Page 1: Dan Ross NextGen ppt FINAL

Bridging the Gap

Strategies for Transit and Active Transportation

Next Generation Transportation Certificate

Page 2: Dan Ross NextGen ppt FINAL

Happy Projects

Stories of success are often similar.

Stories of failure are plentiful, diverse, and entertaining.

Page 3: Dan Ross NextGen ppt FINAL

Course Outline

1. Introduction

2. Define Strategies and Skills

3. Positive and Negative Examples

Approximately 45 minutes

Page 4: Dan Ross NextGen ppt FINAL

Course Presenter

Dan Ross, CPEng. (NZ), MUP

Senior Transportation Planner, Opus International Consultants, Ltd.

North Vancouver, British Columbia, Canada

Formerly

- Transit Planner – Edmonton Transit System

- Senior Transportation Consultant – Opus, Auckland, NZ

- Traffic Planner/Borough Planner – New York City DOT

- Associate City Planner – New York City DCP

Page 5: Dan Ross NextGen ppt FINAL

Why This Topic?Similarities towards active transportation and transit

Burden of proof is on you

- Gatekeepers

- Prejudices

- Responsive strategies

- Different delivery and outcomes

Page 6: Dan Ross NextGen ppt FINAL

Why This Topic?

High Level plans have similar intentions

• Higher PT/AT trips

• Reduced emissions

• Denser development

• Translate ‘down’ to specific plans

New York, NY

Auckland, NZ

Vancouver, BC

Edmonton, AB

Page 7: Dan Ross NextGen ppt FINAL

A Common Path

High Level Policy

Priority Statement

Program/Schedule of Projects

Feasibility?

Planners

Engineers

Investigation

Page 8: Dan Ross NextGen ppt FINAL

Some Success

1st Ave Complete Street –New York, NY

Dunsmuir St. bike lanes –Vancouver, BC

Beach Rd cycle lanes –Auckland, NZ

Page 9: Dan Ross NextGen ppt FINAL

Some Success – NYC

NYCDOT

- Cycle mode increases, not at expense of transit

- Fewer crashes, reduced risk

Page 10: Dan Ross NextGen ppt FINAL

Other SuccessAuckland, NZ – North Shore to CBD

New Zealand Transport Agency

Page 11: Dan Ross NextGen ppt FINAL

Other Success

Vancouver, BC

City of Vancouver

Metro Vancouver

Page 12: Dan Ross NextGen ppt FINAL

Setbacks

Daily Mail UK

MySanAntonio.com

Washington Post

Page 13: Dan Ross NextGen ppt FINAL

Setbacks

Toronto Sun

Gothamist NYC

Page 14: Dan Ross NextGen ppt FINAL

Obstacles – Public OppositionBike lanes vs. Parking/Business loss

Brooklynpaper.com

Chicago Gazette

Page 15: Dan Ross NextGen ppt FINAL

Obstacles – Public OppositionMalcolm MayesElitism/’Social Engineering’ Edmonton Sun

NY Daily News

The Onion

Page 16: Dan Ross NextGen ppt FINAL

Old Perceptions Dying Hard‘Boondoggle’ and Public Menace Double Standard

New Zealand Herald, 2007

Page 17: Dan Ross NextGen ppt FINAL

Old Perceptions Dying Hard

Calgary Sun

NY Daily News

‘Boondoggle’ and Public Menace Double Standard

Page 18: Dan Ross NextGen ppt FINAL

What Could Possibly Go Wrong?

High Level Policy

Priority Statement

Program/Schedule of Projects

Feasibility?

Planners

EngineersInvestigation

Page 19: Dan Ross NextGen ppt FINAL

Planners and EngineersPlanners Engineers

Responsible for this Responsible for this

Page 20: Dan Ross NextGen ppt FINAL

Traffic Engineers

Decision Making Factors

• Applied Precedence

• Common Sense

• Methodology

• Ethics

• Empathy - for motorists

Page 21: Dan Ross NextGen ppt FINAL

Engineers are people, too

Page 22: Dan Ross NextGen ppt FINAL

Considerations

• Design/Engineering Standards Guidelines

• Need for defensible decisions

• What’s worked before?

Guiding Methodology

Page 23: Dan Ross NextGen ppt FINAL

1. Effects on Traffic – short and long term

2. Constructability – how much and where?

3. Whole life costs – operations and maintenance

Minimal Considerations

Page 24: Dan Ross NextGen ppt FINAL

‘Business Case’

1. Traffic Impacts

2. Constructability

3. Operations and Maintenance

4. Other elements to consider

Page 25: Dan Ross NextGen ppt FINAL

Traffic ImpactsDo Minimum/Do Nothing vs. Proposal

Page 26: Dan Ross NextGen ppt FINAL

2. What will happen to affected/displaced traffic?

- modelling, route analyses, mode shift?

Traffic ImpactsBe Prepared to Discuss

1. What is an ‘acceptable’ impact?

- i.e., LOS, v/c ratio, peak impacts

3. How many people are affected? Not just cars

- Quantify comparative impacts

Page 27: Dan Ross NextGen ppt FINAL

Example 1Broadway Blvd – New York, NY

• Road diet for major Manhattan street; 33rd

St – 59th St

• Not possible without extensive network modelling

• Led to Greenlight for Midtown projects

• Continuously monitored and updated

Page 28: Dan Ross NextGen ppt FINAL

Example 1 – con’t.Broadway Blvd – New York, NY

• Willingness to experiment

• Reduced capacity impacts verified

• Low-cost treatments in short term

• Adjustments made with monitoring

Page 29: Dan Ross NextGen ppt FINAL

Example 1 – con’t.Broadway Blvd – New York, NY

Before After

B’way south of 59th St

Page 30: Dan Ross NextGen ppt FINAL

Example 1 – con’t.Broadway Blvd – New York, NY

Before After

Times Square

Page 31: Dan Ross NextGen ppt FINAL

Example 2

Cycle Boulevards – Auckland, NZ

Hillsborough Rd /Quona Ave

Dominion Rd /Memorial Ave

• 1st attempt at Portland-style bike boulevards

• Suburban areas with few impacts, design changes

• Some capacity analysis ultimately required

Page 32: Dan Ross NextGen ppt FINAL

Example 2 – con’t.Auckland Cycle Boulevards

• Originally rerouted 0.5km to south to new signalized intersection

• Crossing impacts forced into scope

• No adverse impacts – approved

Dominion Rd/Memorial Ave

Page 33: Dan Ross NextGen ppt FINAL

Example 2 – con’t.Auckland Cycle Boulevards

Hillsborough Rd/Quona Ave

• Full signalization preferred

• Alternative scenarios forced into scope

• Impacts deemed too severe; signalized crossing accepted

Page 34: Dan Ross NextGen ppt FINAL

Constructability

• Schedule/Programme?

• Simple and cheap is good

Page 35: Dan Ross NextGen ppt FINAL

Example 3Ngahue Drive – Auckland, NZ

New StonefieldsDevelopment

(former quarry)

Auckland Council GIS Viewer

cycling facilities

cycling facilities • 1.5km connecting

cycle way

• On strategic network

• 3m-5m wide boulevard/berm next to golf course

• No room for on-road facilities

Page 36: Dan Ross NextGen ppt FINAL

Example 3 – con’t.Ngahue Drive – Auckland, NZ

• Utility poles, drainage, structural, encroachment, arboreal issues

• $2.1M - $6.4M cost

• Residential side imperfect but cheaper

• Optics of cost vs. inability to provide quality (it’s only money)

Google Street View

Page 37: Dan Ross NextGen ppt FINAL

Example 4Materials

Auckland, NZFort Street Shared Space

• High-quality redesign

• Full consultation

• NZ$23M for 800m

Jean Batten Place

Before

After

Page 38: Dan Ross NextGen ppt FINAL

Example 4 – con’t.Materials

New York, NYNYCDOT Plaza Program

Pearl St Plaza, Brooklyn

• Concrete, asphalt only

• Local partnerships

• Minimal design, cost

• Potential for staging

Corona Plaza, Queens

Page 39: Dan Ross NextGen ppt FINAL

Operations and Maintenance

Page 40: Dan Ross NextGen ppt FINAL

Edmonton Complete Streets Pilot Projects

Design Elements

Example 5

• Sustainability initiative from Transportation Master Plan

• NACTO-influenced

• Application constraints

- curb build-outs

- lane widths

www.edmonton.ca

Page 41: Dan Ross NextGen ppt FINAL

Edmonton Complete Streets Pilot Projects

Design Elements

Example 5 – con’t.

Curb Extensions

City of Edmonton –Complete Streets Guidelines, 2013

Page 42: Dan Ross NextGen ppt FINAL

Edmonton Complete Streets Pilot Projects

Design Elements

Example 5 – con’t.

City of Edmonton –Complete Streets Guidelines, 2013

Preferred Lane Widths

Page 43: Dan Ross NextGen ppt FINAL

Edmonton Complete Streets Pilot Projects

Design Elements

Example 5 – con’t.

Bad for Bulb-outs

Curb Extensions

• No plow equipment for curb extensions

• Delay until existing fleet is upgraded

Page 44: Dan Ross NextGen ppt FINAL

Edmonton Complete Streets Pilot Projects

Design Elements

Example 5 – con’t.

Preferred Lane Widths

Seasonal Road Diet

• ‘Windrow’s reduce curbside widths

• Alberta min. is 4.2m to compensate

Page 45: Dan Ross NextGen ppt FINAL

• National Ass’n of City Transportation Officials (NACTO)

• Vehicle-Miles Traveled (VMT) over LOS – CEQA

• Multimodal LOS Analyses

• Improved GIS applications

• Data collection techniques

• Social Media outreach

• Tasteful Obstinacy – not new

New-ish Resources

Page 46: Dan Ross NextGen ppt FINAL

New-ish Resources – con`t

`NYCDOT Current Projects`

http://www.nyc.gov/html/dot/html/about/current-projects.shtml

‘California Senate Bill (SB) 743’

http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201320140SB743

‘Updating Transportation Impacts Analysis in the CEQA Guidelines’

Page 47: Dan Ross NextGen ppt FINAL

Summary

• Burden of Proof is on you

• Know your implementation context

• Consider risks during planning

• Challenge engineers

• Build your Business Case

Page 48: Dan Ross NextGen ppt FINAL

Building a Better Business Case

1. Traffic Impacts

2. Constructability

3. Operations & Maintenance

• What will happen to traffic?

• Analysis in scope or RFP

• How will this thing be built?

• Timing of construction

• Materials

• Minimum access requirements?

• How will it function?

• Who will maintain?

Burden of proof is on you

Page 49: Dan Ross NextGen ppt FINAL