Top Banner
PETRONET LNG LIMITED CORPORATE PRESENTATION
22

DAHEJ TERMINAL LNG

Jun 03, 2018

Download

Documents

Evelyn Brown
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 1/22

PETRONET LNG LIMITED

CORPORATE PRESENTATION

Page 2: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 2/22

PLLPLL – – DAHEJ TERMINALDAHEJ TERMINAL

SHAREHOLDERS

ONGC, BPCL, GAIL & IOCL – (Public Sector Undertakings)

GDFI (Strategic Partner), Asian Development Bank , Institutions & Public

DAHEJ TERMINAL

oca e n one o e us es n us r a u s n es ern n a.

10.0 MMTPA capacity

7.5 MMTPA sourced through Long Term Contract with RasGas

 Additional LNG being sourced through Spot /Short Term Contracts

Entered into marketing alliance with GAIL, IOCL & BPCL under a passthrough contract

Connected to major trunk pipelines HBJ, DUPL and GSPL network 

Currently supplying around 21% of total gas consumption

DAHEJTERMINAL

Page 3: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 3/22

SECOND LNG BERTH AT DAHEJSECOND LNG BERTH AT DAHEJ

 Developing second LNG Jetty at Dahej Terminal.

. .

 Existing marine facilities adequate for 11.0 MMTPA 

of LNG.

 New Jetty helps mitigating risk.

 Facilitating berthing of tankers up-to 260,000 CBM

Q-Max .

 Commissioning – III Quarter, 2013.

 – .

Page 4: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 4/22

LNG STORAGE TANKSLNG STORAGE TANKS

Page 5: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 5/22

DAHEJ EXPANSION FACILITIESDAHEJ EXPANSION FACILITIES

HP PUMPSHP PUMPS SHELL & TUBE VAPORIZERSSHELL & TUBE VAPORIZERS

Page 6: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 6/22

DAHEJ EXPANSION FACILITIESDAHEJ EXPANSION FACILITIES

 AIR HEATER GTG

GLYCOL WATER SYSTEM

Page 7: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 7/22

PETRONET’S III LNG VESSELPETRONET’S III LNG VESSEL --ASEEM ASEEM

Page 8: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 8/22

INDIA’S GAS INFRASTRUCTUREINDIA’S GAS INFRASTRUCTURE

Page 9: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 9/22

INTEGRATED POWER PLANT AT DAHEJINTEGRATED POWER PLANT AT DAHEJ

 Completed Detail Feasibility Report for a 1200 MW Power Plant.

  In process - Land Acquisition & Environment Clearance.

 LNG terminal facilitates harnessing Cold Energy.

 Configuration of:

  3 x 356 MW total 1068 MW Sin le shaft CCGT Investment of US 700 Million

  10% increase in power generation capacity, arising out of harnessing cold energy.

  Aggregate Project cost of about Rs 3,000 crore (Rs 2.80 crore / MW).

  Primary fuel for Project to be sourced from international markets.

  Aggregate gas requirement of 1.0–1.1 MMTPA.

 –to Power Plant.

  Implementation time-frame of 12-15 months for pre-development activities & further 27-33 monthsfor commencement of commercial operations.

Page 10: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 10/22

LNG TRUCK LOADING FACILITIESLNG TRUCK LOADING FACILITIES –– DAHEJDAHEJ

 Truck Loading facility at Dahej terminal wascommissioned in August 09, 2007 as a Pilot

.

 Currently about 3-4 trucks are loaded on dailybasis & total of around 1700 trucks have beenoa e a e.

 Facility can handle 2500 loadings per year.

 At present LNG (by road tanker) is being sold tothree consumers – two in Gujarat and one inMaharashtra.

  Several new customers (up to 800 KMS) arelined up for off-take of LNG for industrial andcity gas use.

Page 11: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 11/22

TRUCK LOADING FACILITIESTRUCK LOADING FACILITIES –– DAHEJDAHEJ

WEIGH BRIDGE VAPORISATION FACILITIES

Page 12: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 12/22

SOLID CARGO PORT PROJECTSOLID CARGO PORT PROJECT-- DAHEJDAHEJ

  Petronet formed a 26% Joint Venture Company with the Adani Group to execute a Solid Cargo.

  Port is being constructed North of the existing LNG jetty in Dahej

  Being executed in two phases

  Handling 18.0 MMTPA of cargo/year

  Cost Rs.1200 crore (US$240 Million)

  Scheduled to be completed by August, 2010 (Phase-I) & December, 2010 (Phase-II)

Page 13: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 13/22

SOLID CARGO PORT PROJECTSOLID CARGO PORT PROJECT-- DAHEJDAHEJ

PILE DRIVING IN MAIN BERTH 1 APPROACH BUND

13

Page 14: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 14/22

KOCHI LNG TERMINALKOCHI LNG TERMINAL

  LNG Terminal is a part of newly created Special Economic Zone and PLL is one of the Co-developers.

 Capacity - 2.5 MMTPA, expandable to 5.0 MMTPA 

 Whessoe - Project Management Consultant.

 Site Grading and Reclamation Work – Completed.

 Work for building two LNG Storage Tanks awarded to IHI, Japan.

, .

 Work related to Marine Facilities awarded to Afcons Infrastructure Limited.

 Work related to Administration Buildin Warehouse Worksho & Occu ational Health Centre

awarded to MARG Limited.

 Scheduled Mechanical Completion– December, 2011SITE FOR KOCHI LNG TERMINAL

Page 15: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 15/22

KOCHI LNG TERMINALKOCHI LNG TERMINALFACILITIES

  Jetty & other Marine Facilities for handling ship

IMPLEMENTATION SCHEDULE

sizes (65000 m3 to 216000 m3)

  Unloading and vapor return arms   Two Full Containment Storage Tanks (155000 M3

net Capacity)n- an umps, o o ompressors

 Re-condenser, Booster Pumps   2 High Pressure Shell & Tube Vaporizers.

  1 High Pressure Shell & Tube Vaporizer for Heat.

  1 Submerged Combustion Vaporizer.   Metering Units, Gas Turbine Generators  Air Heaters, Utilities   Cold Heat Recover Condensate Water Stora e

 Additional investment on Vaporizer Plant/Utilities for handling 5 MTPA will be US$100million(approx.) SITE FOR KOCHI LNG TERMINAL

Page 16: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 16/22

KOCHI PROJECTKOCHI PROJECT

Page 17: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 17/22

TANK 101 & 102TANK 101 & 102

Page 18: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 18/22

MARINE FACILITIESMARINE FACILITIES

Page 19: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 19/22

Page 20: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 20/22

PLLPLL-- FINANCING STRUCTUREFINANCING STRUCTURE

Particulars Dahej Dahej Expansion Kochi Total

Equity CapitalInternal accruals/Premium

170-

-85*

-210*

170295

Shareholders Fund 170 85 210 465

Debt 280 235 490 1005

Total Means of Finance 450 320 700 1470

*PLL generates approx. US$ 100 Million cash from its existing operations. After servicingshareholders, the balance will be used to finance Expansion Projects.

Page 21: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 21/22

CAPITAL EXPENDITURE/INVESTMENTCAPITAL EXPENDITURE/INVESTMENT

--Particulars Rs. (Crore) US$ (Million)

CAPEX

 2nd Jetty at Dahej (2013) Power Plant at Dahej (March, 2013) Kochi LNG Terminal First uarter 2012

10003200

220700

3600 800

INVESTMENT

o argo or – w an ecem er,

Grand Total 7900 1742

The Company has also undertaken expansion of an Institution to accommodate 500additional differently abled /challenged children (difficult to put a value to this initiative).

Page 22: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 22/22