Top Banner
This work was performed within the FLYSEC Project (Optimizing time-to-FLY and enhancing airport SECurity), with the support of the European Commission and the Horizon 2020 Programme, under Grant Agreement No. 653879 Document Date: 28/06/2018 Work Package 8: Dissemination and Exploitation Document Dissemination Level: Public D8.2 Final Brochure Ref. Ares(2018)4024131 - 30/07/2018
17

D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

Jun 28, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

This work was performed within the FLYSEC Project (Optimizing time-to-FLY and enhancing airport SECurity), with the support of the European Commission and

the Horizon 2020 Programme, under Grant Agreement No. 653879

Document Date: 28/06/2018

Work Package 8: Dissemination and Exploitation Document Dissemination Level: Public

D8.2 Final Brochure

Ref. Ares(2018)4024131 - 30/07/2018

Page 2: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

2

Abstract

This deliverable is about the FLYSEC Final Brochure. It contains information about the FLYSEC project and results together with a breakdown of the security concept, system architecture and integrated system components. There are dedicated milestone sections for the Proof of Concept held at Schönhagen Airport in Berlin and the final field test executed at Luxembourg Airport including evaluation of the overall FLYSEC project. Finally, the brochure closes with the FLYSEC impact and future opportunities that have derived from the project. The brochure was initially distributed at the FLYSEC Final Event held in Brussels, Belgium on June 28th, 2018 and continues to be used for dissemination purposes.

Page 3: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

3

Project Information

Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

Project Coordinator National Center for Scientific Research “Demokritos”, EL Project Funded by European Commission

Under the Programme Horizon 2020 Secure Societies Subcall Disaster-resilience: safeguarding and securing society,

including adapting to climate change Topic DRS-16-2014 “Critical Infrastructure Protection topic 6:

Improving the aviation security chain” Funding Instrument Research & Innovation Action

Grant Agreement No. 653879

Document Information

Document Reference D8.2 Document Title Final Brochure

Work package reference WP8 – Dissemination and Exploitation Authored by Dimitris Kyriazanos (NCSRD), Eleonora Doukoudaki (NCSRD)

With contributions by Alexandra Papagianni, Stelios Thomopoulos (NCSRD), Holger Zeiser (EASC), ICTS, EMZA, EASC, Lux-Airport, UL, ELBIT, EXODUS, EPSILON, CG-S

Dissemination Level Public Cover photo Airport Crowd Simulation © Integrated Systems Laboratory

Document Verification

Main author(s) Dimitris Kyriazanos (NCSRD), Eleonora Doukoudaki (NCSRD)

Internal Review and Verification Stelios Thomopoulos (NCSRD), Holger Zeiser (EASC)

Page 4: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

4

List of Acronyms and Abbreviations

ACRONYM EXPLANATION

EC European Commission

EU European Union

FLYSEC Optimising time-to-FLY and enhancing airport SECurity

Page 5: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

5

Table of Contents

1 FINAL BROCHURE 6

Page 6: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

6

1 FINAL BROCHURE1

1The brochure is available to download in high quality and distributable version via a public link in

FLYSEC website: http://www.fly-sec.eu/information.html. http://www.fly-sec.eu/files/content/documents/180711_FLYSEC_Booklet_Pages%20upload.pdf

Page 7: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

7

Page 8: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

8

Page 9: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

9

Page 10: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

10

Page 11: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

11

Page 12: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

12

Page 13: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

13

Page 14: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

14

Page 15: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

15

Page 16: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

16

Page 17: D8.2 Final Brochure - FLYSEC · D8.2 Final Brochure Document Version 1.0 3 Project Information Project Name Optimising time-to-FLY and enhancing airport SECurity Project Acronym FLYSEC

D8.2 Final Brochure Document Version 1.0

17