and Western Cape Provinces

Mergent Technologies (Pty) LTD.

Consultation with WC and EC Environmental authorities and pre consultation meetings to establish their requirements, Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation and management of the WC & EC DACE authorization process

2004 Environmental Management Programme (EMP) for the mining of granite on the farm Elandsfontein 440 JQ, Brits District, North West Province

Keeley Granite (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation management of the NW DME authorization process and development of rehabilitation mitigation measures for the waste rock dumps

2004 Environmental Impact Management Process for the proposed Nursery and Tea Garden development on Portion 382 of the farm Zwavelpoort 373 JR, Pretoria East

Reg Botha Landscape Designs cc.

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation and management of the GDACE authorization process

2005 Environmental Management Process for the proposed Outfall Sewer, Sewer Pump Station, Sewer Pump Line and Storm Water Channel: Ga-Rankuwa units 23, 24 & 25

City of Tshwane Metropolitan Municipality

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report

Page 5: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

graphics, report compilation and management of the NW DACE authorization process

2005 Environmental Management Programme (EMP) for the mining of granite on the farm Hoekfontein 432 JQ, Brits District, North West Province (Extension of mining area and mining license)

Keeley Granite (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation management of the NW DME authorization process and development of rehabilitation mitigation measures for the waste rock dumps

2005 Environmental Impact Evaluation (Scoping Report) for the proposed township establishment, Sekampaneng, Hammanskraal, North West Province

City of Tshwane Metropolitan Municipality

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the NW DACE authorization process

2005 Environmental Management Programme (EMP) for the mining of granite in the Bakenberg area, Mokerong District, Mokopane, Limpopo Province

Keeley Granite (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, DWAF Water Use Application, report compilation management of the Limpopo DME authorization process and development of rehabilitation mitigation measures for the waste rock dumps

2005 Environmental Impact Evaluation (Exemption application) for the proposed township establishment, Kudube 3742, Hammanskraal, North West Province

City of Tshwane Metropolitan Municipality

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the NW DACE authorization process

2005 Environmental application and impact management process (scoping report) for the proposed Cultura Park Ext 1 development, Bronkhorstpruit, Gauteng Province

Klipeiland (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the GDACE authorization

Page 6: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

process

2005 Environmental Imapct Management Process (scoping report) for the proposed resort development on portion 38 of the farm Aventura, Middelburg District, Mpumalanga Province

Mr P Coetzee

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation and management of the Mpumalanga DALA authorization process

2005 Environmental Management Programme (EMP) for the mining of granite in the Djsate area, Greater Tubatse District, Sekukhuneland, Limpopo Province

Keeley Granite (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWAF Water Use Application, report compilation, management of the Limpopo DME authorization process and development of rehabilitation mitigation measures for the waste rock dumps

2005 Environmental application and impact management process for the proposed Hogsback township development – visual impact assessment & professional consultation

AGES (Pty) LTD.

Site Reconnaissance and collection of physical site characteristic data, compilation of photographic record of the visual context of the site surroundings for the VIA. Assistance with the integration of this information into the Scoping Report

2006

Environmental Impact Management Process (Exemption and Scoping Report applications) for various cellular masts and telecommunications infrastructure for Cell C – Free State, Eastern Cape, Mpumalanga, Limpopo, North West and Gauteng Provinces

Cell C (Pty) LTD.

Consultation with the various Environmental authorities and pre consultation meetings to establish their requirements, Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the DACE authorization process

2006 Environmental Impact Assessment Process (Scoping Report application) for the proposed township development on the Remainder of the farm Driehoek 275 IS, Secunda, Mpumalanga Province

SASOL Dorpsontwikkeling (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the Mpumalanga DALA authorization process

Page 7: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

2006 Environmental application and impact management process for the proposed estate development on the remainder of the farm Hondspoort 625 JR, Bronkhorstspruit area, Gauteng Province

Vredevors Dienste (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the GDACE authorization process

2006 Environmental Consultation & Water Use Applications to DWAF for the proposed Rapids Country Estate near Belfast, Mpumalanga

Weltevreden Family Trust

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, water use application, report compilation and management of the Mpumalanga DALA authorization process

2006 Environmental Impact Management Process (Scoping Report application) for the proposed estate and resort development on the farm Grootsuikerboschkop , Dullstroom, Mpumalanga Province

True Projects

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation and management of the Mpumalanga DALA authorization process

2006 Visual Impact Assessment and Site Sensitivity Report for the proposed township & resort establishment at Rooiberg, Limpopo Province

Naluwan Section 21 (Pty) LTD.

Site Reconnaissance and collection of physical site characteristic data, compilation of photographic record of the visual context of the site surroundings for the VIA. Integration of this study into a Site Sensitivity Report

2007

Environmental Impact Management Process (exemption application) and Environmental Management Plan (EMP) for the proposed private resort development on portion 211, a portion of portion 183 of the farm Kaalplaats 577 IQ, Vanderbijl Park, Gauteng Province

Lochvaal Aquatic Club (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the GDACE authorization process

2007 Environmental Impact Assessment Process (Basic Assessment) for the proposed township developments on portions 66 & 71 of the farm Steenekoppie 153 IQ, Magaliesburg, Gauteng Province

La’fer Property Investments

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the GDACE authorization process

Page 8: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

2007

Environmental Impact Assessment Process (Scoping & EIA application), Visual Impact Assessment and Water use Licence Application for the design and construction of route K72 (approximately 4,5km of road p126-1 Hendrik Potgieter and approximately 2km of the N14 Krugersdorp highway) including the new interchange and Crocodile River Crossing, Mogale City, Gauteng Province

Development & Engineering Consultants (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, water use application report compilation and management of the GDACE authorization process. Site Reconnaissance and collection of physical site characteristic data, compilation of photographic record of the visual context of the site surroundings for the VIA

2007 Environmental Consultation and Management Process (Basic Assessment) for Major Storm Water systems upgrade in Soshanguve, Mamelodi and Eersterust, Tshwane, Gauteng Province

City of Tshwane Metropolitan Municipality

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2007 Environmental application and impact management process for the proposed township development on portions 25 and a portion of portion 61 of the farm Rietfontein 375 JR, Kungwini, Gauteng Province

Uniqon Wonings (Pty) LTD.

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process (Project Halted)

2007

Environmental Impact Management Process (Scoping & EIA application process) for the proposed residential estate development on portions 81, 82 & 83 of the farm Doornkloof 391 JR, Kungwini & Tshwane Districts, Gauteng Province

SKAI Developments

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the GDACE authorization process. (Project still in Process)

2007 Environmental Consultation and impact management process for the proposed Firelogs Charcoal project near Xanagas, Ghanzi District, Botswana

Firelogs (Pty) LTD.

Pre consultation meetings with the relevant Botswana National Government Department to establish their requirements for the study. Consultation with specialist consultants,

Page 9: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

development of application report, report compilation and submission to the Botswana Department of Environmental Affairs

2007 Environmental Impact Management Process (Scoping & EIA application process) for the proposed Industrial Township Development on portion 4 of the farm The Willows 340 JR, Pretoria East, Gauteng Province

Uniqon Wonings (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with development of report graphics, report compilation and management of the GDACE authorization process

2007 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed Glen Austin Township Development, Holding 454, Glen Austin Ext 3, Midrand

Charprop 299 cc

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, report compilation and management of the GDACE authorization process

2007

Environmental Impact Management Process (Scoping report (SR) and Environmental Management Programme Report (EMPR)) for the proposed gabbro-norite mining activities on the farm Leeuwkop 402 JQ, Bethanie District, North West Province, for Harlequin Duck Properties (Pty) LTD.

Keeley Granite (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics, DWAF Water Use Application, report compilation, management of the North West Province DME authorization process and development of rehabilitation mitigation measures for the waste rock dumps

2007 Environmental Impact Management Process: Process Consultations with the GDACE regarding the relevant assessment process for the proposed extensions to the Nasrec Station, Johannesburg, Gauteng Province

Development & Engineering Consultants (Pty) LTD.

Consultation with specialist consultants, report compilation and management of the GDACE authorization process

2007 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed Serapeng Road Extensions, Mamelodi, Gauteng Province

Development & Engineering Consultants (Pty) LTD.

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

Page 10: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

2007

Environmental Impact Management Process (Basic Impact Assessment application) for the proposed upgrade of the storm water infrastructure, Klipkruisfontein Phases I - III, Soshanguve, Gauteng Province

City of Tshwane Metropolitan Municipality: Roads & Storm Water Division

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2007

Environmental Impact Management Process (NEMA S24G – Non Compliance Application) for the pre authorization start of the Klipkruisfontein Phases I – III storm water upgrade project, Soshanguve, Gauteng Province

City of Tshwane Metropolitan Municipality: Roads & Storm Water Division

Involved in the Project Management capacity: Facilitation of the public participation process, development of report graphics, report compilation and management of the GDACE Non Compliance authorization process

2007 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed construction of new storm water infrastructure and an associated road, Nuwe Eersterust, Gauteng

City of Tshwane Metropolitan Municipality: Roads & Storm Water Division

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2007 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed construction of new Telecommunications Broadcasting Mast, Holy Cross and Cofimfaba, Eastern Cape Province

SENTECH LTD.

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the EC DEAT authorization process

2008 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed construction of new Telecommunications Broadcasting Mast, Burgersfort, Limpopo Province

SENTECH LTD.

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the Limpopo Province DEDET, authorization process

2008 Environmental Impact Management Process (Basic Impact Assessment applications) for the proposed construction of new Cellular Broadcasting Masts, (Midrand Area) Gauteng Province

IM Ferreira and Associates

Involved in the project management capacity: Consultation with specialist consultants,

Page 11: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2008 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed construction of new storm water infrastructure, Soshanguve Block R, Gauteng

City of Tshwane Metropolitan Municipality: Roads & Storm Water Division

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2009 Environmental Impact Management Process (NEMA S24G – Non Compliance Application) for the illegal construction activity in the Wetlands associated with the Misty Hills Development, Gauteng

Theos Projects (PTY) Ltd.

Specialist wetland consultations, facilitation of the public participation process, assistance development of report graphics, and report compilation and management of the GDACE authorization process

2009

Environmental Impact Management Process (NEMA S24G – Non Compliance Application) for the N4 Gateway Light Industrial Township Development on portion 4 of the farm The Willows 340 JR, Pretoria East, Gauteng Province

Uniqon Wonings (PTY) Ltd.

Specialist wetland and engineering consultations, facilitation of the public participation process, assistance development of report graphics, and report compilation and management of the GDACE authorization process

2009 Environmental Impact Management Process: Process Consultations with the GDACE regarding the relevant assessment process for the proposed extensions to the Cresta Shopping Centre, Johannesburg, Gauteng

Development & Engineering Consultants (Pty) LTD.

Consultation with specialist consultants, report compilation and management of the GDACE authorization process.

2009 Environmental Impact Management Process (Basic Impact Assessment applications) for the proposed construction of new Cellular Broadcasting Masts, (Midrand Area) Gauteng Province

IM Ferreira and Associates

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2009 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed construction of new Telecommunications Broadcasting Mast, Nqeleni, Eastern Cape Province

SENTECH LTD. Involved in the project management capacity: Consultation with

Page 12: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the EC DEAT authorization process

2009 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed construction of 4 satellite antenna systems, Nasrec, Gauteng Province

SENTECH LTD.

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2009 Environmental Impact Management Process (Basic Impact Assessment application) for the proposed construction of new storm water infrastructure, Soshanguve Block V Extension 1, Gauteng Province

Von Willich & VRBA Consulting Engineers

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2009 Draft Site Selection Report and Pre-Feasibility Report (PFS) for the proposed Construction of a Hydrotalcite (Pyrosorb) Plant, Malelane, Mpumalanga Province.

Nkhomazi Chemicals

Consultation with specialist consultants, review of the relevant legislation and other documentation, site visit for site selection purposes, assistance with the drafting of PFS report

2010

Environmental Impact Management Process (Basic Impact Assessment applications) for the proposed Construction of a Hydrotalcite (Pyrosorb) Plant, Malelane, Mpumalanga Province

Nkhomazi Chemicals

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the MDALA authorization process

2010

Environmental Impact Management Process (Scoping report (SR) and Environmental Management Programme Report (EMPR)) for the proposed Nebo Granite mining activities on the farm Salomons Tempel 230 KR, Mokopane Area, Limpopo Province

Keeley Granite (Pty) LTD.

Consultation with specialist consultants, facilitation of the public participation process, assistance with development of report graphics, DWAF Water Use Application, report compilation,

Page 13: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

management of the Limpopo DME authorization process and development of rehabilitation mitigation measures for the waste rock dumps

2010

Environmental Impact Management Process (Basic Impact Assessment applications) for the proposed residential estate development and Office Park development on portions 91 Klipeiland 524 JR, Kungwini Local Municipality, Gauteng Province

Sunglide 166 cc.

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2010

Environmental Impact Management Process (Basic Impact Assessment applications) in terms of the Waste Licence Application Requirements for the proposed new Godrich Toyota Dealership development on portion 171 Klipeiland 524 JR, Kungwini Local Municipality, Gauteng Province

Godrich Toyota

Involved in the project management capacity: Consultation with specialist consultants, facilitation of the public participation process, assistance with the development of report graphics and final report compilation, management of the GDACE authorization process

2011

Environmental Impact Management Process (Scoping report (SR) and Environmental Impact Assessment Report (EIR)) in terms of the Air Emissions Licence Requirements for the proposed Charcoal Oven Development , Dibeng, Sishen Area, Northern Cape Province

Sishen Iron Ore Company

Compilation of scoping report

2011

Environmental Impact Management Process Environmental Management Report (EMP)) for the proposed Leandra and Delmas Transport Truck Depots, Mpumalanga Province

Eqstra Flexi Logistics: A Division of the EQSTRA Corporation (PTY) Ltd.

Consultation with specialist consultants, planning of the public participation process, development of report graphics, report compilation, management of the Mpumalanga DEDET authorization process to date.

2011 Environmental Impact Management Process EIA Confirmation Process for the proposed new Telecommunication Mast, Kyalami, Gauteng Province

Technology Cluster (PTY) Ltd.

Consultation with specialist consultants, development of report graphics, report compilation, management of the GDARD authorization process to date.

2011

Environmental Impact Management Process (Final Basic Impact Assessment Report) for the proposed new Vogelfontein Light Industrial Township Development, City of Ekurhuleni, Gauteng Province

LEAP Landscape Architects and Environmental Consultants CC for Growth Point Properties

Compilation of Final Basic Assessment Report.

Page 14: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

2011

Environmental Impact Management Process (Basic Impact Assessment application) for the proposed new Leandra Transport Truck Depot on portion 29 of the Farm De Goedehoop 308-IR, Leandra Area, Mpumalanga, Province

Eqstra Flexi Logistics: A Division of the EQSTRA Corporation (PTY) Ltd.

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWAF Water Use Application, report compilation, management of the MDEDET authorization process

2011 Integrated Water Use Licence Application for the Marekele Nature Estate, Thabazimbi, Limpopo Province

Marekele Home Owners Association (PTY) Ltd.

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWA Integrated Water Use Application, report compilation, management of the Limpopo DWA authorization process (Project in Process)

2011

Environmental Impact Management Process (Exemption of full Basic Impact Assessment process) for the proposed new Bophirima District Municipal Offices, Vryburg, North West Province

Bophirima District Municipality SiFr Architects

Consultation with specialist consultants, facilitation of the public participation process and management of the NWDEDECT authorization process.

2012

Environmental Impact Management Process (Exemption of full Basic Impact Assessment process) for the proposed new Tourism Information Centre, Vryburg, North West Province

Bophirima District Municipality SiFr Architects

Consultation with specialist consultants, facilitation of the public participation process and management of the NWDEDECT authorization process.

2012 Integrated Water Use Licence Applications for the Netcare Linmed Hospital, Rynfield, Benoni, Gauteng Province

Galago Environmental

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWA Integrated Water Use Application, report compilation, management of the Gauteng DWA authorization process

2012

Environmental Impact Management Process (Draft Environmental Impact Assessment Report (EIAR)) for the proposed Middelburg Eastern Bypass Project, Middelburg, Mpumalanga

Bapela Cave Klapwijk cc for the Steve Tshwete Local Municipality

Consultation with specialist consultants, assistance with facilitation of the public participation process, development of report graphics, report compilation, management of the MDEDET authorization process (Project in Process)

2012 Environmental Impact Management Process (Environmental Authorization Notifications and Appeal Process for the proposed Brooklyn Circle Upgrade Project, City of Tshwane Local Municipality,

Bapela Cave Klapwijk for the City of Tshwane Local Municipality

Consultation with specialist consultants, assistance with

Page 15: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

Gauteng

facilitation of the public participation process, development of report graphics, report compilation, management of the GDARD Appeal process (Project in Process)

2013

Environmental Impact Management Process EIA Confirmation Process for the proposed new Bushbuckridge Police Station, Bushbuckridge, Mpumalanga

Stefan Frylinck & Associates Town & Regional Planners

Consultation with specialist consultants, development of report graphics, report compilation, management of the DEA authorization process to date

2013

Environmental Impact Management Process (Basic Impact Assessment application) and Water Use Licence Applications for proposed Strategic Road Upgrades & the Construction of Cycle Paths & Pedestrian Walkways in Temba, Mabopane, Hammanskraal & Olievenhoutbos, City of Tshwane Municipality, Gauteng

Tsoletso Projects (PTY) Ltd for the City Of Tshwane Metropolitan Municipality

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWAF Water Use Application, report compilation, management of the GDARD authorization process

2013 Integrated Water Use Licence Application for the Proposed Erand Mixed Use Development, Midrand , Gauteng

Galago Environmental

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWA Integrated Water Use Application, report compilation, management of the Gauteng DWA authorization process

2013

Environmental Impact Management Process (NEMA S24G – Non Compliance Application) for the Development comprising various facilities and infrastructure along the Duiwenhoks River, Vermaaklikheid, Hessequa Local Municipality

Riverbend Properties (Pty) Ltd.

Environmental management consultations, facilitation of the public participation process, assistance development of report graphics, and report compilation and management of the WCDEADP authorization process(Project in Process)

2013

Environmental Impact Management Process (Scoping report (SR) and Environmental Impact Assessment Report (EIR)) for the proposed Ladysmith Mixed Use Township Development Ladysmith, Emnambithi/Ladysmith Local Municipality, KwaZulu-Natal Province

Bapela Cave Klapwijk Land Planning & Design for the Emnambithi/Ladysmith Local Municipality

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, report compilation, management of the KZNDAEA authorization process (Project in Process)

2013 Environmental Impact Management Process (Basic Impact Assessment application) and Water Use Licence Applications for proposed Upgrade of Road K46 from the K55 to the N14 Intersection in the Diepsloot Area

Knight Piésold Consulting (PTY) Ltd.

Consultation with specialist consultants, facilitation of the public

Page 16: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

of the Johannesburg Metropolitan Municipality, Gauteng participation process, development of report graphics, DWA Water Use Application, report compilation, management of the GDARD authorization process (Project in Process)

2013 Environmental Impact Management Process (Basic Impact Assessment application) NEM:WA (Act 59 of 2008) Waste Licence Application, Laser Park, Johannesburg Metropolitan Municipality, Gauteng

KR Polymers (PTY) Ltd.

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, management of the GDARD authorization process (Project in Process)

2014

Environmental Impact Management Process (Basic Impact Assessment application) and Water Use Licence Applications for the proposed Road Upgrades & in Hammanskraal & Olievenhoutbos, City of Tshwane Municipality, Gauteng

Tsoletso Projects (PTY) Ltd for the City Of Tshwane Metropolitan Municipality

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWAF Water Use Application, report compilation, management of the GDARD authorization process

2014

Environmental Impact Management Process (Basic Impact Assessment application) and Water Use Licence Applications for the proposed Pedestrian Bridge Crossing of the Atteridgeville Railway Line nand Upgrades of the Pedestrian Walkway along a section of the Skinnerspruit, City of Tshwane Municipality, Gauteng

Tsoletso Projects (PTY) Ltd for the City Of Tshwane Metropolitan Municipality

Consultation with specialist consultants, facilitation of the public participation process, development of report graphics, DWAF Water Use Application, report compilation, management of the GDARD authorization process

Environmental Compliance Monitoring

2003

Environmental Impact Management Process – Environmental Audit & Monitoring during the construction of the 800mm steel water pipeline in the Magaliesberg Protected Natural Environment Waverly, Pretoria

City of Tshwane Metropolitan Municipality

Compilation of final report

2003 Environmental Compliance Audit at Alkantpan, Northern Cape for ARMSCOR

ARMSCOR (Pty) LTD.

Consultations with clients and specialists, research, Compilation of final report

2004 Environmental Compliance Audit at Protechnik Laboratories (Pty) LTD, Centurion, for ARMSCOR

ARMSCOR (Pty) LTD.

Site inspection and measurement of compliance against existing audit report, development of report graphics, compilation and presentation of new report and associated findings

2004 Environmental Compliance Audit at the Gerotek Test Facility, Pretoria West, for ARMSCOR

ARMSCOR (Pty) LTD.

Site inspection and measurement of compliance against existing audit report,

Page 17: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

development of report graphics, compilation and presentation of new report and associated findings

2005 Environmental Compliance Audit at the ARMSCOR Head Office Complex, Erasmuskloof, Pretoria, for ARMSCOR

ARMSCOR (Pty) LTD.

Site inspection and measurement of compliance against existing audit report, development of report graphics, compilation and presentation of new report and associated findings

2005 Environmental Monitoring (Environmental Control Officer – ECO) on various township development projects for CTMM in Tshwane, Gauteng Province

City of Tshwane Metropolitan Municipality

Site inspection and measurement of compliance against existing EMP reports, development of report graphics, compilation and presentation of monthly ECO reports and associated findings

2006 Environmental Compliance Audit for the Institute for Maritime Technology (IMT), Simons Town, Western Cape Province

ARMSCOR (Pty) LTD.

Consultations with clients and specialists, research, Compilation of final report

2008 Environmental Monitoring (Environmental Control Officer – ECO) on the Misty Hills township development Bronkhorstspruit, Gauteng Province

Theos Projects (PTY) Ltd.

Site inspection and measurement of compliance against existing EMP reports, development of report graphics, compilation and presentation of monthly ECO reports and associated findings

2009 Environmental Monitoring (Environmental Control Officer – ECO) on the Mamelodi Hostels Demolition and Redevelopment Project, Mamelodi, Gauteng Province

DEG Engineers

Site inspection and measurement of compliance against existing EMP reports, development of report graphics, compilation and presentation of monthly ECO reports and associated findings

2009 Environmental Monitoring (Environmental Control Officer – ECO) on the construction of a Water reservoir and associated Pipeline, Klipkruisfontein, for CTMM in Tshwane, Gauteng Province

AGES (PTY) Ltd.

Site inspection and measurement of compliance against existing EMP reports, development of report graphics, compilation and presentation of monthly ECO reports and associated findings

2009 Environmental Monitoring on the Pokhathaba Platinum Mine EMP, Burgersfort Area, Limpopo Province

Platinum Australia

Site inspections and measurement of compliance against existing Limpopo DMR EMP, development of report graphics, compilation of monitoring findings report

Page 18: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

2010 Environmental Monitoring on the Kumba Iron Ore Prospecting Phase EMP, Polokwane Area, Limpopo Province

Sishen Iron Ore Company

Site inspection and measurement of compliance against existing DMR Prospecting EMP, development of report graphics, compilation of monitoring findings report

2010 Environmental Compliance Monitoring at the Airports Company of South Africa’s (ACSA) Corporate facilities, as well as the Kimberley, and Cape Town International and Airports.

Sizwe Ntsaluba for the Airports Company of South Africa’s (ACSA)

Site inspection and measurement of compliance against existing ACSA Internal Documentation, national Environmental Management Legislation and ISO 14001 directives, compilation of monitoring findings report & presentation of the findings

2011 Environmental Compliance Monitoring at the Airports Company of South Africa’s (ACSA) OR Tambo International Airport.

Sizwe Ntsaluba for the Airports Company of South Africa’s (ACSA)

Site inspection and measurement of compliance against existing ACSA Internal Documentation, national Environmental Management Legislation and ISO 14001 directives, compilation of monitoring findings report & presentation of the findings

2011 Environmental Compliance Monitoring on the Pokhathaba Platinum Mine EMP, Burgersfort Area, Limpopo Province

Platinum Australia

Site inspections and measurement of compliance against existing Limpopo DMR EMP, development of report graphics, compilation of monitoring findings report. Advise on methodologies to reach and hold compliance

2011

Environmental Monitoring (Environmental Control Officer – ECO) for the construction of the Landscaped Roofs at the 360˚ Kransberg Highlands International Green Estate

EcoZa PTY Ltd.

Site inspection and measurement of compliance against existing EMP reports, development of report graphics, compilation and presentation of monthly ECO reports and associated findings and management of the LDEDET compliance & monitoring section process

2012 Environmental Monitoring (Environmental Control Officer – ECO) for the construction of the Northam WWTW and Treated Water Pipeline

Aurecon SA (PTY) Ltd.

Site inspection and measurement of compliance against existing EMP reports, development of report graphics, compilation and presentation of monthly ECO reports

Page 19: DATE PROJECT CLIENT RESPONSIBILITIESspoorenvironmental.co.za/documentation/JCVR_ Projects CV_01-2014.pdfCONCISE CV OF PROJECTS IN WHICH JC VAN ROOYEN WAS INVOLVED IN January 1999 –

DATE PROJECT CLIENT RESPONSIBILITIES

and associated findings and management of the LDEDET compliance & monitoring section process

2012 Environmental Compliance Monitoring at the Airports Company of South Africa’s (ACSA) King Shaka International Airport.

Advantage ACT for the Airports Company of South Africa’s (ACSA)

Site inspection and measurement of compliance against existing ACSA King Shaka International Airport RoD, compilation of monitoring findings report & presentation of the findings

2013 Environmental Monitoring (Environmental Control Officer – ECO) for the Construction of the Thabazimbi WWTW

Aurecon SA (PTY) Ltd.

Site inspection and measurement of compliance against existing EMP reports, development of report graphics, compilation and presentation of monthly ECO reports and associated findings and management of the LDEDET compliance & monitoring section process