HP TECHNOLOGY@WORK 2011 THE INSTANT-ON ENTERPRISE IS HERE
May 25, 2015
HP TECHNOLOGY@WORK 2011THE INSTANT-ON ENTERPRISE IS HERE
DATA CENTRES –ONE SIZE DOESNOT FIT ALL
David WotzkoHP Critical Facilities Services
AGENDA
– Challenges
– Data Centre Solutions
– HP Critical Facilities Services
– Next Steps
3
CHALLENGES
Management software
Network
Servers
Power & cooling
Storage
HP CONVERGED INFRASTRUCTURE
THE DATA CENTRE OF THE
FUTURE WILL BE BUILT ON
A CONVERGED
INFRASTRUCTURE
BUSINESS & DATA CENTRE PRESSURES
6
BUSINESS
OPERATIONS
FACILITIESIT INFRASTRUCTURE
Economic Uncertainty
TOP CHALLENGES FOR TODAY’S DATA CENTRES
– The most often cited top minded challenge for the data centre is power and cooling
– Space is the #3 challenge • often linked with power and cooling
– As companies become increasingly dependent on IT, reliability and availability of the on IT, reliability and OVERALL data centre is crucial
21.8%
15.5%
12.4%
8.8%
8.3%
2.1%
3.6%
4.1%
6.2%
6.7%
Other
Complete withoffshoring/outsourcing
Technology
Security
Maintenance
Staffing/qualified staff
Growth/change
Costs/budgets
Space/spaceplanning/size limitations
Availability/redunancy/DR
Power & cooling
7.3%
DATA CENTRE TYPES
ENTERPRISE
– High reliability
– Heterogeneous
– Mix density
– Customised
– Tier 3-4
8
INTERNET
– Low reliability
– Homogeneous
– High density
– Standardised
– Tier 1-2
CO-LOCATION
– Average reliability
– Heterogeneous
– Market driven mixed density
– Standardised
– Tier 2-3
DATA CENTRE SOLUTIONS
MULTI-TIERED HYBRID DESIGN: MTHD
Redundant MEP for critical applications
MEP for less-critical applications
Now-unused floor space
High-availability pod for highly critical applications
Pod for less-critical applications
MULTI-TIERED HYBRID VS. MONOLITHIC
Provides same operational framework (i.e., Tier level I, II, III, or IV) across all pods
Allows applications of similar criticality to be deployed in different pods
MEP infrastructure provides the required operational level to each pod
BENEFITS OF MULTI-TIERED HYBRID DESIGN
Reduced cost of building & retro-fitting
data centres
Up to 25% less that monolithic
Dynamic IT environment
Adaptivenot static facility
response
Variable & scalable
availability
Direct correlation to desired
uptime
Avoids unused redundancy
Reducing facilities and energy costs
FLEX DC
Innovative concept -
challenging conventional data
centre design
Designed with a centre core module for networking and security, surrounded by four server rooms
Cooling equipment attaches to the rear of each data center module
Generators and power conditioning units are housed next to the facility
ELEMENTS OF HP FLEX DC: THE BUTTERFLY
Power Conditioning Module
Generator Module
ITM Module
Cooling Module
Central Core
M8 –800 kW Module
BENEFITS OF HP FLEX DC
Industrialisedapproach
Low cost solution
Modular architecture
Limitless scalability
and flexibility
Innovative cooling
technology
Low cost energy
efficiency
Shortened concept to
commissioned cycle
Significantly reduces time
to productivity
Standard design module
Suitablefor all
climate zones
HP PODPERFORMANCE-OPTIMIZED DATA CENTRE
HP PODSize•20ft or 40ft
Capacity• 10 or 22 50U
full-depth racks
• Support for 3,520 compute nodes,12,000 LFF drives or any combination
• Power capacity290kW or 450kW
Efficiency• PUE ratio <1.25 (1.07 excluding chiller)
BENEFITS OF HP POD
Lower construction &
acquisition costs
Up to 45% lessthan bricks & mortar
Reduced construction &
deployment time
12–16 weeks worldwide
Reduced operating expenses
Energy efficient PUE ratio as low
as 1.25
Higher equipment
density
Up to 27kW/rack (avg) (max
34kW)
HP CRITICAL FACILITIES SERVICES
CFS OVERVIEW
Formerly known as EYP MCF
360 Staff (300 Technical)
22 Offices in 15 countries
16 industry segments Largest Financial, Telecom, Internet, Government
Best-in-class high performance computing leadership and experience
Designed 2.7 million+ sqm critical space
Commissioned 1.8 million+ sqm of raised-floor environments
Current work in over 35 countries
Active projects in North & South America, Europe, Asia, Middle East
Majority of customers multi-national corporations
Designed the majority of the major Tier 4 “Greenfield” data/operations centers in the US in the last 3 years
Leader in E2 design Designed first LEED certified center
Designed first LEED GOLD center
Patent holder on DC Data center
DATA CENTRE LIFE CYCLE
PLAN
DESIGN
BUILD
COMMISSION
OPERATE
OPTIMISE
CRITICAL FACILITIES PORTFOLIO
Consulting• Trusted Advisor for
critical facilities
• Critical facility data center roadmap
• CFC Program Management
Assurance• Commissioning &
testing
• Facility operations strategy
• Failure & forensic analysis
Design• Facility design,
programming & cost modeling
• Engineering infrastructure
• Technology (cable plant) infrastructure
Implementation• Data Center Design-Build
Turnkey Service
• CFI On-Site Services
• Flexible Data Center
• DC Right-Sizing* • DC Sourcing Options* • Facility Infrastructure (FI)
Capability Maturity Model Assessment*
• Energy Efficiency Assessment• Thermal Assessment• Conceptual Planning Service
• Operational Risk Assessment
• Basic Capacity Survey• Infrastructure Condition
and Capacity Analysis
• Operational Continuous Improvement service*
• Reliability Assurance Testing*• Site Selection Service*
• Energy efficient design • Outsourced energy efficiency management services
Critical Facilities Standardised Services
Energy Efficiency Management *
HP TECHNOLOGY@WORK 2011THE INSTANT-ON ENTERPRISE IS HERE
QUESTIONS?
NEXT STEPS
Visit: The Cloud System Feature
Engage: See the HP Rep at rear of clinic
Seek more: Request follow up via Eval Form
Re-Live: www.hp.com.au/taw11post