Ashok Bhatla May 2012
Jul 02, 2015
Ashok Bhatla
May 2012
With the advent of Cloud Computing and Big Data, Data center investments are a major decision for any medium to large enterprise.
Companies are also faced with the challenge of different Hosting Models like Co location, Managed hosting, Outsourcing etc.
There is a lack of mathematical decision models which help management to make informed decisions.
Setup a modern energy efficient data center with minimum cost, high computing power, at a desired location with low chances of natural disasters – providing best value to the business it serves.
Develop a Decision Model for data center site selection for companies settings up their own dedicated data centers.
Decision Model can also be used for companies consolidating their data centers.
Define Overall Key Decisions
Select Different Criteria and Factors
Select Different Alternatives
Gather Expert Opinion for Criteria & Factors
Measure and Identify Relative weights
Calculate Impact of criteria on overall
decisions
Conclude the best possible site for an IT
Data Center
ik
y
ijD
-kjijFw
- yiiCwi
Av
DFwCwAv
ij
ij
y
i
k
jijiji
Cunder factors ofNumber
model in the criteria ofNumber
Cin factor for ranking eAlternativ
)1( Cin factor of Weight
)1 ( criterion of Weight
valuefinal eAlternativ
1 1
==
=
====
=
∗∗= ∑∑= =
Exper t 1: IT Data Center Manager – responsible for operations of Data Center.
Exper t 2: Facilities Planner – responsible for design and construction of buildings
Exper t 3: IT Systems Engineer – responsible for IT systems like routers, switches and servers.
Exper t 4: Finance Analyst – responsible for the NPV and ROI Analysis and Budgeting etc.
Exper t 5: Electrical Engineer – responsible for Cooling and Power Issues in a Data Center
% of Criteria 1
% of Criteria 2
Pairwise comparison of Criteria's
C1: Geographical Factors C2: Financial Factors
C1: Geographical Factors C3: Political Factors
C1: Geographical Factors C4: Social Factors
C2: Financial Factors C3: Political Factors
C2: Financial Factors C4: Social Factors
C3: Political Factors C4: Social Factors
% of Factor 1
% of Factor 2
Pairwise Comparison of Geographical Criteria Factors (F11-F15)
F11: Disaster Avoidance F12: Transport Availability/ Accessibility
F11: Disaster Avoidance F13: TelecomNetwork Availability
F11: Disaster Avoidance F14: Power Availability
F11: Disaster Avoidance F15: Water Availability
F12: Transport Availability/ Accessibility F13: TelecomNetwork Availability
F12: Transport Availability/ Accessibility F14: Power Availability
F12: Transport Availability/ Accessibility F15: Water Availability
F13: Telecom Network Availability F14: Power Availability
F13: Telecom Network Availability F15: Water Availability
F14: Power Availability F15: Water Availability
Criterion Factors Desirability Values (0-100)
Site A Site B Site C Site D
C1: Geographical Factors
F11: Disaster Avoidance
F12: Transport Availability/ Accessibility
F13: Telecom Network Availability
F14: Power Availability
F15: Water Availability
C2: Financial Factors
F21: Land Cost
F22: Building Construction Cost
F23: Variable Costs – electricity cost, property tax
C3: Political Factors
F31: Tax Structure, Incentives and Subsidies
F32: Jobs Creation
C4: Social Factors
F41: Safety & Security, Crime
F42: Laws related to Urban Planning