PT. Waskita Karya, Tbk. DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA NASIONAL PENGADAAN BARANG & JASA PEMERINTAH Oleh: Ir. Mohamad Indrayana, M.EngSc SVP System, Technology & Research Division Jakarta, 12 Agustus 2019 www.institutBIM.id
92

DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Nov 05, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PT. Waskita Karya, Tbk.

DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA NASIONAL

PENGADAAN BARANG & JASA PEMERINTAH

Oleh:

Ir. Mohamad Indrayana, M.EngSc

SVP – System, Technology & Research Division

Jakarta, 12 Agustus 2019

www.institutBIM.id

Page 2: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 3: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Lini Bisnis Waskita Karya (Produk Utama)

Precast5

Waskita melalui PT

Waskita Beton Precast

bergerak dalam

penyediaan bahan baku

dengan memproduksi

produk beton berkualitas

tinggi seperti :

❖ Girder

❖ Spun Pile

❖ Box Culvert

❖ Sheet Pile

❖ dll

melaluiPT

Karya Realty

Waskita

Waskita

(“WKR”)

investasi

melakukan

di bidang

pengembangan realty

dan property yang

berfokus pada bangunan

gedung seperti :

❖ Hotel

❖ Apartment

❖ SOHO

❖ Kantor

❖ Mixed Use

Energy/

Infrastruktur

Waskita Karya melalui PT

Waskita Karya Energi

(“WKE”) / PT Waskita

Karya Infrastruktur (“WKI”)

melakukan investasi di

bidang Infrastruktur non

tol serta pengembangan

power

energi

dan pengelolaan

plant khususnya

terbaharukan

1 2 3Jalan Tol Realty

melalui PT

Toll Road

Waskita

Waskita

(“WTR”)

investasi

melakukan

di bidang

infrastruktur jalan tol dan

telah memiliki 18 ruas

jalan tol di Jawa &

Sumatera.

WTR bertujuan menjadi

developer jalan tol yang

berfokus sebagai feeder

konstruksi bagi Waskita

Konstruksi4

Waskita mengerjakan

yangproyek-proyek

berasal dari:

❑ Internal:

Anak Perusahaan /

Investasi

❑Eksternal:

Pemerintah, BUMN/D,

Swasta, Luar Negeri

Investasi KonstruksiSupply

Material

Konstruksi

Waskita fokus

perusahaan

konstruksi

sebagai

jasa

dengan

keahlian utama di bidang

konstruksi sipil dan

gedung.

Konstruksi

Page 4: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Struktur Grup Perusahaan

22 Perusahaan

Terafiliasi dengan

kepemilikan 18

Ruas Jalan Tol

Jalan

Tol

Kapasitas

PrecastTerbesar

di IndonesiaPrecast

9 Perusahaan

Bergerak

dibidang Realty,

Infrastruktur,

Energy,

Pelabuhan dan

lainnya

Lainnya

Lini Bisnis

Page 5: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

About : Company’s Background

• PT Waskita Karya (Persero) Tbk, ticker code : WSKT:IJ, is Indonesia’s largest state

owned construction company engaged in 5 business lines; construction services, toll

road investment, precast concrete, realty and energy.

• Waskita Karya was first established as a foreign company named Aannemings

Maatschapiij N,V, Then became nationalized as State Owned Company in 1961.

• Listed in Indonesia Stock Exchange in December 2012 by issuing new shares

amounting IDR 1,2 Trillion.

• Issued new shares in June 2015 through Rights Issue with the total IDR 5.298 Bio :

- Government Capital Injection IDR 3.499 Bio

- Public IDR 1.798 Bio

• Issued new shares of PT Waskita Beton Precast Tbk through IPO in Indonesia Stock

Exchange on 20 September 2016 with the total proceed amounting IDR 5,2 Trillion.

128.952Total Assets (IDR Bio)

Government

66%

Public

34%

124.392

97.896

61.433

30.309

8.788 12.542

2.228 3.701 4.079 5.1168.366

FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 1Q19

Ownership – 1Q19

Page 6: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Panjang Pembangunan Tol (KM)

2015 2016 2017 2018

Jalan Tol Solo – Ngawi 12,38 28,67 21,25 6,53

Jalan Tol Bekasi – Cawang –Kampung Melayu

1,70 6,00 2,89 0,62

Jalan Tol PematangPanggang – Kayu Agung

- 4,83 22,78 45,88

Jalan Tol Terbanggi Besar –Kayu Agung

- 1,61 35,62 20,81

Jalan Tol Kayu Agung –Palembang – Betung

- 7,09 15,31 28,67

Jalan Tol Solo – Kertosono 1,37 10,50 8,05 1,08

Jalan Tol Ngawi Madiun 0,90 7,53 9,82 1,74

Jalan Tol Batang - Semarang - 7,60 40,22 25,55

Jalan Tol Pemalang - Batang 2,61 21,96 13,91

Jalan Tol Pejagan - Pemalang 7,96 11,35 22,95 7,96

Proyek Jalan Tol Waskita Karya

44.1

119.29

299.05 288.83

0

100

200

300

400

2015 2016 2017 2018

Pembangunan Jalan Tol(km)

Panjang Jalan Tol (km)

Page 7: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Perkembangan Industri Konstruksi

Agrikultur

Manufaktur

Konstruksi

1940 Sekarang

Page 8: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PERKEMBANGAN INDUSTRI KONSTRUKSI

Page 9: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 10: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 11: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 12: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 13: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BUILD IT DIGITALLY beforeBUILDING IT PHYSICALLY What is BIM?

BUILDING INFORMATION MODELING is modeling TECHNOLOGY and associated set of PROCESSto produce, communicate, analyze and use DIGITAL INFORMATION MODELS for construction project life-cycle.

Page 14: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 15: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 16: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BIM ADOPTION AROUND THE WORLD

The adoption of BIM is

increasing worldwide as

the construction industry is

becoming largely aware of

the benefits it offers

It’s just a matter of time

when BIM techniques will

completely replace the

traditional methods of

construction.

Page 17: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 18: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

APAKAH INISIATIF INSTITUT BIM INDONESIA?

• VISI

Menjadi organisasi pelopor dan memimpin pengembangan dan implementasi BIM di Indonesia

• MISI

Memimpin terwujudnya standar dan protokol BIM, menginformasikan dan membagikan metodologi serta strategi BIM secara umum untuk industri arsitektur, enjiniring dan konstruksi di Indonesia, agar kemudian dapat berpartisipasi dan berkolaborasi di industri global

Design The Standard, Building The Future

• 2013 – 2018 : BIM masuk dalam kurikulum S1 Arsitektur (KAAB Accredited), S1 Sipil

• 2014 : diskusi antar para praktisi pengguna BIM dalam ranah Arsitektur dan Engineering.

• 2016: Diskusi panel implementasi BIM dan Tantangan Pengembangan BIM Protocol untuk Indonesia.

• 2017: Indonesia BIM Forum.

• 2017: sekitar 100 anggota dari kalangan praktisi dan akademisi.

• 2018 : Workshop Pilot Project Morotai, PUPR

• 2018 : Indonesia BIM Conference.

• 2019 : Indonesia BIM Forum.

www.institutBIM.id

Jakarta :Pandega Desain Weharima - PDW Architects

Plaza 3 Pondok Indah, Blok B-5Jl. TB Simatupang, Jakarta

PT. Waskita Karya (persero), TbkJl. MT. Haryono kav.10

Bandung :Gedung Arsitektur

Labtek IX B- Institut Teknologi BandungJalan Ganeca no.10

Bandung

Yogyakarta :Ruang PFK (Campus Facility Management)

Gd. M. Natsir Lt.2 Sayap SelatanKampus Terpadu Universitas Islam Indonesia

Jl. Kaliurang KM. 14,5 Sleman Yogyakarta

Coming As BIM COE : Universitas Gadjah Mada- YogyakartaInstitut Teknologi Sepuluh Nopember

Universitas Diponegoro - SemarangUniversitas Negeri Riau - Pekanbaru

(PERKUMPULAN MASYARAKAT BIM INDONESIA)

Page 19: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

www.institutBIM.id

• KOMISI KERJA INSTITUT BIM INDONESIA• Pengawas : Ir. Hadjar Seti Adji, M.Eng Sc

: Prasetyoadi, ST. MUDD

• Ketua Komisi : Kharis Alfi, S.T

• Sekretaris : Bobby Henatta, S.T

• Bendahara : Amy Rachmadhani, S.T

• Penelitian & Pengembangan untuk Standarisasi dan Protokol

Aswin Indraprastha, PHD

Riva Tomasowa, S.T, M.Arch

Galuh Lidra Putra, B.A

Wawan Setiawan, S.T, MSc

Arief Rahman, S.T

• Kompetensi & Pendidikan

Ahmad Irsan, S.T, M.Arch

Bhima Rahadi, S.T

• Hubungan Strategis Antar Lembaga

Wawan Setiawan, S.T, MSc

Arief Rahman, S.T

• Sumberdaya Manusia & Pembinaan Komunitas

Fauzan Alfi, S.T, M.T

Ahmad Shiddiq Wangsaputra, S.T

Page 20: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

how about INDONESIA ?4 october

2017

Page 21: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 22: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

www.institutBIM.id

Page 23: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

www.institutBIM.id

Page 24: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

www.institutBIM.id

Page 25: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

WASKITA BIM SOLDIER – STRATEGIC PLANNING

Training

Awareness

Pelatihan External

Pelatihan Internal

Program

Roadmap BIM

Rencana kerja Triwulan

Standard

BIM Kurikulum

Library

Templates

Panduan

Manual

Measurement

Kriteria

Dashboard Monitoring

Procedure

SOP BIM 1-6

Terstruktur

Sistematis

Masif

Juli 2018 Juli 2019

Page 26: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PROGRAM AND INFRASTRUCTURE July 2018 December 2018 July 2019Target December

2019

IN-HOUSE TRAINING 0 Hour 240 Hours 1000 Hours 1360 Hours

EXTERNAL TRAINING 0 Hour 280 Hours 320 Hours 350 Hours

BIM CURRICULUM, STANDARD & MANUAL 0 Page 50 Pages 500 Pages 1000 Pages

BIM ENGINEERS TRAINED 0 Person 65 Persons 200 Persons 300 Persons

BIM COLLABORATORS 0 Person 10 Persons 75 Persons 150 Persons

BIM IMPLEMENTED TENDER PROPOSAL 0 Project 27 Projects 51 Projects 75 Projects

ON-GOING BIM IMPLEMENTED PROJECTS 0 Project 3 Projects 20 Projects 25 Projects

BIM AUTHORING SOFTWARES 1 License 25 Licenses 40 Licenses 45 Licenses

C.D.E. COLLABORATORS 0 User 25 Users 125 Users 300 Users

HARDWARES HoloLens, VR Headsets, Smart Boards

DEVICES Laser Scanners, LiDAR, Fixed Wing Drones, Rotary Drones, GPS Geodetics,

WASKITA BIM SOLDIER – BIM RESOURCES 2019

Page 27: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

WASKITA BIM SOLDIER – BIM TRAINING

Page 28: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

WASKITA BIM SOLDIER – BIM TRAINING

Page 29: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BIM COORDINATION & COLLABORATION

Page 30: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

WASKITA DALAM PERGERAKAN DIGITALISASI E&C NASIONAL

Evaluasi modul belajar

BIM kementerian PUPR

Uji Coba Sistem Pelatihan

Perencanaan Konstruksi

dengan Teknologi BIM

bersama kementerian PUPR

Kuliah umum, Workshop,

FGD dengan beberapa

Universitas di Indonesia

Bekerjasama dengan

Kementerian PUPR dan iBIMi

dalam meningkatkan awareness

terhadap Digitalisasi Konstruksi

di Indonesia

Berdiskusi mengenai Positioning

Balitbang PU dalam menghadapi

pembangunan Infrastruktur pada

era revolusi industry 4.0

Berdiskusi mengenai

database digitalisasi

konstruksi di Indonesia

dengan LKPP

Page 31: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Glossary :

BIM = Building Information Modeling

IFC = Industrial Foundation Classes

IPD = Integrated Project Delivery

IDM = Information Delivery Manual

IFD = International Framework for Dictionaries

BLM = Building Lifecycle Management

PLM = Precinct Lifecycle Management

BS 1192:2007+A2:2016 = Collaborative production of

architectural, engineering and construction information

PAS 1192 = Publicly Available Standard for BIM

BS 8541 = Library Object for AEC

ISO 19650 = Organization of information about construction works -

Information management using building information modelling

2019 :

IMPROVED DATA

SOURCE & OPEN

COLLABORATION

WASKITA BIM MATURITY

Page 32: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 33: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 34: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BIM MODEL

STRUKTUR,

ARSITEKTUR MEP

3D VISUALIZATION

WALK THROUGHVISUALISASI PROJECT DAN

CONSTRUCTION DALAM BENTUK 3

DIMENSI

3D METHOD

SIMULATIONMENYAJIKAN METODE

PELAKSANAAN DALAM ANIMASI

3D UNTUK MENJADAI BAHAN

EVALUASI DAN MELAKUKAN

PERBAIKAN SEHINGGA DICAPAI

METODE KERJA YANG OPTIMAL

DAN AMAN

3D COORDINATION CLASH

DETECTIONKOMPOSIT ARSITEKTUR STRUKTUR

DAN MEP, MENGIDENTIFIKASI AREA

PADAT, LOW HEAD ROOM, CLASH

ANTAR DISIPLIN, MEMBAHAS DALAM

RAPAT KOORDINASI, MENGUSULKAN

SOLUSI UNTUK DICAPAI BANGUNAN

YANG TERKOORDINASI SEHINGGA

MENGANTISIPASI BONGKAR PASANG

DAN PEKERJAAN ULANG

4D CONSTRUCTION

SEQUENCESMENGGABUNGKAN BIM MODEL

DENGAN DATA SKEDUL

PEKERJAAN SEHINGGA

DIHASILKAN TAHAPAN

PEKERJAAN, MELAKUKAN

EVALUASI DAN MELAKUKAN

PERBAIKAN UNTUK DICAPAI

RENCANA PEKERJAAN YANG

OPTIMAL

5D QUANTITY TAKE

OFF COST ESTIMATEMENGGUNAKAN BIM MODEL

SEBAGAI SUMBER DATA

INFORMASI KUANTITAS YANG

DIGUNAKAN UNTUK

MERENCANAKAN DAN

MEMONITOR BIAYA KONSTRUKSI

2D DOCUMENTATION &

SHOPDRAWINGMEMPRODUKSI SHOPDRAWING DARI

BIM MODEL SEHINGGA DIDAPAT

SHOPDRAWING YANG AKURAT DAN

TERKOORDINASI

3D BAR BENDING &

BAR CUTTING LISTMEMANFAATKAN BIM MODEL

UNTUK MERANCANG BESTAD

DAN MEMBUAT GAMBAR

FABRIKASI BESI DAN DAFTAR

POTONG SECARA AKURAT

6D ENERGY ANALYSISMENGGUNAKAN BIM MODEL

UNTUK MELAKUKAN STUDI

KINERJA BANGUNAN TERHADAP

PENGGUNAAN ENERGY YANG

EFISIEN

7D FACILITY

MANAGEMENTMENGGUNAKAN BIM MODEL

SESUAI AKTUAL TERBANGUNAN

UNTUK MENGELOLA

PEMELIHARAAN BANGUNAN

SECARA DIGITAL

AS BUILD MODELMENGUPDATE BIM MODEL

SESUAI DENGAN AKTUAL

PELAKSANAAN KONSTRUKSI

UNTUK KEMUDIAN DIGUNAKAN

SEBAGAI DATA PEMELIHARAN

BANGUNAN

BIM KEY KNOWLEDGE

Page 35: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Laser Scanner

Quantity Take Off (5D)

Photogrammetry

WMS Animation

3D Visualization

Common Data

Environment

Schedule/4D

Simulation

BIM Waskita Karya sedang

memasuki tahap level 2 dengan

berkolaborasi digital secara internal

dan eksternal, sementara kedalaman

dimensinya sudah memasuki 7D

Shop Drawing

IMPLEMENTASI BIM DI WASKITA KARYA

Page 36: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Project Manager

QHSE Dpt.Business Unit

Representative

Operational Dept.

Engineering Dept.

Administration Contract Dept.

Administration Dept.

Logistic Dept

Project Manager

QHSE Dept.Business Unit

Representative

Operational Dept.

Engineering Dept.

Administration Contract Dept.

Administration Dept.

Logistic Dept

Project Before 2019 Project After 2019

CDE

BIM Level 2 CERTIFIED

COMMON DATA ENVIRONMENT, INTERNAL

Page 37: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Owner

ArchitectSuppliers &

Vendors

Contractors

MEP EngineerQuantity Surveyor

Civil Engineer

Structural Engineer

Current Expected

CDE

BIM Level 2 CERTIFIED

COMMON DATA ENVIRONMENT, ECOSYSTEM

Owner

ArchitectSuppliers &

Vendors

Contractors

MEP EngineerQuantity Surveyor

Civil Engineer

Structural Engineer

Page 38: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PEMANFAATAN COMMON DATA ENVIRONMENT DALAM PROYEK

Page 39: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PEMANFAATAN COMMON DATA ENVIRONMENT DALAM PROYEK

Page 40: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PENGARUH DIGITALISASI TERHADAP PERKEMBANGAN KONSTRUKSI

Page 41: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PENGARUH DIGITALISASI TERHADAP PERKEMBANGAN KONSTRUKSI

Page 42: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PENGARUH DIGITALISASI TERHADAP PERKEMBANGAN KONSTRUKSI

Page 43: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

PENGARUH DIGITALISASI TERHADAP PERKEMBANGAN KONSTRUKSI

Page 44: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 45: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA

Page 46: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA -TERRESTRIAL LASER SCANNER (TLS)

Page 47: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

• Terrestrial Laser Scanner (TLS) merupakan High Definition Surveying (HDS)yang mana merupakan suatu revolusi dalamproses survei pemetaan saat ini.

• TLS dapat mengambil data lebih cepat dan lebih detail jika dibandingkan dengan metodekonvensional.

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –TERRESTRIAL LASER SCANNER (TLS)

Prinsip Kerja

• TLS bekerja dengan mengirimkan sinar laser keseluruh bidang pandang .

• Setiap kali sinar laser menyentuh permukaanreflektif, sinar dipantulkan kembali ke arahpemindai .

• Hasil data merupakan kumpulan titik-titik (pointclouds) setiap titik memiliki nilai koordinat yangdapat diikatkan ke titik control sehingga memilikikeakuratan yang tinggi

Pengertian

Page 48: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

UAV DRONE

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA-PHOTOGRAMMETRY

Page 49: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

TEKNOLOGI KONSTRUKSI WASKITA KARYA -PHOTOGRAMMETRY

Page 50: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

WASKITA RAJAWALI TOWER

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 51: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

WASKITA RAJAWALI

TOWER

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 52: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PEMANFAATAN WEARABLE DEVICES HOLOLENS

Page 53: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

APARTEMENT SOLTERA

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 54: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

APARTEMEN YUKATA

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 55: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

APARTEMEN NINE PLAZA

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 56: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

UIII

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 57: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

AQUATIC PAPUA

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 58: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BANDARA DEPATI

AMIR

TEKNOLOGI KONSTRUKSI DIGITAL WASKITA KARYA –PENERAPAN DALAM PROYEK BANGUNAN

Page 60: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

POWER PLANT

Portofolio BIM Waskita – EPC Division

Page 61: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

TRE

WATER TREATMENT PLANT

Portofolio BIM Waskita – EPC Division

Page 62: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

No Nama Proyek Lokasi

1 Jalan Tol Pematang Panggang KayuAgung Seksi 4A (Interchange)

Sumatera Selatan

2 Jalan Tol Kuala Tanjung - Inderapura Sumatera Utara

3 Workshop Fabrikasi Baja PT WKI Banten

JALAN TOL PPKA

PABRIK BAJA CIKANDE

JALAN TOL KTIP

Portofolio BIM Waskita – Infrastructure 1 Division

Page 63: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Jalan Tol Pematang Panggang - Kayu Agung Seksi 4A (Interchange)

Portofolio BIM Waskita – Infrastructure 1 Division

Page 64: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Junction Indrapura

Main Road Kuala TanjungJalan Tol Kuala Tanjung Indrapura

Portofolio BIM Waskita – Infrastructure 1 Division

Page 65: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Workshop Fabrikasi Baja PT WKI

Portofolio BIM Waskita – Infrastructure 1 Division

Page 66: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Designed Road

Photogrammetry and laser

scanner

Toll Gate

Cipularang Toll Road

Designed Bridge

Existing Toll Gate

Used Existing Ramp

Destroyed Existing Ramp

Jakarta – Cikampek Selatan, Junction Sadang

Portofolio BIM Waskita – Infrastructure 2 Division

Page 67: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Portofolio BIM Waskita – Infrastructure 2 Division

Page 68: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Tol Cimanggis - Cibitung Seksi 2

Portofolio BIM Waskita – Infrastructure 2 Division

Page 69: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

TOL PROBOLINGGO-BANYUWANGI

Portofolio BIM Waskita – Infrastructure 3 Division

Page 70: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

TOL TELUK BALIKPAPAN

Portofolio BIM Waskita – Infrastructure 3 Division

Page 71: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BENDUNGAN MARGATIGA

Portofolio BIM Waskita – Infrastructure 3 Division

Page 72: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BENDUNGAN JLANTAH

Portofolio BIM Waskita – Infrastructure 3 Division

Page 73: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BENDUNGAN BENER

Portofolio BIM Waskita – Infrastructure 3 Division

Page 74: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BENDUNGAN TEMEF

Portofolio BIM Waskita – Infrastructure 3 Division

Page 75: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 76: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

LANDASAN PEMIKIRAN

1. Peraturan Presiden Nomor 54 Tahun 2010 Tentang Pengadaan Barang/Jasa,

2. Peraturan Presiden Nomor 35 Tahun 2011 Tentang Perubahan Atas Peraturan Presiden Nomor 54 Tahun

2010 Tentang Pengadaan Barang/Jasa Pemerintah,

3. Peraturan Presiden Nomor 70 Tahun 2012 Tentang Perubahan Kedua Atas Peraturan Presiden Nomor 54

Tahun 2010 Tentang Pengadaan Barang/Jasa Pemerintah,

4. Peraturan Presiden Nomor 172 Tahun 2014 Tentang Perubahan Ketiga Atas Peraturan Presiden Nomor

54 Tahun 2010 Tentang Pengadaan Barang/Jasa Pemerintah Dan

5. Peraturan Presiden Nomor 4 Tahun 2015 Tentang Perubahan Keempat Atas Peraturan Presiden Nomor

54 Tahun 2010 Tentang Pengadaan Barang/Jasa

6. Peraturan Presiden Nomor 16 Tahun 2018 Tentang Pengadaan Barang/Jasa Pemerintah

Page 77: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

LANDASAN PEMIKIRAN

Page 78: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

LANDASAN PEMIKIRAN

Page 79: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 80: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

IMPLIKASI BIM DAN PENGARUHNYA DALAM PRAKTEK JASA KONSTRUKSI

Page 81: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Usulan Skema Untuk Memasukkan

Komponen Biaya Penerapan BIM

dalam Proyek Konstruksi

● Dengan Menerapkan BIM, Penyedia Jasa

Berhak Menawarkan Jasa Konstruksi Lebih

Tinggi

● Dengan Proyeksi Penghematan yang dicapai,

Sekian Persen dari Proyeksi Penghematan

dikembalikan ke Proyek sebagai Peningkatan

Mutu Konstruksi

● Seluruh Investasi terkait Software, Hardware

& Infrastruktur Pendukung, disediakan oleh

Pemberi Tugas

IMPLIKASI BIM DAN PENGARUHNYA DALAM PRAKTEK JASA KONSTRUKSI

Page 82: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

GARIS BESAR PBJP

Identifikasi Kebutuhan(mulai)

Penetapan Barang/Jasa

Cara

Jadwal

Anggaran PengadaanBarang/Jasa

Persiapan Swakelola

Penetapan sasaran

Penyelenggara Swakelola

Rencana Kegiatan

Jadwal Pelaksanaan

RAB

Persiapan PBJ Melalui Penyedia

Menetapkan HPS

Menetapkan rancangan Kontrak

Menetapkan spesifikasi teknis/KAK

Menetapkan uang muka, jaminan uang muka, jaminan pelaksanaan, jaminan pemeliharaan,sertifikat garansi dan/atau penyesuaian

harga

Pelaksanaan PBJ melalui Swakelola

Pelaksanaan SwakelolaTipe (I, II, III, IV)

Pembayaran Swakelola

Pengawasan danPertanggungjawaban

Pelaksanaan PBJ melaluiPenyedia

Pelaksanaan Pemilihan

Pelaksanaan kontrak

Serah Terima Hasil Pekerjaan(Selesai)

Perencanaan Pengadaanterdiri atas: Perencanaan PBJ melalui Swakelola dan/atau

Penyedia

Pokja Pemilihan: persiapan pemilihan

PP

K

Perencanaan Persiapan Pelaksanaan

Page 83: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

Hal yang dipengaruhi oleh implementasi BIM Issue Terkait

1. Metode Penyampaian EIR(TOR) & BEP

(RKS) dalam Kontrak

2. Metode & Standar Kinerja Deliverable

dokumentasi konsultan, reff. ISO 19650

3. Metode Lelang dan dokumen lelang,

pembuatan BQ

4. Metode serah terima data forcon ke

kontraktor

5. Metode Koordinasi, Review dan Approval

6. Metode Audit Progres dan serah terima

7. Kualifikasi perusahaan dan SDM

1. Klausul kontrak, Layanan BIM Terintegrasi

atau Terpisah

2. Roadmap pengembangan, Kompetensi

SDM dan penyedia jasa

3. Standard Prosedur Pengadaan barang dan

jasa

4. CDE (Common data environment)

5. Work Breakdown Structure - ID

(Uniformat/Masterformat/Uniclass)

6. Standard target dan kinerja BIM

7. Penerapan gradual, Selaras dengan

Roadmap PUPR

8. Program sertifikasi bertahap

IMPLIKASI BIM DAN PENGARUHNYA DALAM PRAKTEK JASA KONSTRUKSI

Page 84: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

BIM LIBRARY

DATABASE KOMPONEN PROCUREMENT NASIONAL

Page 85: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 86: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...
Page 87: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

DATABASE KOMPONEN PROCUREMENT NASIONAL

Page 88: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

DATABASE KOMPONEN PROCUREMENT NASIONAL

Page 89: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

DATABASE KOMPONEN PROCUREMENT NASIONAL

Page 90: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

DATABASE KOMPONEN PROCUREMENT NASIONAL

Page 91: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...

● Penyediaan Barang dan Jasa Konstruksi

(kesepakatan data bersama-CDE, menyamakan

tujuan dibangunnya model BIM, database material

konstruksi, komponen manufaktur, perencana,

kontraktor dll)

● Proses & Persyaratan Lelang (tenaga ahli,

kompetensi personil, kompetensi perusahaan

berdasarkan jenis & karakter pekerjaan)

● Proses Approval & Audit serta aspek Legal

(Kriteria Model BIM dalam setiap tahapan

pekerjaan, cara pemasukan dokumentasi & model

BIM, dokumentasi utk progress pekerjaan &

approvalnya, penyerahan dokumentasi as-built)

Kesepakatan dalam Interpretasi &

Pemufakatan Tujuan Pelaksanaan BIM

Pengembangan digitalisasi konstruksi nasional, 19-20 Maret 2019,

berdiskusi dg Bappenas dan BIM-UK, fasilitasi oleh CDBB, EU BIM

Task group dan British Council Indonesia, Mott MacDonald,

Hadir sbg undangan Kementrian PUPR, BSN, BNSP, KIAT(PPP/KPBU),

LPKJN, institut BIM Indonesia-PT.Waskita Karya Tbk

IMPLIKASI BIM DAN PENGARUHNYA DALAM PRAKTEK JASA KONSTRUKSI

Page 92: DATABASE KOMPONEN DIGITAL INDONESIA SEBAGAI SUMBER DATA ...