Daniel R Cameron Elementary School 1234 N Monticello Ave Chicago, IL 60651 This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Facility Assessment Report Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors Campus Summary Main 1897 120,281 $6,026,168 4 Annex (1905) 1905 17,053 $773,331 1 SITE $342,800 Campus Total $7,142,299 137,334 Building: Main Category: Building Exterior Item - Type Quantity Unit Rank Cost Location Group Comments Entrance Entrance Control - Audio #5 - NW 6 EA 1 $497 Entrance Control - Audio and Video #2 - E 6 EA 1 $702 Entrance Control - Audio and Video #3 - Main - NE 6 EA 1 $702 Entrance Control - Audio and Video #8 - SW 6 EA 1 $702 Exterior Doors - Exterior FRP Door #1 - SE 6 EA 3 $1,894 Exterior Doors - Exterior FRP Door #2 - E 6 EA 3 $1,894 Exterior Doors - Exterior FRP Door #3 - Main - NE 6 EA 3 $1,894 Exterior Doors - Exterior FRP Door #4 - N 6 EA 3 $1,894 Exterior Doors - Exterior FRP Door #5 - NW 6 EA 6 $3,788 Exterior Doors - Exterior FRP Door #6 - NW 6 EA 2 $1,263 Exterior Doors - Exterior FRP Door #7 - W 6 EA 1 $631 Exterior Doors - Exterior FRP Door #7.1 - W 6 EA 1 $631 Exterior Doors - Exterior FRP Door #7.2 - SW 6 EA 1 $631 Exterior Doors - Exterior FRP Door #8 - SW 6 EA 2 $1,263 Exterior Doors - Transom Lite #1 - SE 6 EA 3 $940 Exterior Doors - Transom Lite #2 - E 6 EA 1 $313 Exterior Doors - Transom Lite #3 - Main - NE 6 EA 3 $940 Exterior Doors - Transom Lite #4 - N 6 EA 3 $940 Exterior Doors - Transom Lite #5 - NW 6 EA 3 $940 Page 1 of 47 CAMERON Assessment Date: 9/10/14
47

Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Oct 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.

Facility Assessment Report

Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors

Campus Summary

Main 1897 120,281 $6,026,1684

Annex (1905) 1905 17,053 $773,3311

SITE $342,800

Campus Total $7,142,299137,334

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Entrance Control - Audio #5 - NW 6EA1 $497

Entrance Control - Audio and Video #2 - E 6EA1 $702

Entrance Control - Audio and Video #3 - Main - NE 6EA1 $702

Entrance Control - Audio and Video #8 - SW 6EA1 $702

Exterior Doors - Exterior FRP Door #1 - SE 6EA3 $1,894

Exterior Doors - Exterior FRP Door #2 - E 6EA3 $1,894

Exterior Doors - Exterior FRP Door #3 - Main - NE 6EA3 $1,894

Exterior Doors - Exterior FRP Door #4 - N 6EA3 $1,894

Exterior Doors - Exterior FRP Door #5 - NW 6EA6 $3,788

Exterior Doors - Exterior FRP Door #6 - NW 6EA2 $1,263

Exterior Doors - Exterior FRP Door #7 - W 6EA1 $631

Exterior Doors - Exterior FRP Door #7.1 - W 6EA1 $631

Exterior Doors - Exterior FRP Door #7.2 - SW 6EA1 $631

Exterior Doors - Exterior FRP Door #8 - SW 6EA2 $1,263

Exterior Doors - Transom Lite #1 - SE 6EA3 $940

Exterior Doors - Transom Lite #2 - E 6EA1 $313

Exterior Doors - Transom Lite #3 - Main - NE 6EA3 $940

Exterior Doors - Transom Lite #4 - N 6EA3 $940

Exterior Doors - Transom Lite #5 - NW 6EA3 $940

Page 1 of 47CAMERON Assessment Date: 9/10/14

Page 2: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Exterior Doors - Transom Lite #7 - W 6EA1 $313

Exterior Stairs - Concrete #1 - SE spalling5LF20 $2,192

Exterior Stairs - Concrete #2 - E Cracks5LF20 $2,192

Exterior Stairs - Concrete #5 - NW 6LF52 $4,252

Exterior Stairs - Concrete #8 - SW 6LF6 $491

Exterior Stairs - Stone #4 - N Spalling5LF20 $5,423

Power Door Operator and Controls #3 - Main - NE 6EA2 $0

Ramp Handrail - Steel_Ramp Handrail #5 - NW Bent5LF60 $636

Ramps - Concrete #5 - NW 6LF25 $3,756

Foundation

Foundation - Masonry Entire Building 7LF1,160 $0

Foundation - Masonry Entire Building Coal room seepage5LF10 $3,335

Superstructure - Heavy Timber Entire Building 7SF120,041 $0

Superstructure - Heavy Timber Entire Building Slab buckle in N basement corridor by IDF room5SF240 $0

Lighting

Exterior Lighting - Parapet or Roof Mounted Entire Building 6EA9 $4,829

Exterior Lighting - Wall Mounted Entire Building 6EA1 $289

Roof System

Cell Tower #7 - W 6EA1 $736

Chimney - Brick Chimney- Concrete/ Mortar Liner #7 - W 6LF90 $85,921

Chimney - Brick Chimney- Concrete/ Mortar Liner #7 - W Efflorescence5LF30 $85,547

Chimney - Metal Flue #7 - W 6LF36 $5,693

Coping - Stone #11 - Low Door #8 6LF23 $739

Coping - Stone #12 - N Entrance 6LF30 $964

Coping - Terra Cotta #1 - SE 6LF416 $13,361

Coping - Terra Cotta #10 - Low SSE 6LF26 $835

Coping - Terra Cotta #2 - Middle 6LF421 $13,522

Coping - Terra Cotta #3 - NE 6LF272 $8,736

Coping - Terra Cotta #4 - N 6LF60 $1,927

Coping - Terra Cotta #5 - NW 6LF375 $12,044

Coping - Terra Cotta #6 - Low N Courtyard 6LF8 $257

Coping - Terra Cotta #7 - W 6LF135 $4,336

Coping - Terra Cotta #8 - Low SE 6LF20 $642

Coping - Terra Cotta #9 - Low SW 6LF96 $3,083

Downspouts - Exterior Downspouts #10 - Low SSE 6LF14 $465

Downspouts - Exterior Downspouts #11 - Low Door #8 Remove debris in scupper box6LF13 $432

Page 2 of 47CAMERON Assessment Date: 9/10/14

Page 3: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Roof System

Downspouts - Exterior Downspouts #12 - N Entrance 6LF15 $498

Downspouts - Exterior Downspouts #2 - Middle 6LF183 $6,082

Downspouts - Exterior Downspouts #3 - NE 6LF65 $2,160

Downspouts - Exterior Downspouts #4 - N 6LF61 $2,027

Downspouts - Exterior Downspouts #6 - Low N Courtyard 6LF13 $432

Downspouts - Exterior Downspouts #7 - W 6LF12 $399

Downspouts - Exterior Downspouts #8 - Low SE 6LF13 $432

Downspouts - Exterior Downspouts #9 - Low SW 6LF12 $399

Downspouts - Interior Downspouts #1 - SE 6LF244 $8,109

Downspouts - Interior Downspouts #5 - NW 6LF252 $8,375

Parapet - 16" - 30" Height #11 - Low Door #8 6LF23 $919

Parapet - 16" - 30" Height #12 - N Entrance 6LF30 $1,199

Parapet - 16" - 30" Height #2 - Middle 6LF391 $15,622

Parapet - 16" - 30" Height #3 - NE 6LF40 $1,598

Parapet - 16" - 30" Height #4 - N 6LF60 $2,397

Parapet - 16" - 30" Height #5 - NW 6LF375 $14,983

Parapet - 16" - 30" Height #7 - W 6LF135 $5,394

Parapet - 16" - 30" Height #8 - Low SE 6LF20 $799

Parapet - 16" - 30" Height #9 - Low SW 6LF96 $3,836

Parapet - Parapet < 16" Height #6 - Low N Courtyard 6LF8 $170

Parapet - Parapet > 30" #1 - SE 6LF411 $26,272

Parapet - Parapet > 30" #1 - SE Efflorescence5LF5 $1,898

Parapet - Parapet > 30" #10 - Low SSE 6LF26 $1,662

Parapet - Parapet > 30" #2 - Middle 6LF30 $1,918

Parapet - Parapet > 30" #3 - NE 6LF202 $12,912

Parapet - Parapet > 30" #3 - NE S efflorescence5LF30 $9,847

Roof Structure #1 - SE 7SF9,068 $0

Roof Structure - Concrete #9 - Low SW 7SF532 $0

Roof Structure - Heavy Timber #12 - N Entrance 7SF125 $0

Roof Structure - Heavy Timber #2 - Middle 7SF8,599 $0

Roof Structure - Heavy Timber #3 - NE 7SF4,148 $0

Roof Structure - Heavy Timber #4 - N 6SF1,580 $17,171

Roof Structure - Heavy Timber #6 - Low N Courtyard Wet wood planking7SF1,123 $0

Roof Structure - Steel with Clay Tile Arch #10 - Low SSE Gaps, missing tile7SF845 $0

Roof Structure - Steel with Clay Tile Arch #11 - Low Door #8 7SF208 $0

Roof Structure - Steel with Clay Tile Arch #5 - NW Open joints, efflorescence7SF7,342 $0

Roof Structure - Steel with Clay Tile Arch #7 - W 7SF1,017 $0

Page 3 of 47CAMERON Assessment Date: 9/10/14

Page 4: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Roof System

Roof Structure - Steel with Clay Tile Arch #8 - Low SE 7SF384 $0

Roof - Metal #12 - N Entrance 6SF125 $1,675

Roof - Modified Bitumen #1 - SE Minor water ponding, repair flashing at air intake6SF9,068 $85,324

Roof - Modified Bitumen #10 - Low SSE Poor seams, water ponding5SF845 $17,775

Roof - Modified Bitumen #11 - Low Door #8 Remove debris6SF208 $1,957

Roof - Modified Bitumen #2 - Middle Minor water ponding, repair flashing at air intake6SF8,599 $80,911

Roof - Modified Bitumen #3 - NE Remove debris6SF4,148 $39,030

Roof - Modified Bitumen #4 - N 6SF1,580 $14,867

Roof - Modified Bitumen #5 - NW Poor seams, bubbles, open joints, water ponding5SF7,342 $154,441

Roof - Modified Bitumen #6 - Low N Courtyard Poor seams, water ponding, debris4SF1,123 $30,785

Roof - Modified Bitumen #7 - W Some water ponding, poor seams5SF1,017 $21,393

Roof - Modified Bitumen #8 - Low SE 6SF384 $3,613

Roof - Modified Bitumen #9 - Low SW Poor seams5SF532 $11,191

Walls

Cornice - Masonry Projecting Limestone Entire Building 6LF2,320 $80,452

Cornice - Metal Projecting Entire Building 6LF1,160 $40,226

Exterior Walls - Brick Entire Building Efflorescence5SF100 $1,777

Exterior Walls Entire Building 6SF71,829 $0

Exterior Walls - Stone-Cast Entire Building 6SF1,360 $9,141

Exterior Walls - Stone-Cut Entire Building 6SF1,200 $8,065

Windows

Guard - Guards perforated Entire Building 6SF3,640 $46,482

Guard - Guards perforated Entire Building Ripped4SF52 $4,414

Lintels - Brick Entire Building 6LF66 $0

Lintels - Steel Entire Building 6LF132 $3,832

Lintels - Stone Entire Building 6LF3,458 $0

Windows - Sash Aluminum Double-pane Entire Building Balance issues5SF13,832 $745,104

Windows - Sash Aluminum Double-pane Entire Building Graffiti5SF52 $0

Windows - Sash Aluminum Entire Building Balance issues5SF416 $14,937

Windows - Wood- Double-pane Entire Building 6SF40 $299

Building Exterior Subtotal: $1,854,608

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Page 4 of 47CAMERON Assessment Date: 9/10/14

Page 5: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Automatic Transfer Switch Storage Room, Electrical Room 6EA3 $1,224

Emergency A/C Power - Auditoium and Aisle Lighting Entire Building / 1st Floor 6SF3,376 $1,786

Emergency A/C Power - Corridors and Stairs Entire Building 6SF27,741 $8,331

Emergency A/C Power - Gym Entire Building / 3rd Floor 6SF4,418 $1,643

Emergency A/C Power - Lunchrooms Entire Building / Basement 6SF3,119 $1,160

Emergency A/C Power - Students Toilets Entire Building 6SF3,103 $1,154

Emergency Battery Packs - Corridors and Stairs Basement Emerg-Lite (No Other Data Available)7EA1 $0

Emergency Generator- Outdoor- Diesel - 101 - 150 KW Site South 150 KVA, Diesel, Double Wall Containment Tank, with secondary containment, Installed in 2012, 270 Gallon Tank

7EA1 $0

Exit Signs - Auditoium Entire Building 7EA17 $0

Exit Signs - Corridors and Stairs Entire Building No Additional Data Available7EA31 $0

Exit Signs - Gym Entire Building / 3rd Floor No Additional Data Available7EA2 $0

Exit Signs - Lunchroom Entire Building / Basement No Additional Data Available7EA5 $0

Security System - CCTV Entire Building 6SF120,281 $36,120

Security System - Intrusion Detection Entire Building 5SF120,281 $120,401

Main Service

Independent Electrical Service for emergency power Electrical Room 7EA1 $0

Main Electrical Service - 1600 A 120/240/3PH Electrical Room 7EA1 $0

PA System Entire Building 6SF154,535 $50,827

Power Distribution

Lighting and Power Panels - 100 A Entire Building / 1st Floor Location: Main Entrance (1st Floor)7EA1 $0

Lighting and Power Panels - 100 A Entire Building / 1st Floor Location: Janitoral Closet7EA1 $0

Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Gym7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Electrical Room Open Wiring Work Not Completed4EA2 $9,699

Lighting and Power Panels - 100 A Entire Building / Mechanical Room Location: Basement7EA1 $0

Lighting and Power Panels - 100 A Entire Building / Mechanical Room Location: Basement7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Outside Assemble Hall in Corridor7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Main Entrance7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Storage Room 106A7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Main Entrance7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 2nd Floor Location: Storage Room 206A7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 2nd Floor Location: Near Room 2067EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 2nd Floor Location: Near Room 2067EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 2nd Floor Location: Storgare Room 206A7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 2nd Floor Location: Corridor7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 3rd Floor Location: Storage Room 306A7EA1 $0

Page 5 of 47CAMERON Assessment Date: 9/10/14

Page 6: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Power Distribution

Lighting and Power Panels - Above 100 A Entire Building / 3rd Floor Location: Storage Room 306A7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / 3rd Floor Location: Corridor7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Basement Location: Basement7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Mechanical Room Location: Basement7EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Mechanical Room Location Fan Room #27EA1 $0

Lighting and Power Panels - Above 100 A Entire Building / Mechanical Room Location: Basement7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Electrical Room Location: Basement7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Electrical Room Location: Basement7EA1 $0

Main Distribution Panels - 400 - 600 amp Entire Building / Electrical Room Location: Basement7EA1 $0

Main Distribution Panels - Greater than 600 amp Entire Building / Electrical Room Location: Basement7EA1 $0

Electrical System Subtotal: $232,344

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fire Alarm

Fire Alarm Panel Entire Building / Boiler Room 6EA1 $6,406

Fire Alarm Strobe Lights Entire Building 6SF120,281 $43,000

Fire Alarm_System Entire Building 6SF120,281 $58,481

Fire Pump Controller Entire Building / Mechanical Room 6EA1 $1,823

Pump Room Assembly

Fire Pump - 25-50 hp Sprinkler Room Pump Seals Leaking5EA1 $8,163

Sprinkler System

Dry Sprinkler System Entire Building No Other Data Available5SF120,281 $43,000

Sprinkler Heads Entire Building No Other Data Available7SF120,281 $0

Sprinkler Piping Entire Building No Other Data Available5SF120,281 $84,281

Safty System Subtotal: $245,154

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Conditioning

Condensing Unit- Roof Mounted - Less than 5 tons Roof 6EA1 $3,334

Page 6 of 47CAMERON Assessment Date: 9/10/14

Page 7: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Handling Systems

Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils - Less

than 4000 cfm

Mechanical Room Piping Leaking, Open Wiring4EA1 $60,794

Air Intake Mechanical Room / Roof 6EA1 $5,765

Make Up Air Unit- Indoor Mounted- Electric Coil - 10,001 - 20,000 cfm Fan Room New York Blower Company, 2 speed 20 HP Motor, 580/1170 RPM, 12,350 CFM, Filter's falling out of filter rack, hold down clips are missing, lighting inside filter compartment doesn't work, Cregier Electric Reheat Coil

5EA1 $35,731

Make Up Air Unit- Indoor Mounted- Electric Coil - 10,001 - 20,000 cfm Fan Room New York Blower Company, 2 speed 20 HP

Motor, 580/1170 RPM, 12,350 CFM, Filter's falling

out of filter rack, hold down clips are missing,

lighting inside filter compartment doesn't work,

Cregier Electric Reheat Coil

5EA1 $35,731

Make Up Air Unit- Indoor Mounted- Electric Coil - 10,001 - 20,000 cfm Fan Room New York Blower Company, 2 speed 20 HP

Motor, 580/1170 RPM, 12,350 CFM, Filter's falling

out of filter rack, hold down clips are missing,

lighting inside filter compartment doesn't work,

Cregier Electric Reheat Coil

5EA1 $35,731

Boiler Systems

Boiler Auxiliary- Condensing Hot Water - Less than 500 HP Boiler Room HP = 1.5 @ 3500 RPM, S#: 185129 CFM: 140 Installed 1973

5EA2 $24,702

Chemical Pot Feeder Boiler Room Pulsatron, 12 GPD, Series C, Installed 2011 S#: 275616

6EA2 $1,450

Condensing- Hot Water Boiler - Greater 4000 MBH Boiler Room Installed 1973 Natural Gas, M#: 4-5-102, PSI: 15 8192 BTU/HR

5EA2 $215,164

Dual Temperature Pump Boiler Room Shipco, S#: 21830, 1/2 HP5EA1 $11,038

Dual Temperature Pump Boiler Room Type CRVD 120 1E S#: 1752824 & 25 3/4 HP at 1725 RPM

5EA2 $22,076

Hot Water Pump Boiler Room M# DWT45V, S#: 1225042254 (4 Pumps) Armstrong, 1.5 HP M#: C513 RPM 1800 20 GPM @ 45'Head

5EA1 $4,704

Piping - Dual Temperature Pipes- Steel Boiler Room 5LF200 $2,997

Gas Booster

Gas Booster Boiler Room / Basement No Other Information Available6EA2 $998

Heating Devices

Unit Heater - Electric Entire Building Location: Yard Storage6EA2 $556

Unit Heater - Electric Entire Building / 1st Floor Location: Girl's Restroom6EA1 $278

Unit Heater - Electric Entire Building / 1st Floor Location: Boy's Restroom6EA1 $278

Unit Heater - Electric Entire Building / 1st Floor Location: Janitorial Closet6EA1 $278

Unit Heater - Electric Entire Building / 2nd Floor Location: Abandoned Bathroom Next Room 2135EA1 $1,008

Page 7 of 47CAMERON Assessment Date: 9/10/14

Page 8: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Heating Devices

Unit Heater - Hot Water Entire Building / Boiler Room 5EA1 $1,532

Temperature Control

Pneumatic System Entire Building Champion Compressor: M# HR515D-8CC, S#: 102478, Air Dryer: M#: CRN50A1, S#: 1000027-85-862, R134A @ 50 SCFM

5SF120,281 $414,524

Thermostats Entire Building 4EA31 $0

Ventilation

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA1 $592

Mechanical System Subtotal: $882,222

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Electric Heater - Less than 20 KW Kitchen / 1st Floor Open Wiring Work needed5EA1 $2,443

Gas Heater - 150000 - 300000 BTU/HR Boiler Room 6EA2 $620

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building Piping Leaking , Clamps & Corrosion Present6SF120,281 $24,080

Domestic Piping-Cold Water Horizontal Lines Entire Building Piping Leaking , Clamps & Corrosion Present6SF120,281 $29,240

Domestic Piping-Cold Water Risers Entire Building Piping Leaking , Clamps & Corrosion Present6SF120,281 $22,360

Domestic Piping-Hot Water from Risers to Fixtures Entire Building PPiping Leaking , Clamps & Corrosion Present6SF120,281 $18,920

Domestic Piping-Hot Water Horizontal Lines Entire Building Piping Leaking , Clamps & Corrosion Present6SF120,281 $22,360

Domestic Piping-Hot Water Return Lines Entire Building Piping Leaking , Clamps & Corrosion Present6SF120,281 $17,200

Domestic Piping-Hot Water Return Risers Entire Building Piping Leaking , Clamps & Corrosion Present6SF120,281 $17,200

Sanitary Piping Entire Building Check Valve Warped r in Fan Room Bad6SF120,281 $110,081

Storm Piping Entire Building Backflow Problem in Fan6SF120,281 $104,921

Vent Piping Entire Building Corrosion Present6SF120,281 $80,841

Pumps

Pumps - Domestic Booster Pump-Duplex Boiler Room 6EA1 $1,977

Page 8 of 47CAMERON Assessment Date: 9/10/14

Page 9: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Pumps

Pumps - Domestic Booster Pump-Duplex Boiler Room 6EA1 $1,977

Pumps - Sump-Simplex Coal Room (Basement) No Information available, pump & motor were down in the pit

5EA1 $5,627

Pumps - Sump-Simplex IDF Room / 1st Floor 6EA1 $745

Plumbing System Subtotal: $460,592

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #011 (Pre School)

AC Units Basement 6EA1 $496

Casework Basement 6LF10 $253

Ceiling - Plaster/Drywall Basement 6SF800 $2,768

Doors - Wood Doors inclu hw Basement 6EA1 $301

Floor - Tile Basement 6SF800 $1,750

Lighting - Pendent/Surface Basement 7EA10 $0

Storage/ Closet Basement shares with classroom 0126SF278 $2,016

Walls - Masonry Basement 6SF263 $827

Walls - Plaster/Drywall Basement 6SF874 $2,412

Work Sink Basement sink in base cabinet6EA1 $379

Classroom #012 (Pre School)

AC Units Basement 6EA2 $991

Casework Basement 6LF7 $177

Ceiling - Plaster/Drywall Basement 6SF950 $3,288

Doors - Wood Doors inclu hw Basement 6EA1 $301

Floor - Tile Basement 6SF475 $1,039

Floor - Wood Basement 6SF475 $3,349

Lighting - Pendent/Surface Basement 7EA16 $0

Marker Board Basement 7LF24 $0

Storage/ Closet Basement 6SF278 $2,016

Walls - Plaster/Drywall Basement 6SF1,067 $2,945

Work Sink Basement sink in base cabinet6EA1 $379

Classroom #100 (Regular Classroom)

AC Units 1st Floor 6EA1 $496

Ceiling - Plaster/Drywall 1st Floor 6SF921 $3,187

Page 9 of 47CAMERON Assessment Date: 9/10/14

Page 10: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #100 (Regular Classroom)

Chalk Board 1st Floor 4LF20 $1,836

Doors - Transom Window 1st Floor 6SF6 $102

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Wood 1st Floor 6SF921 $6,493

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF16 $0

Walls - Plaster/Drywall 1st Floor 6SF1,467 $4,049

Walls - Plaster/Drywall 1st Floor Peeling paint5SF16 $82

Classroom #102 (Regular Classroom)

AC Units 1st Floor 6EA2 $991

Ceiling - Plaster/Drywall 1st Floor 6SF921 $3,187

Chalk Board 1st Floor 4LF20 $1,836

Doors - Transom Window 1st Floor 6SF6 $102

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Wood 1st Floor 6SF921 $6,493

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF16 $0

Walls - Plaster/Drywall 1st Floor 6SF1,460 $4,029

Classroom #104 (Regular Classroom)

AC Units 1st Floor 6EA2 $991

Ceiling - Plaster/Drywall 1st Floor 6SF921 $3,187

Doors - Transom Window 1st Floor 6SF6 $102

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Wood 1st Floor 6SF921 $6,493

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF16 $0

Walls - Plaster/Drywall 1st Floor 6SF1,460 $4,029

Classroom #106 (Regular Classroom)

AC Units 1st Floor 4EA2 $12,173

Casework 1st Floor 6LF4 $101

Ceiling - Plaster/Drywall 1st Floor 6SF840 $2,907

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile/Sheet 1st Floor 6SF840 $841

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF16 $0

Storage/ Closet 1st Floor 6SF190 $1,378

Page 10 of 47CAMERON Assessment Date: 9/10/14

Page 11: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #106 (Regular Classroom)

Walls - Metal Panel 1st Floor Wainscoting6SF312 $2,329

Walls - Plaster/Drywall 1st Floor 6SF1,040 $2,870

Classroom #107 (Regular Classroom)

AC Units 1st Floor 6EA1 $496

Ceiling - Plaster/Drywall 1st Floor 6SF840 $2,907

Chalk Board 1st Floor 4LF30 $2,754

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile/Sheet 1st Floor 6SF836 $837

Floor - Tile/Sheet 1st Floor Damaged5SF4 $23

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF5 $0

Storage/ Closet 1st Floor 6SF156 $1,131

Walls - Metal Panel 1st Floor Wainscoting6SF316 $2,359

Walls - Plaster/Drywall 1st Floor 6SF1,030 $2,843

Classroom #109 (Regular Classroom)

AC Units 1st Floor 6EA1 $496

Casework 1st Floor 6LF4 $101

Ceiling - Plaster/Drywall 1st Floor 6SF830 $2,872

Doors - Transom Window 1st Floor Interior transom windows6SF18 $305

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile/Sheet 1st Floor 6SF830 $831

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF20 $0

Storage/ Closet 1st Floor 6SF152 $1,102

Walls - Metal Panel 1st Floor Wainscoting6SF316 $2,359

Walls - Plaster/Drywall 1st Floor 6SF1,030 $2,843

Classroom #111 (Kindergarten)

AC Units 1st Floor 6EA2 $991

Ceiling - Plaster/Drywall 1st Floor 6SF880 $3,045

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile/Sheet 1st Floor 6SF880 $881

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Walls - Metal Panel 1st Floor Wainscoting6SF372 $2,777

Walls - Plaster/Drywall 1st Floor 6SF1,000 $2,760

Page 11 of 47CAMERON Assessment Date: 9/10/14

Page 12: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #112 (Regular Classroom)

AC Units 1st Floor 6EA1 $496

Ceiling - Plaster/Drywall 1st Floor 6SF826 $2,858

Chalk Board 1st Floor 4LF15 $1,377

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile/Sheet 1st Floor 6SF826 $827

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF15 $0

Storage/ Closet 1st Floor 6SF152 $1,102

Walls - Metal Panel 1st Floor 6SF316 $2,359

Walls - Plaster/Drywall 1st Floor 6SF1,030 $2,843

Classroom #200 (Regular Classroom)

AC Units 2nd Floor 6EA1 $496

Casework 2nd Floor 6LF9 $227

Ceiling - Plaster/Drywall 2nd Floor 6SF921 $3,187

Chalk Board 2nd Floor 4LF20 $1,836

Doors - Transom Window 2nd Floor 6SF6 $102

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor 6SF921 $6,493

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,452 $4,007

Walls - Plaster/Drywall 2nd Floor Peeling paint5SF8 $41

Classroom #201 (Regular Classroom)

AC Units 2nd Floor 6EA1 $496

Ceiling - Plaster/Drywall 2nd Floor 6SF920 $3,184

Chalk Board 2nd Floor 4LF20 $1,836

Doors - Transom Window 2nd Floor 6SF6 $102

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor 6SF920 $6,486

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Plaster/Drywall 2nd Floor Cracking5SF77 $393

Walls - Plaster/Drywall 2nd Floor 6SF1,383 $3,817

Classroom #203 (Computer Lab)

AC Units 2nd Floor 6EA1 $496

Casework 2nd Floor 6LF9 $227

Page 12 of 47CAMERON Assessment Date: 9/10/14

Page 13: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #203 (Computer Lab)

Ceiling - Plaster/Drywall 2nd Floor 6SF920 $3,184

Chalk Board 2nd Floor 4LF30 $2,754

Doors - Transom Window 2nd Floor 6SF9 $152

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor 6SF920 $6,486

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Plaster/Drywall 2nd Floor Water damged5SF20 $102

Walls - Plaster/Drywall 2nd Floor 6SF1,440 $3,974

Classroom #205 (Computer Lab)

AC Units 2nd Floor 6EA2 $991

Ceiling - Plaster/Drywall 2nd Floor 6SF938 $3,246

Chalk Board 2nd Floor 4LF10 $918

Charging Station 2nd Floor 6EA1 $485

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF938 $2,052

Lighting - Pendent/Surface 2nd Floor 6EA13 $1,611

Walls - Plaster/Drywall 2nd Floor 6SF1,854 $5,117

Wireless System 2nd Floor 6EA1 $372

Work Sink 2nd Floor 6EA1 $379

Classroom #206 (Regular Classroom)

AC Units 2nd Floor 4EA2 $12,173

Ceiling - Plaster/Drywall 2nd Floor 6SF827 $2,862

Doors - Transom Window 2nd Floor 6SF6 $102

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF827 $1,809

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Storage/ Closet 2nd Floor 6SF195 $1,414

Walls - Plaster/Drywall 2nd Floor Wainscoting6SF420 $1,375

Walls - Plaster/Drywall 2nd Floor 6SF980 $2,705

Classroom #207 (Regular Classroom)

Ceiling - Plaster/Drywall 2nd Floor 6SF840 $2,907

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF840 $1,838

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Page 13 of 47CAMERON Assessment Date: 9/10/14

Page 14: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #207 (Regular Classroom)

Marker Board 2nd Floor 7LF20 $0

Storage/ Closet 2nd Floor 6SF189 $1,370

Walls 2nd Floor Wainscoting6495 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,155 $3,188

Classroom #208 (Regular Classroom)

AC Units 2nd Floor 6EA1 $496

Casework 2nd Floor 6LF6 $152

Ceiling - Plaster/Drywall 2nd Floor 6SF862 $2,983

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor Missing tile5SF6 $35

Floor - Tile 2nd Floor 6SF856 $1,873

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF16 $0

Storage/ Closet 2nd Floor 6SF185 $1,341

Walls - Plaster/Drywall 2nd Floor 6SF1,251 $3,453

Walls - Plaster/Drywall 2nd Floor Wainscoting6SF339 $1,110

Classroom #209 (Regular Classroom)

Ceiling - Plaster/Drywall 2nd Floor 6SF840 $2,907

Chalk Board 2nd Floor 4LF30 $2,754

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 5SF6 $35

Floor - Tile 2nd Floor 6SF834 $1,825

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF20 $0

Storage/ Closet 2nd Floor 6SF150 $1,088

Walls - Plaster/Drywall 2nd Floor Wainscoting6SF495 $1,621

Walls - Plaster/Drywall 2nd Floor 6SF1,155 $3,188

Classroom #210 (Regular Classroom)

AC Units 2nd Floor 6EA1 $496

Casework 2nd Floor 6LF6 $152

Ceiling - Plaster/Drywall 2nd Floor 6SF862 $2,983

Chalk Board 2nd Floor 4LF20 $1,836

Doors - Transom Window 2nd Floor 6SF18 $305

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Page 14 of 47CAMERON Assessment Date: 9/10/14

Page 15: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #210 (Regular Classroom)

Floor - Tile 2nd Floor 6SF862 $1,886

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF5 $0

Storage/ Closet 2nd Floor 6SF150 $1,088

Walls - Plaster/Drywall 2nd Floor 6SF1,382 $3,814

Classroom #211 (Regular Classroom)

AC Units 2nd Floor 4EA2 $12,173

Ceiling - Plaster/Drywall 2nd Floor 6SF900 $3,115

Chalk Board 2nd Floor 4LF30 $2,754

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF900 $1,969

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF30 $0

Storage/ Closet 2nd Floor 6SF200 $1,450

Walls - Plaster/Drywall 2nd Floor 6SF1,360 $3,753

Classroom #212 (Regular Classroom)

AC Units 2nd Floor 6EA1 $496

Ceiling - Plaster/Drywall 2nd Floor 6SF826 $2,858

Chalk Board 2nd Floor 4LF5 $459

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF826 $1,807

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF20 $0

Storage/ Closet 2nd Floor 6SF150 $1,088

Walls - Plaster/Drywall 2nd Floor 6SF420 $1,375

Walls - Plaster/Drywall 2nd Floor 6SF980 $2,705

Classroom #300 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF9 $227

Ceiling - Plaster/Drywall 3rd Floor 6SF805 $2,786

Chalk Board 3rd Floor 4LF28 $2,571

Doors - Transom Window 3rd Floor 6SF11 $186

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF805 $5,675

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF23 $0

Page 15 of 47CAMERON Assessment Date: 9/10/14

Page 16: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #300 (Regular Classroom)

Storage/ Closet 3rd Floor 6SF57 $413

Walls - Plaster/Drywall 3rd Floor 6SF1,319 $3,640

Classroom #301 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF9 $227

Ceiling - Plaster/Drywall 3rd Floor 6SF812 $2,810

Chalk Board 3rd Floor 4LF22 $2,020

Doors - Transom Window 3rd Floor 1 glass pane missing6SF11 $186

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF812 $5,725

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF56 $406

Walls - Plaster/Drywall 3rd Floor 6SF1,322 $3,649

Classroom #302 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF9 $227

Ceiling - Plaster/Drywall 3rd Floor 6SF799 $2,765

Chalk Board 3rd Floor 4LF57 $5,233

Doors - Transom Window 3rd Floor 6SF11 $186

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF799 $5,633

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF56 $406

Walls - Plaster/Drywall 3rd Floor 6SF1,282 $3,538

Classroom #303A (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Ceiling - Plaster/Drywall 3rd Floor 6SF688 $2,381

Chalk Board 3rd Floor 4LF41 $3,764

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF688 $1,505

Lighting - Pendent/Surface 3rd Floor 7EA10 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,227 $3,386

Page 16 of 47CAMERON Assessment Date: 9/10/14

Page 17: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #303B (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF5 $126

Ceiling - Plaster/Drywall 3rd Floor 6SF563 $1,948

Chalk Board 3rd Floor 4LF8 $734

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF563 $1,232

Lighting - Pendent/Surface 3rd Floor 7EA10 $0

Walls - Plaster/Drywall 3rd Floor 6SF1,102 $3,041

Classroom #304 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF9 $227

Ceiling - Plaster/Drywall 3rd Floor 6SF811 $2,807

Chalk Board 3rd Floor 4LF42 $3,856

Doors - Transom Window 3rd Floor 6SF11 $186

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF811 $5,717

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 6SF60 $435

Walls - Plaster/Drywall 3rd Floor 6SF1,315 $3,629

Classroom #306 (Regular Classroom)

AC Units 3rd Floor 6EA2 $991

Ceiling - Plaster/Drywall 3rd Floor 6SF867 $3,000

Chalk Board 3rd Floor 4LF34 $3,121

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF867 $1,897

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF21 $0

Storage/ Closet 3rd Floor 6SF207 $1,501

Walls - Plaster/Drywall 3rd Floor 6SF1,409 $3,889

Classroom #307 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF5 $126

Ceiling - Splined 3rd Floor 6SF859 $700

Ceiling - Splined 3rd Floor tiles stained, cracked and some missing5SF6 $58

Chalk Board 3rd Floor 4LF10 $918

Page 17 of 47CAMERON Assessment Date: 9/10/14

Page 18: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #307 (Regular Classroom)

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF865 $1,893

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF22 $0

Storage/ Closet 3rd Floor 6SF170 $1,233

Walls - Plaster/Drywall 3rd Floor 6SF1,368 $3,776

Work Sink 3rd Floor sink in base cabinet6EA1 $379

Classroom #308 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Ceiling - Plaster/Drywall 3rd Floor 6SF872 $3,018

Chalk Board 3rd Floor 4LF22 $2,020

Doors - Transom Window 3rd Floor 6SF30 $508

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF872 $1,908

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF32 $0

Storage/ Closet 3rd Floor 308A - Storage6SF204 $1,479

Walls - Plaster/Drywall 3rd Floor 6SF1,419 $3,916

Classroom #309 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Ceiling - Plaster/Drywall 3rd Floor 6SF878 $3,038

Chalk Board 3rd Floor 4LF18 $1,653

Doors - Transom Window 3rd Floor 6SF30 $508

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF878 $1,921

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF17 $0

Storage/ Closet 3rd Floor 309A - Storage6SF190 $1,378

Walls - Plaster/Drywall 3rd Floor 6SF1,462 $4,035

Classroom #310 (Regular Classroom)

AC Units 3rd Floor 6EA2 $991

Ceiling - Plaster/Drywall 3rd Floor 6SF863 $2,986

Chalk Board 3rd Floor 4LF8 $734

Doors - Transom Window 3rd Floor 6SF30 $508

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF863 $1,888

Page 18 of 47CAMERON Assessment Date: 9/10/14

Page 19: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #310 (Regular Classroom)

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF23 $0

Storage/ Closet 3rd Floor 310A - Storage6SF174 $1,262

Walls - Plaster/Drywall 3rd Floor 6SF1,400 $3,864

Classroom #311 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF9 $227

Ceiling - Plaster/Drywall 3rd Floor 6SF929 $3,215

Chalk Board 3rd Floor 4LF20 $1,836

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF929 $2,033

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF24 $0

Storage/ Closet 3rd Floor 311A - Storage6SF249 $1,805

Walls - Plaster/Drywall 3rd Floor 6SF1,304 $3,599

Classroom #312 (Regular Classroom)

AC Units 3rd Floor 6EA1 $496

Casework 3rd Floor 6LF9 $227

Ceiling - Plaster/Drywall 3rd Floor 6SF868 $3,004

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF868 $1,899

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF18 $0

Storage/ Closet 3rd Floor 312A - Storage6SF194 $1,407

Walls - Plaster/Drywall 3rd Floor 6SF1,343 $3,707

Classrooms Subtotal: $496,487

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

AC Unit 108 Counselor's Office 6EA1 $496

Ceiling - Plaster/Drywall 108 Counselor's Office 6SF610 $2,111

Doors - Wood Doors inclu hw 108 Counselor's Office 6EA2 $602

Floor - Tile 108 Counselor's Office 6SF609 $1,332

Page 19 of 47CAMERON Assessment Date: 9/10/14

Page 20: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Floor - Tile 108 Counselor's Office Damaged tile5SF1 $6

Lighting - Pendent/Surface 108 Counselor's Office 7EA10 $0

Power Distribution 108 Counselor's Office 6EA6 $12,749

Storage/ Closet 108 Counselor's Office 6SF250 $1,813

Walls - Plaster/Drywall 108 Counselor's Office 6SF1,300 $3,588

Ceiling - Plaster/Drywall 1st Floor C/CM Office 6SF286 $990

Doors - Transom Window 1st Floor C/CM Office 6SF54 $914

Doors - Wood Doors inclu hw 1st Floor C/CM Office 6EA1 $301

Floor - Carpet 1st Floor C/CM Office 5SF286 $1,468

Lighting - Pendent/Surface 1st Floor C/CM Office 7EA2 $0

Power Distribution 1st Floor C/CM Office 6EA12 $25,499

Walls - Plaster/Drywall 1st Floor C/CM Office 6SF1,016 $2,804

Work SInk 1st Floor C/CM Office 6EA1 $508

Ceiling - Plaster/Drywall 2nd Floor Teacher's Lounge 6SF500 $1,730

Doors - Wood Doors inclu hw 2nd Floor Teacher's Lounge 6EA1 $301

Floor - Carpet 2nd Floor Teacher's Lounge 6SF500 $1,065

Lighting - Pendent/Surface 2nd Floor Teacher's Lounge 7EA8 $0

Power Distribution 2nd Floor Teacher's Lounge 6EA6 $12,749

Walls - Plaster/Drywall 2nd Floor Teacher's Lounge 6SF643 $2,106

Walls - Plaster/Drywall 2nd Floor Teacher's Lounge 6SF663 $1,830

Ceiling - Plaster/Drywall 3rd floor - 305 Social Worker 6SF478 $1,654

Doors - Wood Doors inclu hw 3rd floor - 305 Social Worker 6EA1 $301

Floor - Tile 3rd floor - 305 Social Worker 6SF478 $1,046

Lighting - Pendent/Surface 3rd floor - 305 Social Worker 7EA6 $0

Power Distribution 3rd floor - 305 Social Worker cut wires / exposed data - voice lines6EA12 $25,499

Storage/ Closet 3rd floor - 305 Social Worker 6SF30 $218

Walls - Plaster/Drywall 3rd floor - 305 Social Worker 6SF1,110 $3,063

AC Unit 3rd floor - 313 Assistant Principle 6EA1 $496

Ceiling - Plaster/Drywall 3rd floor - 313 Assistant Principle 6SF428 $1,481

Doors - Wood Doors inclu hw 3rd floor - 313 Assistant Principle 6EA1 $301

Floor - Tile 3rd floor - 313 Assistant Principle floor tiles cracked and missing5SF3 $17

Floor - Tile 3rd floor - 313 Assistant Principle 6SF425 $930

Lighting - Pendent/Surface 3rd floor - 313 Assistant Principle 7EA6 $0

Power Distribution 3rd floor - 313 Assistant Principle 6EA12 $25,499

Storage/ Closet 3rd floor - 313 Assistant Principle 6SF30 $218

Walls - Plaster/Drywall 3rd floor - 313 Assistant Principle 6SF1,110 $3,063

Ceiling - Plaster/Drywall 3rd floor - office inside gym 6SF337 $1,166

Page 20 of 47CAMERON Assessment Date: 9/10/14

Page 21: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Doors - Wood Doors inclu hw 3rd floor - office inside gym 6EA1 $301

Floor - Tile 3rd floor - office inside gym 6SF337 $737

Lighting - Pendent/Surface 3rd floor - office inside gym broken5EA2 $365

Lighting - Pendent/Surface 3rd floor - office inside gym 7EA2 $0

Power Distribution 3rd floor - office inside gym 6EA2 $4,250

Walls - Plaster/Drywall 3rd floor - office inside gym 6SF1,532 $4,228

Work SInk 3rd floor - office inside gym broken5EA1 $1,508

Ceiling - Plaster/Drywall Basement - 008 NCLB Parent Room 6SF1,048 $3,627

Doors - Wood Doors inclu hw Basement - 008 NCLB Parent Room 6EA1 $301

Floor - Tile Basement - 008 NCLB Parent Room 6SF1,048 $2,293

Lighting - Pendent/Surface Basement - 008 NCLB Parent Room 7EA13 $0

Power Distribution Basement - 008 NCLB Parent Room 6EA16 $33,998

Storage/ Closet Basement - 008 NCLB Parent Room 6SF618 $4,481

Walls - Masonry Basement - 008 NCLB Parent Room 6SF816 $2,567

Walls - Plaster/Drywall Basement - 008 NCLB Parent Room wainscot6SF540 $1,490

Work SInk Basement - 008 NCLB Parent Room sink in base cabinet6EA1 $508

AC Unit Engineer's Office 6EA1 $496

Ceiling - Plaster/Drywall Engineer's Office 6SF310 $1,073

Doors - Transom Window Engineer's Office 6SF8 $135

Doors - Wood Doors inclu hw Engineer's Office 6EA1 $301

Floor - Tile Engineer's Office 6SF310 $678

Lighting - Pendent/Surface Engineer's Office 7EA6 $0

Power Distribution Engineer's Office 6EA4 $8,500

Walls - Plaster/Drywall Engineer's Office 6SF746 $2,059

AC Unit Main office 6EA1 $496

Ceiling - Plaster/Drywall Main office 6SF44 $152

Doors - Wood Doors inclu hw Main office 6EA1 $301

Floor - Tile Main office 6SF456 $998

Floor - Tile Main office Damaged or missing tile5SF8 $46

Lighting - Pendent/Surface Main office 7EA10 $0

Power Distribution Main office One outlet trips regularly5EA4 $15,407

Storage/ Closet Main office 6SF74 $537

Walls - Plaster/Drywall Main office 6SF1,158 $3,196

Ceiling - Plaster/Drywall Nurse's Office 6SF195 $675

Doors - Wood Doors inclu hw Nurse's Office 6EA1 $301

Floor - Tile Nurse's Office 6SF195 $427

Lighting - Pendent/Surface Nurse's Office Missing light sheild6EA2 $248

Page 21 of 47CAMERON Assessment Date: 9/10/14

Page 22: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Power Distribution Nurse's Office 6EA4 $8,500

Storage/ Closet Nurse's Office 6SF6 $44

Walls - Metal Panel Nurse's Office Wainscoting5SF323 $9,880

Walls - Plaster/Drywall Nurse's Office 6SF496 $1,369

Ceiling - Plaster/Drywall Principal's Office 6SF325 $1,125

Doors - Wood Doors inclu hw Principal's Office 6EA1 $301

Floor - Carpet Principal's Office 6SF325 $692

Lighting - Pendent/Surface Principal's Office 7EA3 $0

Power Distribution Principal's Office 6EA4 $8,500

Walls - Plaster/Drywall Principal's Office 6SF745 $2,056

AC Unit Room 101 Book Room Office 6EA1 $496

Ceiling - Plaster/Drywall Room 101 Book Room Office 6SF364 $1,260

Doors - Wood Doors inclu hw Room 101 Book Room Office 6EA1 $301

Floor - Wood Room 101 Book Room Office 6SF364 $2,566

Lighting - Pendent/Surface Room 101 Book Room Office 7EA7 $0

Power Distribution Room 101 Book Room Office 6EA4 $8,500

Storage/ Closet Room 101 Book Room Office 6SF50 $363

Walls - Plaster/Drywall Room 101 Book Room Office 6SF1,280 $3,533

Work SInk Room 101 Book Room Office Unused5EA1 $1,508

AC Unit Room 101 Book Room 6EA1 $496

Ceiling - Plaster/Drywall Room 101 Book Room 6SF1,434 $4,963

Doors - Wood Doors inclu hw Room 101 Book Room 6EA2 $602

Floor - Tile/Sheet Room 101 Book Room 6SF1,434 $1,435

Lighting - Pendent/Surface Room 101 Book Room 7EA22 $0

Power Distribution Room 101 Book Room 6EA28 $59,497

Walls - Plaster/Drywall Room 101 Book Room 6SF1,740 $4,802

AC Unit Room 113 6EA1 $496

Ceiling - Plaster/Drywall Room 113 6SF612 $2,118

Doors - Wood Doors inclu hw Room 113 6EA1 $301

Floor - Tile Room 113 6SF612 $1,339

Lighting - Pendent/Surface Room 113 7EA10 $0

Power Distribution Room 113 6EA20 $42,498

Storage/ Closet Room 113 6SF176 $1,276

Walls - Metal Panel Room 113 Wainscotting6SF226 $1,687

Walls - Plaster/Drywall Room 113 6SF1,343 $3,707

Auditorium & Theater

Balcony Seating 1st Floor 6EA372 $64,697

Page 22 of 47CAMERON Assessment Date: 9/10/14

Page 23: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Auditorium & Theater

Ceiling - Plaster/Drywall 1st Floor 6SF3,376 $28,145

Doors - Wood Doors inclu hw 1st Floor 6EA7 $2,107

Floor - Carpet 1st Floor 6SF764 $1,628

Lighting - Pendent/Surface 1st Floor 6EA57 $7,062

Lighting - Wall Mounted 1st Floor 6EA16 $1,982

Main Floor Seating 1st Floor 6EA405 $70,436

Sound System 1st Floor Replace speakers not operating5EA1 $27,165

Stage 1st Floor 6SF725 $4,188

Stage Curtain 1st Floor 6EA5 $0

Stage-Stairs - Wood 1st Floor 6LF8 $94

Stairs - Asphalt 1st Floor 6LF32 $297

Walls - Masonry 1st Floor Marble6SF346 $1,089

Walls - Plaster/Drywall 1st Floor Peeling paint5SF57 $643

Walls - Plaster/Drywall 1st Floor 6SF2,900 $13,810

Gymnasia

Ceiling - Plaster/Drywall 3rd Floor 6SF4,418 $24,386

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor - Wood 3rd Floor 6SF4,418 $31,146

Lighting - Metal Halide/ High Pressure Sodium 3rd Floor 6EA16 $2,140

Lighting - Metal Halide/ High Pressure Sodium 3rd Floor broken5EA4 $907

Scoreboards 3rd Floor Not operating5EA1 $10,580

Walls - Plaster/Drywall 3rd Floor 6SF3,548 $9,792

Walls - Structural Glazed Tile 3rd Floor 6SF1,982 $6,235

Kitchen

Ceiling - Lay-in Basement 6SF624 $1,874

Doors - Wood Doors inclu hw Basement 6EA1 $301

Floor - Tile Ceramic/ Porcelain Basement 6SF624 $1,321

Lighting - Lay-in Basement 7EA9 $0

Storage/ Closet Basement coolers6SF158 $1,146

Walls - Plaster/Drywall Basement 6SF405 $1,118

Walls - Vinyl Coated Gypsum Panel Basement 6SF405 $1,118

Library

AC Unit 2nd Floor 4EA3 $18,259

Casework 2nd Floor 6LF117 $2,955

Ceiling - Plaster/Drywall 2nd Floor 6SF1,670 $5,779

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Page 23 of 47CAMERON Assessment Date: 9/10/14

Page 24: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Library

Floor - Carpet 2nd Floor 6SF1,670 $3,558

Lighting - Pendent/Surface 2nd Floor 7EA31 $0

Walls - Plaster/Drywall 2nd Floor 6SF2,120 $5,851

Lunch & Multipurpose Room

Ceiling - Plaster/Drywall 3rd floor - weight room inside gym 6SF672 $2,326

Doors - Wood Doors inclu hw 3rd floor - weight room inside gym no handles5EA1 $1,174

Floor - Weight/ Fitness Room Floor Matting 3rd floor - weight room inside gym 6SF672 $3,517

Lighting - Pendent/Surface 3rd floor - weight room inside gym 7EA2 $0

Walls - Plaster/Drywall 3rd floor - weight room inside gym 6SF2,353 $6,494

Ceiling - Lay-in Basement - Lunchroom A 6SF1,984 $5,958

Doors - Wood Doors inclu hw Basement - Lunchroom A 6EA2 $602

Floor - Tile Basement - Lunchroom A 6SF1,984 $4,341

Lighting - Lay-in Basement - Lunchroom A 7EA33 $0

Serving Line Basement - Lunchroom A 6LF28 $1,666

Walls - Plaster/Drywall Basement - Lunchroom A 6SF946 $2,611

Walls - Vinyl Coated Gypsum Panel Basement - Lunchroom A 6SF924 $2,550

Ceiling - Lay-in Basement- Lunchroom B 6SF1,135 $3,408

Doors - Steel Doors incl hw Basement- Lunchroom B 6EA4 $1,204

Floor - Tile Basement- Lunchroom B 6SF1,135 $2,483

Lighting - Lay-in Basement- Lunchroom B 7EA17 $0

Serving Line Basement- Lunchroom B 6LF11 $655

Walls - Plaster/Drywall Basement- Lunchroom B 6SF464 $1,281

Walls - Vinyl Coated Gypsum Panel Basement- Lunchroom B Coming away from wall5SF8 $59

Walls - Vinyl Coated Gypsum Panel Basement- Lunchroom B 6SF616 $1,700

Mechanical/ Service Rooms

Auditorium Plenums 1st Floor 6SF3,500 $21,672

Mechanical/ Service Rooms 1st Floor Elevator equipment6SF78 $559

Janitor's Closet 2nd Floor 6SF24 $172

Storage Room 2nd Floor 2nd floor - below gym6SF70 $502

Janitor's Closet 3rd Floor next to girls bath - no light6SF11 $79

Janitor's Closet 3rd Floor next to 303A/303B vestibule6SF83 $595

Storage Room 3rd Floor 315 Storage6SF123 $881

Air Intake Plenums Basement Location: South plenum. Peeling paint throughout5SF600 $7,988

Air Intake Plenums Basement Location: off boiler room6SF160 $991

Air Tunnel Basement 6SF200 $1,238

Auditorium Plenums Basement 6SF4,000 $24,768

Page 24 of 47CAMERON Assessment Date: 9/10/14

Page 25: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Mechanical/ Service Rooms

Boiler Room Basement Location: Ceiling. Peeling paint6SF2,016 $14,443

Coal Room Basement Location:" Walls: efflorescence. Ceiling :holes no fire stop

5SF944 $15,227

Interior Stairs Basement 6LF24 $217

Janitor's Closet Basement 6SF12 $86

Janitor's Closet Basement Location: JC at girl's toilet .No fire stop at conduit chase

6SF12 $86

Mechanical/ Service Rooms Basement Location: Tank Room. Brick efflorescence5SF415 $6,694

Mechanical/ Service Rooms Basement Location: Heating Chamber6SF830 $5,946

Mechanical/ Service Rooms Basement Location: Elect./ Engine Room6SF770 $5,517

Mechanical/ Service Rooms Basement Location: North Fan/ Engine Room: efflorescence, holes- no fire stop, and peeling paint

5SF980 $15,808

Storage Room Basement Dry Storage 006A6SF106 $759

Storage Room Basement Room 0376SF290 $2,078

Storage Room Basement Storage 006 - Peeling paint at ceiling / walls6SF888 $6,362

Storage Room Basement Location: above coal room6SF360 $2,579

Vaults Basement Location: Electrical Room. Brick efflorescence5SF400 $6,452

Restroom

Accessories 1st Floor 6SF650 $5,995

Ceiling - Plaster/Drywall 1st Floor 6SF650 $2,249

Floor Drain 1st Floor 6EA2 $2,118

Floor - Tile Ceramic/ Porcelain 1st Floor 6SF650 $1,376

Hand Dryer 1st Floor 6EA1 $230

Lavatory 1st Floor 6EA3 $959

Lighting - Pendent/Surface 1st Floor 7EA10 $0

Partitions 1st Floor 6EA5 $1,485

Urinals 1st Floor 6EA6 $2,016

Walls - Plaster/Drywall 1st Floor 6SF328 $905

Walls - Tile 1st Floor 6SF1,076 $2,354

Water Closet 1st Floor 6EA5 $1,680

Accessories 2nd Floor 6SF387 $3,569

Accessories 2nd Floor 6SF387 $3,569

Accessories 2nd Floor 6SF90 $830

Ceiling - Plaster/Drywall 2nd Floor 6SF387 $1,339

Ceiling - Plaster/Drywall 2nd Floor 6SF90 $311

Ceiling - Plaster/Drywall 2nd Floor 6SF387 $1,339

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Page 25 of 47CAMERON Assessment Date: 9/10/14

Page 26: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor Drain 2nd Floor 6EA1 $1,059

Floor Drain 2nd Floor 6EA1 $1,059

Floor - Terrazzo 2nd Floor 6SF387 $847

Floor - Terrazzo 2nd Floor 6SF387 $847

Floor - Tile Ceramic/ Porcelain 2nd Floor 6SF90 $190

Hand Dryer 2nd Floor 6EA1 $230

Hand Dryer 2nd Floor 6EA2 $460

Hand Dryer 2nd Floor 6EA2 $460

Lavatory 2nd Floor 6EA3 $959

Lavatory 2nd Floor 6EA1 $320

Lavatory 2nd Floor 6EA3 $959

Lighting - Pendent/Surface 2nd Floor 7EA1 $0

Lighting - Pendent/Surface 2nd Floor 7EA4 $0

Lighting - Pendent/Surface 2nd Floor 7EA4 $0

Partitions 2nd Floor 6EA7 $2,078

Partitions 2nd Floor 6EA5 $1,485

Walls - Plaster/Drywall 2nd Floor 6SF597 $1,648

Walls - Plaster/Drywall 2nd Floor 6SF576 $1,590

Walls - Plaster/Drywall 2nd Floor 6SF470 $1,297

Walls - Structural Glazed Tile 2nd Floor 6SF604 $1,900

Walls - Structural Glazed Tile 2nd Floor 6SF531 $1,671

Walls - Tile Ceramic/ Porcelain 2nd Floor 6SF60 $136

Water Closet 2nd Floor 6EA5 $1,680

Water Closet 2nd Floor 6EA1 $336

Water Closet 2nd Floor 6EA7 $2,352

Accessories 3rd floor - inside 305 social worker office 6SF89 $821

Ceiling - Plaster/Drywall 3rd floor - inside 305 social worker office 6SF89 $308

Doors - Wood Doors inclu hw 3rd floor - inside 305 social worker office 6EA1 $301

Floor Drain 3rd floor - inside 305 social worker office 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd floor - inside 305 social worker office 6SF89 $188

Hand Dryer 3rd floor - inside 305 social worker office 6EA1 $230

Lavatory 3rd floor - inside 305 social worker office 6EA1 $320

Lighting - Pendent/Surface 3rd floor - inside 305 social worker office 7EA1 $0

Walls - Plaster/Drywall 3rd floor - inside 305 social worker office 6SF506 $1,397

Water Closet 3rd floor - inside 305 social worker office 6EA1 $336

Accessories 3rd Floor 6SF697 $6,429

Page 26 of 47CAMERON Assessment Date: 9/10/14

Page 27: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Accessories 3rd Floor 6SF330 $3,044

Ceiling - Plaster/Drywall 3rd Floor 6SF697 $2,412

Ceiling - Plaster/Drywall 3rd Floor 6SF330 $1,142

Doors - Transom Window 3rd Floor 6SF19 $322

Doors - Transom Window 3rd Floor 6SF19 $322

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor Drain 3rd Floor 6EA1 $1,059

Floor Drain 3rd Floor 6EA2 $2,118

Floor - Terrazzo 3rd Floor 6SF330 $722

Floor - Terrazzo 3rd Floor 6SF697 $1,525

Hand Dryer 3rd Floor 6EA2 $460

Hand Dryer 3rd Floor 6EA2 $460

Lavatory 3rd Floor 6EA3 $959

Lavatory 3rd Floor 6EA2 $639

Lighting - Pendent/Surface 3rd Floor 7EA13 $0

Lighting - Pendent/Surface 3rd Floor 7EA4 $0

Partitions 3rd Floor 6EA2 $594

Partitions 3rd Floor 6EA6 $1,782

Urinals 3rd Floor 6EA10 $3,360

Walls - Plaster/Drywall 3rd Floor 6SF360 $994

Walls - Plaster/Drywall 3rd Floor 6SF468 $1,292

Walls - Tile Ceramic/ Porcelain 3rd Floor 6SF1,050 $2,372

Walls - Tile Ceramic/ Porcelain 3rd Floor 6SF528 $1,193

Water Closet 3rd Floor 1 toilet broken - constantly runs6EA4 $1,344

Water Closet 3rd Floor 6EA7 $2,352

Accessories Auditorium restrooom 6SF168 $1,550

Ceiling - Plaster/Drywall Auditorium restrooom 6SF168 $581

Doors - Wood Doors inclu hw Auditorium restrooom 6EA1 $301

Floor - Terrazzo Auditorium restrooom Water damaged5SF6 $314

Floor - Terrazzo Auditorium restrooom 6SF168 $368

Lavatory Auditorium restrooom 6EA1 $320

Lighting - Pendent/Surface Auditorium restrooom 7EA1 $0

Partitions Auditorium restrooom 6EA1 $297

Urinals Auditorium restrooom 6EA1 $336

Walls - Plaster/Drywall Auditorium restrooom Water damaged5SF5 $26

Walls - Plaster/Drywall Auditorium restrooom 6SF620 $1,711

Water Closet Auditorium restrooom 6EA1 $336

Page 27 of 47CAMERON Assessment Date: 9/10/14

Page 28: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Accessories Auditorium- Women's Toilet 6SF91 $839

Ceiling - Plaster/Drywall Auditorium- Women's Toilet 6SF91 $315

Doors - Wood Doors inclu hw Auditorium- Women's Toilet 6EA1 $301

Floor - Terrazzo Auditorium- Women's Toilet 6SF91 $199

Lavatory Auditorium- Women's Toilet Sink leaking5EA1 $1,590

Lighting - Pendent/Surface Auditorium- Women's Toilet 7EA1 $0

Partitions Auditorium- Women's Toilet 6EA1 $297

Walls - Plaster/Drywall Auditorium- Women's Toilet 6SF423 $1,167

Water Closet Auditorium- Women's Toilet 6EA2 $672

Accessories Basement - bath 013A inside classroom

012

6SF32 $295

Ceiling - Lay-in Basement - bath 013A inside classroom

012

6SF32 $96

Doors - Wood Doors inclu hw Basement - bath 013A inside classroom 012

6EA1 $301

Floor Drain Basement - bath 013A inside classroom 012

6EA1 $1,059

Floor - Tile Basement - bath 013A inside classroom 012

6SF32 $70

Lavatory Basement - bath 013A inside classroom

012

6EA1 $320

Lighting - Pendent/Surface Basement - bath 013A inside classroom

012

7EA1 $0

Walls - Vinyl Coated Gypsum Panel Basement - bath 013A inside classroom 012

6SF180 $497

Water Closet Basement - bath 013A inside classroom 012

6EA1 $336

Accessories Basement- Room 037 Storage Not a working restroom5SF291 $5,759

Ceiling - Plaster/Drywall Basement- Room 037 Storage Peeling paint throughout5SF291 $2,667

Doors - Wood Doors inclu hw Basement- Room 037 Storage 6EA1 $301

Floor - Concrete Basement- Room 037 Storage 6SF291 $154

Lighting - Pendent/Surface Basement- Room 037 Storage 7EA1 $0

Partitions Basement- Room 037 Storage 6EA1 $297

Showers Basement- Room 037 Storage Not in use as restroom5EA1 $1,172

Walls - Plaster/Drywall Basement- Room 037 Storage 6SF690 $1,904

Water Closet Basement- Room 037 Storage Not a working restroom5EA1 $1,344

Accessories Basement 6SF397 $3,662

Accessories Basement 6SF652 $6,014

Ceiling - Plaster/Drywall Basement 6SF397 $1,374

Ceiling - Plaster/Drywall Basement 6SF652 $2,256

Page 28 of 47CAMERON Assessment Date: 9/10/14

Page 29: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Doors - Wood Doors inclu hw Basement 6EA2 $602

Doors - Wood Doors inclu hw Basement 6EA1 $301

Floor Drain Basement 6EA2 $2,118

Floor Drain Basement 6EA2 $2,118

Floor - Terrazzo Basement 6SF652 $1,427

Floor - Tile Ceramic/ Porcelain Basement 6SF397 $840

Hand Dryer Basement 6EA2 $460

Lavatory Basement 6EA3 $959

Lavatory Basement 6EA3 $959

Lighting - Lay-in Basement 7EA5 $0

Lighting - Pendent/Surface Basement 7EA10 $0

Partitions Basement 6EA7 $2,078

Partitions Basement 6EA3 $891

Urinals Basement 6EA3 $1,008

Walls - Plaster/Drywall Basement 6SF328 $905

Walls - Structural Glazed Tile Basement 6SF656 $2,064

Walls - Tile Ceramic/ Porcelain Basement 6SF1,076 $2,431

Water Closet Basement 6EA4 $1,344

Water Closet Basement 6EA7 $2,352

Accessories Engineer's Restroom 6SF66 $609

Ceiling - Plaster/Drywall Engineer's Restroom Peeling paint throughout5SF66 $605

Doors - Wood Doors inclu hw Engineer's Restroom 6EA1 $301

Floor - Terrazzo Engineer's Restroom 6SF66 $144

Lavatory Engineer's Restroom 6EA1 $320

Lighting - Pendent/Surface Engineer's Restroom 7EA1 $0

Partitions Engineer's Restroom 6EA1 $297

Walls - Masonry Engineer's Restroom 6SF24 $76

Walls - Masonry Engineer's Restroom 5SF16 $780

Walls - Plaster/Drywall Engineer's Restroom 6SF300 $828

Accessories Main Office Restroom 6SF60 $553

Ceiling - Plaster/Drywall Main Office Restroom Peeling paint throughout5SF60 $550

Doors - Wood Doors inclu hw Main Office Restroom 6EA1 $301

Floor - Tile Main Office Restroom 6SF60 $131

Lavatory Main Office Restroom 6EA1 $320

Lighting - Pendent/Surface Main Office Restroom 7EA1 $0

Partitions Main Office Restroom 6EA1 $297

Walls - Plaster/Drywall Main Office Restroom Peeling paint throughout5SF390 $2,956

Page 29 of 47CAMERON Assessment Date: 9/10/14

Page 30: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Water Closet Main Office Restroom 6EA1 $336

Accessories Room 101 6SF176 $1,623

Ceiling - Plaster/Drywall Room 101 6SF176 $609

Doors - Wood Doors inclu hw Room 101 6EA1 $301

Floor - Terrazzo Room 101 6SF176 $385

Hand Dryer Room 101 6EA1 $230

Lavatory Room 101 Unused. toilet used as storage6EA2 $639

Lighting - Pendent/Surface Room 101 7EA1 $0

Partitions Room 101 6EA2 $594

Walls - Plaster/Drywall Room 101 5SF702 $5,320

Water Closet Room 101 6EA2 $672

Rooms (Other Than Classrooms) Subtotal: $1,132,813

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Plaster/Drywall 1st Floor 6SF6,096 $37,746

Doors - Steel Doors incl hw 1st Floor 6EA6 $1,806

Drinking Fountains - Single Fountain 1st Floor 6EA5 $1,379

Floor - Terrazzo 1st Floor 6SF2,515 $21,111

Floor - Tile/Sheet 1st Floor 6SF189 $103

Floor - Wood 1st Floor 6SF3,176 $22,390

Lighting - Lay-in 1st Floor 7EA1 $0

Lighting - Pendent/Surface 1st Floor 7EA41 $0

Stairs - Terrazzo 1st Floor 6LF3 $28

Walls - Plaster/Drywall 1st Floor 6SF11,504 $50,997

Ceiling - Plaster/Drywall 2nd Floor 6SF5,766 $35,702

Doors - Steel Doors incl hw 2nd Floor 6EA6 $1,806

Drinking Fountains - Single Fountain 2nd Floor 6EA5 $1,379

Floor - Terrazzo 2nd Floor 6SF2,551 $21,413

Floor - Tile/Sheet 2nd Floor 6SF39 $21

Floor - Wood 2nd Floor 6SF3,176 $22,390

Lighting - Lay-in 2nd Floor 7EA1 $0

Lighting - Pendent/Surface 2nd Floor 7EA39 $0

Walls - Plaster/Drywall 2nd Floor 6SF11,045 $48,962

Page 30 of 47CAMERON Assessment Date: 9/10/14

Page 31: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Lay-in 3rd Floor 6SF215 $646

Ceiling - Plaster/Drywall 3rd Floor 6SF5,766 $35,702

Doors - Steel Doors incl hw 3rd Floor 6EA5 $1,505

Drinking Fountains - Single Fountain 3rd Floor 6EA5 $1,379

Floor - Terrazzo 3rd Floor 6SF2,612 $21,925

Floor - Tile/Sheet 3rd Floor 6SF382 $208

Floor - Wood 3rd Floor 6SF3,176 $22,390

Lighting - Lay-in 3rd Floor 7EA1 $0

Lighting - Pendent/Surface 3rd Floor 7EA40 $0

Lighting - Wall Mounted 3rd Floor 7EA2 $0

Walls - Plaster/Drywall 3rd Floor 6SF12,496 $55,395

Ceiling - Lay-in Basement 6SF1,090 $3,273

Drinking Fountains - Single Fountain Basement 6EA5 $1,379

Floor - Asphalt Floor Basement 6SF4,607 $6,983

Floor - Terrazzo Basement 6SF871 $7,311

Floor - Tile/Sheet Basement 6SF29 $31

Floor - Tile/Sheet Basement 5SF6 $35

Floor - Tile/Sheet Basement 6SF1,436 $780

Lighting - Lay-in Basement 7EA7 $0

Stairs - Concrete Stairs Basement 6LF7 $58

Student Lockers - One Tier Basement 6EA6 $557

Walls - Masonry Basement 5SF598 $24,714

Walls - Vinyl Coated Gypsum Panel Basement 6SF2,375 $6,555

Ceiling - Plaster/Drywall Basement 6SF5,626 $34,836

Doors - Steel Doors incl hw Basement 6EA8 $2,408

Doors - Transom Window Basement 6EA59 $999

Doors - Wood Doors include hw Basement 6EA7 $2,107

Floor - Tile Ceramic/ Porcelain Basement 6SF348 $970

Lighting - Pendent/Surface Basement 7EA46 $0

Stairs - Terrazzo Basement 6LF17 $158

Walls - Plaster/Drywall Basement 6SF6,127 $27,161

Walls - Structural Glazed Tile Basement 6SF592 $1,862

Ceiling - Plaster/Drywall North Corridor of Auditorium Platform 6SF133 $824

Doors - Wood Doors include hw North Corridor of Auditorium Platform 6EA1 $301

Floor - Terrazzo North Corridor of Auditorium Platform 6SF81 $680

Floor - Tile/Sheet North Corridor of Auditorium Platform 6SF52 $28

Lighting - Pendent/Surface North Corridor of Auditorium Platform 7EA2 $0

Page 31 of 47CAMERON Assessment Date: 9/10/14

Page 32: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Stairs - Terrazzo North Corridor of Auditorium Platform 6LF4 $37

Walls - Plaster/Drywall North Corridor of Auditorium Platform 6SF558 $2,474

Ceiling - Plaster/Drywall South Corridor of Auditorium Platform 6SF327 $2,025

Doors - Wood Doors include hw South Corridor of Auditorium Platform 6EA3 $903

Floor - Terrazzo South Corridor of Auditorium Platform 6SF277 $2,325

Lighting - Pendent/Surface South Corridor of Auditorium Platform 7EA1 $0

Stairs - Terrazzo South Corridor of Auditorium Platform 6LF6 $56

Walls - Plaster/Drywall South Corridor of Auditorium Platform 6SF508 $2,252

Walls - Concrete Block West Vestibule of Auditorium / Basement 6SF716 $2,099

Walls - Plaster/Drywall West Vestibule of Auditorium / Basement 6SF457 $2,026

Ceiling - Plaster/Drywall West Vestibule of Auditorium 6SF410 $2,539

Doors - Wood Doors include hw West Vestibule of Auditorium 6EA3 $903

Floor - Tile Ceramic/ Porcelain West Vestibule of Auditorium 6SF410 $1,143

Lighting - Pendent/Surface West Vestibule of Auditorium 7EA3 $0

Safety

Security Cameras Main Office / Entire Building 6EA11 $2,134

Security Cameras Main Office / Entire Building 2 cameras are view is blocked 5EA4 $2,751

Stairs

Ceiling - Plaster/Drywall East Stair at center of N-S corridor / 3rd

Floor

6SF700 $5,125

Floor - Terrazzo East Stair at center of N-S corridor 6SF478 $4,012

Handrails East Stair at center of N-S corridor 6LF168 $1,456

Lighting - Pendent/Surface East Stair at center of N-S corridor 7EA4 $0

Stairs - Terrazzo East Stair at center of N-S corridor 6LF74 $687

Walls - Plaster/Drywall East Stair at center of N-S corridor 6SF3,083 $8,509

Ceiling - Plaster/Drywall North - middle of building - east of

elevator / 3rd Floor

6SF676 $4,949

Floor - Asphalt North - middle of building - east of elevator

6SF440 $3,410

Floor - Wood North - middle of building - east of elevator

6SF62 $437

Handrails North - middle of building - east of elevator

6LF155 $1,343

Lighting - Pendent/Surface North - middle of building - east of

elevator

7EA4 $0

Stairs - Asphalt North - middle of building - east of

elevator

6LF56 $520

Stairs - Terrazzo North - middle of building - east of elevator

6LF19 $176

Page 32 of 47CAMERON Assessment Date: 9/10/14

Page 33: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Stairs

Walls - Plaster/Drywall North - middle of building - east of

elevator

6SF1,921 $5,302

Ceiling - Plaster/Drywall South 6SF700 $5,125

Floor - Terrazzo South 6SF478 $4,012

Handrails South 6LF168 $1,456

Lighting - Pendent/Surface South 7EA4 $0

Stairs - Terrazzo South 5LF1 $54

Stairs - Terrazzo South 6LF73 $677

Walls - Plaster/Drywall South 6SF3,083 $8,509

Ceiling - Plaster/Drywall Stair SE of Gym from 3rd to 1st / 3rd

Floor

6SF584 $4,276

Floor - Terrazzo Stair SE of Gym from 3rd to 1st 6SF323 $2,711

Handrails Stair SE of Gym from 3rd to 1st 6LF186 $1,612

Lighting - Pendent/Surface Stair SE of Gym from 3rd to 1st 7EA3 $0

Stairs - Terrazzo Stair SE of Gym from 3rd to 1st 6LF93 $863

Walls - Plaster/Drywall Stair SE of Gym from 3rd to 1st 6SF3,766 $10,394

Ceiling - Plaster/Drywall stairs NE of gym to another elevator

corridor / 3rd Floor

6SF81 $593

Handrails stairs NE of gym to another elevator

corridor

6LF36 $312

Stairs - Terrazzo stairs NE of gym to another elevator corridor

6LF18 $167

Walls - Plaster/Drywall stairs NE of gym to another elevator corridor

6SF540 $1,490

Ceiling - Plaster/Drywall SW corner of Assembly Hall - from grade to balcony

6SF73 $534

Floor - Terrazzo SW corner of Assembly Hall - from

grade to balcony

6SF27 $227

Handrails SW corner of Assembly Hall - from

grade to balcony

6LF44 $381

Lighting - Pendent/Surface SW corner of Assembly Hall - from grade to balcony

7EA1 $0

Stairs - Terrazzo SW corner of Assembly Hall - from grade to balcony

6LF26 $241

Walls - Plaster/Drywall SW corner of Assembly Hall - from grade to balcony

6SF486 $1,341

Vertical Conveyance

Elevator - Hydraulic Elevator Stopping in between floors and leaking oil per

engineer

5EA1 $86,984

Page 33 of 47CAMERON Assessment Date: 9/10/14

Page 34: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Building Interior Subtotal: $721,948

Total Building Cost $6,026,168

Building: Annex (1905)

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Entrance Control - Audio #11 - W 6EA1 $497

Exterior Doors - Exterior Steel Door #10 - S 6EA1 $481

Exterior Doors - Exterior Steel Door #11 - W 6EA2 $961

Exterior Doors - Exterior Steel Door #9 - E 6EA2 $961

Foundation

Foundation - Concrete Entire Building 7LF605 $0

Superstructure - Steel Entire Building 7SF17,053 $0

Lighting

Exterior Lighting - Wall Mounted Entire Building Need bulbs6EA3 $866

Roof System

Chimney - Metal Flue Entire Building 6LF36 $5,693

Coping - Metal Entire Building Some vegetation at E and W6LF605 $19,431

Downspouts - Exterior Downspouts Entire Building 6LF72 $2,393

Roof Structure - Steel / Metal Deck/ Concrete Topping Entire Building 7SF16,650 $0

Roof - Metal Entire Building 6SF16,650 $223,095

Walls

Canopy - Metal Entire Building 6SF216 $4,639

Cornice - Wood Entire Building 6LF605 $20,980

Exterior Walls - Brick Entire Building 6SF7,001 $47,054

Exterior Walls - Stone-Cut Entire Building 6SF259 $1,741

Windows

Curtain wall - Louver Entire Building 6SF288 $3,229

Guard - Guards perforated Entire Building 6SF259 $3,307

Windows - Sash Aluminum Double-pane Entire Building 6SF1,850 $13,810

Page 34 of 47CAMERON Assessment Date: 9/10/14

Page 35: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Building Exterior Subtotal: $349,138

Building: Annex (1905)

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Automatic Transfer Switch Electrical Room 6EA1 $408

Emergency A/C Power - Corridors and Stairs Entire Building 6SF2,064 $620

Emergency A/C Power - Students Toilets Entire Building 6SF767 $285

Emergency Battery Packs - Corridors and Stairs 1st Floor 6EA4 $810

Exit Signs - Corridors and Stairs Entire Building 7EA7 $0

Security System - CCTV Entire Building 6SF17,053 $5,121

Security System - Intrusion Detection Entire Building 6SF17,053 $4,389

Main Service

Independent Electrical Service for emergency power Electrical Room 7EA1 $0

Main Electrical Service - 1000 A 120/208/3PH Electrical Room 7EA1 $0

PA System Entire Building 6SF17,053 $5,609

Power Distribution

Lighting and Power Panels - 100 A Electrical Room Location MDF/Communication Room 1267EA1 $0

Lighting and Power Panels - 100 A Electrical Room / 1st Floor Location: Main Entrance (ASCO Contactor @ 100A)

7EA1 $0

Lighting and Power Panels - 100 A Electrical Room 7EA1 $0

Lighting and Power Panels - 100 A Electrical Room 7EA1 $0

Lighting and Power Panels - Above 100 A Electrical Room 7EA1 $0

Lighting and Power Panels - Above 100 A Electrical Room 7EA1 $0

Main Distribution Panels - 400 - 600 amp Electrical Room 7EA1 $0

Main Distribution Panels - 400 - 600 amp Electrical Room 7EA1 $0

Main Distribution Panels - Less than 400 amp Electrical Room 7EA1 $0

Transformers - 277/480 - 120/208 Electrical Room 7EA1 $0

Electrical System Subtotal: $17,242

Building: Annex (1905)

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Page 35 of 47CAMERON Assessment Date: 9/10/14

Page 36: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fire Alarm

Fire Alarm Panel Electrical Room 6EA1 $6,406

Fire Alarm Strobe Lights Electrical Room / Entire Building Restroom Strobes Lights Damaged6SF17,053 $6,096

Fire Alarm_System Electrical Room / Entire Building 6SF17,053 $8,291

Sprinkler System

Sprinkler Heads Entire Building 7SF17,053 $0

Sprinkler Piping Entire Building / Mechanical Room 5SF17,053 $11,949

Wet Sprinkler System Entire Building 5SF17,053 $6,096

Safty System Subtotal: $38,839

Building: Annex (1905)

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Conditioning

Condensing Unit- Ground Mounted - Less than 5 tons MDF/Communication Room 126 No Other Data Available6EA1 $3,334

Air Handling Systems

Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils - Less than 4000 cfm

Mechanical Room Open Wiring, Piping Leaks, Corrosion Present6EA1 $3,350

Air Intake Mechanical Room / Roof 6EA1 $5,765

Boiler Systems

Boiler Auxiliary- Non Condensing Hot Water - 2001 - 3000 MBH Mechanical Room 6EA2 $4,093

Combustion Dampers Mechanical Room 6EA2 $818

Dual Temperature Pump Mechanical Room Seals Leaking & Corrsion Present5EA2 $22,076

Glycol Feed System Mechanical Room 6EA1 $539

Hot Water Pump Mechanical Room 5EA1 $4,704

Non Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 2001 - 3000 MBH

Mechanical Room Corrosion Present, Leaking, etc.6EA2 $1,996

Piping - Dual Temperature Pipes- Steel Mechanical Room / Entire Building 6LF600 $1,133

Water Fill System Mechanical Room With a 40 Gallon Make Up Tank (Pump Leaks at Seal, Corrosion Present)

6EA1 $1,168

Heating Devices

Unit Heater - Hot Water Entire Building Location: Both Restrooms6EA2 $558

Unit Heater - Hot Water Entire Building / 1st Floor Locations (Vestibules = 2, Corridor =2)6EA4 $1,117

Unit Heater - Hot Water Entire Building / Mechanical Room Location: PLBG/FP Room6EA1 $279

Unit Heater - Hot Water Entire Building / Mechanical Room Location Elect/Mech Rm6EA1 $279

Page 36 of 47CAMERON Assessment Date: 9/10/14

Page 37: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Unit Ventilation

Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/

Self Contained Compressor

1st Floor Offices = 2, Classrroms, MDF/Communication

Room 126

6EA13 $16,220

Ventilation

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Roof No Other Data Availabe6EA2 $1,185

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof No Other Data Available6EA1 $592

Mechanical System Subtotal: $69,205

Building: Annex (1905)

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Gas Heater - 150000 - 300000 BTU/HR Mechanical Room 6EA1 $310

Piping

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF17,053 $4,146

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF17,053 $3,170

Domestic Piping-Hot Water Return Lines Entire Building 6SF17,053 $2,439

Sanitary Piping Entire Building 6SF17,053 $15,607

Storm Piping Entire Building 6SF17,053 $14,875

Vent Piping Entire Building 6SF17,053 $11,461

Plumbing System Subtotal: $52,008

Building: Annex (1905)

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #400 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF855 $2,568

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF855 $1,871

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF20 $0

Walls - Concrete Block 1st Floor 6SF932 $2,732

Walls - Plaster/Drywall 1st Floor 6SF250 $690

Page 37 of 47CAMERON Assessment Date: 9/10/14

Page 38: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #401 (Computer Lab)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF865 $2,598

Chalk Board 1st Floor 4LF12 $1,102

Charging Station 1st Floor 6EA1 $485

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF865 $1,893

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF12 $0

Walls - Concrete Block 1st Floor 6SF1,187 $3,480

Wireless System 1st Floor 6EA1 $372

Classroom #402 (Regular Classroom)

Ceiling - Lay-in 1st Floor 6SF855 $2,568

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF855 $1,871

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF20 $0

Walls - Concrete Block 1st Floor 6SF687 $2,014

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Classroom #403 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF870 $2,613

Chalk Board 1st Floor 4LF12 $1,102

Doors - Steel Doors incl hw 1st Floor Out of alignment5EA1 $1,174

Floor - Tile 1st Floor 6SF870 $1,903

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF12 $0

Walls - Concrete Block 1st Floor 6SF674 $1,976

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Classroom #404 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF855 $2,568

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF855 $1,871

Floor - Tile 1st Floor 5SF1 $6

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF20 $0

Page 38 of 47CAMERON Assessment Date: 9/10/14

Page 39: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #404 (Regular Classroom)

Walls - Concrete Block 1st Floor 6SF937 $2,747

Walls - Plaster/Drywall 1st Floor 6SF250 $690

Classroom #405 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF870 $2,613

Chalk Board 1st Floor 6LF11 $245

Doors - Steel Doors incl hw 1st Floor Out of alignment5EA1 $1,174

Floor - Tile 1st Floor 6SF870 $1,903

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF8 $0

Walls - Concrete Block 1st Floor 6SF674 $1,976

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Classroom #406 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF855 $2,568

Doors - Steel Doors incl hw 1st Floor 5EA1 $1,174

Floor - Tile 1st Floor 6SF855 $1,871

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF20 $0

Walls - Concrete Block 1st Floor 6SF637 $1,867

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Classroom #407 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF880 $2,643

Chalk Board 1st Floor 4LF12 $1,102

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF880 $1,925

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF10 $0

Walls - Concrete Block 1st Floor 6SF594 $1,741

Walls - Plaster/Drywall 1st Floor 6SF590 $1,628

Classroom #408 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF855 $2,568

Chalk Board 1st Floor 4LF20 $1,836

Page 39 of 47CAMERON Assessment Date: 9/10/14

Page 40: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #408 (Regular Classroom)

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF855 $1,871

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF20 $0

Walls - Concrete Block 1st Floor 6SF637 $1,867

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Classroom #409 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF870 $2,613

Chalk Board 1st Floor 4LF11 $1,010

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF870 $1,903

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF11 $0

Walls - Concrete Block 1st Floor 6SF674 $1,976

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Classroom #410 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF855 $2,568

Chalk Board 1st Floor 4LF20 $1,836

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF855 $1,871

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF20 $0

Walls - Concrete Block 1st Floor 6SF637 $1,867

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Classroom #411 (Regular Classroom)

Casework 1st Floor 6LF19 $480

Ceiling - Lay-in 1st Floor 6SF870 $2,613

Chalk Board 1st Floor 4LF11 $1,010

Doors - Steel Doors incl hw 1st Floor Door out of alignment5EA1 $1,174

Floor - Tile 1st Floor 6SF870 $1,903

Lighting - Lay-in 1st Floor 7EA9 $0

Marker Board 1st Floor 7LF12 $0

Walls - Concrete Block 1st Floor 6SF674 $1,976

Walls - Plaster/Drywall 1st Floor 6SF500 $1,380

Page 40 of 47CAMERON Assessment Date: 9/10/14

Page 41: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #411 (Regular Classroom)

Classrooms Subtotal: $116,506

Building: Annex (1905)

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Ceiling - Lay-in 110 6SF352 $1,057

Doors - Wood Doors inclu hw 110 6EA1 $301

Floor - Tile 110 6SF352 $770

Lighting - Lay-in 110 7EA4 $0

Power Distribution 110 6EA10 $21,249

Walls - Concrete Block 110 6SF234 $686

Walls - Plaster/Drywall 110 6SF590 $1,628

Ceiling - Lay-in 128 Storage Water stained5SF4 $32

Ceiling - Lay-in 128 Storage 6SF186 $559

Doors - Steel Doors incl hw 128 Storage Door out of alignment and no strike plate5EA1 $1,174

Floor - Tile 128 Storage 6SF190 $416

Lighting - Lay-in 128 Storage 7EA3 $0

Power Distribution 128 Storage 6EA4 $8,500

Walls - Concrete Block 128 Storage 6SF413 $1,211

Walls - Plaster/Drywall 128 Storage 6SF288 $795

MDF_IDF

AC Unit 1st Floor 4EA1 $6,086

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Finishes 1st Floor 6SF360 $2,569

Mechanical/ Service Rooms

Janitor's Closet 1st Floor 6SF33 $236

Mechanical/ Service Rooms 1st Floor 6SF499 $3,575

Vaults 1st Floor Door out of alignment5SF197 $3,178

Restroom

Accessories 1st Floor 6SF45 $415

Accessories 1st Floor 6SF227 $2,094

Accessories 1st Floor 6SF540 $4,981

Ceiling - Lay-in 1st Floor 6SF540 $1,622

Page 41 of 47CAMERON Assessment Date: 9/10/14

Page 42: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Ceiling - Plaster/Drywall 1st Floor 6SF44 $152

Ceiling - Plaster/Drywall 1st Floor 6SF45 $156

Ceiling - Plaster/Drywall 1st Floor 6SF227 $786

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Doors - Steel Doors incl hw 1st Floor 6EA1 $301

Floor Drain 1st Floor 6EA2 $2,118

Floor Drain 1st Floor 6EA2 $2,118

Floor Drain 1st Floor 6EA1 $1,059

Floor Drain 1st Floor 6EA1 $1,059

Floor - Concrete 1st Floor 6SF540 $286

Floor - Concrete 1st Floor 6SF216 $114

Floor - Tile 1st Floor 6SF44 $96

Floor - Tile 1st Floor 6SF11 $24

Floor - Tile 1st Floor 6SF45 $98

Hand Dryer 1st Floor 6EA1 $230

Hand Dryer 1st Floor 6EA1 $230

Lavatory 1st Floor 6EA1 $320

Lavatory 1st Floor 6EA4 $1,278

Lavatory 1st Floor 6EA1 $320

Lavatory 1st Floor 6EA4 $1,278

Lighting - Lay-in 1st Floor 7EA5 $0

Lighting - Lay-in 1st Floor 7EA1 $0

Lighting - Lay-in 1st Floor no cover6EA1 $119

Lighting - Lay-in 1st Floor 6EA5 $595

Partitions 1st Floor 6EA1 $297

Partitions 1st Floor 6EA11 $3,266

Urinals 1st Floor 6EA6 $2,016

Urinals 1st Floor 2 broken5EA2 $2,688

Walls - Concrete Block 1st Floor 6SF1,340 $3,928

Walls - Concrete Block 1st Floor 6SF262 $768

Walls - Concrete Block 1st Floor 6SF1,336 $3,916

Walls - Plaster/Drywall 1st Floor 6SF252 $695

Water Closet 1st Floor 6EA1 $336

Water Closet 1st Floor 3 missing seats6EA11 $3,696

Water Closet 1st Floor 6EA3 $1,008

Water Closet 1st Floor 6EA1 $336

Page 42 of 47CAMERON Assessment Date: 9/10/14

Page 43: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Building: Annex (1905)

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Rooms (Other Than Classrooms) Subtotal: $99,423

Building: Annex (1905)

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Lay-in 1st Floor 6SF1,985 $5,961

Ceiling - Plaster/Drywall 1st Floor 6SF158 $978

Doors - Steel Doors incl hw 1st Floor 6EA2 $602

Drinking Fountains - Single Fountain 1st Floor 6EA2 $551

Floor - Tile Ceramic/ Porcelain 1st Floor 6SF79 $220

Floor - Tile/Sheet 1st Floor 6SF1,985 $1,079

Lighting - Lay-in 1st Floor 7EA25 $0

Walls - Concrete Block 1st Floor 6SF6,129 $17,967

Safety

Camera Viewing Station 1st Floor Main Office, MDF, Annex Office and remote viewing

6EA4 $2,730

Security Cameras 1st Floor / Entire Building 6EA1 $194

Security Cameras 1st Floor / Entire Building Shared system with Main Bldg. Cameras do not appear to be working

5EA1 $688

Building Interior Subtotal: $30,971

Total Building Cost $773,331

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Athletic

Surface - Concrete South Poured surface6SF1,285 $0

Civil/Drainage

Civil/ Drainage - Catch Basin Entire Site 7EA8 $0

Civil/ Drainage - Site Manhole Entire Site 7EA15 $0

Fencing

Fencing - Chain Link Entire Site Bent, loose5LF60 $3,659

Page 43 of 47CAMERON Assessment Date: 9/10/14

Page 44: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fencing

Fencing - Chain Link Entire Site 6LF640 $12,017

Fencing - New Standard Ornamental Entire Site 6LF490 $15,633

Landscape

Benches Entire Site NW6EA1 $430

Landscape - Grass Entire Site 6SF7,424 $6,157

Landscape - Hardscape- Concrete Entire Site N, Cracks5SF3,188 $29,815

Parkway trees Entire Site 6EA20 $13,201

Planting Beds/ Area Entire Site 6SF410 $674

Play Area - Asphalt/ Hardscape Entire Site NW play area6SF2,595 $7,236

Play Area - Asphalt/ Hardscape Entire Site S play area; movement, detioration around annex4SF3,030 $23,918

Trash Receptacles Entire Site S6EA1 $312

Parking Lot

Concrete Curbs SW 6LF340 $4,366

Interior Plantings SW 6LF60 $2,553

Lighting - Lighting SW Site6EA8 $3,722

Lighting - Pole Mounted SW Parking Lot6EA4 $5,810

Surface - Asphalt SW 6SF15,080 $36,444

Trash Enclosure - Chain Links SW 6SF400 $7,018

Playground

Equipment - Combo 3-12 NW Graffiti5EA1 $95,838

Equipment - Pre K 3-5 South 6EA1 $3,546

Surface - Poured Surface NW 6SF2,438 $17,850

Surface - Poured Surface South 6SF383 $2,804

Surface - Square Rubber Mats South 6SF2,440 $13,154

Sidewalks

Sidewalks - Internal Walks Entire Site Spalling5LF60 $2,553

Sidewalks - Perimeter Sidewalks Entire Site E, cracks5SF125 $1,194

Sidewalks - Perimeter Sidewalks Entire Site N, cracks5SF125 $1,194

Sidewalks - Perimeter Sidewalks Entire Site 6SF14,747 $29,313

Sidewalks - Perimeter Sidewalks Entire Site W, cracks5SF250 $2,388

Signage

Marquee - Building Mounted Back Lighted NW, East and North NW6EA1 $0

Monument - Building Mounted Cut Letter Sign NW, East and North N6EA2 $0

Monument - Building Mounted Cut Letter Sign NW, East and North E6EA1 $0

Page 44 of 47CAMERON Assessment Date: 9/10/14

Page 45: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Site Subtotal: $342,800

Total Site Cost $342,800

Campus Total ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space

reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;

it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report;

by the time the report is compiled, they have been resolved.

$7,142,299

Definitions

● Quantity

● Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,

depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and

additional work triggered by building codes.

means, for each item, the total number (or amount) of that item that exists and was evaluated.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like

chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

● Cost

● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs.

Page 45 of 47CAMERON Assessment Date: 9/10/14

Page 46: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

NNY40842081761920204203Regular ClassroomComputer Lab 2nd Floor

NNY408420846221938Teacher's Lunch205Regular ClassroomComputer Lab 2nd Floor

NNY401052601861880107111Regular ClassroomKindergarten 1st Floor

NNN4040801530800011011Pre SchoolPre School Basement

NYN4040801850950013012Pre SchoolPre School Basement

NNY40842081851921101100Regular ClassroomRegular Classroom 1st Floor

NNY40842081851921102102Regular ClassroomRegular Classroom 1st Floor

NNY40842081651921104104Regular ClassroomRegular Classroom 1st Floor

NNY40842081761840104106Regular ClassroomRegular Classroom 1st Floor

NNY40942281861840105107Regular ClassroomRegular Classroom 1st Floor

NNY40842081861830106109Regular ClassroomRegular Classroom 1st Floor

NNY40842081761826108112Regular ClassroomRegular Classroom 1st Floor

NNY40842081761920202200Regular ClassroomRegular Classroom 2nd Floor

NNY40842081861920201201Regular ClassroomRegular Classroom 2nd Floor

NNY40128420861827206206Regular ClassroomRegular Classroom 2nd Floor

NYY40842081761840207207Regular ClassroomRegular Classroom 2nd Floor

NNY40842081761862208208Regular ClassroomRegular Classroom 2nd Floor

NNY40842081761840210209Regular ClassroomRegular Classroom 2nd Floor

NNY40842081761862208A210Regular ClassroomRegular Classroom 2nd Floor

NNY40842081716900211211Regular ClassroomRegular Classroom 2nd Floor

NYY40842081761826212212Regular ClassroomRegular Classroom 2nd Floor

NYN40961921661805302300Regular ClassroomRegular Classroom 3rd Floor

NYN401022042261812301301Regular ClassroomRegular Classroom 3rd Floor

NYN401062121751799303302Regular ClassroomRegular Classroom 3rd Floor

NNN40771531451688Home Mech room303ARegular ClassroomRegular Classroom 3rd Floor

NNN40771532861563Home Mech Room303BRegular ClassroomRegular Classroom 3rd Floor

NYN40106212600811304304Regular ClassroomRegular Classroom 3rd Floor

NYN40721441111867306306Regular ClassroomRegular Classroom 3rd Floor

NYN40971941761865305307Regular ClassroomRegular Classroom 3rd Floor

NYN40721441661872307308Regular ClassroomRegular Classroom 3rd Floor

YYN40571141660878308309Regular ClassroomRegular Classroom 3rd Floor

NYN40721441320863309310Regular ClassroomRegular Classroom 3rd Floor

NYN401472941051929310311Regular ClassroomRegular Classroom 3rd Floor

NYN40102204621868311312Regular ClassroomRegular Classroom 3rd Floor

Annex (1905)

NYN40741471450865123401Regular ClassroomComputer Lab 1st Floor

Page 46 of 47CAMERON Assessment Date: 9/10/14

Page 47: Daniel R Cameron Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2610D.pdf · CAMERON Page 3 of 47 Assessment Date: 9/10/14. Daniel R Cameron Elementary School 1234

Daniel R Cameron Elementary School1234 N Monticello Ave Chicago, IL 60651

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Annex (1905)

YYY40601441871855124400Regular ClassroomRegular Classroom 1st Floor

YYY40601441871855122402Regular ClassroomRegular Classroom 1st Floor

NNN40741471881870121403Regular ClassroomRegular Classroom 1st Floor

YNY40601441871855108404Regular ClassroomRegular Classroom 1st Floor

NNN40741471650870104405Regular ClassroomRegular Classroom 1st Floor

YNY40601441871855107406Regular ClassroomRegular Classroom 1st Floor

NNN40741471870880103407Regular ClassroomRegular Classroom 1st Floor

YNY40601441871855106408Regular ClassroomRegular Classroom 1st Floor

NYN40741471881870102409Regular ClassroomRegular Classroom 1st Floor

NNY40601441871855105410Regular ClassroomRegular Classroom 1st Floor

NYN40741472081870101411Regular ClassroomRegular Classroom 1st Floor

Page 47 of 47CAMERON Assessment Date: 9/10/14