PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO A. PEKERJAAN STRUKTUR I PEKERJAAN PERSIAPAN - Rp II PEKERJAAN TANAH & URUGAN - Rp III PEKERJAAN PONDASI - Rp IV PEKERJAAN STRUKTUR BETON - Rp V KONSTRUKSI RANGKA ATAP & PENUTUP ATAP - Rp SUB TOTAL PEKERJAAN STRUKTUR - Rp B. PEKERJAAN ARSITEKTUR I PEKERJAAN PELAPIS LANTAI - Rp II PEKERJAAN DINDING - Rp III PEKERJAAN KUSEN - Rp IV PEKERJAAN PLAFOND - Rp V PEKERJAAN CAT - Rp VI PEKERJAAN RAILLING - Rp VII PEKERJAAN SANITAIR - Rp VIII PEKERJAAN EXTERIOR - Rp SUB TOTAL PEKERJAAN ARSITEKTUR - Rp C. PEKERJAAN MEKANIKAL & ELEKTRIKAL (ME) I PEKERJAAN ELEKTRIKAL - Rp II PEKERJAAN ELEKTRONIK - Rp III PEKERJAAN MECHANIKAL+PLUMBING - Rp SUB TOTAL PEKERJAAN ME - Rp D. PEKERJAAN GROUNDTANK I PEKERJAAN STRUKTUR - Rp SUB TOTAL PEKERJAAN GROUNDTANK - Rp E. PEKERJAAN PERLENGKAPAN I PERLENGKAPAN - Rp II - Rp III PEKERJAAN SALURAN - Rp SUB TOTAL PEKERJAAN PERLENGKAPAN - Rp PEKERJAAN KERAMIK BIBIR SELASAR REKAPITULASI RENCANA ANGGARAN BIAYA NO U R A I A N JUMLAH SUB TOTAL RENCANA ANGGARAN BIAYA TOTAL
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
A. PEKERJAAN STRUKTURI PEKERJAAN PERSIAPAN -Rp II PEKERJAAN TANAH & URUGAN -Rp III PEKERJAAN PONDASI -Rp IV PEKERJAAN STRUKTUR BETON -Rp V KONSTRUKSI RANGKA ATAP & PENUTUP ATAP -Rp
SUB TOTAL PEKERJAAN STRUKTUR -Rp
B. PEKERJAAN ARSITEKTURI PEKERJAAN PELAPIS LANTAI -Rp II PEKERJAAN DINDING -Rp III PEKERJAAN KUSEN -Rp IV PEKERJAAN PLAFOND -Rp V PEKERJAAN CAT -Rp VI PEKERJAAN RAILLING -Rp VII PEKERJAAN SANITAIR -Rp VIII PEKERJAAN EXTERIOR -Rp
SUB TOTAL PEKERJAAN ARSITEKTUR -Rp
C. PEKERJAAN MEKANIKAL & ELEKTRIKAL (ME)I PEKERJAAN ELEKTRIKAL -Rp II PEKERJAAN ELEKTRONIK -Rp III PEKERJAAN MECHANIKAL+PLUMBING -Rp
SUB TOTAL PEKERJAAN ME -Rp D. PEKERJAAN GROUNDTANK
I PEKERJAAN STRUKTUR -Rp
SUB TOTAL PEKERJAAN GROUNDTANK -Rp E. PEKERJAAN PERLENGKAPAN
I PERLENGKAPAN -Rp II -Rp III PEKERJAAN SALURAN -Rp
SUB TOTAL PEKERJAAN PERLENGKAPAN -Rp
PEKERJAAN KERAMIK BIBIR SELASAR
REKAPITULASIRENCANA ANGGARAN BIAYA
NO U R A I A N JUMLAH SUB TOTAL
RENCANA ANGGARAN BIAYA TOTAL
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
REKAPITULASIRENCANA ANGGARAN BIAYA
NO U R A I A N JUMLAH SUB TOTAL
RENCANA ANGGARAN BIAYA TOTAL
F. PEKERJAAN LANDSCAPEPEKERJAN PAVING -Rp -Rp
G. PEKERJAAN AKSES JALANI G. PEKERJAAN AKSES JALAN -Rp
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
A. PEKERJAAN STRUKTURI PEKERJAAN PERSIAPAN
1 Pekerjaan Striping Tanah t = 20 cm m2 6.975,00 - - 2 Urugan Tanah Pudel 65 cm m3 4.533,75 - - 3 Urugan Tanah 100 cm m3 18.616,02 - - 4 Pemadatan Tanah + Pudel m3 21.487,77 - - 5 Pengukuran dan Bouwplank m' 248,00 - - 6 Pagar Sementara m' 244,00 - - 7 Direksi Keet m2 36,00 - - 8 Gudang Bahan m2 60,00 - -
-
II PEKERJAAN TANAH & URUGAN1 Galian Tanah Pondasi Pile Cap Type 1 (PC1) m3 37,04 - - 2 Galian Tanah Pondasi Pile Cap Type 2 (PC2) m3 42,59 - - 3 Galian Tanah Pondasi Pile Cap Type 3 (PC3) m3 39,98 - - 4 Urugan Tanah Kembali Pondasi Pile Cap Type PC1 m3 11,11 - - 5 Urugan Tanah Kembali Pondasi Pile Cap Type PC2 m3 12,78 - - 6 Urugan Tanah Kembali Pondasi Pile Cap Type PC3 m3 12,00 - - 7 Urugan Pasir Bawah Pondasi Pile Cap Type PC1 t=10 cm m3 4,08 - - 8 Urugan Pasir Bawah Pondasi Pile Cap Type PC2 t=10 cm m3 7,10 - - 9 Urugan Pasir Bawah Pondasi Pile Cap Type PC3 t=10 cm m3 6,66 - -
10 Urugan Pasir Bawah Lantai t = 10 cm m3 279,05 - - 11 Urugan Tanah Pudel Peninggian Elevasi Bangunan t=0,5 m3 1.395,27 - -
-
III PEKERJAAN PONDASI1 Pondasi Tiang Pancang
- Mobilisasi Tiang Pancang Jacking ls 1,00 - - - Tiang Pancang Ukuran 25 cm x 25 cm m' 5.028,00 - - - Pemecah kepala pancang ttk 419,00 - -
2 Lantai Kerja Bawah Pondasi Pile Cap Type PC1 t= 5 cm m3 2,04 - - 3 Lantai Kerja Bawah Pondasi Pile Cap Type PC2 t= 5 cm m3 3,55 - - 4 Lantai Kerja Bawah Pondasi Pile Cap Type PC3 t= 5 cm m3 3,33 - - 5 Lantai Kerja Bawah Sloof Type S1 25/50 m3 9,32 - - 6 Lantai Kerja Bawah Sloof Type S2 25/40 m3 8,67 - - 7 Beton Pondasi Pile Cap Type PC1 Uk. 130x130x50
8 Beton Pondasi Pile Cap Type PC2 Uk. 120x120x40 - Bekisting m2 80,64 - - - Besi Beton kg 9.621,18 - - - Beton K 300 m3 24,19 - -
9 Beton Pondasi Pile Cap Type PC3 Uk. 130x130x40 - Bekisting m2 70,72 - - - Besi Beton kg 9.058,68 - - - Beton K 300 m3 22,98 - -
10 Beton Sloof Type S1 25/50- Bekisting m2 931,69 - - - Besi Beton Polos kg 4.486,14 - -
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
JUMLAH PEKERJAAN PERSIAPAN
JUMLAH PEKERJAAN TANAH
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
- Besi Beton Ulir kg 16.313,71 - - - Beton K 300 m3 93,17 - -
11 Beton Sloof Type S2 25/40- Bekisting m2 728,28 - - - Besi Beton Polos kg 7.581,56 - - - Besi Beton Ulir kg 9.637,54 - - - Beton K 300 m3 69,36 - -
-
IV PEKERJAAN STRUKTUR BETONIV.1 PEKERJAAN STRUKTUR BETON LANTAI 1
1 Kolom Type K1 50/50 Elv. -1.65- Bekisting m2 779,70 - - - Besi Beton Polos kg 3.205,73 - - - Besi Beton Ulir kg 15.362,12 - - - Beton K 300 Ready Mix m3 97,46 - -
2 Kolom Type K2 60/50 Elv.-1.65- Bekisting m2 374,60 - - - Besi Beton Polos kg 1.639,07 - - - Besi Beton Ulir kg 7.569,74 - - - Beton K 300 Ready Mix m3 57,63 - -
3 Plat Lantai Dasar t=10 cm Elv.+0.50- Pembesian Wiremesh m2 2.790,54 - - - Beton K 300 Ready Mix m3 279,05 - -
-
IV.2 PEKERJAAN STRUKTUR BETON LANTAI 21 Balok Type B1 30/70
- Bekisting m2 1.679,60 - - - Besi Beton Polos kg 8.205,35 - - - Besi Beton Ulir kg 33.723,94 - - - Beton K 300 Ready Mix m3 207,48 - -
2 Balok Type B2 25/50- Bekisting m2 863,00 - - - Besi Beton Polos kg 4.155,40 - - - Besi Beton Ulir kg 15.110,96 - - - Beton K 300 Ready Mix m3 86,30 - -
3 Kolom Type K1 50/50 Elv. +4.00- Bekisting m2 572,70 - - - Besi Beton Polos kg 2.354,65 - - - Besi Beton Ulir kg 11.283,68 - - - Beton K 300 Ready Mix m3 71,59 - -
4 Kolom Type K2 60/50 Elv.+4.00- Bekisting m2 275,15 - - - Besi Beton Polos kg 1.203,92 - - - Besi Beton Ulir kg 5.560,07 - - - Beton K 300 Ready Mix m3 42,33 - -
5 Plat Lantai 2 t= 12 cm Elv.+4.00- Bekisting m2 1.477,28 - - - Besi Beton Polos kg 22.370,93 - - - Beton K 300 Ready Mix m3 177,27 - -
-
JUMLAH PEKERJAAN STRUKTUR BETON LANTAI 1
JUMLAH PEKERJAAN STRUKTUR BETON LANTAI 2
JUMLAH PEKERJAAN PONDASI
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
IV.3 PEKERJAAN STRUKTUR BETON LANTAI ATAP ELV.+7.161 Balok Type B1 30/70
- Bekisting m2 323,00 - - - Besi Beton Polos kg 1.577,95 - - - Besi Beton Ulir kg 6.485,37 - - - Beton K 300 Ready Mix m3 39,90 - -
2 Balok Type B2 25/50- Bekisting m2 556,50 - - - Besi Beton Polos kg 2.679,58 - - - Besi Beton Ulir kg 9.744,21 - - - Beton K 300 Ready Mix m3 55,65 - -
3 Balok Type B4 20/30- Bekisting m2 305,92 - - - Besi Beton Polos kg 976,04 - - - Besi Beton Ulir kg 1.973,08 - - - Beton K 300 Ready Mix m3 22,94 - -
4 Plat Lantai Atap Elv.+7.16- Bekisting m2 371,02 - - - Besi Beton Polos kg 4.279,30 - - - Beton K 300 Ready Mix m3 37,10 - -
-
IV.4 PEKERJAAN STRUKTUR BETON LANTAI TRIBUN1 Balok Type B1 30/70
- Bekisting m2 323,00 - - - Besi Beton Polos kg 1.577,95 - - - Besi Beton Ulir kg 6.485,37 - - - Beton K 300 Ready Mix m3 39,90 - -
2 Balok Type B3-1 30/60- Bekisting m2 370,80 - - - Besi Beton Polos kg 2.996,55 - - - Besi Beton Ulir kg 6.660,02 - - - Beton K 300 Ready Mix m3 44,50 - -
3 Balok Type B3-2 30/60- Bekisting m2 205,20 - - - Besi Beton Polos kg 1.658,29 - - - Besi Beton Ulir kg 3.350,58 - - - Beton K 300 Ready Mix m3 24,62 - -
4 Plat Lantai Atap Tribun t=10 cm- Bekisting m2 87,52 - - - Besi Beton Polos kg 1.009,45 - - - Beton K 300 Ready Mix m3 8,75 - -
5 Kolom Type K1 50/50- Bekisting m2 327,50 - - - Besi Beton Polos kg 1.346,51 - - - Besi Beton Ulir kg 6.452,60 - - - Beton K 300 Ready Mix m3 40,94 - -
6 Kolom Type K2 60/50 - Bekisting m2 434,27 - - - Besi Beton Polos kg 1.900,16 - - - Besi Beton Ulir kg 8.775,54 - - - Beton K 300 Ready Mix m3 66,81 - -
JUMLAH PEKERJAAN STRUKTUR BETON LANTAI ATAP ELV.+7.16
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
7 Plat Beton Tribun t= 15 cm- Bekisting m2 222,26 - - - Besi Beton Polos kg 2.081,01 - - - Besi Beton Ulir kg 6.176,69 - - - Beton K 300 Ready Mix m3 33,34 - -
-
IV.5 PEKERJAAN STRUKTUR BETON RING BALOK1 Balok Type B4 20/30 Elv. +11.70
- Bekisting m2 228,16 - - - Besi Beton Polos kg 727,95 - - - Besi Beton Ulir kg 1.471,55 - - - Beton K 300 Ready Mix m3 17,11 - -
2 Balok Type B4 20/30 Elv. +14.70- Bekisting m2 228,16 - - - Besi Beton Polos kg 727,95 - - - Besi Beton Ulir kg 1.471,55 - - - Beton K 300 Ready Mix m3 17,11 - -
3 Plat Lantai Atap Elv.+14.70- Bekisting m2 371,02 - - - Besi Beton Polos kg 4.279,30 - - - Beton K 300 Ready Mix m3 37,10 - -
-
IV.6 PEKERJAAN STRUKTUR TANGGA1 Tangga Beton Type 1 ( 4 Unit )
- Bekisting m2 61,74 - - - Besi Beton Polos kg 1.172,82 - - - Besi Beton Ulir kg 3.216,88 - - - Beton K 300 m3 17,29 - -
2 Tangga Beton Type 2 ( 2 Unit )- Bekisting m2 19,48 - - - Besi Beton Polos kg 369,97 - - - Besi Beton Ulir kg 1.014,77 - - - Beton K 300 m3 5,45 - -
- -
JUMLAH PEKERJAAN STRUKTUR TANGGAJUMLAH PEKERJAAN STRUKTUR BETON
JUMLAH PEKERJAAN STRUKTUR BETON LANTAI TRIBUN
JUMLAH PEKERJAAN STRUKTUR BETON RING BALOK
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
V. KONSTRUKSI RANGKA ATAP & PENUTUP ATAP1 Rangka Batang Pipa Bangunan Utama
- Pipa dia. 8 " t = 8,2 mm kg 19.822,36 - - - Pipa dia. 6 " t = 7,1 mm kg 29.705,48 - - - Pipa dia. 2 " t = 3,9 mm kg 35.962,75 - - - Gording C 150.50.20.2,3 kg 11.423,33 - - - Kolom WF 400.400.13.21 kg 6.880,00 - - - Perakitan baja kg 103.793,93 - - - Angker besi dia 30 mm bh 160,00 - - - Plate sambungan t 12 mm pipa 8" kg 2.415,43 - - - Plate sambungan t 12 mm pipa 6" kg 3.526,44 - - - Baut sambungan dia. 16 mm bh 4.320,00 - - - Pengelasan m 972,00 - - - End Plate t 25 mm kg 379,94 - - - Plate plandes t 25 mm kg 628,00 - - - Finishing Cat Semprot Duco m2 2.966,04 - -
2 Penutup atap zincalum t : 0,45 mm Colour Bond m2 3.480,00 - - 3 Pasang Insulasi m2 3.480,00 - -
- JUMLAH TOTAL PEKERJAAN STRUKTUR
- JUMLAH PEKERJAAN RANGKA ATAP
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
B. PEKERJAAN ARSITEKTURI PEKERJAAN PELAPIS LANTAIa. PEKERJAAN LANTAI I
c. PEKERJAAN DINDING LANTAI TRIBUN1 Pasangan Dinding bata 1/2 bata m2 1.005,97 - - 2 Plesteran m2 2.011,93 - - 3 Acian m2 2.011,93 - - 4 Benangan sudut m 2.454,40 - -
-
JUMLAH PEKERJAAN PELAPIS LANTAI
JUMLAH PEKERJAAN DINDING
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.) JUMLAH TOTAL (Rp.)
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.) JUMLAH TOTAL (Rp.)
III PEKERJAAN KUSEN a. PEKERJAAN KUSEN LANTAI I
1 Pintu Type P1 Unit 17,00 - - 2 Pintu Type P2 Unit 7,00 - - 3 Pintu Type P3 Unit 8,00 - - 4 Pintu Type P4 Unit 24,00 - - 5 Pintu Type P5 Unit 1,00 - - 6 Bovenlight BV1 Unit 32,00 - - 7 Bovenlight BV2 Unit 8,00 - - 8 Jendela J1 Unit 6,00 - - 9 Jendela J2 Unit 7,00 - -
10 Jendela J3 Unit 4,00 - - 11 Pintu Jendela Type PJ1 Unit 2,00 - -
b. PEKERJAAN KUSEN LANTAI II1 Pintu Type P1 Unit 13,00 - - 2 Pintu Type P2 Unit 2,00 - - 3 Pintu Type P3 Unit 8,00 - - 4 Pintu Type P4 Unit 24,00 - - 5 Jendela J1 Unit 10,00 - - 6 Jendela J2 Unit 6,00 - - 7 Bovenlight BV1 Unit 32,00 - - 8 Bovenlight BV3 Unit 5,00 - -
c. PEKERJAAN KUSEN LANTAI TRIBUN1 Jendela J2 Unit 4,00 - - 2 Jendela JT1 Unit 20,00 - - 3 jendela JT2 Unit 20,00 - -
-
IV PEKERJAAN PLAFONDa. PEKERJAAN PLAFOND LANTAI I
1 Gypsum board 9 mm + rangka metal hollow m2 1.136,53 - - 2 List gypsum T. 10 cm m 984,40 - -
b. PEKERJAAN PLAFOND LANTAI II1 Gypsum board 9 mm + rangka metal hollow m2 1.499,78 - - 2 List gypsum T. 10 cm m 752,56 - -
-
JUMLAH PEKERJAAN KUSEN
JUMLAH PEKERJAAN PLAFOND
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
1 Aluminium Composite Panel m2 1.400,00 - - 2 Tulisan "GOR BOJONEGORO" ls 1,00 - - 4 Canopy Kaca Tempered t = 12 mm m2 70,00 - -
-
JUMLAH PEKERJAAN SANITAIR
JUMLAH PEKERJAAN EXTERIORTOTAL PEKERJAAN ARSITEKTUR GEDUNG -
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
NO JUMLAH
C. PEKERJAAN MEKANIKAL & ELEKTRIKAL (ME)PEKERJAAN ELEKTRIKAL
IA PEKERJAAN PENYAMBUNGAN DAYA PLN 197 kVA -Rp B PEKERJAAN PANEL -Rp C PEKERJAAN KABEL FEEDER -Rp
-Rp IIA PEKERJAAN PENERANGAN & STOP KONTAK LANTAI.1 -Rp B PEKERJAAN PENERANGAN LANTAI.2 -Rp C PEKERJAAN PENERANGAN LUAR -Rp D PEKERJAAN PENERANGAN TRIBUN DAN ARENA -Rp E PEKERJAAN PETIR -Rp F PEKERJAAN KABEL TRAY -Rp
-Rp -Rp
PEKERJAAN ELEKTRONIKIIIA PEKERJAAN SOUND SYSTEM (TATA SUARA) GEDUNG -Rp B PEKERJAAN CCTV GEDUNG -Rp C PEKERJAAN FIRE ALARM GEDUNG -Rp
-Rp PEKERJAAN MECHANIKAL+PLUMBING
IVA PEKERJAAN INSTALASI TATA UDARA (AC) -Rp B PEKERJAAN INSTALASI AIR BERSIH -Rp C PEKERJAAN INSTALASI AIR KOTOR DAN BEKAS -Rp D PEKERJAAN INSTALASI HYDRANT -Rp
-Rp -Rp
SUB TOTAL JUMLAH PEKERJAAN MECHANIKAL DAN PLUMBING SUB TOTAL JUMLAH PEKERJAAN MEP
REKAPITULASI RENCANA ANGGARAN BIAYA
URAIAN PEKERJAAN
JUMLAH
JUMLAH SUB TOTAL JUMLAH PEKERJAAN ELEKTRIKAL
SUB TOTAL JUMLAH PEKERJAAN ELEKTRONIKA
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
NO SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
C. PEKERJAAN MEKANIKAL DAN ELEKTRIKALPEKERJAAN ELEKTRIKAL
IA PEKERJAAN PENYAMBUNGAN DAYA PLN 197 kVA1 Biaya Penyambungan kVA 197,00 - - 2 Uang Jaminan Instalasi kVA 197,00 - - 3 Trafo 250 kVA unit 1,00 - - -
B PEKERJAAN PANEL1 LVMDP (LOW VOLTAGE MAIN DISTRIBUTION PANEL) unit 1,00 - - 2 AMF GENSET unit 1,00 - - 3 LP-Penerangan Lantai.1 unit 1,00 - - 4 PP-Power Outlet Lantai.1 unit 1,00 - - 5 LP-Penerangan Lantai.2 unit 1,00 - - 6 LP-Penerangan Luar unit 1,00 - - 7 PP-Tribun unit 1,00 - - 8 PP-Lampu Arena unit 1,00 - - 9 PP-AC Lantai.1 unit 1,00 - -
10 PP-AC Tribun unit 1,00 - - 11 PP-Pompa Distribusi unit 1,00 - - 12 PP-Pompa Hydrant unit 1,00 - - 13 PP-Scoringboard.1 unit 1,00 - - 14 PP-Scoringboard.2 unit 1,00 - - 15 Panel Grounding lot 1,00 - - -
C PEKERJAAN KABEL FEEDER1 Kabel Feeder NYFGBY 4 x 2 (4 x 240) mm, dari Trafo ke LVMDP m 80,00 - - 2 Kabel Feeder NYFGBY 4 x 2 (4 x 185) mm, dari LVMDP ke Genset m 20,00 - - 3 Kabel Feeder NYY 4 x 50 mm + BC 35 mm, dari LVMDP ke PP -AC.1 m 20,00 - - 4 Kabel Feeder NYY 4 x 50 mm + BC 35 mm, dari LVMDP ke PP -AC.2 m 20,00 - - 5 Kabel Feeder NYY 4 x 50 mm + BC 35 mm, dari LVMDP ke PP -Lapangan m 20,00 - - 6 Kabel Feeder NYY 4 x 16 mm + BC 10 mm, dari LVMDP ke LP-Lampu Exterior m 20,00 - - 7 Kabel Feeder NYFGBY 4 x 10 mm + BC 6 mm, dari LVMDP ke LP-Lampu Jalan m 20,00 - - 8 Kabel Feeder NYY 4 x 16 mm + BC 10 mm, dari LVMDP ke SDP-Pompa m 20,00 - - 9 Kabel Feeder NYY 4 x 10 mm + BC 6 mm, dari LVMDP ke PP-Power Outlet Lt.1 m 20,00 - -
10 Kabel Feeder NYY 4 x 10 mm + BC 6 mm, dari LVMDP ke PP-Tribun m 20,00 - - 11 Kabel Feeder NYY 4 x 6 mm + BC 6 mm, dari LVMDP ke LP-Penerangan Lt.1 m 20,00 - - 12 Kabel Feeder NYY 4 x 6 mm + BC 6 mm, dari LVMDP ke LP-Penerangan Lt.2 m 20,00 - - 13 Kabel Feeder NYY 4 x 4 mm + BC 6 mm, dari LVMDP ke LP-Penerangan Luar m 20,00 - - 14 Kabel Feeder NYY 4 x 16 mm + BC 10 mm, dari LVMDP ke PP-Pompa Distribusi m 25,00 - - 15 Kabel Feeder FRC 4 x (1x70) mm + BC 50 mm, dari LVMDP ke SDP-Hydrant m 25,00 - - 16 Kabel Feeder NYY 4 x 95 mm + BC 70 mm, dari LVMDP ke LP-Scoringboard.1 m 20,00 - - 17 Kabel Feeder NYY 4 x 95 mm + BC 70 mm, dari LVMDP ke LP-Scoringboard.2 m 20,00 - - -
-
RENCANA ANGGARAN BIAYA
URAIAN PEKERJAAN
JUMLAH SUB TOTAL
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
- D PEKERJAAN KABEL TRAY1 Pekerjaan Kabel Tray W 400x100mm (Elektrikal) Lantai.1 m 65,00 - - 2 Pekerjaan Kabel Tray W 400x100mm (Elektronik) Tribun m 75,00 - - 3 Instalasi Kabel Tray m 140,00 - - 4 Acessories + Support ls 1,00 - - -
E PEKERJAAN PETIR1 Head Penangkal Petir Non radio aktif radius 120 meter bh 2,00 - - 2 Penghantar Petir / Down Conductor m 75,00 - - 3 Dudukan & Tiang Penangkal Petir Unit 2,00 - - 4 Instalasi pemasangan Petir ls 1,00 - - 5 Testing & Commisioning ls 1,00 - - 6 Perijinan Depnaker ls 1,00 - - -
- JUMLAH SUB TOTAL
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
NO SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
RENCANA ANGGARAN BIAYA
URAIAN PEKERJAAN
III SISTIM TATA UDARAInstalasi AC (Tata Udara) Lantai.1
1 Instalasi + pemasangan+ drain ttk 8,00 - - AC wall mounted 1 PK / 9.000 BTU/H Unit 8,00 - - material bantu ls 1,00 - - -
2 Instalasi + pemasangan+ drain ttk 2,00 - - AC wall mounted 1,5 PK / 13.500 BTU/H Unit 2,00 - - material bantu ls 1,00 - - -
AC wall mounted 0,5 PK / 4.500 BTU/H Unit 2,00 - - material bantu ls 1,00 - - -
2 Instalasi + pemasangan+ drain ttk 5,00 - - AC wall mounted 1 PK / 9.000 BTU/H Unit 5,00 - - material bantu ls 1,00 - - -
4 Instalasi + pemasangan+ drain ttk 2,00 - - AC wall mounted 2 PK / 18.000 BTU/H Unit 2,00 - - material bantu ls 1,00 - - -
-
IV PEKERJAAN INSTALASI SOUND SYSTEM
A PEKERJAAN SOUND SYSTEM PUBLIC ADDRESS & EVAC SYSTEMI PERALATAN UTAMA SOUND SYSTEM LANTAI.11 Voice Alarm System Controller LBB 1990/00 Unit 1,00 - - 2 Call Station LBB 1956/00 Unit 1,00 - - 3 Power Amplifier 240W LBB 1935/20 Unit 1,00 - - 4 DVD + MP3 Player Pioneer Unit 1,00 - - 5 Digital AM/FM Radio Tuner PA-T608 Unit 1,00 - - 6 Double Cassette Deck PA-W600 Unit 1,00 - - 7 Graphic Equalizer DBX231 Unit 1,00 - - 8 Monitor Panel PM-9208 Unit 1,00 - - 9 Blower Panel PF-9302 Unit 1,00 - -
10 Power Switch Panel Unit 1,00 - - 11 Box MDF-SS w/ Accessories Unit 1,00 - - 12 Cabinet Rack w/ Accessories Set 1,00 - - -
JUMLAH SUB TOTAL
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
VIII PEKERJAAN FIRE ALARM SYSTEMA PERALATAN UTAMA1 MCFA 1 Loop Addressable IO64 Unit 1,00 - - 2 Annunciator RLCD-C Unit 1,00 - - 3 MDF - FA c/w Accessories Unit 1,00 - - 4 UPS 1500VA + External Battery ls 1,00 - - 5 Grounding System set 1,00 - - - B INSTALASI FIRE ALARM SYSTEM
PEKERJAAN MECHANIKAL+ PLUMBINGI PEKERJAAN INSTALASI AIR BERSIH1 PENGADAAN / PEMASANGAN POMPA AIR BERSIH
a. Pompa Transfer Utama + Kabel power Unit 2,00 - - Type centrifugal end suction (type NBG 65-40-200/172) Total head : 30 m1Debit : 75 m3/jmMotor : 400w,2900 rpm,50hz5,5 kw
2 b. Pompa Booster (type Hydro 1000 CS 2xCR15-2) + Kabel power Unit 2,00 - - Total head : 32 m1Debit : 2x10 m3/jmMotor : 400w,2900 rpm,50hz2 x4kw
3 c. Pompa Sewage (type SEG 40.12.2.50B c/w Unit 2,00 - - auto coupling (ADC) + Kabel powerTotal head : 15 m1Debit : 2,2 lps/15 mMotor : 400w,2900 rpm,50hz2 x4kw
JUMLAH SUB TOTAL
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
NO SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
RENCANA ANGGARAN BIAYA
URAIAN PEKERJAAN
4 d. Presure tank 1000 ltr Unit 1,00 - - 5 e. Tandon atas fibre galss kap= 4 m3 bh 4,00 - - 6 f. Peralatan Pompa (tandon kap. = 300 m3)
a. Pipa Ø 65 mm m' 5,00 - - b. Pipa Ø 50 mm m' 26,00 - - c. Pipa Ø 40 mm m' 27,00 - - d. Pipa Ø 32 mm m' 7,00 - - e. Pipa Ø 20 mm m' 22,00 - - f. Pipa Ø 15 mm m' 43,00 - -
2 Gate Valve Ø 50 mm Bh 1,00 - - 3 Gate Valve Ø 32 mm Bh 3,00 - - 4 Material Bantu Ls 1,00 - - 5 Testing & Comissioning Ls 1,00 - - -
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
NO SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
RENCANA ANGGARAN BIAYA
URAIAN PEKERJAAN
V INSTALASI AIR BERSIH LANTAI.1 / 21 BAHAN PIPA PPR - PN 20
a. Pipa Ø 65 mm m' 5,00 - - b. Pipa Ø 50 mm m' 24,00 - - c. Pipa Ø 40 mm m' 13,00 - - d. Pipa Ø 32 mm m' 9,00 - - e. Pipa Ø 20 mm m' 28,00 - - f. Pipa Ø 15 mm m' 58,00 - -
2 Gate Valve Ø 50 mm Bh 1,00 - - 3 Gate Valve Ø 32 mm Bh 3,00 - - 4 Material Bantu Ls 1,00 - - 5 Testing & Comissioning Ls 1,00 - - - VI INSTALASI AIR BERSIH LANTAI.2 / 11 BAHAN PIPA PPR - PN 20
a. Pipa Ø 50 mm m' 46,00 - - b. Pipa Ø 40 mm m' 38,00 - - c. Pipa Ø 32 mm m' 21,00 - - d. Pipa Ø 20 mm m' 43,00 - - e. Pipa Ø 15 mm m' 38,00 - -
2 Gate Valve Ø 65 mm Bh 1,00 - - 3 Gate Valve Ø 32 mm Bh 4,00 - - 4 Material Bantu Ls 1,00 - - 5 Testing & Comissioning Ls 1,00 - - -
VII INSTALASI AIR BERSIH LANTAI.2 / 21 BAHAN PIPA PPR - PN 20
a. Pipa Ø 50 mm m' 46,00 - - b. Pipa Ø 40 mm m' 38,00 - - c. Pipa Ø 32 mm m' 21,00 - - d. Pipa Ø 20 mm m' 43,00 - - e. Pipa Ø 15 mm m' 38,00 - -
2 Gate Valve Ø 65 mm Bh 1,00 - - 3 Gate Valve Ø 32 mm Bh 4,00 - - 4 Material Bantu Ls 1,00 - - 5 Testing & Comissioning Ls 1,00 - - -
- PEKERJAAN HYDRANT
I PERALATAN UTAMA HYDRANT1 Pompa Hydrant (Model 4AEF12-Peerless Pump) 750 GPM+ Kabel power unit 2,00 - - 2 Pompa Jockey (Model CR 10 - 14) 38 GPM + Kabel power unit 2,00 - - 3 Header 8" lot 1,00 - - 4 Tangki Tekan (Pressure tank) 500 lt tek. Kerja 10 bar bh 1,00 - - 5 Pressure Switch bh 3,00 - - 6 Pressure indicator bh 4,00 - - 7 Instalasi pompa ls 1,00 - -
-
JUMLAH SUB TOTAL
JUMLAH SUB TOTAL
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
III SALURAN KAWASAN 1 Galian tanah saluran m3 39,72 - - 2 Urugan kembali m3 13,24 - - 3 Urugan pasir bawah saluran m3 7,94 - - 4 Pasangan Buis Beton U 30 m' 264,80 - - 5 Penutup saluran (Griill) m' 264,80 - -
- - TOTAL PEKERJAAN PERLENGKAPAN
URAIAN PEKERJAAN
PENGADAAN PERLENGKAPAN GOR BOJONEGORORENCANA ANGGARAN BIAYA
JUMLAH PEKERJAAN PERLENGKAPAN
JUMLAH PEKERJAAN KERAMIK BIBIR SELASAR
JUMLAH SALURAN KAWASAN
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
F. PEKERJAAN LANDSCAPE1 Pekerjaan Paving
Pemasangan Kanstin m' 250,00 - - Pemasangan Paving Blok m2 2.603,00 - - Urugan Pasir bawah paving t. 10 cm m3 260,30 - -
-
G. PEKERJAAN AKSES JALAN1 Pekerjaan Pematangan Akses Jalan m3 2.673,00 - -
-
H. PEKERJAAN JEMBATAN1 Pekerjaan Pemasangan Box Culvert unit 5,00 - -
-
JUMLAH PEKERJAAN LANDSCAPE
JUMLAH PEKERJAAN JALAN AKSES
JUMLAH PEKERJAAN JEMBATAN 1 UNIT
RENCANA ANGGARAN BIAYA
NO. ITEM PEKERJAAN SAT. VOL. HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
JUMLAH TOTAL (Rp.)
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
1 M2 STRIPING T = 20 CMSAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
Pekerja O.H 0,0500 -Rp - Mandor O.H 0,0050 -Rp -
Jumlah -
1 M' BOUWPLANKSAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
Kayu Meranti (usuk 5/7) m3 0,0120 -Rp - Paku kg 0,0200 -Rp - Kayu Meranti (Papan 2/20) m3 0,0070 -Rp - Pekerja O.H 0,1000 -Rp - Tukang Kayu O.H 0,1000 -Rp - Kepala Tukang Kayu O.H 0,0100 -Rp - Mandor O.H 0,0050 -Rp -
Jumlah -
1 M' PAGAR PENGAMANSAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
Dolken Kayu ø 8 - 10 / 400 cm btg 1,2500 -Rp - Semen portland (40kg) kg 0,0500 -Rp - Seng Gelombang 3" - 5" lbr 1,2000 -Rp - Pasir Beton m3 0,0050 -Rp - Koral Beton m3 0,0090 -Rp - Kayu Meranti (usuk 5/7) m3 0,0110 -Rp - Paku kg 0,0600 -Rp - Meni Besi m2 0,4500 -Rp - Pekerja O.H 0,4000 -Rp - Tukang Kayu O.H 0,2000 -Rp - Kepala Tukang Kayu O.H 0,0200 -Rp - Mandor O.H 0,0200 -Rp -
Jumlah -
1 M2 DIREKSI KEETSAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
Dolken Kayu ø 8 - 10 / 400 cm btg 1,2500 -Rp - Semen portland (40kg) kg 35,0000 -Rp - Seng Gelombang 3" - 5" lbr 1,2000 -Rp - Kayu Meranti (usuk 5/7) m3 0,0500 -Rp - Paku Biasa 2" - 5" kg 0,8500 -Rp - Bata Merah bh 30,0000 -Rp - Jendela Nako bh 2,0000 -Rp - Kaca Polos 3 mm m2 0,0800 -Rp - Kunci Tanam bh 1,0000 -Rp - Plywood t = 4 mm lbr 0,0600 -Rp - Meni Besi m2 0,4500 -Rp - Pekerja O.H 0,4000 -Rp - Tukang Kayu O.H 0,2000 -Rp - Kepala Tukang Kayu O.H 0,0200 -Rp - Mandor O.H 0,0200 -Rp -
Jumlah -
Tenaga Kerja
KEBUTUHAN
Bahan
Tenaga Kerja
KEBUTUHAN
Bahan
Tenaga Kerja
ANALISA HARGA SATUAN
KEBUTUHAN
Tenaga Kerja
KEBUTUHAN
Bahan
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGORO
ANALISA HARGA SATUAN
1 M2 GUDANG BAHANSAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
Dolken Kayu ø 8 - 10 / 400 cm btg 1,2500 -Rp - Semen portland (40kg) kg 3,0000 -Rp - Seng Gelombang 3" - 5" lbr 1,0000 -Rp - Kayu Meranti (usuk 5/7) m3 0,0300 -Rp - Paku Biasa 2" - 5" kg 0,5000 -Rp - Besi Strip kg 1,1000 -Rp - Bata Merah bh 10,0000 -Rp - Jendela Nako bh 1,0000 -Rp - Kaca Polos 3 mm m2 0,0800 -Rp - Kunci Tanam bh 1,0000 -Rp - Plywood 4 mm lbr 0,0600 -Rp - Meni Besi m2 0,4500 -Rp - Pekerja O.H 0,4000 -Rp - Tukang Kayu O.H 0,2000 -Rp - Kepala Tukang Kayu O.H 0,0200 -Rp - Mandor O.H 0,0200 -Rp -
Jumlah -
1 M3 GALIAN TANAH KEDALAM 1 METERSAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
Pekerja O.H 0,900 - - Mandor O.H 0,045 - -
Jumlah -
1 M3 URUGAN TANAH KEMBALISAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
Pekerja O.H 0,300 - - Mandor O.H 0,015 - -
Jumlah -
1 M3 URUGAN PASIRSAT INDEKS HARGA BAHAN / UPAH JUMLAH HARGA
1 M2 PEKERJAAN FASADE ACRILICSat Indeks Harga Satuan Jumlah Harga
Acrilic t = 1 mm m2 1,100 -Rp -Rp Besi Hollow 40/40 bh 4,750 -Rp -Rp Baut dia. 6 mm bh 8,000 -Rp -Rp Dyna Bolt dia. 10 mm bh 10,000 -Rp -Rp Rifet bh 7,000 -Rp -Rp
Jumlah -Rp
Kebutuhan
PEKERJAAN
Kebutuhan
PEKERJAAN
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG OLAHRAGA TERTUTUP (INDOOR)LOKASI : KABUPATEN BOJONEGOROBAGIAN PEK. : ANALISA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL, PLUMBING (MEP)
Pompa Jockey (Model CR 10 - 14) 38 GPM + Kabel power 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
28 Presure tank 1000 ltr
Pressure Tank 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)NO URAIAN KOEF. SAT.
29 Pressure Switch / unit
Pressure Switch 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
30 Pressure Gauge / unit
Pressure Gauge 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
31 Check Valve 4" / unit
Check Valve 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
32 Check Valve 1 1/2" / unit
Check Valve 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
33 Gate Valve 3/4" / bh
Gate Valve 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
34 Gate Valve 1" / bh
Gate Valve 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)NO URAIAN KOEF. SAT.
35 Gate Valve 1 1/2" / bh
Gate Valve 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
36 Gate Valve 2" / bh
Gate Valve 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
37 Gate Valve 3" / bh
Gate Valve 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
38 Gate Valve 4" / bh
Gate Valve 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
39 Gate Valve 6" / bh
Gate Valve 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
40 Fleksible Joint 5" / unit
Flexible joint 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)NO URAIAN KOEF. SAT.
41 Fleksible Joint 4" / unit
Flexible joint 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
42 Fleksible Joint 2.5" / unit
Flexible joint 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
43 Strainer 5" / unit
Starainer 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
44 Strainer 2.5" / unit
Starainer 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
45 Foot Valve 5" / unit
Foot Valve 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
46 Foot Valve 2.5" / unit
Foot Valve 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)NO URAIAN KOEF. SAT.
47 Safety Valve 3" / unit
Safety Valve 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
48 Automatic Air Valve / unit
Automatic Air Valve 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
49 Flow Meter 3" / bh
Flow meter 3" 1,000 bh - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
50 Priming Tank 100 liter / unit
Priming Tank 1,000 unit - -
Ongkos Pasang 1,000 ls - -
Jumlah -
Dibulatkan -
51 Hydrant Box InDoor / bh
Hydrant Box InDoor 1,000 bh - -
Ongkos Pasang 1,000 lot - -
Jumlah -
Dibulatkan -
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGOROSUB BAGIAN : DAFTAR HARGA SATUAN BAHAN & UPAH
NO SATUAN / UNIT HARGA SATUAN
I BAHAN SEMEN / PC1 Semen PC (40kg) zak2 Semen portland (40kg) kg3 Semen Warna kg
II BAHAN BETON1 Ready Mix K-225 m32 Ready Mix K-300 m33 Tiang Pancang 25/25 cm K 500 m
III BAHAN KACA1 Kaca Bening t = 5 mm m22 Kaca Bening t = 6 mm m23 Kaca Bening t = 8 mm m24 Kaca Polos 3 mm m25 Kaca Tempered t = 10 mm m26 Kaca Tempered t = 12 mm m27 Kaca Frame Less t = 8 mm m28 Kaca es t 5 mm m29 Stiker Sandblast m210 Acrilic t = 1 mm m2
IV BAHAN BATUAN / ALAM1 Bata Merah bh2 Batu Kali Belah 15/20 cm m33 Kapur Pasang m34 Kerikil m35 Koral Beton Kg6 Pasir beton Kg7 Pasir pasang m38 Pasir Urug m39 Sirtu m3
10 Buis Beton U 30 m
JENIS BARANG / JASA
NO SATUAN / UNIT HARGA SATUANJENIS BARANG / JASA
V BAHAN CAT1 Air ltr2 Cat Dasar kg3 Cat Penutup kg4 Cat Wathershield kg5 Cat Meni Zincromate kg6 Plamir kg7 Serat Fiber m28 Waterproofing kg9 Cat Meni Kayu kg10 Cat Kayu kg11 Cat Meni Besi kg12 Cat duco kg13 Finishing. Melamik m214 Cat garis lantai lapangan m215 Ampelas lbr16 Kuas Bh17 Kapek Bh
VI BAHAN ATAP & PLAFOUND1 Gypsumboard 120 x 240 x 9 mm lbr2 List Gypsum m3 Seng Gelombang 3" - 5" lbr
VII BAHAN BESI1 Aluminium Composite Panel m22 Baut dia. 6 mm bh3 Kawat Beton kg4 Besi Beton Ulir kg5 Besi Pipa/WF kg6 Besi Hollow 20/40 m'
58 Sekrup Fixer bh59 Slimar Alumunium 3/10 cm m60 Partisi Kubikal Toilet m261 Jendela Nako bh62 Kunci Tanam bh
IX BAHAN LANTAI1 Floor Hardener m22 Keramik 33,3 x 33,3 m27 Keramik 33.3x66.6 m28 Homogenous tile 60 x 60 m29 Homogenous tile 60 x 60 kasar m2
X BAHAN KAYU1 Dolken Kayu ø 8 - 10 / 400 cm btg2 Kayu Cetakan m33 Kayu Cetakan m34 Minyak Bekisting ltr5 Plywood t = 4 mm lbr6 Multiplek 12 mm lbr7 Teakwood 4 mm lbr8 Parquet m29 Lem kayu kg
XI BAHAN SANITASI1 Floor Drain bh2 Kloset Duduk bh3 Kran Air dia. 1/2" bh4 Urinoir bh5 Wastafel bh8 Kloset jongkok bh
XII ALAT1 Alat Bantu (1 Set @ 3 Alat) jam2 Jack Base 60 cm bh3 U Head 60cm bh4 Pipa Support set5 Tie Rod set6 Main Frame 170 cm bh7 Leade Frame 90 cm bh8 Cross Brace 212 cm bh9 Cross Brace 192 cm bh
NO SATUAN / UNIT HARGA SATUANJENIS BARANG / JASA
10 Join Pen bh11 U Head 60 cm bh12 Horri Beam kg13 Sewa Crane 30 ton - min. 8 jam (termasuk mob/demob, operator, BBM) jam14 Sewa Dump Truck 5 T (min 5 jam) jam15 Sewa injection tiang pancang - min. 8 jam(termasuk mob/demob, operator, BBM) jam16 Sewa Pompa Beton m3
XIV BAHAN LAIN-LAIN1 Mobilisasi Tiang Pancang Jacking ls2 Tiang Pancang 25x25 Square K 500 m'3 Tulisan "GOR BOJONEGORO" ls4 Roof Mesh m25 Aluminium foil m26 Glass Wool m27 Banner m28 Tanaman Hias btg9 Tanaman/Pohon Palem btg10 Tanaman Rumput Hias m211 Lampu PJU 250 W + tiang 1 cabang h = 9 m + pondasi unit12 Instalasi Lampu PJU unit13 Pintu gerbang unit14 Pas. Batu Alam Andesit Garis Alur 20/40 cm m215 Box cuilvert uk. 3.5 x 1.2 x 0.3 m bh16 Aspal Cutback kg17 Solar ltr18 Sewa katrol jam19 Kawat las kg20 Sewa alat las jam21 Tangga Service unit22 Plat Penutup Tandon unit
NO SATUAN / UNIT HARGA SATUANJENIS BARANG / JASA
XV UPAH DAN TENAGA1 Mandor O.H3 Kepala tukang kayu O.H4 Kepala tukang batu O.H5 Kepala tukang cat O.H6 Kepala tukang besi O.H7 Kepala tukang kaca O.H8 Tukang kayu O.H9 Tukang batu O.H10 Tukang besi O.H11 Tukang Cat O.H12 Tukang Kaca O.H13 Pekerja O.H
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA TERTUTUP (INDOOR) LOKASI : KABUPATEN BOJONEGOROSUB BAGIAN : DAFTAR HARGA SATUAN BAHAN & UPAH
NO SAT. HARGA SATUAN (Rp.)
KABEL & HEAD PETIR1 Kabel NYFGBY 4x240mm m'2 Kabel NYFGBY 4x185mm m'3 Kabel NYY 4x95mm m'4 Kabel NYY 4x50mm m'5 Kabel NYY 4x35mm m'6 Kabel NYY 4x25mm m'7 Kabel NYY 4x16mm m'8 Kabel NYY 4x10mm m'9 Kabel NYY 4x6mm m'10 Kabel NYY 4x4mm m'11 Kabel FRC 1x70mm m'12 Kabel FRC 1x35mm m'13 Kabel NYA 25mm m'14 Kabel NYA 10mm (ex. 4 besar) m'15 Kabel NYA 6mm (ex. 4 besar) m'16 Kabel NYM 4x4mm (ex. 4 besar) m'17 Kabel NYM 2 x 2.5 mm m'18 Kabel NYM 3 x 2.5 mm m'19 Kabel NYA 2 x 1.5 mm m'20 Kabel NYM 3 x 1.5 mm m'21 Kabel NYM 3 x 4 mm m'22 Kabel BC 6 mm m'23 Kabel BC 10 mm m'24 Kabel BC 16 mm m'25 Kabel BC 35 mm m'26 Kabel BC 50 mm m'27 Kabel BC 70 mm m'28 Kabel BC 95 mm m'29 Penangkal petir non radioaktif radius 120m (ex.GE) Franklein unit30 Spit Tembaga bh31 Klem Tembaga bh
JENIS BAHAN
NO SAT. HARGA SATUAN (Rp.)JENIS BAHAN
KOMPONEN LAMPU1 Lampu RM T5 2x28 W bh2 Downlight 18 W bh3 Lampu Exit Double Side c/w Nicad battery bh4 Lampu Tribun Mercury ML 500 Watt Set5 Lampu 283 MHN-TD 150 Watt Set6 Saklar tunggal bh7 Saklar tunggal (saklar engkel) bh8 Saklar ganda (saklar seri) bh9 Saklar hotel (saklar tukar) bh10 Stop kontak dinding 1 phase bh11 Stop kontak AC 1 phase bh12 Exhaust Fan Ceiling bh13 Exhaust Fan Ceiling Tribun bh14 Pipa Conduit clipsal 20 mm ljr15 Kabel Tray W 400 x 100 mm m16 Elbow Tray W 400 x 100 mm bh 17 Tee Tray W 400 x 100 mm bh18 Dos bh
UNIT AC1 AC wall mounted 0,5 PK / 4.500 BTU/H unit2 AC wall mounted 1 PK / 9.000 BTU/H unit3 AC wall mounted 1,5 PK / 13.500 BTU/H unit4 AC wall mounted 2 PK / 18.000 BTU/H unit
SOUND SYSTEMA Sound System Arena
Centre Cluster1 Two-way multi-element speaker. Dual 8" woofers with Four HF Compression unit
Driver on Two Wavegu-ides, 350 Watt (Passive),120ᵒ x 6ᵒ, 16 Ω EVA-2082S/12062 Two-way multi-element speaker. Dual 8" woofers with four HF Compression unit
Driver on Two Wavegu-ides, 350 Watt (Passive),120ᵒ x 6ᵒ, 16Ω EVA-2082S/12203 Subwoofer speaker. Dual 15" woofers 1000 watt (Passive),4Ω EVA-2151D unit4 Line Array Extended Grid for Top Array EVA-EG2 unit5 Line Array Standard Grid for Bottom array EVA-SG2 unit6 Power Amplifier, 2 x 600W @ 4 Ohms, 2U, XLR/Phoenix Type Inputs, unit
Barrier Strip Outputs, Ready for Optional Card CPS2.12
NO SAT. HARGA SATUAN (Rp.)JENIS BAHAN
B Downfill Cluster1 Two-way coaxial horn-load loudspeaker, 500 watt (Passive), 15" Woofer and HF unit
Compression Driver Rotatable HF and MB Waveguides, Bi-Amp,90ᵒx90ᵒ EVH-1152S/962 Power Amplifier, 2 x 1200W @ 4 Ohms, 2U, XLR/Phoenix Type Inputs, Barrier Strip unit
Ready For Optional Card CPS 2.12
C VIP Sidefill1 Dual 8” Two-Way 90° x 50° Full-Range Loudspeaker System, Include U-Bracket EV unit2 Power Amplifier, 2 x 600W @ 4 Ohms, 2U, XLR/Phoenix Type Inputs, Barrier Strip O unit
Ready For Optional Card CPS 2.6
D Microphones1 Handheld UHF wireless Microphone, Dynamic Vocal Mix Cardioid R300-HD unit2 Headset UHF wireless Microphone, Condenser Vocal Mic Cardioid R300-E unit3 Dual Rack Mount Kit RM-D unit4 UHF Antenna distribution amplifier APD4+ unit5 Log periodic antena LPA500 unit6 Low Loss semi flexiblecoaxial cable, TNC M Connector,75 Feet CXU-75 unit7 Wired SuperCardioid Dynamic Vocal microphone PL80A unit8 Active Direct Box DI2 unit9 Tripod Floor Stand Mic with Boom Arm unit10 Profesional DVD/CD Player unit
E Signal Processor1 Mixing Console 16ch, 6.Aux, Dual 24bit Stereo Effects, USB-Audio Interface CMS-1 unit2 Digital Signal Processor & Matrix System Controller N8000 unit3 Analog Input Module 8ch AI-1 unit4 Analog Output Module 8ch AO-1 unit5 ControlRoom Speaker Active 8" 800 Watts Two-Way ZxA1-90B unit6 Supervision and Control Remote Card for Power Amplifier RCM-810 unit7 RackMount PC Controller with KVM LCD 17" and Cuztomize GUI For IRISnet unit8 30-RU Open Rack Cabinet w/ Power Distribution Panel dan PreWired Rack Cable unit
F Public Address & EVAC SystemPeralatan Utama
1 Voice Alarm System Controller LBB 1990/00 Unit2 Call Station LBB 1956/00 Unit3 Power Amplifier 240W LBB 1935/20 Unit4 DVD + MP3 Player Pioneer Unit5 Digital AM/FM Radio Tuner PA-T608 Unit
14 ARV bh15 ASV bh16 Main Alarm valve bh17 Flow meter 3" bh18 Priming tank 100 liter ( tanki pancingan )+ dudukan bh19 Hidrant box indoor lengkap dgn assessories bh20 Pompa Hydrant Elektrik Kap. 500 US GPM, head 70 m unit
Motor 37 kW 21 Jockey Pump 120 lpm head 70 m, motor 3 kW unit22 pressure tank 500 lt tek. 10 bar bh23 Pressure Switch bh24 Pressure gauge bh25 Sprinkler bh
PERALATAN1 Pompa Transfer Utama + Kabel power type centrifugal end suction (type Hydro 2000 Unit2 Pompa Booster (type Hydro 2000 MPC-E CRE 15 - 2) + Kabel power Unit3 Pompa Hydrant (Model 4AEF12-Peerless Pump) 750 GPM+ Kabel power Unit4 Pompa Jockey (Model CR 10 - 14) 38 GPM + Kabel power Unit5 Presure tank 1000 ltr Unit6 Tandon atas fibre galss kap= 4 m3 Unit7 Pompa Sewage (type SEG 40.12.2.50B c/w auto coupling (ADC) + Kabel power Unit8 Water Level Kontrol (WLC) Unit9 Fire Extinguisher dry powder 3 kg bh10 Fire Extinguiser 6 kg dry powder bh11 Bio Septic tank kap. 20 m3 Unit12 Genset 500 kVA type CC500P Unit