DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

Aug 04, 2019

Download

Documents

tranhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

DALEKOVODT: +385 1 241 11 11

E: [email protected]

www.dalekovod.com

2018

CONNECTING WORLDS, BUILDING THE FUTURE

Page 2: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

EOS SYSTEM2

CONNECTING WORLDS, BUILDING THE FUTURE

70 YEARS LONG TRADITION1500 EMPLOYEESOFFICES IN NORWAY, SWEDEN, FINLAND13 YEARS OF NORDIC PRESENCE

Page 3: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

DIGITALIZING POWER LINES AND

SUBSTATIONS3

Page 4: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

DIGITALIZING POWER LINES AND SUBSTATIONS

4

- LIDAR + orthophoto

- High resolution photo

Page 5: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

5

•3D model (PLS-CADD, PRIMTECH)

•Checkings:

- Tower and equipment position and verticality

- Conductor tension and position

- Infrastructure vicinity

- Clearances

DIGITALIZING POWER LINES AND SUBSTATIONS

Page 6: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

6

•Implementation of 3D models in Google Earth

– Model synchronization with GPS devices

– Availability of the model on tablets and smartphones

– Built-in equipment and tower data

DIGITALIZING POWER LINES AND SUBSTATIONS

Page 7: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

EOS SYSTEM7

EXTERNAL OBJECTS SUPERVISION

Page 8: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

WHAT IS EXTERNAL OBJECTS SUPERVISION (EOS) SYSTEM ?

8

OBJECT OBSERVABILITYVarious kinds of sensors and on-line measurements (electrical or non-electrical)

INTEGRATED OBJECT DIGITALIZATION SYSTEM

Multiobject and multisystem solution

EXTERNAL OBJECTS

Distant objects, hard to reach and veryoften dispersed in locations

NON-OBSERVABLE

Objects without any signal or with onlyfew non integrated signals

NO CRITICAL EVENT ALARM

External objects very often belong to keyinfrastructure that needs to be alarmedon critical event

SPATIAL-TIME-REFERENCINGGeographical locatingTime synchronization

DATABASEData storage and archivingPost mortem analysis

ALARMINGEarly warning andalarms on critical events

Page 9: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

WHY EOS SYSTEM ?

9

23,4 kWh

POWER SUPPLY

WIND SPEED

DEW POINT

TEMPERATURE

DOOR OPENED

RFID CARD NAME CONFIRMATION

40%

40 kmh

28 ˚C

KLARIC

OBJECT CROOFTOP

OBJECT DCABINET

40%

23,8 V

25 ˚C

40%

OBJECT ASTAND ALONE

OBJECT BTELECOM

MAST

MOTION DETECT

BATTERYVOLTAGE

MICROLINK SIGNAL

DOOR OPENED

TEMPERATURE

MOISTURE

OPERATOR 1

Page 10: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

ON LINE SYSTEM MONITORINGDigitalization of existing objects

MEASUREMENTS AND SENSORINGBetter observability and visibility of existing objects

ALARMING AND WARNINGEarly warning values and signals

DATABASEAnalyzing critical events, post-mortem diagnostics

02

01

03

04

SENSORSTAGE SOFTWARE – FUNCTIONALITY AND MOBILITY

Page 11: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

SENSORSTAGE – EXAMPLE

11

Page 12: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

12WIDE AREA MONITORING SYSTEM

Page 13: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

WAMS – SYSTEM FOR FUTURE GRIDS

13

Voltage/frequency instability

detection

Oscillations and frequency

disturbances

Dynamic overload

Detection

Preventive action

Suggestions

State Estimation

Benchmarking

~

GPS

Vectors

U(t), I(t)

Re

U2I

2

U1

U3

I1I

3

Im

~

RMS values

Sampling:

e.g. 0.5 Hz

Large number of signals:

e.g. 10 000

System overvue

Stationary conditionsMeasurements

A/D

Data

URMS, IRMS

A/D

PMURTU

SCADA / EMSWAMS

Function “Real time Power System

Monitoring” Vectors !

(time stamp)

Sampling:

20…60 Hz

Lower number of

signals e.g. 20…100

System overvue

Dinamic and

stationary events

Page 14: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

WAMS – POWER SYSTEM ON-LINE MONITORING

14

Page 15: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

PDC WIZARD SOFTWARE

15

Better system monitoring :

optimising investments

systems on the edge

Larger share of renewables (wind)

system control with constant

increase of renewable energy

Needs:

flexible power system control applications

integration to existing infrastructure

– PMUs, communications

Smart Grid Backbone

PDCWizard –

developed system is

applicable and liable

to modifications

regarding system

needs

Page 16: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

SMART CITY INFRASTRUCTURE16

Page 17: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

DIGITAL URBAN INFRASTRUCTURE

17

Page 18: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

DIGITAL URBAN INFRASTRUCTURE

18

Page 19: DALEKOVOD - hgk.hr · -Tower and equipment position and verticality-Conductor tension and position-Infrastructure vicinity-Clearances DIGITALIZING POWER LINES AND SUBSTATIONS. 6 •Implementation

DIGITAL URBAN INFRASTRUCTURE