217 Universitas Indonesia DAFTAR ACUAN [1] Infrastructure Policy Brief, “The Road To Economic Growth, Strategic Priorities For The Road Sector in Indonesia”, (ADB: Januari, 2005). [2] APBN-RAPBN 1999-2000. [3] Bappenas, Rincian Anggaran Pembangunan Menurut Sektor/Sub Sektor, 2005. [4] Heru Dewanto, Kualitas Layanan Jasa Infrastruktur, (www.suarapublik.org, 2005). [5] Kwik Kian Gie, Memprihatinkan, Kualitas Layanan Jasa Infrastruktur, (www.suarapublik.org, April 2005). [6] US Department of Energy, How To Measure Performance, A Handbook Of Techniques And Tools, (www.ini.gov/PBM/Handbook), hal. 1-4. [7] Data Departemen Pekerjaan Umum, 2003. [8] [9] Global Competitiveness Report, 2006-2007. [10] Competitiveness in Developing Asia, p 214, 2003. [11] Competitiveness in Developing Asia, p 215, 2003 [12] BPS: Stratifikasi Pendidikan Formal Angkatan Kerja, 1995. [13] Jacob Nuwa Wea, Antara Kualitas Pencari Kerja dan Pasar, (www.suarapublik.org. 2005). [14] LPJK, Workshop Harmonisasi Standar Kompetensi 5 Bidang Jasa Konstruksi, (Jakarta: LPJKN, 2003). [15] Asiyanto, , Metoda Pelaksanaan Pekerjaan Jalan Aspal, (Jakarta: Fakultas Teknik, UI, 1999). [16] [17] Listiana Rozana, ”Peningkatan Produktifitas Tenaga Kerja Konstruksi Pekerjaan Jalan Berdasarkan Elemen Waktu Kerja”, Tesis, Fakultas Teknik, UI, 2005. [18] Purnomo, Manajemen Pembangunan Jalan, Seminar Orientasi Pegawai Baru di Proyek Induk Pembangunan Jalan Jalur Pantura, 2005. [19] Central Product Classification – Version 11, United Nation, 2000. [20] Peraturan LPJK No. 11 tahun 2006. Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
14
Embed
DAFTAR ACUAN - lontar.ui.ac.idlontar.ui.ac.id/file?file=digital/119477-D 00925 Peningkatan...Kompetensi Kerja Tenaga Terampil Pada Proyek Konstruksi Jalan, Thesis Manajemen Konstruksi
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
217 Universitas Indonesia
DAFTAR ACUAN [1] Infrastructure Policy Brief, “The Road To Economic Growth, Strategic Priorities For The Road Sector in Indonesia”, (ADB: Januari, 2005). [2] APBN-RAPBN 1999-2000. [3] Bappenas, Rincian Anggaran Pembangunan Menurut Sektor/Sub Sektor, 2005. [4] Heru Dewanto, Kualitas Layanan Jasa Infrastruktur, (www.suarapublik.org, 2005). [5] Kwik Kian Gie, Memprihatinkan, Kualitas Layanan Jasa Infrastruktur, (www.suarapublik.org, April 2005). [6] US Department of Energy, How To Measure Performance, A Handbook Of Techniques And Tools, (www.ini.gov/PBM/Handbook), hal. 1-4. [7] Data Departemen Pekerjaan Umum, 2003. [8] [9] Global Competitiveness Report, 2006-2007. [10] Competitiveness in Developing Asia, p 214, 2003. [11] Competitiveness in Developing Asia, p 215, 2003 [12] BPS: Stratifikasi Pendidikan Formal Angkatan Kerja, 1995. [13] Jacob Nuwa Wea, Antara Kualitas Pencari Kerja dan Pasar,
(www.suarapublik.org. 2005). [14] LPJK, Workshop Harmonisasi Standar Kompetensi 5 Bidang Jasa Konstruksi, (Jakarta: LPJKN, 2003). [15] Asiyanto, , Metoda Pelaksanaan Pekerjaan Jalan Aspal, (Jakarta: Fakultas Teknik, UI, 1999). [16] [17] Listiana Rozana, ”Peningkatan Produktifitas Tenaga Kerja Konstruksi Pekerjaan Jalan Berdasarkan Elemen Waktu Kerja”, Tesis, Fakultas Teknik, UI, 2005. [18] Purnomo, Manajemen Pembangunan Jalan, Seminar Orientasi Pegawai
Baru di Proyek Induk Pembangunan Jalan Jalur Pantura, 2005. [19] Central Product Classification – Version 11, United Nation, 2000. [20] Peraturan LPJK No. 11 tahun 2006.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
218 Universitas Indonesia
[21] Peraturan LPJK No. 12 tahun 2006. [22] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [23] International Labour Office, Bureau of Statistics, 2002. [24] Dolly Yuono, Optimasi Biaya Tenaga Kerja Proyek Jalan Pada Kontraktor Jalan Kelas Besar, Tesis Manajemen Konstruksi, 2005. [25] [26] Noor Dhulam, , Analisis Masalah Hambatan Dalam Pencapaian Kompetensi Kerja Tenaga Terampil Pada Proyek Konstruksi Jalan, Thesis Manajemen Konstruksi FTUI, 2005. [27] www.tamu.edu , International Competitiveness, 2003. [28] Michael E Porter, Competitive Strategy: Techniques for Analyzing Industries and Competitors, The Free Press, 1980. [29] Competitiveness in Developing Asia, 2003. [30] Sutermeister, R.A. People and Productivity, (New York: Mc Graw Hill, 1976), hal. 45. [31] Gibson, Organisasi-Perilaku-Proses Edisi III, Jilid 1, Jakarta: Erlangga, 1996. [32] Ilyas Yaslis, “Kinerja”, Makalah Pusat Kajian Administrasi, Jakarta, 2000. [33] Sutermeister, R.A. People and Productivity, (New York: Mc Graw Hill, 1976), hal. 45. [34] Ilyas Yaslis, “Kinerja”, Makalah Pusat Kajian Administrasi, Jakarta, 2000. [35] US Department of Energy, How To Measure Performance, A Handbook Of Techniques And Tools, (www.ini.gov/PBM/Handbook), hal. 1-4. [36] Ilyas Yaslis, “Kinerja”, Makalah Pusat Kajian Administrasi, Jakarta, 2000. [37] US Department of Energy, loc.cit. [38] Ratna Juwita, “Hubungan Kepuasan Kerja dengan Kinerja Tenaga Kerja”, Makalah Program Studi Kajian Administrasi, (Jakarta: 2003). [39] US Department of Energy, “How To Measure Performance, A Handbook Of Techniques And Tools”, 2001. [40] Capacity Building Workshop Sektor Konstruksi, LPJK, 2005.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
[41] Dolly Yuono Optimasi Biaya Tenaga Kerja Proyek Jalan Pada Kontraktor Jalan Kelas Besar, Tesis Manajemen Konstruksi FTUI, 2005.
[42] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [43] [44] Kurniawan,Wawan. Pengukuran dan peningkatan produktifitas PT “P”. 1996. [45] [46] Thomas, H. Randolp; Maloney, William F.; Horner,R. Malcolm; Smith,W. Gary R.; Handa, Vir K. dan Steve R. Sanders, 1990, Modeling Construction Labor Productivity, Journal of Construction Engineering and Management, ASCE Vol. 116 No.4 December 1990, NP, ASCE. [47] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [48] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [49] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [50] Thomas, H. Randolp; Maloney, William F.; Horner,R. Malcolm; Smith,W.
Gary R.; Handa, Vir K. dan Steve R. Sanders, 1990, Modeling Construction Labor Productivity, Journal of Construction Engineering and Management, ASCE Vol. 116 No.4 December 1990, NP, ASCE,p 2
[51] Humphreys, Kenneth K., 1991, Jelen’s Cost and Optimization Engineering
3rd Ed., Singapore, McGraw-Hill International Editions. [52] Trigunarsyah, B. Constructability Practices among Construction Contractors
in Indonesia. Journal of Construction Engineering and Management, ASCE. Vol.130 No.5. October 2004.
[53] Soenarno, Pemerintah Akan Dorong Teknologi Tepat Guna di Bidang Konstruksi, (Jakarta: Properti.net, 2004). [54] Young H. Park & David M. Miller, Multi-Factor Analysis of Firm-Level Performance through Feed-Forward, Feed-Back Relationships, (Alabama: Management Science and Statistics Journal, University of Alabama, 2003). [55] [56] Makarand Hastak and Aury Shaked, Journal of Management in
Engineering – January-February 2000 [57] Akbar Alfa, Standar Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam Pekerjaan Jalan, Tesis Manajemen Konstruksi FTUI, 2005. [58] [59] PT. Wijaya Karya, “Rencana Kerja Proyek”, 2004 [60] U.S. Department of Labor, Bureau of Labor Statistics, Construction Laborers [http://www.bls.gov, Mei 2005]
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
220 Universitas Indonesia
[61] Construction Online, Promoting Competence in Construction [www.ConstructionOnline.com, 2005] [62] [63] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [64] [65] Arditi, David and Gunaydin, H.Murat, (1998). Factor That Affect Process Quality In The Life Cycle of Building Project, Journal of Construction Engineering and Management, Vol. 124, No. 3, ASCE. [66] Ronald E. Walpole dan Raymond H. Myers, Probability and Statictics for
Engineers and Scientist, Edisi IV, (Macmillan Publishing, 1990). [67] Singgih Santoso, Mengatasi Berbagai Masalah Statistik dengan SPSS versi
11.5, (Jakarta: PT. Elex Media Komputindo, 2003). [68] Phillip B. Stark, Glossary of Statistical Term, (www.berkeley.edu/~stark/ SticiGui/Text /gloss.htm. 2004). [69] Ronald E. Walpole dan Raymond H. Myers, Probability and Statictics for
Engineers and Scientist, Edisi IV, (Macmillan Publishing, 1990).
[70] Singgih Santoso, Mengatasi Berbagai Masalah Statistik dengan SPSS versi 11.5, (Jakarta: PT. Elex Media Komputindo, 2003).
[71] Phillip B. Stark, Glossary of Statistical Term, (www.berkeley.edu/~stark/ SticiGui/Text /gloss.htm. 2004). [72] M. Nazir, Metode Penelitian, (Jakarta: Ghalia Indonesia, 1988), hal. 99. [73] W. Gulo, Metodologi Penelitian, (Jakarta: Grasindo, 2002), hal. 110. [74] [75] Riduwan, Skala Pengukuran dan Variabel-Variabel Penelitian,
(Jakarta: Alfabeta, 2002), hal. 24. [76] Robert K.Yin, Case Study Research ; Design and Methods, Edisi II, (India:
[80] Saaty, T.L., Fundamental of Decision Making, RSW Publication, Pittsburg, PA, 1994. [81] Boediono dan Wayan Koster, Teori dan Aplikasi Statistik dan Probabilitas,
(Bandung: PT. Remaja Rosdakarya, 2004). [82] Singgih Santoso, Menguasai Statistik di Era Informasi dengan SPSS 12,
(Jakarta: Elex Media Komputindo, 2005). [83] [84] Boediono dan Wayan Koster, Teori dan Aplikasi Statistik dan Probabilitas, (Bandung: PT. Remaja Rosdakarya, 2004. [85] [86] [87] [88] [89] [90] [91] Andi, 10 Model Penelitian dan Pengolahannya Dengan SPSS 10.01., Wahana Komputer Yogyakarta, 2002. [92] James R. Evans and David L. Olson, Introduction to Simulation and Risk
Analysis, Prentice Hall Inc., New Jersey, 1998. [93] [94] [95] Walpole, R.E and R.H. Myers, Probability and statistics for engineers and scientist, 5-th edition, New Jersey, Prentice Hall. [96] [97] Yin, Robert K., Case Study Research, Design and Methods, Second
Edition, Sage Publications, 1997. [98] Apriyani Talaohu, Perencanaan Alokasi Tenaga Kerja Pada Proyek Jalan Di Perusahaan Skala Besar, Tesis Manajemen Konstruksi FTUI, 2005 [99] Project Management Institute. A Guide to the Project Management Body Of Knowledge. 2000. [100] Dolly Yuono Optimasi Biaya Tenaga Kerja Proyek Jalan Pada Kontraktor
Jalan Kelas Besar, Tesis Manajemen Konstruksi FTUI, 2005. [101] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [102] Thomas, H. Randolp; Maloney, William F.; Horner,R. Malcolm; Smith,W. Gary R.; Handa, Vir K. dan Steve R. Sanders, 1990, Modeling Construction Labor Productivity, Journal of Construction Engineering and Management, ASCE Vol. 116 No.4 December 1990, NP, ASCE [103] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [104] Andi, 10 Model Penelitian dan Pengolahannya Dengan SPSS 10.01., Wahana Komputer Yogyakarta, 2002. [105] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
222 Universitas Indonesia
[106] Construction Industry Training Study, Indentifikasi Nama Jabatan Kerja untuk Pekerjaan Jalan, Puslatjakon – LPJK, 2003. [107] Noor Dhulam, , Analisis Masalah Hambatan Dalam Pencapaian
Kompetensi Kerja Tenaga Terampil Pada Proyek Konstruksi Jalan, Thesis Manajemen Konstruksi FTUI, 2005.
[108] Tan W. “ Research Methods in Real Estate & Construction”. 1995 [109] Naoum, S.G.D. “Dissertation Research and Writing For Construction Students”. 1999 [110] Gulo, W., Metodelogi Penelitian, Grasindo, Jakarta, 2002, hal. 110 - 111 [111] [112] Akbar Alfa, Bakuan Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam Pekerjaan Jalan, Thesis Manajemen Konstruksi FTUI, 2005. [113] Boediono dan Wayan Koster, Teori dan Aplikasi Statistik dan Probabilitas, (Bandung: PT. Remaja Rosdakarya, 2004). [114] [115] [116] [117] Andi, 10 Model Penelitian dan Pengolahannya Dengan
SPSS 10.01., Wahana Komputer Yogyakarta, 2002. [118] Walpole, R.E and R.H. Myers, Probability and statistics for engineers and scientist, 5-th edition, New Jersey, Prentice Hall. [119]. Apriyani Talaohu, Perencanaan Alokasi Tenaga Kerja Pada Proyek Jalan
Di Perusahaan Skala Besar, Tesis Manajemen Konstruksi FTUI, 2005. [120] Asiyanto. Construction Project Cost Management. Jakarta: PT Pradnya Paramita, 2003. [121] Soeharto, I. Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta : Erlangga. 1997. [122] Ashworth. Cost Studies Of Buildings. Longman Group UK Limited, 1988. [123] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [124] Listinia Rozana, Peningkatan Produktifitas Tenaga Kerja Konstruksi Pekerjaan Jalan Berdasarkan Elemen Waktu Kerja, Tesis Manajeman Konstruksi FTUI, 2005. [125] [126] [127] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [128] Direktorat Jenderal Bina Marga Departemen Pekerjaan Umum, No. 028/T/BM/1995
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
223 Universitas Indonesia
[129] Construction Industry Training Study (CITS), Puslatjakon – LPJKN, 2003. [130] Akbar Alfa, Bakuan Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam Pekerjaan Jalan, Tesis Manajemen Konstruksi FTUI, 2005. [131] Noor Dhulam, , Analisis Masalah Hambatan Dalam Pencapaian Kompetensi Kerja Tenaga Terampil Pada Proyek Konstruksi Jalan, Tesis Manajemen Konstruksi FTUI, 2005. [132] Riduwan, Skala Pengukuran dan Variabel-Variabel Penelitian, (Jakarta:
Alfabeta, 2002), hal. 9.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
224 Universitas Indonesia
DAFTAR PUSTAKA
A Ravindran, Don T. Phillips, James J. Selberg, Operation Research, Principles and
Practice, John Willey & Sons, 2000.
Agus Dharma, Manajemen Prestasi Kerja, Jakarta: Rajawali Press, 1991.
Akbar Alfa, Bakuan Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam