DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion Presented by: Christian Berg Mørch ([email protected]) Torsdag den 20. november 2014 The suction bucket jacket a new wind turbine foundation concept
39

DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

May 06, 2018

Download

Documents

doantuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion

Presented by: Christian Berg Mørch ([email protected])

Torsdag den 20. november 2014

The suction bucket jacket – a new wind turbine foundation concept

Page 2: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

2

Introduction to the suction bucket jacket

Borkum SBJ Jacket configuration and responsibility split

Introduction to site assessment.

Integrated loads – methodology and results. Suction bucket design challenges

Load Measuring program setup

Suction Installation process predicted and measured.

First results from load measuring program

Questions

Agenda The suction bucket jacket – a new wind turbine foundation concept

Page 3: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Installation process

1) The suction bucket jacket is lowered to the seabed

2) An under pressure is applied to the buckets by means of individual pumps

3) The hydrostatic pressure difference and the deadweight causes the buckets to

penetrate the soil

4) The suction pumps are recovered to the installation vessel

5) A thin layer of concrete is injected between seabed and bucket lid

3

Introduction to the suction bucket jacket Functionality of the suction bucket jacket

Page 4: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

4

Introduction to the suction bucket jacket Functionality of the suction bucket jacket

P

Page 5: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

5

Motivations for suction bucket jackets (SBJ)

Strategic rationale

What can the technology do

Introduction

• A 'Suction Bucket Jacket' is a steel jacket foundation

installed with suction pump technology instead of ~50 m

piles driven into the seabed

Key benefits from use of a 'Suction Bucket Jacket'

• Enabler / License to Operate for noise regulated projects

(especially in Germany), as the concept solves noise

regulation issue and associated noise mitigation costs

• Enabler for certain soil conditions

• A cost reduction compared to the current foundation

technology on deeper waters and large WTGs

German cluster offshore wind farm key assumptions

Cost down potential for future wind farms

FID

Foundation installation year

Park capacity

WTG size

No. of positions

Positions suitable for suction buckets

Q3, 2015

2017-2018

576 MW

6MW

96

100 %

Foundation cost reduction potential for German cluster

CAPEX

mEUR / position

Why do we need a full scale test

Be ready for the German cluster projects

• A full scale test is required now to ensure a

proven technology and certification in

Germany for the 'German cluster' projects in

due time

Prove technology for Offshore Wind

• The 'Suction Bucket' technology has been

used for decades within the offshore oil & gas.

The loads from offshore wind turbines differ

significantly from the oil & gas structures and

are more dynamic

• As scaled model test can only verify parts of

the load spectre, a full scale test is required in

order to verify the full concept

wind loads

wave loads

wind loads

wave loads

Vertical

loads

Vertical

loads

Jacket on suction

buckets

Calculations based on GOW weather, water depth and soil conditions

15-20%

Jacket w.

buckets

(DP2)

4.6

3.3

1.3

Jacket w.

buckets

(Jack-up)

5.1

3.3

1.8

Jacket

w. piles

5.3

3.0

2.3

Monopiles

5.6

2.9

2.7

Supply

Installation

Page 6: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

6

Introduction to the suction bucket jacket

Borkum SBJ Jacket configuration and responsibility split

Introduction to site assessment.

Integrated loads – methodology and results. Suction bucket design challenges

Load Measuring program setup

Suction Installation process predicted and measured.

First results from load measuring program

Questions

Agenda The suction bucket jacket – a new wind turbine foundation concept

Page 7: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

7

Rotor Nacelle and Tower - Confidential part.

Integrated loads and Design Basis

Jacket design and hydrodynamic loads

Geotechnical design

Responsibility split

- Jacket structures for future projects

WTG Supplier

Geotechnical

design

Structural design

WTG Supplier

Page 8: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

8

Overall Time Schedule – Result

- Jacket structures for future projects

Approval

• Basic Design approved the 21st of

February 2014

• Duration 8 month

• 2nd BSH release submitted according to

schedule

• 3rd BSH release 21st of May

Page 9: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

9

WTG Supplier

Cable protection

Scour protection

Bucket installation

Foundation

installation vessel

WTG installation

Foundation installation

Cable installation

Geotechnical design

Structural design

Jacket

Under lid grouting

Co-funded by

Offshore Wind Accelerator - LOI

Suction Bucket Jacket prototype project Co-funder & Sub-contractors

Page 10: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

10

Borkum Suction Bucket Jacket Overview

- Jacket structures for future projects

• Weight

• TP: 130 t

• Jacket: 372 t

• Buckets: 250 t

• Total: 752 t

• Footprint: 23 x 23 m

• Top: 16 x 16 m

• Buckets: 8 x 8 m

• TP b.o.s: + 20.5 m

• TP t.o.s: + 23.5 m

• Interface flange: + 24.7m

• Total height: 56.6 m

Page 11: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

11

Introduction to the suction bucket jacket

Borkum SBJ Jacket configuration and responsibility split

Introduction to site assessment.

Integrated loads – methodology and results. Suction bucket design challenges

Load Measuring program setup

Suction Installation process predicted and measured.

First results from load measuring program

Questions

Agenda The suction bucket jacket – a new wind turbine foundation concept

Page 12: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

12

BKR01 – Position M05

- Jacket structures for future projects

• Water depth: 24.41 m

• Hmax: 18.3 m

• Mainly sand

Pos. M05

Page 13: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

13

BKR01 – Position M05

- Jacket structures for future projects

Main geotechnical data

Lab test overview

• Index tests

• Triaxial

• Static drained and undrained

• Cyclic drained and undrained

• DSS

• Bender element

• Permeability

Page 14: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

14

- Jacket structures for future projects

Metrological conditions from Fino mast. Uncomplicated !

Suction Bucket Jacket Design Basis. What was the challenge.

Page 15: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

15

Suction Bucket Jacket Design Basis. What was the challenge.

The real challenge was the waves !

• Fino I Waverider. 2003-07-30 - 2011-01-31

• Wamos waveradar 2004-01-27 - 2011-02-27

• Site specific hindcast data,DHI 1994-2007

• Tilo (2007) and Britta (2006)

• Extreme wave height is based on negotiations with DNV

• Largest measured Hs in the area is 11m. Individual waves of up to 18m are recorded

• FINO data was applied for loads and design.

- Jacket structures for future projects

1 2 5 10 20 50 1006

6.5

7

7.5

8

8.5

9

9.5

10

10.5

Return period [yr]

Hs (

m)

Return period plot

Return period value

95% confidence bounds

Observations

Shiermonnikoog Nord

1979-2010

Page 16: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

16

BKR01- Suction Bucket Jacket Design Basis. What was the challenge.

Position M05

yes

- Jacket structures for future projects

Page 17: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

17

Introduction to the suction bucket jacket

Borkum SBJ Jacket configuration and responsibility split

Introduction to site assessment.

Integrated loads – methodology and results. Suction bucket design challenges

Load Measuring program setup

Suction Installation process predicted and measured.

First results from load measuring program

Questions

Agenda The suction bucket jacket – a new wind turbine foundation concept

Page 18: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

How do we calculate the loads ? Suction Bucket Jacket Integrated loads - methodology

Structural design

Page 19: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

19

Suction Bucket Jacket Suction Bucket jacket studies – ROSA

- Jacket structures for future projects

• Rambøll internal software.

• Full ULS and FLS substructure sizing and code check (ROSA)

• Code check for each simulation time step

• Variation in soil conditions – soft, best estimate and stiff

• sadasd

Structural design

Page 20: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

20

BKR01- Suction Bucket Jacket Bucket design interface loads

Operational loads – most exposed bucket

Extreme loads – most exposed bucket. Lower bound stiffness

* Dynamic wave excess pressure have not been accounted for

0 100 200 300 400 500 600-2000

-1500

-1000

-500

0

500

Time sec

Vert

ical fo

rce k

N

Page 21: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

21

- Jacket structures for future projects

Suction Bucket Jacket Integrated loads – soil degradation and pore pressure from 35 hour storm

• Rayleigh distribution of sea states

• All compass directions

• Isolated wave impact and effect

• Counting and randomization

• Resting period of 70 sec.

Page 22: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

22

- Jacket structures for future projects

Suction Bucket Jacket Integrated loads – soil degradation and pore pressure from 35 hour storm

• Counting and randomization are very important

• Resting period between waves will dominate the pore

pressure built up and the effective strength.

NGI demonstrated that

• The soil had undrained behaviour

• No degradation in soil cyclic strength and stiffness

• Accumulated deformation from multiple storms could not

be successfully estimated.

Page 23: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

23

- Jacket structures for future projects

Suction Bucket Jacket Integrated loads – ULS secant stiffness evaluation

Page 24: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

24

- Jacket structures for future projects

Suction Bucket Jacket Integrated loads – FLS secant stiffness evaluation

Page 25: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

25

Introduction to the suction bucket jacket

Borkum SBJ Jacket configuration and responsibility split

Introduction to site assessment.

Integrated loads – methodology and results. Suction bucket design challenges

Load Measuring program setup

Suction Installation process predicted and measured.

First results from load measuring program and outlook

Questions

Agenda The suction bucket jacket – a new wind turbine foundation concept

Page 26: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

26

- Jacket structures for future projects

141 sensors, 50 Hz

Wave heights

Pore pressure sensors

Inclinations

Accelerations

Turbine system will be connected

Suction Bucket Jacket Load measuring program

Page 27: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

27

Introduction to the suction bucket jacket

Borkum SBJ Jacket configuration and responsibility split

Introduction to site assessment.

Integrated loads – methodology and results. Suction bucket design challenges

Load Measuring program setup

Suction Installation process predicted and measured.

First results from load measuring program and outlook

Questions

Agenda The suction bucket jacket – a new wind turbine foundation concept

Page 28: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

28

Page 29: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Offshore installation of the SBJ Suction in buckets AB and BC as a function of time

Three stages can been identified on figure

<1.8m: Successful start but ending in cycling the flow between 1,5 and 1,8m

1,8-6,4m: 600ton ballast applied. Fast penetration until pressure limited at ~200kPa is reached.

Cycling of suction starts around 6,2m penetration and not very successful.

6,4-6,6m: Pressure up to 320kPa applied on AB and cycled. Installation aborted at 6,6m

30

Page 30: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

31

Cycling starts at 1,5m penetration.

Possible piping at this stage but calculated critical suction pressure not exceeded.

A lot of noise in the echo sounder (BC) supports that theory.

No-flow caused by unexpected impermeable layer at 3m penetration?

Offshore installation of the SBJ Suction in buckets AB and BC as a function of penetration and critical

gradient.

Page 31: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Good match between suction pressure and maximum pressure required during no-flow for CPT A

Possible intermediate impermeable layer at 3m

During no-flow case CPT A. Penetration not possible below 6,2m, as is the case for the SBJ.

Possible piston effect around 3m seen on echo sounder (around 800min)

32

Offshore installation of the SBJ Suction in buckets AB and BC as a function of penetration and required

no-flow suction

Page 32: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

33

Introduction to the suction bucket jacket

Borkum SBJ Jacket configuration and responsibility split

Introduction to site assessment.

Integrated loads – methodology and results. Suction bucket design challenges

Load Measuring program setup

Suction Installation process predicted and measured.

First results from load measuring program and outlook

Questions

Agenda The suction bucket jacket – a new wind turbine foundation concept

Page 33: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

34

Observations from the measuring system First recordings from the system - TP accelerations and inclinations

Page 34: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Observations from the measuring system Transition piece accelerations after accidental boat impact

35

Page 35: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Observations from the measuring system Transition piece accelerations after accidental boat impact

36

Page 36: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Observations from the measuring system Transition piece accelerations after accidental boat impact

37

Page 37: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Eigen frequency design calculation 2.6 Hz

Eigen frequency observed 2.9 Hz

Eigen frequency fixed buckets 4.0 Hz

Observations from the measuring system Comparison between design and observed Eigen frequency

38

Page 38: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

Observations from the measuring system Transition piece accelerations after accidental boat impact

39

Page 39: DANSK GEOTEKNISK FORENING Samspil mellem jord … · DANSK GEOTEKNISK FORENING Samspil mellem jord og konstruktion ... Suction bucket design ... Possible piping at this stage but

40

- Jacket structures for future projects

Suction Bucket Jacket Further investigations to undertake for CoE reduction

Maximum compression pressure, kPa 74

Maximum tension pressure, kPa 39

Wave excess pressure