A. CLEARING OPERATIONManpower Php. 1,810,042.80Equipment Fuel
Php. 550,000.00
B. DAMAGE STRUCTURES 1. Market Mall (roofing / lighting) Php.
6,000,000.002. Covered Court (Champaca/St. Benedict) Php.
2,400,000.003. DOJ Building Php. 300,000.004. Teatro Php.
300,000.00
C. ROADS / SIDEWALK (potholes) Php. 3,000,000.00
D. RIP-RAP Php. 5,000,000.00Php. 19,360,042.80
E. DAMAGE POLE1. Meralco pole 14 2. Government pole 13. PLDT
6
TYPHOON GLENDADAMAGED ASSESSMENT
July 17, 2014
REPAIR & MAINTENANCE PROJECTS
Project Title / Description Project Cost1. Repair / Rehab of
Existing Dilapidated Sidewalk,
Curbs & Gutter @ Various Streets within Marikina City Php.
1,499,917.622. Sectional Blocking Repair of Various Streets
within Marikina City Php. 1,999,765.883. Patching of Cold Mixed
@ Various Streets
within Marikina City Php. 499,910.254. Asphalt Overlay @ Various
Streets within
Marikina City Php. 699,122.235. Replacement of Fiber Glass Roof
of Market Zone
@ Kap. Venciong St., Sto. Nino, Marikina City Php.
1,805,496.316. Repair of Multi-Purpose Gymnasium Affection by
Typhoon
Glenda @ St. Benedict Subd., Nangka, Marikina City Php.
1,805,699.047. Sectional Blocking Repair of Rancho 1 gate, Rancho
Ave.,
Concepcion 2, Marikina City Php. 412,341.298. Repair /
Maintenance of Vehicle Php. 1,000,000.00
Php. 9,722,252.62
TYPHOON MARIODAMAGED ASSESSMENT
August 19, 2014