+60.13 m +60.49 m +65.00 m +69.05 m +73.10 m +77.15 m +73.35 m +69.30 m +65.25 m +60.30 m +64.57 m +68.65 m +56.00 m +56.00 m +56.00 m +83.80 m +82.18 m +82.08 m +78.60 m +84.05 m +82.45 m +76.41 m +72.05 m +70.06 m +56.00 m +65.00 m +69.05 m +73.10 m +77.15 m +77.40 m +73.35 m +69.30 m +65.25 m +60.30 m +60.49 m +64.57 m +68.65 m +56.00 m +56.00 m +83.80 m +82.18 m +80.95 m +84.05 m +81.45 m +78.60 m +76.32 m +71.65 m LOND ON LEEDS CARD IFF NEWC ASTLE BRIST OL GLAS GOW ABER YSTWYTH NEWT OWN BRAD FORD MANC HESTER LOUG HBOROUGH d arnton 3 A R C H I T E C T U R E B CARDIFF CARDIFF CARDIFF CARDIFF 5 Callaghan Square, Cardiff, CF10 5BT Tel: 029 2034 2688 www.darntonb3.com B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BY QMS INTERNATIONAL - CERTIFICATE NUMBER GB18714’ COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. CLIENT CLIENT CLIENT CLIENT PROJECT PROJECT PROJECT PROJECT DRAWING DRAWING DRAWING DRAWING DRAWN DRAWN DRAWN DRAWN CHECKED CHECKED CHECKED CHECKED c c c c CREATION DATE CREATION DATE CREATION DATE CREATION DATE DARTONB3 DRAWING NO. DARTONB3 DRAWING NO. DARTONB3 DRAWING NO. DARTONB3 DRAWING NO. R R RE E EV V VI I IS S SI I IO O ON N N THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS PREPARED BY CONSULTANTS AND SUB-CONTRACTORS. THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FOR CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF. DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS. PLOT DATE: PLOT DATE: PLOT DATE: PLOT DATE: PROJECT NO. COMPANY ZONE LEVEL TYPE ROLE NUMBER 1 : 200 E 17/05/2017 15:12:54 TAFF VALE REDEVELOPMENT Site Sections 1 MH MS 10/02/17 RHONDDA CYNON TAFF CBC CONSULTATION CONSULTATION CONSULTATION CONSULTATION Model Ref: FILL OUT UNDER PROJECT PROPERTIES SCALE @A1 11431 - DB3 - SI - ZZ - DR - A - 90201 1 : 200 Site Section 1 Site Section 1 Site Section 1 Site Section 1 1 : 200 Site Section 2 Site Section 2 Site Section 2 Site Section 2 Rev Rev Rev Rev Date Date Date Date Description Description Description Description B B By y y C C Ch h hk k k # 10/02/17 First Issue MH MS A 08/03/17 Issued to HNLA MH MS B 09/03/17 Building C glazing amended MH MS C 28/03/17 Building C glazing A/B stairs amended MH MS D 31/03/17 TENDER ISSUE MH MS E 17/05/17 CONSULTATION ISSUE NF MS 0 m 20 1:200 15 10 5