UNIVERSITY OF MUMBAI Campus Development Unit https://dhe.maharashtra.etenders.in Date: 6th July, 2019 CORRIGENDUM 3 E-Tender Notice No.: CDU/305/61 of 2019 dated 10th June 2019 Name of work: Construction of Bal Apte Centre at Kalina Campus,University of Mumbai, Village Kole-Kalyan, Santacruz (E), Mumbai-98. As per the pre-bid meeting held on 26th June, 2019 at 11.30 am in cabin of University Engineer, Main Building, 1st floor, R. No. 118, Fort Campus, Fort, Mumbai- 400 032, copy of drawing for Construction of Bal Apte Centre at Kalina Campus,University of Mumbai, Village Kole-Kalyan, Santacruz (E), Mumbai-98 is attached that are supposed to be treated as part of Original Tender document and as a common set of deviation. Sd/ University Engineer University of Mumbai
10
Embed
Date: 6th July, 2019 CORRIGENDUM 3 · Construction of Bal Apte Centre at Kalina Campus,University of Mumbai, Village Kole-Kalyan, Santacruz (E), Mumbai-98 is attached that are supposed
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
UNIVERSITY OF MUMBAI
Campus Development Unit https://dhe.maharashtra.etenders.in
Date: 6th July, 2019 CORRIGENDUM 3
E-Tender Notice No.: CDU/305/61 of 2019 dated 10th June 2019 Name of work: Construction of Bal Apte Centre at Kalina Campus,University of Mumbai, Village Kole-Kalyan, Santacruz (E), Mumbai-98. As per the pre-bid meeting held on 26th June, 2019 at 11.30 am in cabin of University Engineer, Main Building, 1st floor, R. No. 118, Fort Campus, Fort, Mumbai- 400 032, copy of drawing for Construction of Bal Apte Centre at Kalina Campus,University of Mumbai, Village Kole-Kalyan, Santacruz (E), Mumbai-98 is attached that are supposed to be treated as part of Original Tender document and as a common set of deviation.
Sd/ University Engineer University of Mumbai
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
9.05
2.7
48
.2
0
UPDN
16.69
14
.4
5
2.05 3.30 2.05
2.0
0
2 M WIDE PASSAGE
6.27
11
.8
7
10.34
9.2
0
2 M WIDE PASSAGE
ELECT
ROOM
AHU
ROOM
3.40 X 3.90
ENTRANCE LOBBY
6.25 X 8.0 M
RAISED PLATFORM
3.0 X 1.75
3.0 X 1.75
ROOM-02
3.50 X 2.40
ROOM-01
3.50 X 2.40
STORE
3.40 X 2.40
UP
GROUND FLOOR PLAN
SCALE 1:100
ADMIN AREA
5.62 X 4.5 M
HIS
WC
WC
WC
HER
WC
WC
WC
ART GALLERY
AREA
16.86 X 9.10
ACTIVITY HALL CUM
AUDIO VIDEO ROOM
5.85 X9.10 M
CANTEEN
8.35 X 6.65
HANDI.
TOILET
1.80 X 2.15
3.85 1.20
6.47 3.00
48.04
9.47
3.50 7.94 3.50 2.13
15.00
10
.8
45
.5
33
.6
5
30
.9
5
1.7
0
1.7
0
4.4
5
B B'
A
A'
C'
C
BUILT UP AREA CALCULATION
PROPOSED FLOOR AREA
1. PLINTH AREA = 1118.33 SQ.M
2. FIRST FLOOR AREA = 759.40 SQ.M
3. SECOND FLOOR AREA = 1028.71 SQ.M
4. THIRD FLOOR AREA = 1024.32 SQ.M
5. FOURTH FLOOR AREA = 645.02 SQ.M
TOTAL AREA OF PROPOSED BLDG = 4575.78 SQ.M
ST-2
2 M WIDE
STAIRCASE
2.00
2.0
5
2.0
01
.5
0
LOUNGE
2.58 X 2.65 M
3.10
CABIN
3.0 X 2.65 M
2.00
PANTRY
HIS
HER
FIRE
DUCT
FIRE
DUCT
UP
UP
LECTURE HALL
10.30 X 12.00 M
CAPACITY 100 SEATS
1.5
0
FRD
FRD
FRD
FRD
FRD
FRD
FRD
FRD
UP
HANDICAPPED
RAMP
FRD
FRD
FRD
FRD
FRD
FRD
FRD
ST-1
2 M WIDE
STAIRCASE
D
D'
LIFT
2.0 X 1.90
LIFT
2.0 X 1.90
FRD
STORE
6.3 X 2.0 M
PANTRY
SP
AC
E F
OR
S
TA
TU
E
UP
FRD
FRD
FRD
FRD
FRD
GD
GROUND FLOOR PLAN
DRINKING
WATER
FOUNTAIN
12
.6
0
CENTRALISED AIRCONDITIONED
CENTRALISED AIRCONDITIONED
4.8
0
SHRUB
BED
5.90 4.25 23.10 1.46 8.28
LIFT LOBBY
9.5 X 3.5 M
3.35
2.13
15.008.75 2.75 5.19 3.50 7.94 3.50 2.13 7.80 1.10
19.10
11.85
1.657.978.331.3633.301.203.85
3.30
12.60
18.35
1
57.65
30.95
3.40
3.52
2.50
0.85
0.15
3 4 6
7
9
0.25
0.95
0.80 1.05
0.70
2
0.25
4.14
5
8
10
11
1315
14
1.36
0.25
0.05
1.20
0.25
0.15
18.80
11.65
LAST APPROVED BUILT UP AREA = 968.09 SQ.M
(EXCLUDING 1.5 TIMES LECTURE HALL AREA)
PROPOSED PLINTH AREA INCLUDING 1.5 TIMES
LECTURE HALL AREA = 997.36 SQ.M
8.75
0.25
7.94
0.25
0.30
0.25
12
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1 FOR APPROVAL27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
1. APPROVED GROUND FLOOR BUILT UP AREA = 968.09 SQ.M
2. AMENDED GROUND FLOOR PROPOSED BUILT UP AREA = 997.36 SQ.M
3. APPROVED FIRST FLOOR BUILT UP AREA = 712.19 SQ.M
4. AMENDED FIRST FLOOR PROPOSED BUILT UP AREA = 732.87 SQ.M
5. APPROVED LECTURE HALL AREA BUILT UP AT GROUND FLOOR = 121.79 SQ.M
6. ADDITION OF 0.5 TIMES LECTURE HALL AREA = 120.97 SQ.M
7. APPROVED DOUBLE HEIGHT LOBBY BUILT UP AREA AT FIRST FLOOR=26.53 SQ.M
8. ADDITION OF 0.5 TIMES DOUBLE HEIGHT LOBBY AREA = 26.53 SQ.M
9. AMENDED GROUND FLOOR AREA AFTER ALL ADDITIONS =1118.33 SQ.M
10. AMENDED FIRST FLOOR AREA AFTER ALL ADDITIONS = 759.40 SQ.M
TOTAL AMENDED AREA OF GROUND & FIRST FLOOR = 1877.73 SQ.M
AMENDED AREA STATEMENT FOR EARLIER APPROVED LAYOUTS:
AREA STATEMENT SQ.M
AREA AS PER PR CARDa)
Deductions for
ROAD SETBACK AREA
RESERVATION FOR TATA POWER STATION
2.
a)
b)
c)
TOTAL (a+b+c+d+e)
968900.0
54331.94
1946.76
5000.00
77530.06
Balance area of Plot (1 minus 2)861782.32
3.
Deduction for 5% Amenity space (5% OF '3')4.43089.12
Net area of plot (3-4)5.818693.20
Deduction for Recreational ground (15% of 3 )6.NA
Balance Area of plot (5-6)7.
F.S.I Permissible (F.A.R)
9. Permissible Built Up Area (7X8)
1.00
AREA AS PER NEW CTS PLAN-'P' LINE DIAGRAMb)970143.60
AS PER 'P' LINE DIAGRAM - SUBDIVISION-3c)939312.38
SUB DIVISION-031.939312.38
818693.20
RESERVATION FOR GARDEN / PARK
RESERVATION FOR SPORTS COMPLEX
(AS PER MODOFICATION-MHE50)
d)16251.36
8.
17.PARKING STATEMENT
e)
f)
d) Required Car Parking for PROF.BAL APTE CENTER
(one for 35 SQ.M carpet area of Administrative office and
public service area)
82 SQ.M
Proposed Car parking 02 No's
Proposed Visitor parking02 No's
TOTAL PROPOSED PARKING FOR "PROF.BAL APTE CENTER
FOR STUDIES IN STUDENTS & YOUTH MOVEMENTS"
04 No's
818693.20
10. Existing Built up Area (As per Architect-Statement) 224094.04
11. Approved Built up Area for 'HINDI BHASHA BHAVAN' 1498.72
12.
Approved Built Up area for PROF.BAL APTE CENTER
FOR STUDIES IN STUDENTS & YOUTH MOVEMENTS
1828.61
13. TOTAL Built Up area Approved(10+11+12)227421.37
14. AMENDED AREA FOR PROF.BAL APTE CENTER FOR
STUDIES IN STUDENTS & YOUTH MOVEMENTS
4575.78
15. Total Built Up Area Proposed =13+(14-12) 230168.54
16. F.A.R Consumed (15/9)0.28
GROUND FLOOR AREA CALCULATION
ADDITION:
LAST APPROVED PLINTH BUILT UP AREA = 968.22 SQ.M
( EXCLUDING 0.5 TIMES LECTURE HALL AREA)
ADDITION :
1. 8.75 X 0.25 = 2.19 SQ.M
2. 0.80 X 0.95 = 0.76 SQ.M
4. 4.14 X 0.25 = 1.04 SQ.M
5. 7.94 X 0.25 = 1.99 SQ.M
6. 2.13 X 0.25 = 0.53 SQ.M
8. 0.15 X 11.65 = 1.75 SQ.M
9. 15.0 X 0.30 = 4.50 SQ.M
10. 18.80 X 0.15 = 2.82 SQ.M
11. 8.33 X 0.25 = 2.08 SQ.M
12. 3.77 X 1.36 = 5.13 SQ.M
13. 33.30X 0.25 = 8.33 SQ.M
15. 3.85 X 0.25 = 0.96 SQ.M
TOTAL DEDUCTION = 32.06 SQ.M
BUILT UP AREA AFTER ADDITION & DEDUCTION = 997.36 SQ.M
ADDITION FOR 0.5 AREA OF LECTURE HALL = 997.36 + 120.97 SQ.M
TOTAL PLINTH BUILT UP AREA = 1118.33 SQ.M
DEDUCTION :
3. 1.05 X 0.70 = 0.74 SQ.M
7. 0.85 X 2.50 = 2.13 SQ.M
14. 1.20 X 0.05 = 0.06 SQ.M
TOTAL DEDUCTION = 2.92 SQ.M
SCALE 1:500
SITE PLAN
01
SITE PLAN
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:17:24 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:40:48 +05'30'
LECTURE HALL BUA AREA CALCULATION:
EARLIER DOUBLE HEIGHT LOBBY AREA
14.70 X16.57 =243.58 SQ.M
DEDUCTION
A. 0.74 X 14.70 M = 10.88 SQ.M
DEDUCTION IN EARLIER APPROVED LECTURE HALL AREA = 243.58 SQ.M -10.88 SQ.M
LECTURE HALL BUILT UP AREA AFTER DEDUCTION = 232.70 SQ.M
ADDITION
B. 0.15 X 15.83 M = 2.37 SQ.M
C. 15.0 X 0.30 M = 4.50 SQ.M
D. 0.15 X 15.83 M = 2.37 SQ.M
TOTAL AREA OF ADDITION = 9.24 SQ.M
TOTAL AREA AFTER ALL DEDUCTION AND ADDITION IS = 241.94 SQ.M
LECTURE HALL AREA AFTER CONSIDERING 0.5 TIMES = 120.97 SQ.M
2.13
15.008.75 2.75 5.19 3.50 7.94 3.50 2.13 7.80 1.10
19.10
11.85
1.657.978.331.3633.301.203.85
3.30
12.60
18.35
1
57.65
30.95
3.40
3.52
2.50
0.85
0.15
3 4 6
7
9
0.25
0.95
0.80 1.05
0.70
2
0.25
4.14
5
8
10
11
1315
14
1.36
0.25
0.05
1.20
0.25
0.15
18.80
11.65
LAST APPROVED BUILT UP AREA = 968.09 SQ.M
(EXCLUDING 1.5 TIMES LECTURE HALL AREA)
PROPOSED PLINTH AREA INCLUDING 1.5 TIMES
LECTURE HALL AREA = 997.36 SQ.M
8.75
0.25
7.94
0.25
0.30
0.25
12
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
GROUND FLOOR- BUILT UP AREA LINE DIAGRAM
LECTURE HALL 'P' LINE DIAGRAM
GROUND FLOOR AREA CALCULATION
ADDITION:
LAST APPROVED PLINTH BUILT UP AREA = 968.22 SQ.M
( EXCLUDING 0.5 TIMES LECTURE HALL AREA)
ADDITION :
1. 8.75 X 0.25 = 2.19 SQ.M
2. 0.80 X 0.95 = 0.76 SQ.M
4. 4.14 X 0.25 = 1.04 SQ.M
5. 7.94 X 0.25 = 1.99 SQ.M
6. 2.13 X 0.25 = 0.53 SQ.M
8. 0.15 X 11.65 = 1.75 SQ.M
9. 15.0 X 0.30 = 4.50 SQ.M
10. 18.80 X 0.15 = 2.82 SQ.M
11. 8.33 X 0.25 = 2.08 SQ.M
12. 3.77 X 1.36 = 5.13 SQ.M
13. 33.30X 0.25 = 8.33 SQ.M
15. 3.85 X 0.25 = 0.96 SQ.M
TOTAL DEDUCTION = 32.06 SQ.M
BUILT UP AREA AFTER ADDITION & DEDUCTION = 997.36 SQ.M
ADDITION FOR 0.5 AREA OF LECTURE HALL = 997.36 + 120.97 SQ.M
TOTAL PLINTH BUILT UP AREA = 1118.33 SQ.M
DEDUCTION :
3. 1.05 X 0.70 = 0.74 SQ.M
7. 0.85 X 2.50 = 2.13 SQ.M
14. 1.20 X 0.05 = 0.06 SQ.M
TOTAL DEDUCTION = 2.92 SQ.M
GROUND FLOOR - BUILT UP AREA DIAGRAM
SCALE 1:100
GROUND FLOOR - LECTURE HALL AREA LINE DIAGRAM
SCALE 1:100
LECTURE HALL
DOUBLE HEIGHT AREA
15.00
14.70
0.30
15.83
0.74
16.57
0.15 14.70 0.15
A
DB
C
0.15
0.15
3.77
02
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:22:52 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:41:45 +05'30'
9.0
5
UP
4.7
51
2.6
0
6.4748.04
1.15 M HIGH
PARAPET WALL
FIRST FLOOR PLAN
SCALE 1:100
9.05
9.0
5
CLASS ROOM 02
5.35 X 8.95 M
CLASS ROOM 03
5.35 X 8.95 M
CONFERENCE ROOM
5.35 X 8.95 M
2 M WIDE PASSAGE
2 M WIDE PASSAGE
DOUBLE HEIGHT
ENTRANCE LOBBY
HIS
WC
WC
WC
HER
WC
WC
WC
FACULTY ROOM
5.62 X 7.45 M
AV APPARATUS ROOM
B B'
A
A'
C'
C
UPDN
4.3
5
ST-1
2 M WIDE
STAIRCASE
3.0 X 1.75 3.0 X 1.75
FIRE
DUCT
SERVICE
SLAB
FOR
ELECT.
UP
5.30
FRD
FRD FRD FRD FRD FRD
FRD
FRD
FRD
FRD
HANDICAPPED
RAMP
FRD
FIRE
DUCT
ST-2
2 M WIDE
STAIRCASE
D
D'
LIFT
2.0 X 1.90
LIFT
2.0 X 1.90
CLASS ROOM
8.24 X 6.65 M
LAB ROOM
8.24 X 6.65 M
CLASS ROOM 01
5.35 X 8.95 M
FRD FRD
PH TOILET
1.8 X 2.25M
FRD
FACULTY ROOM
5.62 X 7.45 M
PANTRY
5.30
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
FIRST FLOOR PLAN
DRINKING
WATER
FOUNTAIN
2.42 10.12 4.14 3.50 7.94 3.50 2.13 9.05
14
.4
5
15.00
19
.1
08
.2
03
.6
5
LIFT LOBBY
9.5 X 3.5 M
FRD
FRD
FRD
0.25
1.25
1.66
2.42 10.12 4.14 3.50 7.94 3.50 2.13 9.35 14.05
2.51
2.99
6.478.331.3633.301.203.85
12.60
4.75
3.35
0.25
3.40
3 4
5
7
17.35
57.15
6.47
8.20
0.05
0.25
3.90
3.77
0.25
11.85
8
9
10
0.05
6
21
1.36
0.25
0.25
1.20
15
0.25
6.47
8.20
DOUBLE HEIGHT LOBBY CALCULATION:
LOBBY AREA 6.47 X 8.20 M = 53.05 SQ.M
AREA TO BE CONSIDERED 1.5 TIMES IN FSI
0.5 X 53.05 = 26.52 SQ.M
FIRST FLOOR AREA CALCULATION
ADDITION:
APPROVED AREA OF FIRST FLOOR
= 712.19 SQ.M
DEDUCTION :
9. 1.20 X 0.05 = 0.06 SQ.M
AREA AFTER DEDUCTION =712.13 SQ.M
ADDITION
1. 2.42 X 0.25 = 0.61 SQ.M
2. 4.14 X 0.25 = 1.04 SQ.M
3. 7.94 X 0.25 = 1.99 SQ.M
4. 2.13 X O.25 = 0.53 SQ.M
5. 1.66 X 0.05 = 0.08 SQ.M
6. 8.33 X 0.25 = 2.08 SQ.M
7. 3.77 X 1.36 = 5.13 SQ.M
8. 33.30 X 0.25 = 8.33 SQ.M
10. 3.85 X 0.25 = 0.96 SQ.M
TOTAL ADDITION AREA = 20.74 SQ.M
AMENDED FIRST FLOOR AREA= 732.87 SQ.M
ADDITIONAL DOUBLE HEIGHT LOBBY AREA
CONSIDEREING 0.5 TIMES = 26.53 SQ.M
AMENDED FIRST FLOOR BUILT UP AREA
= 759.40 SQ.M
DOUBLE HEIGHT
LOBBY AREA
FIRST FLOOR - BUILT UP AREA DIAGRAM
SCALE 1:100
FIRST FLOOR- BUILT UP AREA LINE DIAGRAM
5.32
LAST APPROVED BUILT UP AREA = 712.19 SQ.M
AMENDED BUILT UP AREA = 732.87 SQ.M
03
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:23:40 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:43:04 +05'30'
UPDN
4.7
51
2.6
0
6.47
48.04
SECOND FLOOR PLAN
SCALE 1:100
CLASS ROOM 01
5.30 X 9.0 M
CLASS ROOM 02
5.30 X 9.0 M
2 M WIDE PASSAGE
2 M WIDE PASSAGE
HIS
WC
WC
WC
HER
WC
WC
WC
IT & BMS
ROOM
B B'
A
A'
C'
C
3.8
1
4.3
5
ST-1
2 M WIDE
STAIRCASE
3.0 X 1.75 3.0 X 1.75
FIRE
DUCT
SERVICE
SLAB
FOR
ELECT.
UP
5.30 5.305.32
6.20
FRD
FRD FRD FRD FRD FRD FRD
FRD
FRD
HANDICAPPED
RAMP
FRD
FIRE
DUCT
ST-2
2 M WIDE
STAIRCASE
D
D'
9.0
5
LIFT
2.0 X 1.90
LIFT
2.0 X 1.90
CLASS ROOM 02
5.30 X 9.0 M
LIBRARY
RECREATION
ROOM
8.90 X 8.0 M
FELLOW RESEARCH ASSISTANT AREA
9.7 X 5.0 M
FRD FRD
FELLOW RESEARCH ASSISTANT
8.3 X 6.15
FELLOW
RESEARCH ROOM
6.2 X 9.0 M
PH TOILET
1.8 X 2.25M
FRD
DN
ARCHIVE
XEROX
RA
CK
SERVER
ROOM
LIB
RA
RIA
N
FRD
FRD
FRD
FRD
FRD
FRD
5.53 X 3.82 M
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1 FOR APPROVAL27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
DRINKING
WATER
FOUNTAIN
2.42 10.12 4.14 3.50 7.94 3.50 2.13 9.05
14
.4
5
15.00
10
.8
48
.2
78
.2
03
.6
5
2.42 3.50 7.940 3.500 14.048
42.991.2003.850
4.750
12.60
3.35
4.75
3.500
4.75
3.500
1 3 4 5 6
8
11
17.35
57.15
3.646
2.564
8.204
2.94
9.34
2
10.121 4.140 2.130
0.850
9.11
2.644
17.35
4.750
7
9
10
PROPOSED BUILT UP AREA FOR THIRD FLOOR = 785.23 SQ.M
(INCLUDING POCKET TERRACES)
POCKET TERRACE
POCKET TERRACE
LIFT LOBBY
9.5 X 3.5 M
WATER
DISPENSER
STEP
SEATING AREA
3.85 1.20 5.90 4.25 23.10 1.46 8.28
9.0
5
FRD
FRD
SECOND FLOOR - BUILT UP AREA DIAGRAM
SCALE 1:150
SECOND FLOOR BUILT UP AREA CALCULATION
ADDITION:
A. 57.65 X 30.95 = 1784.60 SQ.M
TOTAL ADDITION = 1784.60 SQ.M
DEDUCTION :
1. 2.42 X 18.35 = 44.41 SQ.M
2. 10.12 X 13.60 = 137.63 SQ.M
3. 4.14 X 18.35 = 75.97 SQ.M
4. 3.50 X 17.10 = 59.86 SQ.M
5. 7.94 X 18.35 = 145.70 SQ.M
6. 3.50 X 17.10 = 59.86 SQ.M
7. 2.12 X 18.35 = 38.90 SQ.M
8. 8.90 X 14.45 = 128.63 SQ.M
9. 3.15 X 11.85 = 37.33 SQ.M
10. 6.46 X 3.65 = 23.57 SQ.M
11. 1.20 X 3.35 = 4.02 SQ.M
TOTAL DEDUCTION = 755.88 SQ.M
SECOND FLOOR BUILT UP AREA= 1028.71 SQ.M
THIRD FLOOR BUILT UP AREA CALCULATION
ADDITION:
A. 57.15 X 17.35 = 991.55 SQ.M
DEDUCTION :
1. 2.42 X 4.75 = 11.50 SQ.M
2. 4.14 X 4.75 = 19.67 SQ.M
3. 3.50 X 3.50 = 12.25 SQ.M
4. 7.94 X 4.75 = 37.72 SQ.M
5. 3.50 X 3.50 = 12.25 SQ.M
6. 2.13 X 4.75 = 10.12 SQ.M
7. 9.34 X 0.85 = 7.94 SQ.M
8. 14.05 X 2.56 = 35.97 SQ.M
9. 8.20 X 2.64 = 21.65 SQ.M
10. 9.11 X 3.65 = 33.25 SQ.M
11. 1.20 X 3.35 = 4.02 SQ.M
TOTAL DEDUCTION = 206.32 SQ.M
AREA AFTER DEDUCTION = 785.23 SQ.M
SECOND FLOOR PLAN
SECOND FLOOR- BUILT UP AREA LINE DIAGRAM
15.003.50 7.94 3.50 2.13 8.90
3.156.4742.991.203.85
1 2 3 4 5 6 7 8
9
1011
57.65
2.42 10.12 4.14
PROPOSED BUILT UP AREA FOR SECOND FLOOR = 1028.50 SQ.M
04
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:24:24 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:44:35 +05'30'
SH
DN
LUNCH ROOM /
COMMON ROOM
PH TOILET
1.8 X 2.25M
SHSHSH SH
SHSHSH SH
12
.6
0
6.47
48.04
THIRD FLOOR PLAN
SCALE 1:100
2 M WIDE PASSAGE2 M WIDE PASSAGE
LIFT
2.0 X 1.90
LIFT
2.0 X 1.90
B B'
A
A'
C'
C
3.8
2
UPDN
4.3
5
ST-1
2 M WIDE
STAIRCASE
3.0 X 1.75 3.0 X 1.75
FIRE
DUCT
UP
HANDICAPPED
RAMP
FRD
FIRE
DUCT
ST-2
2 M WIDE
STAIRCASE
D
D'
LIFT LOBBY
DRYING BALCONY
BOY'S REST ROOM
BOY'S
DORMITORY
52 BED'S
LIFT LOBBY
6.35 X 3.5 M
HIS
TOILET
WET AREA
WASH BASIN
AREA
OPEN TERRACE AT
3RD FLOOR LEVEL
FRD
DN
WC
WC
WC
WC
WC
WC
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1 FOR APPROVAL27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
DRINKING
WATER
FOUNTAIN
16.69 3.50 7.94 3.50 2.13 9.05
14
.4
5
15.00
10
.8
98
.2
28
.2
03
.6
5
3.85 1.20 5.90 4.25 23.10 1.46 8.28
2.42 3.50 7.940 3.500 14.048
42.991.2003.850
4.750
12.60
3.35
4.75
3.500
4.75
3.500
1 3 4 5 6
8
11
17.35
57.15
3.6
46
2.564
8.204
2.94
9.34
2
10.121 4.140 2.130
0.850
9.11
2.644
17.35
4.750
7
9
10
PROPOSED BUILT UP AREA FOR THIRD FLOOR = 785.23 SQ.M
(INCLUDING POCKET TERRACES)
POCKET TERRACE
POCKET TERRACE
WARDEN'S
ROOM
5.25 X 4.92 M
WATER
DISPENSER
2.0
0
FRD
FRD
FRD
FRD
FRD
FRD
FRD
THIRD FLOOR BUILT UP AREA CALCULATION
ADDITION:
A. 57.15 X 17.35 = 991.55 SQ.M
DEDUCTION :
1. 2.42 X 4.75 = 11.50 SQ.M
2. 4.14 X 4.75 = 19.67 SQ.M
3. 3.50 X 3.50 = 12.25 SQ.M
4. 7.94 X 4.75 = 37.72 SQ.M
5. 3.50 X 3.50 = 12.25 SQ.M
6. 2.13 X 4.75 = 10.12 SQ.M
7. 9.34 X 0.85 = 7.94 SQ.M
8. 14.05 X 2.56 = 35.97 SQ.M
9. 8.20 X 2.64 = 21.65 SQ.M
10. 9.11 X 3.65 = 33.25 SQ.M
11. 1.20 X 3.35 = 4.02 SQ.M
TOTAL DEDUCTION = 206.32 SQ.M
AREA AFTER DEDUCTION = 785.23 SQ.M
TOTAL BUILT UP AREA AFTER ALL
ADDITION & DEDUCTION THIRD FLOOR
BUILT UP AREA= 1024.32 SQ.M
THIRD FLOOR - BUILT UP AREA DIAGRAM
SCALE 1:100
FOURTH FLOOR AREA CALCULATION
THIRD FLOOR PLAN
THIRD FLOOR- BUILT UP AREA LINE DIAGRAM
16.69 3.50 7.94 3.50 2.13 9.35 4.94
4.20
3.90
3.90
2.65
3.90
2.65
16.50
48.04
16.50
4.7
5
DUCT
DUCT
DUCT
2.00
2.00
15.00
14.45
1.71
0.45 14.05 0.51
5.28
10.89
16.17
12
13
TERRACE AREA
ABOVE 2ND FLOOR LIBRARY
THIRD FLOOR TERRACE AREA
ADDITION:
A. 15.0 X 16.17 = 242.55 SQ.M
DEDUCTION :
12. 0.45 X 1.71 = 0.77 SQ.M
13. 0.51 X 5.28 = 2.69 SQ.M
TOTAL DEDUCTION = 3.46 SQ.M
TOTAL BUILT UP AREA OF TERRACE = 239.09 SQ.M
ADDITION OF TERRACE AREA :
TERRACE AREA = 239.09 SQ.M
05
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:25:32 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:45:21 +05'30'
OPEN TERRACE AT
2ND FLOOR LEVEL
SHSHSH SH CH
SHSHSHSH CH
CH
CH
LO
CK
ER
LUNCH ROOM /
COMMON ROOM
7.25 X 5.47 M
FOURTH FLOOR PLAN
SCALE 1:100
4.7
51
2.6
0
48.04
UPDN
GIRL'S REST ROOM
WET AREA
HER
TOILET
2.1 X1.65 M
LIFT
2.0 X 1.90
LIFT
2.0 X 1.90
DN
GIRL'S DORMITORY
48 BED'S
17.33 X 11.33 M
WA
TE
R
DIS
P
2 M WIDE PASSAGE2 M WIDE PASSAGE
3.0 X 1.75 3.0 X 1.75
FIRE
DUCT
ST-2
2 M WIDE
STAIRCASE
LIFT LOBBY
DRYING BALCONY
LIFT LOBBY
6.35 X 3.5 M
OPEN TERRACE AT
2ND FLOOR LEVEL
ST-1
2 M WIDE
STAIRCASE
PH TOILET
1.8 X 2.25M
FRD
WARDEN'S
ROOM
5.25 X 4.92 M
WC
WC
WC
HER
WC
WC
WC
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
16.69 3.50 7.94 3.50 2.13 9.05
14
.4
5
15.00
10
.8
98
.2
2
3.85 1.20 5.90 4.25 23.10 1.46 8.28 6.46
4.7 X 6.2 M
WATER
DISPENSER
FRD
FRD
FRDFRD
FRD
FRD
FRD
FRD
FOURTH FLOOR AREA CALCULATION
ADDITION:
A. 48.04 X 16.50 = 792.64 SQ.M
TOTAL ADDITION = 792.64 SQ.M
DEDUCTION :
1. 16.68 X 3.90 = 65.05 SQ.M
2. 3.50 X 2.65 = 9.28 SQ.M
3. 7.94 X 3.90 = 30.97 SQ.M
4. 3.50 X 2.65 = 9.28 SQ.M
5. 2.12 X 3.90 = 8.29 SQ.M
6. 4.94 X 4.20 = 20.75 SQ.M
7. 1.20 X 3.35 = 4.02 SQ.M
TOTAL DEDUCTION = 147.62 SQ.M
FOURTH FLOOR BUILT UP AREA = 645.02 SQ.M
FOURTH FLOOR - BUILT UP AREA DIAGRAM
SCALE 1:100
FOURTH FLOOR PLAN
FOURTH FLOOR- BUILT UP AREA LINE DIAGRAM
16.69 3.50 7.94 3.50 2.13 9.35 4.94
4.20
12.30
42.991.203.85
3.90
12.60
3.35
3.90
2.65
3.90
2.65
1 2 3 4 5 6
7
16.50
48.04
16.50
PROPOSED BUILT UP AREA FOR THIRD FLOOR = 645.02 SQ.M
06
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:26:16 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:46:23 +05'30'
OPEN TERRACE AT
3RD FLOOR LEVEL
48.04
DN
ST-1
ST-2
LIFT MACHINE ROOM
OPEN TERRACE AT
3RD FLOOR LEVEL
OPEN TERRACE AT
3RD FLOOR LEVEL
OPEN TERRACE AT
3RD FLOOR LEVEL
OPEN TO SKY TERRACEOPEN TO SKY TERRACE
12
.6
04
.7
5
3.8
02
.7
0
24
.5
5
CLASS ROOM
19
.9
0
PLINTH FLOOR LEVEL
FIRST FLOOR LEVEL
TERRACE LEVEL
GROUND LEVEL
SECTION D-D'
SCALE 1:100
0.9
03
.8
0
PASSAGE
PASSAGE
ACTIVITY HALL
3.8
03
.8
0
PASSAGE
FELLOW RESEARCH
3.8
0
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
PASSAGE
BOY'S DORMITORY
PASSAGE
GIRL'S DORMITORY
1.9
5
OHT LEVEL
TERRACE FLOOR PLAN
SCALE 1:100
OVERHEAD TANK TOP LEVEL
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
TERRACE FLOOR PLAN
07
SECTION D-D'
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:26:57 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:47:05 +05'30'
3.6
5
3.8
02
.7
0
CLASS ROOM 02 CONFERENCE
ROOM
CLASS ROOM 01 FACULTY
ROOM
DOUBLE HEIGHT
ENTRANCE LOBBY
ST-2
ST-2
ART GALLERY AREA
LIFT
SHAFT
PLINTH LEVEL
FIRST FLOOR LEVEL
SECOND FLOOR LEVEL
PASSAGE
SECTION B-B'
SCALE 1:100
GROUND LEVELGROUND LEVEL
3.8
0
6.0
0
PLINTH LEVEL
FIRST LEVEL
UPPER TERRACE LEVEL
DOUBLE HEIGHT
ENTRANCE LOBBY
ROOM 01
RAISED PLATFORM
LECTURE HALL
AV
APPARATUS
ROOM
10
.8
5
SECTION A-A' (THROUGH LECTURE HALL)
SCALE 1:100
GROUND LEVEL GROUND LEVEL
0.9
0
LOWER TERRACE LEVEL
3.8
0
19
.9
0
ACTIVITY HALL CUM
AUDIO VIDEO ROOM
AREA 66 SQ.MCANTEEN
ADMIN ROOM
LIFT
SHAFT
CLASS ROOM 01STAIRCASE
BLOCK
3.8
0
CLASS ROOM
PASSAGE
0.9
0
PLINTH LEVEL
GROUND LEVEL
SECTION C-C'
SCALE 1:100
0.9
03
.8
0
STAIRCASE
BLOCK
ST-2
ST-2
7.4
5
PASSAGE
PASSAGE
GLASS CANOPY SUPPORTED
ON MS ANGLE
MS COLUMN SUPPORT
FOR CANOPY
LIBRARY FLOOR LEVEL
SECOND FLOOR LEVEL
LIBRARY AREAREADING AREA
6.1
51
.1
5
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
TERRACE FLOOR LEVEL
CLASS ROOM 03FELLOW
RESEARCH ROOM
LIFT
SHAFT
LIFT
SHAFT
CLASS ROOM 01STAIRCASE
BLOCK
FELLOW RESEARCH
ASSISTANT AREA
PASSAGE
ST-2
BOY'S DORMITORY
BOY'S COMMON
ROOM
LIFT
SHAFT
LIFT
SHAFT
STAIRCASE
BLOCK
BOY'S RESTROOM
ST-2
GIRL'S DORMITORY
LIFT
SHAFT
LIFT
SHAFT
STAIRCASE
BLOCK
GIRL'S RESTROOM
ST-2
RECREATION
GIRL'S COMMON
ROOM
CLASS ROOM 02
3.8
03
.8
03
.8
02
.7
0
FIRST FLOOR LEVEL
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
TERRACE FLOOR LEVEL
ST-2
PASSAGE
ST-2
PASSAGE
ST-2
PASSAGE
3.8
03
.8
03
.8
01
.9
5
OHT BOTTOM LEVEL
OHT TOP LEVEL
OVERHEAD TANK
OVERHEAD TANK
1.9
5
FD
FD
FD
FD
FD
FD
LIFT MACHINE ROOM
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
2.1
0
19
.9
04
.6
5
RECREATION ROOM
BUILDING SECTIONS
08
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:27:53 +05'30'
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:47:59 +05'30'
PLINTH LEVEL
FIRST FLOOR LEVEL
TERRACE LEVEL
GROUND LEVEL
LIBRARY LEVEL
FRONT ELEVATION
SCALE 1:100
6.1
5
12
.3
0
0.9
0
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
3.8
0
LOWER TERRACE LEVEL
3.8
03
.8
01
.1
5
19
.9
0
PLINTH FLOOR LEVEL
FIRST FLOOR LEVEL
TERRACE LEVEL
BUILDING ELEVATION
SCALE 1:100
GROUND LEVEL
GROUND LEVEL
0.9
0
DOUBLE HEIGHT
ENTRANCE LOBBY
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
FOURTH FLOOR LEVEL
3.8
03
.8
03
.8
0
MUNICIPAL APPROVAL DRAWING
REVISIONS
DESCRIPTION OF DRAWING :
DESCRIPTION OF PROJECT :
PROPOSED "PROF. BAL APTE CENTER
FOR STUDIES IN STUDENTS AND YOUTH MOVEMENTS" ,
ON PLOT BEARING SR. NO 4094 AT VILLAGE KOLE-KALYAN,
KALINA UNIVERSITY CAMPUS, SANTACRUZ(E), MUMBAI-400 098.
STRUCTURAL CONSULTANT:
JOB NO. DRG NO. SCALE. DRAWN BY CHECKED BY DATE
THIS DRAWING IS THE SOLE PROPERTY OF ArchiLab DESIGNS. IT'S USE FOR ANY
PURPOSE OTHER THAN THAT MENTIONED IS TO BE DONE ONLY AFTER PRIOR APPROVAL.
CLIENT :
UNIVERSITY OF MUMBAI
ARCHITECT:
ArchiLab
D E S I G N P R O J E C T S A R T
TM
SIGN & STAMP:
DESCRIPTIONDATE
AS SHOWN
NORTH
01/06/2019
CERTIFICATE OF AREA
CERTIFIED THAT PLOT AREA UNDER REFERENCE WAS SURVEYED BY ME
ON 20/09/17 AND THE DIMENSIONS OF SIDES ETC. OF PLOT STATED ON
PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT TALLIES
WITH THE AREA STATED IN DOCUMENTS.
SIGN:
R0 FOR APPROVAL16 DEC 17
R1FOR APPROVAL
27 DEC 17
R2 FOR APPROVAL04 JAN 17
FIRE OFFICER- 01
SIGN
PROPOSAL NO:
CHE/SPL/3162/H/E/337(NEW)
R3 FOR APPROVAL08 FEB17
FIRE OFFICER- 02
SIGN
FIRE OFFICER- 03
SIGN
R4 AMENDED LAYOUT FOR APPROVAL01 JUNE 19
19
.9
0
BUILDING ELEVATION
09
Vinod Patil
Digitally signed by Vinod Patil Date: 2019.06.21 11:53:37 +05'30'
Ashish Patil
Digitally signed by Ashish Patil Date: 2019.06.21 11:54:10 +05'30'