DAE YOUNG General Industrial Equipments Co., Ltd 1 / 18 Undergro und Power Supply Lines 2001 KORAIL Subway Construction Office Installation of Power Transfer Equipments for Honam Doogye S/S and 6 places * Underground power transfer line (154KV Φ200 6hole) 3.13 ㎞ 2001.12 ~ 2003.12 3,274,814 Iron Tower Maintena nce Works 2005 Hansol Papers Cleaning of Live Wire Insulator * Cleaning of live wire insulator and repair 17 insulators 2005.03 ~ 2006.01 3,264 2006 Hansol EME 154kv Iron Tower Cleaning of Live Wire Insulator * Cleaning of live wire insulator and repair 17 insulators 2006.01 ~ 2006.12 11,871 2006 SeAH Besteel Co. 154KV T/L Cleaning and change of suspension insulator * 19 live wire insulators of154KV line iron tower 2006.02 ~ 2006.08 5,540 2006 Asia Paper MFG 154KV Power line repair work * Inspection, tighten volts, painting and change of insulator for 22 iron towers 2006.01 ~ 2006.05 9,712 2006 KEPCO - Suwon 154KV Nam Suwon S/S #5 M.TR Extention Work * Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK 2006.05 ~ 2006.07 31,573 Transmission Line Works Types of work Year Customer Name Name of Project Descriptions of Project Period Amount USD (1$:1390Won) Details for Major Projects Completed
18
Embed
DAE YOUNG General Industrial Equipments Co., Ltd 1 / 18 Underground Power Supply Lines 2001 KORAIL Subway Construction Office Installation of Power Transfer.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Noksan Steel Manufacturing Factory - Installation of transformer for EAF and LF
* Detailed inspection for 22.9KV 52MVA transformer for furnace and I unit of installation* Detailed inspection for 22.9KV 22.5MVA transformer for furnace and 1 unit of installation* 2nd BUS and installation of water cooling cable
2007. 05~
2007. 12 217,230
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Inspection of Breaker for Power Generation and Transformer
2006Korea South Power - New Incheon
Detailed breakdown inspection for 3rd GT generator and breaker
* Detailed inspection for GCB HEK-3 124V 10KA
2006. 06~
2006. 10 28,094
2007Korea Western Power -Seo Incheon
Detailed breakdown inspection and repair works for 2nd generator and breaker
* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA
2007.01~
2007.02 89,568
2007Korea South Power - New Incheon
4MT 201 #2 COOLER change and filtering insulating oil
* Cooler changing and filtering for TR 154KV 60MVA
2007. 02~
2007. 03 9,353
2007Cheongpyong Water
Pumping#1 S.Tr Detailed inspection and repair work
* Detailed breakdown inspection for TR 154KV 25MVA 1BANK
2007. 05~
2007. 07 10,604
2007Korea South Power - Cheongpyong Water Pumping
#2 S.Tr OLTC detailed inspection
* Detailed breakdown inspection for TR 154KV 25MVA 1BANK OLTC
2007. 06~
2007. 07 40,360
2007Korea Western Power - Seo Incheon
Detailed breakdown inspection for breaker of 1st and 2nd generators
* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA * Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-1 24KV 6300A 63KA
2007. 01~
2007. 09 186,108
Power Generation
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Installation of Substation and Line for Electric Rail Road
2000 Suwon Stationrelocation work of power transformer facilities at Suwon sub-point
* Re-installation for 24 units of disconnecting switch (2P 72.5KV 800A)* Re-installation for 2 units of autotransformer (55KV/25KV 5MVA)* Re-installation for 3 units of breaker (36KV 1200A)
2000.04~
2000.06 241,367
2001
KORAIL - Subway Construction HQ
Installation of power transformer facilities at Doogye S/S and 6 others of Honam line
* Substation facilities 154KV 1 unit, 72.5KV 7 units (power equipments, lighting, power, electric power source facilities)
2001.12~
2003.12 3,274,814
2001KORAIL - Subway Construction HQ
Installation of lines between Shindo - Gangkyung of Honam line
* Installation of Electric Railway lines 112.423 ㎞ , Supplement lines 112.423 ㎞
2001.11~
2005.06 13,370,180
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Installation,Repair, Inspection of Substation & Line for Electric Rail Road
2005Daegu Subway Construction HQ
Power transformer work for Daesil substation at subway Line No. 2
* Installation for 22.9KV power cable for 16,364m* Installation of underground lines for 1,856m * installation of truf 2,711m* Transforming facilities (Distributing boards of 17, TR, GIS and others)
2003.02~
2005.08
808,494
2005 KORAIL - SeoulRepair work for power transformer equipments at Jooan substation
* Detailed inspection for GIS AIR COM, P
2005. 02~
2005. 06 43,165
2005 KORAI - Youngju HQRepair works of power transformer at Anjeong and 3 others
* Repair TR 66KV/55KV 10MVA and GIS
2005. 06~
2005. 09 43,320
2005 Aju EngineeringGIS inspection at Wonduk sub-point of Joongan Line and other
* Detailed inspection for GIS 36KV 1P
2005. 07~
2005. 12 22,927
Electric Rail Road
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Installation,Inspection of Substation & Line for Electric Rail Road
2006 KORAIL - SeeoulRelocation work of rail lines at Ichon station of Kyungwon Line
* Arrangement for Electric Railway lines and supplement lines of 912m, and installation of 14 electric poles* Emergency cable 716m, Protection line and Flashover protection line of 639m
2006.11~
2006.12 79,319
2006 KORAIL - Yangpyong
Detailed breakdown check for gas breaker at Wonju Substation of Joongang Line
* Detailed breakdown inspection for GIS 75KV 1200A 3P
2006. 06~
2006. 08 58,273
Electric Rail Road
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Inspection, Installation, Repair of Power Distribution, House, Dam
2006 KEPCO - OsanHigh voltage B work for year 2006 Osan Branch
* Annual contract for line maintenance for Osan internal 22KV
2005.12~
2006.12 503,597
2006 KEPCO - HwaseongReinforcement work for unstable facilities at 06 Youngheungji
* Installation of 17 poles, Underground cable 2,304m
2006. 01~
2006. 08 63,864
2006
Korea Water Resources Corp.
Electric work for Daeam Dam Sub-Water way
* Power equipments (Input 22.9KV 600m TR, MOF, 6 distributing boards)* Installation of cable (600V CV 325 ㎟ -1C 3,135m*3 / Low voltage line 7500m)* Tunnel lighting, lighting for building Park
2005.12~
2008.11
578,114
2007 KEPCO-OsanInstallation of 6 innes at Joam S/S
* Installation of 88 poles, Pipe lines 2,922m, Installation of underground cable 8,511m
2007. 03~
2007. 12 387,067
2007Korea National Housing Corp.
Electric work for Seongnam Pangyo Apt. 6th site
* Electric and fire protection works for APT 584 households
2007.01~
2009.12 1,040,415
Power Distribution, House
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period