D3.6 D3.6 HEIMDALL Demonstrations Issue 3 Instrument Collaborative Project Call / Topic H2020-SEC-2016-2017/H2020-SEC-2016-2017-1 Project Title Multi-Hazard Cooperative Management Tool for Data Exchange, Response Planning and Scenario Building Project Number 740689 Project Acronym HEIMDALL Project Start Date 01/05/2017 Project Duration 42 months Contributing WP WP 3 Dissemination Level PU Contractual Delivery Date M34 Actual Delivery Date 12/03/2020 Editor David Martín (PCF) Contributors Solange Martínez, Lena Schlegel (EKUT), Benjamin Barth, Monika Friedemann, Christian Knopp, Sandro Martinis, Alberto Viseras Ruiz, (DLR), Alexandros Bartzas, Spyros Pantazis, (SPH), Jordi Vendrell, Celia Conde (PCF), Miguel Mendes (TSYL), Diana Mathew, Angel Grablev, Joseph Muna (AVA), Stéphanie Battiston, Julien Briant (UNISTRA),
128

D3.6 HEIMDALL Demonstrations – Issue 3

Jan 22, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: D3.6 HEIMDALL Demonstrations – Issue 3

D3.6

D3.6

HEIMDALL Demonstrations – Issue 3

Instrument Collaborative Project

Call / Topic H2020-SEC-2016-2017/H2020-SEC-2016-2017-1

Project Title Multi-Hazard Cooperative Management Tool for Data Exchange, Response Planning and Scenario Building

Project Number 740689

Project Acronym HEIMDALL

Project Start Date 01/05/2017

Project Duration 42 months

Contributing WP WP 3

Dissemination Level PU

Contractual Delivery Date M34

Actual Delivery Date 12/03/2020

Editor David Martín (PCF)

Contributors Solange Martínez, Lena Schlegel (EKUT), Benjamin Barth, Monika Friedemann, Christian Knopp, Sandro Martinis, Alberto Viseras Ruiz, (DLR), Alexandros Bartzas, Spyros Pantazis, (SPH), Jordi Vendrell, Celia Conde (PCF), Miguel Mendes (TSYL), Diana Mathew, Angel Grablev, Joseph Muna (AVA), Stéphanie Battiston, Julien Briant (UNISTRA),

Page 2: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

Guido Luzi (CTTC), José Becerra (ICGC), Flavio Pignone (CIMA), Daniel Milla, Edgar Nebot, Jordi Pagès, Laia Estivill, Claudi Gallardo (INT), Sefik Muhic, Jesper Bachmann, Kim Lintrup (FBBR), Bruce Farquharson (SFRS), Silvia Venier, Nedim Jasic (CRI)

Page 3: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 i

Document History

Version Date Modifications Source

0.1 30/10/2019 First draft PCF

0.2 14/12/2019 First Issue PCF

0.3 12/03/2020 QA version INT

1.0.F 12/03/2020 Final Version DLR

Page 4: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 ii

Table of Contents List of Figures ........................................................................................................................ iv

List of Tables .......................................................................................................................... v

List of Acronyms .................................................................................................................... vi

Executive Summary .............................................................................................................. 9

1 Introduction ...................................................................................................................10

2 Glossary ........................................................................................................................11

3 Target audience of the demonstrations .........................................................................13

3.1 Overview of the target audience .............................................................................13

3.2 Goals and benefits .................................................................................................13

Benefits for the technical partners ...................................................................13 3.2.1

Benefits for the end-users ...............................................................................13 3.2.2

4 Methodology for Exercises (Releases B and C).............................................................14

5 Preparation phase of exercise LAND-1 and LAND-2 (Release B) .................................15

5.1 Preparedness phase ..............................................................................................15

Exercise Setup ................................................................................................15 5.1.1

Story ...............................................................................................................17 5.1.2

New system functionalities ..............................................................................23 5.1.3

5.2 Response phase ....................................................................................................25

Exercise Setup ................................................................................................25 5.2.1

Story ...............................................................................................................26 5.2.2

New system functionalities ..............................................................................36 5.2.3

5.3 Execution phase .....................................................................................................37

Dry Runs 1 & 2 ................................................................................................37 5.3.1

Exercise Runs .................................................................................................37 5.3.2

Schedule .........................................................................................................38 5.3.3

5.4 Evaluation phase ....................................................................................................39

Data collection .................................................................................................39 5.4.1

Data analysis...................................................................................................39 5.4.2

6 Preparation phase of exercise FLOOD-1 (Release C) ...................................................46

6.1 Training session .....................................................................................................46

Objectives .......................................................................................................46 6.1.1

Story ...............................................................................................................46 6.1.2

6.2 Preparedness and Response phases .....................................................................54

Exercise Setup ................................................................................................54 6.2.1

Story ...............................................................................................................56 6.2.2

Solutions .........................................................................................................72 6.2.3

6.3 Execution phase .....................................................................................................73

Page 5: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 iii

Dry Runs 1, 2, 3 and 4 ....................................................................................73 6.3.1

Exercise Runs .................................................................................................73 6.3.2

6.4 Evaluation phase ....................................................................................................75

Data collection .................................................................................................75 6.4.1

Data analysis...................................................................................................76 6.4.2

7 Conclusion ....................................................................................................................84

8 References ....................................................................................................................85

9 Annex I. Outcomes of the Dry Run 1 (EUW3) ................................................................86

10 Annex II. Outcomes of the Dry Run 2 (EUW3) ...........................................................88

11 Annex III. Outcomes of the Dry Run 1 (EUW4) ..........................................................90

12 Annex IV. Outcomes of the Dry Run 2 (EUW4) ..........................................................91

13 Annex V. Outcomes of the Dry Run 3 (EUW4) ...........................................................93

14 Annex VI. Outcomes of the Dry Run 4 (EUW4) ..........................................................94

15 Annex VII. Agenda of End-Users Workshop 3............................................................95

16 Annex VIII. Agenda of End-Users Workshop 4...........................................................96

17 Annex IX. List of attendees of End-Users Workshop 3 ...............................................97

18 Annex X. List of attendees of End-Users Workshop 4 ................................................99

Annex XI. Questionnaire for End-Users Workshop 3 .......................................................... 101

19 Annex XII. Template for Observations during Release B Exercises ......................... 111

20 Annex XIII. Questionnaire for End-Users Workshop 4 .............................................. 114

Page 6: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 iv

List of Figures

Figure 5-1. Roles in the exercise organisation for EUW3 ......................................................16

Figure 5-2. Exercise organisation for EUW3 .........................................................................17

Figure 6-1. Roles in the exercise organisation for EUW4 ......................................................55

Figure 6-2. Exercise organisation for EUW4 .........................................................................56

Figure 6-3. Accumulated rainfall from the 11th of November at 00h UTC to the 12th of November at 00h UTC (24h). ...............................................................................................58

Figure 6-4. Accumulated rainfall from the 9th of November at 00h UTC to the 13th of November at 00h UTC (96h). ...............................................................................................58

Figure 6-5. Landslides ..........................................................................................................58

Figure 6-6. Flooded areas ....................................................................................................58

Figure 6-7. Town of Carasco ................................................................................................58

Page 7: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 v

List of Tables

Table 5-1. Legend of LAND-1 of Release B. .........................................................................19

Table 5-2. Storyboard for story LAND-1 of Release B. .........................................................19

Table 5-3. Messages and coordinates for damaged buildings for story LAND-1 ...................22

Table 5-4. Legend of LAND-2 of Release B. .........................................................................27

Table 5-5. Storyboard for LAND-2 of Release B. ..................................................................28

Table 5-6. Vulnerable elements created for story LAND-2 ....................................................36

Table 5-7. Messages and coordinates for damaged buildings for story LAND-2 ...................36

Table 5-8. Photos of End-User Workshop 3. ........................................................................38

Table 5-9. Questionnaire outcomes of exercise LAND-1 (preparedness phase). ..................39

Table 5-10. Open questions from questionnaire outcomes of exercise LAND-1 (preparedness phase). .................................................................................................................................41

Table 5-11. Questionnaire outcomes of exercise LAND-2 (response phase). .......................41

Table 5-12. Open questions from questionnaire outcomes of exercise LAND-2 (response phase). .................................................................................................................................43

Table 6-1. Training session story board – User settings. ......................................................47

Table 6-2. Training session story board – Scenario management. .......................................48

Table 6-3. Training session story board – Alerts. ..................................................................49

Table 6-4. Training session story board – Simulation mode..................................................50

Table 6-5. Training session story board – Impact Assessment and Summary. .....................50

Table 6-6. Training session story board – Response Plan. ...................................................51

Table 6-7. Training session story board – Decision Support. ................................................51

Table 6-8. Training session story board – Scenario matching. ..............................................52

Table 6-9. Training session story board – SitRep. ................................................................53

Table 6-10. Training session story board – Catalogue. .........................................................53

Table 6-11. Legend of the Storyboard for FLOOD-1 of Release C........................................59

Table 6-12. Storyboard for FLOOD-1 of Release C. .............................................................59

Table 6-13: Detailed specification for story FLOOD-1. ..........................................................72

Table 6-14 Photos of End-User Workshop 4 ........................................................................74

Table 6-15. Questionnaire outcomes of system Release C. .................................................76

Page 8: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 vi

List of Acronyms

AB Advisory Board

AVA Avanti Communications LTD

CA

CFRS

Consortium Agreement

Catalan Fire and Rescue Service

CIMA Centro Internazionale in Monitoraggio Ambientale – Fondazione CIMA (CIMA Foundation)

CRI Associazione della Croce Rossa Italiana (Italian Red Cross)

CTTC Centre Tecnològic de Telecomunicacions de Catalunya (Catalan Tecnological Telecommunications Centre)

DLR Deutsches Zentrum für Luft- und Raumfahrt e.V. (German Aerospace Center)

DRM

EC

Disaster Risk Management

European Commission

EKUT Eberhardt Karls Universität Tübingen

EUW End-User Workshop

FBBR Frederiksborg Brand og Redning (Frederiskborg Fire and Rescue Service)

GA Grant Agreement

ICGC Institut Cartogràfic I Geològic de Catalunya (Catalan Institute of Cartography and Geology)

INT Departament d’Interior – Ministry of Home Affairs (Government of Catalonia)

IPR Intellectual Property Right

MoM Minutes of Meeting

PB Project Board

PC Project Coordinator

PCF Fundació d’Ecologia del Foc i Gestió d’Incendis Pau Costa Alcubierre (Pau Costa Foundation)

QMR Quarterly Management Report

SFRS Scottish Fire and Rescue Service

SKP Stage Key Points

SP Service Platform

SPH Space Hellas S.A.

TL Task Leader

TM Technical Manager

Page 9: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 vii

ToC Table of Contents

TSYL Tecnosylva S.L.

UNISTRA Université de Strasbourg (University of Strasbourg)

UI User Interface

WP Work Package

WPL Work Package Leader

Page 10: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 viii

Intentionally blank

Page 11: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 9

Executive Summary

This document provides the concept for demonstrations planned in HEIMDALL, focussing at Releases B and C. The methodology is based on the experiences from DRIVER+ Project.

The methodology describes the three phases of the demonstrations:

the preparation that describes the problem, the exercise and sets the scenario of the exercises and stories;

the execution phase that comprises the dry runs and the final execution of the demonstration exercises;

the evaluation phase, that contains the evaluation made by end-users at the end of the exercises.

Additionally, the training phase was incorporated for Release C under the purpose of guaranteeing sufficient understanding of, and familiarity with, the system by the users prior to the execution phase.

Page 12: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 10

1 Introduction

This document serves as a reference for the demonstration preparation in the HEIMDALL project, focussing on features available for the Release B and C of the system.

As described in the previous deliverables on HEIMDALL Demonstrations [1], the case studies collected in the previous deliverables D3.1 [4], D3.2 [5] and D3.3 [6] will serve as a basis to elaborate the stories of the demonstrations.

We define demonstration as the execution of a story by the end-users using the demo-version of the HEIMDALL system. Thus, for each selected story, one demonstration will be designed based on a dedicated storyboard. Since the last deliverable on HEIMDALL demonstrations (D3.5 - Issue 2) [8] two more Demonstrations exercises were carried out, the first based on a landslide case in Monesi di Mendatica (Italy), corresponding to Release B of the HEIMDALL system, and the second based on a flash flood case in the Entella river (Italy), corresponding to Release C. To guide the development of both demonstrations, storyboards were designed for both of the defined stories. As a core objective, these two stories were due to continue to demonstrate the practical usefulness of the HEIMDALL system during the preparedness and response phases and then to evaluate it. Additionally, for release C the training mode was incorporated into the platform expecting the HEIMDALL platform to be likewise used as a training tool.

As for Release B the HEIMDALL team agreed to develop two stories for one selected landslide case study (CRI) about a landslide in the village of Monesi di Mendatica (region of Liguria, Italy): story LAND-1 for the preparedness phase and story LAND-2 for the response phase. However, for release C it was agreed to develop one single story, FLOOD-1, that integrates both the preparedness and the response phases, and to develop and additional storyboard for a training session before the actual demo.

Demonstrations in HEIMDALL are held within the End-Users Workshops (EUW). The EUWs have the aim to join the end-users partners and the members of the Advisory Board (AB), to facilitate their test and evaluation of the system, through the performance of a series of actions taken as part of the stories.

The specific steps towards the Release B and Release C demonstrations can be summarized as follows:

The requirements for the stories are defined considering the user response planning activities and processes analysis.

Definition of the selected stories.

Definition/description of individual story boards for the features and functionalities to be demonstrated for each of the defined stories considering all the HEIMDALL modules that are available for each Release in question.

Debriefing questionnaire provided to the end-users after each demonstration.

Specification of use cases for the system requirements due for Releases B and C.

Page 13: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 11

2 Glossary

Story General description of a situation, defining the specific hazards and the extent of their impacts, focusing on a specific area of interest. A story always applies to one or more preparedness and response planning phases and associated activities.

Story LAND-1 Story based on landslide case study 1 (CRI) about preparedness activities for a landslide in the village of Monesi di Mendatica (region of Liguria, Italy).

Story LAND-2 Story based on landslide case study 1 (CRI) about response activities for a landslide in the village of Monesi di Mendatica (region of Liguria, Italy).

Story FLOOD-1 (training)

Story based on flash flood case study 2 (CIMA) dedicated to provide training to the end-users and to the members of the AB prior to the demo exercise and that consisted of a reduced version of the story used for the demo that was based on a flood in the town of Carasco, in the Entella river basin (region of Liguria, Italy).

Story FLOOD-1 (demo)

Story based on flash flood case study 2 (CIMA) about preparedness activities for a flood in the town of Carasco in the Entella river basin (region of Liguria, Italy).

Scenario Real or hypothetical situation comprised of a hazard (hazard scenario), projected or produced impacts (risk scenario), and all related disaster management decisions, plans, and lessons learnt for the purpose of risk assessment, training and response planning.

Storyboard Description how the story is presented in the demonstration to the user groups and technical partners, respectively. Individual storyboards will be developed to demonstrate the features and functionalities for each of the selected stories.

Workflow Structured description of the interaction and information flow between user and system, and the system components; no implication of the timeline; formalized specification of the story.

Information flow Is part of the workflow.

Demonstrator A demonstrator of a software system is a piece of software that demonstrates the usage and functionality of the software system. A demonstrator distinguishes from an operational software system in the way that not all components may be stable or fully implemented.

Web services A Web service is a well-defined Web interface that allows to access the functionality of a component.

Modules A module in the HEIMDALL system is a single software artefact with a dedicated single functionality.

Components A component is a logical grouping of one or more modules.

Release B The second release of system functionalities, specifically addressed to be evaluated through the execution of two stories, as part of the demonstration 2.

Page 14: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 12

Release C The second release of system functionalities, specifically addressed to be evaluated through the execution of one story and one training session, as part of the demonstration 3.

Page 15: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 13

3 Target audience of the demonstrations

3.1 Overview of the target audience The target audience of the demonstrations are:

The end-users of the HEIMDALL consortium

The members of the Advisory Board

3.2 Goals and benefits The demonstrations have goals for the technical and the end-user partners in the HEIMDALL consortium as well as for the Advisory Board.

Benefits for the technical partners 3.2.1The technical goals can be summarized as follows:

Learning by doing; improve common understanding; proof of (technical) concept.

Testing.

Collecting feedback from end-users.

Validation of the system in accordance with the Vee Model [1].

Benefits for the end-users 3.2.2The following benefits are envisaged for the end-users:

Understanding of the HEIMDALL service concept and functionalities; opportunities to cooperate in specifying and developing the approach and planned technologies.

Understanding of the expected products; opportunity for active participation in specification and development of products; “collaborative design”.

Page 16: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 14

4 Methodology for Exercises (Releases B and C)

The methodology employed for the demonstration exercises relevant to HEIMDAL Releases B and C is based on the Trial Guidance Methodology developed by the DRIVER+ project, which was described in the HEIMDALL Deliverable D3.5 Demonstrations – Issue 2 [8].

Page 17: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 15

5 Preparation phase of exercise LAND-1 and LAND-2 (Release B)

This chapter describes the preparation phase of Exercise LAND-1 and LAND-2, based on the Preparedness and Response phases of DRM, respectively.

5.1 Preparedness phase This section contains the prepared materials for exercise LAND-1.

Exercise Setup 5.1.1The functionalities implemented for Release B will be presented and evaluated in an interactive exercise by use of the HEIMDALL system modules.

5.1.1.1 Context

Participants: HEIMDALL consortium and members of the AB

What: Demonstration 2 of the HEIMDALL project

Purpose: Test and evaluate Release B functionalities by the end-user partners and the members of the AB

Host: CIMA, at their headquarters in Savona (Italy)

5.1.1.2 Exercise type

The exercise will be conducted as a functional exercise allowing participants to perform their duties in a simulated operational environment. Activities for a functional exercise are scenario-driven, such as the failure of a critical business function or a specific hazard scenario. Functional exercises are designed to exercise specific team members, procedures and resources (e.g. communications, warning, notifications and equipment set-up).

5.1.1.3 Exercise roles

Exercise roles are assigned as follows to the members of the Consortium so as to ensure appropriate performance of the exercise:

EXERCISE OWNER (DLR-KN): Overall coordination, presentation and introduction of Advisory Board, formalities, etc.

SOLUTION COORDINATOR (DLR-KN): Lead rehearsal on day 1. Take care of all system technical aspects, to have ready extra technical information if required, etc.

o ICGC, CTTC will support landslide simulator explanation and in-situ sensors. ICGC has already prepared a short explanation of the Landslide simulator, and a set of extra “case studies” to deeply test the simulator, if is required from the users side.

SCENARIO COORDINATOR (PCF): Introduce the overall framework of Case Studies, Stories, justify the "fictive steps" in the stories, control timeline and evolution of the exercises among different stations.

END-USER COORDINATOR (PCF): Ensure a minimum feedback from the users side, assure attendance from end-users, inform end-users beforehand about the background, objectives of the workshop, what will be done, etc.

Page 18: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 16

DISSEMINATION LEADER (PCF): Take care of having pictures, interview experts during breaks, publish in the media, etc.

ETHICAL AND HUMAN FACTOR ISSUES (EKUT): Prepare and drive the End-User questionnaire. To interview users about the project ethical aspects.

EXERCISE GUIDE (SPH, AVA, DLR-DFD, CIMA): Drive the exercise within the station. As far as possible will let users to "play" and perform all actions in the story by themselves.

NOTE TAKER (Volunteers from HEIMDALL Partners): Gather and take notes of feedback from users along the exercise.

HEIMDALL partners (rest of us): Guide other attendees along the exercise (other EU projects, research institutions, other attendees, etc.).

Figure 5-1. Roles in the exercise organisation for EUW3

5.1.1.4 Exercise Organization

Figure 5-2 depicts the expected configuration of the organisation for LAND-1 exercise. The different locations of each Stage Key Point (SKP) in the storyboard are classified in “On-Field” or “Control Room”. End-users will need to read carefully through each SKP to understand the actions that they need to undertake. Then, participants will performed each SKP in the corresponding station on the HEIMDALL system (On-Field, or Command & Control). Further clarification on the SKP will be provided by the End-User coordinator at the request of the participants, whereas technical assistance will be provided, when required, by the technical partners, who will supervise the overall execution of the exercise.

In this Exercise LAND-1, SKP were classified as follows:

LCR: Local Control Room (Centro Operativo Comunale, COC)

RCR: Regional Control Room (Sala Operativa Regionale, SOR)

FCP: Forward Control Post (Posto di Comando Avanzato, PCA)

F: Field

End-users Technical

partners

Technical

partners

ROLES

SOLUTION

COORDINATOR

(DLR-KN)

SCENARIO

COORDINATOREXERCISE

OWNER

(DLR-KN)

EXERCISE

PARTICIPANTS

EXERCISE

OBSERVERSEnd-users Dissemination

leader (PCF)

EXERCISE

LEADERS

END-USERS

COORDINATOR

(PCF)

Advisory Board

members

Page 19: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 17

Figure 5-2. Exercise organisation for EUW3

Story 5.1.2The story LAND-1 will be developed for the landslide case study 1 (CRI). The preparedness phase will be simulated.

Story is based on:

The context of the end-users and the environment in which they operate

The objective of the exercise

Physical drivers – i.e. natural hazards

Incorporation of damage and losses in a possibly realistic way

Flow of response planning / preparedness activities in the end-users reference workflow

Availability of functionality in the integrated system for Release B supporting the story (and also in stand-alone tool implementation if necessary to evaluate)

5.1.2.1 Story type

Preparedness phase to a Landslide (LAND)

5.1.2.2 Environment

Monesi di Mendatica, Italy; based on landslide case study 1 (CRI). Environment will be taken from D3.2 [5] and D3.3 [6].

Page 20: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 18

5.1.2.3 Players and roles

Target groups must be selected for the exercises according to:

CPO: Civil Protection / Fire Fighter Operator

CRI: Italian Red Cross Operators

CRC: (Regional / Local) Control Room Chief

IC: Incident Commander

LP: Local Police

5.1.2.4 Locations

LCR: Local Control Room (Centro Operativo Comunale, COC)

RCR: Regional Control Room (Sala Operativa Regionale, SOR)

FCP: Forward Control Post (Posto di Comando Avanzato, PCA)

F: Field

The scenario will require a commitment of stakeholders (end-users and decision makers) from different Crisis Management levels (local, regional), such as representatives of regional police and fire services.

Actions will be taken by these stakeholders in a realistic information environment, based on currently available means, Crisis Management plans, rescue procedures and good practices of participants. Solution providers are asked to support the actors in their mission to respond to the story.

5.1.2.5 Stages/Scenes

Stage 1: command and control centre (strategic)

5.1.2.6 Story Description

The story represents the preparedness phase for Monesi di Mendatica landslide. The aims of the actions within this preparedness phase are “to be prepared” and ready against future events, avoiding reactive responses and fostering pro-active decisions by knowing in advance the potential affectations.

Since no in-situ sensors are available for Monesi di Mendatica landslide, some steps included in the story refer to Barberà de la Conca site. Barberà de la Conca is a village in Catalonia (Spain) that is affected by a terrain movement and is being monitored with a monitoring system consisting in in-situ hydrological and geotechnical sensors and periodic GB-SAR campaigns, owned by ICGC. This situation has been represented in the story, trough the creation of a scenario with “fictive data” as part of the HEIMDALL training mode.

This story collects the actions performed by civil protection operators, the red cross operator, the local police in the period before the event, which resulted in a set of preparedness actions, such as the creation and publication of the hydrogeological risk management plan (including both flood and landslide risk in the area surrounding Monesi di Mendatica), the elaboration of a plan for raising population awareness on this type of risks and the identification of lessons learned during previous landslides, as well as a set of training activities.

Page 21: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 19

5.1.2.7 Associated documents

The following associated documents can be found in the HEIMDALL D3.2 on Case Studies – Issue 2 [5].

Hydrogeological risk management plan (HRMP) o Local Plan: Piano Intercomunale di Protezione Civile – Piano di Emergenza

per Rischio Idrogeologico o Regional Plan: Piano Provinciale di Protezione Civile

Hydrogeological risk awareness plan (HRAP)

Historical document on landslides (HD)

Lessons learned document (LLD) o ICS fillable forms from FEMA available at

https://training.fema.gov/icsresource/icsforms.aspx

Weather forecast document (WFD, Bollettino meteo)

5.1.2.8 Storyboards

Storyboards for the defined story stages using implemented functionalities for Release B. Each step in the storyboard is indexed by Stage Key Points (SKP).

Table 5-1. Legend of LAND-1 of Release B.

User interaction with HEIMDALL

No user interaction with HEIMDALL and/or informative step

Relevant information to follow the incident

User interaction - training scenario

No user interaction - training scenario

Relevant information to follow the incident

Table 5-2. Storyboard for story LAND-1 of Release B.

SKP Time Key event Player Location ID Brief description

1. 3 20/09/2016 09:00

The CPO logs into the system

CPO RCR TR_Scen_1

TR_UeRM_12

To log in, create a

scenario

2. 20/09/2016 09:00

The CRI operators logs into the platform and confirm their entry.

CRI RCR TR_UI_1

TR_UeRM_02

User Login

3. 20/09/2016 09:00

The Control Room chief logs into the platform and confirms his/her entry.

CRC RCR TR_UI_1

TR_UeRM_02

User Login

4. 20/09/2016 09:00

The Incident Commander logs into on the platform and confirms his/her entry.

IC RCR TR_UI_1

TR_UeRM_02

User Login

5. 20/09/2016 09:00

The Local Police logs into on the platform and

LP LCR TR_UI_1

TR_UeRM

User Login

Page 22: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 20

confirms his/her entry _02

6. 20/09/2016 09:30

The CPO sets the operation mode as “training”

CPO RCR TR_UI_10 Set the operation mode.

7. 20/09/2016 10:00

Creates a scenario CPO RCR TR_Scen_42,

TR_Scen_43

Create scenario with status=Exercise and urgency=immediate

Name: Barberà_Training

Hazard time: now

Hazard type: terrain movement

Risk level: low

8. CPO monitors the crack sensors of Barberà de la Conca.

CPO RCR Connect to crack sensors

9. CPO wants to display the buildings layer

CPO RCR The assets layer is displayed

10. 20/09/2016 10:00

An increase of the opening speed of the fracture exceeds the threshold set by the user

CPO RCR In-situ sensors sets the alarm on

11. CPO wants to compare the evolution of the crack as a way to asses the potential risk.

CPO RCR Show all GBSAR map layers

Display all GB-SAR layers, let users discuss on the usefulness

12. CPO creates a screenshot with the deformation layer

Right click and save as a file

13. CRC activates first responders and the Geological survey

CRC RCR Alert creation

Message id: (no space in the id name)

Expiration time: not mandatory

Type: terrain movement

Certainty: observed

Risk: Unknown

Response: open to the users

Private alert message to first responders:

“A terrain movement incident might have occurred in Barberà de la Conca”

Page 23: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 21

Private alert message to Geological survey:

“Fire Service needs to assess the potential affectation of a terrain movement detected in Barberà de la Conca”.

14. Geological expert team arrives at location and send information

FIELD TR_DataFR_4

Photos are sent

15. First responders at place FIELD TR_DataFR_5

Find the location of first responders on the field

16. First responders and geological experts make risk assessment on field and send information

Risk assessment is validated with on field information

Informs via chat: “40 building directly affected, 3 severely damaged that shouldn't be inhabited. We cannot guarantee the stability of the church.”

Send location of 5 damaged buildings:

For building

coordinates and

messages, see table

below.

17. IC determines a preventive evacuation of all affected houses

IC RCR

18. IC activates the Emergency Plan

IC RCR

19. 20/09/2016 12:00

Store Lessons Learnt

form Barberà de la

Conca

CPO RCR TR_Scen_17

TR_Scen_48

20. CPO finishes the training

exercise.

IC RCR TR_UI_20

21. 20/09/2016 12:00

The CPO searches and

delete Barberà de la

Conca Scenario

CPO RCR TR_Scen_7

22. 24/11/16 07:00

The CPO sets the

operation mode as

“preparedness”

CPO RCR TR_UI_10

23. In user settings AOI is

set to Liguria

24. 24/11/16 07:00

Creates a new scenario

based on weather data

and area using the

RCR TR_Scen_42,

TR_Scen_

Scenario with:

Scenario name:

Page 24: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 22

current conditions. 43 “Liguria weather”

status=Actual

urgency=future or immediate with weather data only

hazard type: landslide

Risk level: low

area = AOI

Weather data must be associated manually

25. 24/11/16 09:00

The CPO stores a

lessons learned

document

CPO RCR

TR_Scen_

17

TR_Scen_20

TR_Scen_48

To upload documents – external docs attached to scenario.

26. 24/11/16 09:00

The CPO uploads the

hydrogeological risk

management and

population awareness

plan.

CPO RCR TR_DataEx_04

TR_DataEx_05

TR_UI_12

Associate documents to the scenario

From CRI: “These are intended to be external documents (as they are the reference documents for any emergency response / preparedness operation)”

27. 24/11/16 09:00

The CPO queries

access to weather data

and activates the yellow

alert phase (fase di

attenzione) for the

Liguria Region

CPO RCR TR_DataEx_04

TR_UI_12

From CRI: “This is the way the civil protection communicates to the population that an area is on alert”

28. 24/11/16 10:00

CRC wants to confirm

that all users have been

correctly registered to

the system

CRC RCR TR_UI_3 Use chat tool:

Select the First Responders tab

Send a message

Wait response from other users (stations in the exercise)

Table 5-3. Messages and coordinates for damaged buildings for story LAND-1

id X coord. Y coord. Message

1 351938.303 4585871.448 Building already abandoned

2 351930.63 4585868.629 Severely damaged, the building must be evicted

Page 25: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 23

3 351933.344 4585866.176 Severely damaged, the building must be evicted

4 351908.395 4585854.066 Severely damaged, the building must be evicted

5 351974.736 4585877.972 Church must be closed at public and the bell-tower should be

monitored

New system functionalities 5.1.3The following system functionalities are integrated for each module in preparation for Release B. (Refer to D2.3 [3] for a more detailed of module functionalities.)

GUI (Grafical User Interface) o Read/edit/add metadata o Display and distinguish operation modes o Administrator role privileges o Create/store/edit/delete/access incidents o Modify/store information related to a scenario o Manage lessons learnt o Search scenarios based on a set of parameters o Risk assessment information o Create/edit/delete/modify response plans o Manage situational assessment information o Set scenario active o Customize appearance o Display system information o Display AOI o List operation modes o Playback feature for simulations (for landslides) o List of inputs for an active scenario o Link information to scenarios o Impact summary within the selected AOI o Filtering incident information o Indicate/link GOI information o Map toolbar o Save login details locally o Radio/selection buttons o Performing system functions for an active scenario o Weather map and forecast information o Restore session or create new session o Display UTM co-ordinates and search o Pre-formatted table for scenario and simulator parameters

User and role management

o The UeRM shall store the preferences of the users in their private user profile o The UeRM shall allow the system administrator to manage the configuration of

the UeRM o The UeRM shall allow the system administrator to enable and disable features o The UeRM shall allow the system administrator to manage roles and permissions

assigned o The UeRM shall allow the system administrator to manage users o The UeRM shall provide an admin console o The UeRM shall provide an account management console o The UeRM shall allow the user to grant access to other users o The UeRM shall store the roles, the users, their roles and profiles o The UeRM shall maintain a list of login and logout operations o Scenario deletion

Page 26: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 24

o Deletion of scenario and lessons learnt templates o Modification of scenario information o Modification of map symbology o Creation of map layers o IG access (send alerts)

Service platform

o The SP shall provide a database to store EO data o The SP shall receive and store georeferenced information from first responders o The SP shall provide means to configure its operational parameters o The SP shall run on virtualised IT infrastructures o The SP shall be easily extended with new sensors, modules, etc.

Crowdsourced and First Responders Data (App)

o Map of the AOI in the cache memory o Send media to HEIMDALL system

Alert receiver to be checked

External systems o Present information about critical infrastructures o The system shall assign data received from a first responder to a specific incident o The system shall access meteorological information from private stations/users. o The system shall access the information of soil characteristics, elevations and

landslide inventories available in the simulation area o The system shall access and display pre-defined potential damage map

information for a respective region. o The system shall show the location of assets on the map o The system shall allow the deletion of information received from first responders. o The system shall be able to receive incidents through the crowdsourcing

application. o First Responders location

Fire/Flood simulation

o Adjust past fire spread simulations o Estimate the geomorphological elements o Simplified flood simulation o Simplified model o Adjust of past flood simulations o Simplified simulations using multiple discharge input points

Landslide modelling

o Delineate information on source areas o Access weather data o Delineate safe and unsafe areas

Scenario management

o Delete scenario o Associate geotagged pictures to a scenario o Create a scenario with weather data only o Store extended weather parameters o Store weather forecast in different fixed time frames o Mark current weather conditions as verified by a field user o Store area of scenario o Associate GUI screenshots to a scenario o Store lifecycle phase o Store status

Page 27: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 25

o Store urgency o Updated lessons learnt data structure o Updated response plan data structure

Risk and impact assessment

o Estimation of the physical exposure o Assessment of the physical impact o Estimate the expected impact based on the identified affected components,

damage/vulnerability functions and the simulation/EO products o Estimate the number of affected people o Integrate information on monetary values and based on this estimate the impact o Preliminary risk information products based on end user knowledge o Provide the hazard extent to be displayed o Generate risk assessments for forest fires, floods and landslides o Consider cascading effects on vulnerability o Integrate data sets of infrastructures o Identify infrastructures not affected o Information on the municipality membership o Expected physical damage based on identified assets/GOIs

Impact summary

o EDXL-based situation report for scenarios o ISA information for GOIs at risk in a specified geographical location o Modify ISA information o Total percentage of damaged GOIs in AOI o Total degree of physical damage in AOI o Simple filtering of ISA Information

Information gateway

o Different levels of predefined areas o Different types of areas o Different types of users when message is private o Multi-channel capabilities o Share pictures

5.2 Response phase This section contains the prepared materials for exercise LAND-2.

Exercise Setup 5.2.1The functionalities implemented for Release B will be presented and evaluated in an interactive exercise by use of the HEIMDALL system modules.

5.2.1.1 Context

Participants: HEIMDALL consortium and members of the AB.

What: Demonstration 2 of the HEIMDALL project.

Purpose: Test and evaluate Release B functionalities by the end-user partners and the members of the AB.

Host: CIMA, at their headquarters in Savona (Italy).

Page 28: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 26

5.2.1.2 Exercise type

The exercise will be conducted as a functional exercise allowing participants to perform their duties in a simulated operational environment. Activities for a functional exercise are scenario-driven, such as the failure of a critical business function or a specific hazard scenario. Functional exercises are designed to exercise specific team members, procedures and resources (e.g. communications, warning, notifications and equipment set-up).

5.2.1.3 Exercise roles

See 5.1.1.3 Exercise roles.

5.2.1.4 Exercise organisation

See 5.1.1.4 Exercise Organization.

5.2.1.5 Schedule

The schedule results from the selected data collection approaches

Presentation of the story and study questions (15 min).

Each run of the story shall take approximately 30-45 minutes of simulated time, representing from 3 to 4 hours of operational time.

Debriefing questionnaire (30 min).

Story 5.2.2The story LAND-2 will be developed for the landslide case study 1 (CRI). The response phase will be simulated.

Story is based on:

The context of the end-users and the environment in which they operate

The objective of the exercise

Physical drivers – i.e. natural hazards

Incorporation of damage and losses in a possibly realistic way

Flow of response planning / preparedness activities in the end-users reference workflow

Availability of functionality in the integrated system for Release A supporting the story (and also in stand-alone tool implementation if necessary to evaluate)

5.2.2.1 Story type

Response phase to a Landslide (LAND)

5.2.2.2 Environment

Monesi di Mendatica, Italy; based on landslide case study 1 (CRI). Environment will be taken from D3.2.

Page 29: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 27

5.2.2.3 Players and roles

Target groups must be selected for the exercises according to:

CPO: Civil Protection / Fire Fighter Operator

CRI: Italian Red Cross Operator

CRC: (Regional / Local) Control Room Chief

IC: Incident Commander

LP: Local Police

5.2.2.4 Locations

LCR: Local Control Room (Centro Operativo Misto, COM)

RCR: Regional Control Room (Sala Operativa Regionale, SOR)

FCP: Forward Control Post (Posto di Comando Avanzato, PCA)

F: Field

112: 112 Alarm Centre

The scenario will require a commitment of stakeholders (end-users and decision makers) from different Crisis Management levels (local, regional), such as representatives of regional police and fire services.

Actions will be taken by these stakeholders in a realistic information environment, based on currently available means, Crisis Management plans, rescue procedures and good practices of participants. Solution providers are asked to support the actors in their mission to respond to the story.

5.2.2.5 Story Description

The story represents the response phase to the landslide that occurred on November 24th 2016 in Monesi di Mendatica, a village in the Imperia province in the alpine area of the Liguria Region. The Monesi landslides occurred after heavy rainfalls had woken up a paleofrana causing large terrain movements. The story starts in the morning, where the pre-alert phase was activated due to the heavy rainfalls, and continues to the actual emergency response phase.

The road between San Bernardo and Monesi was completely covered by the terrain and therefore Monesi remained isolated from the rest of the area. One house was completely destroyed while 25% of houses were condemned and several others heavily damaged. There were no human casualties as a result of the landslide, but the majority of people living in Monesi had to be rescued from their houses and evacuated in safe areas.

The Regional Control Room of the Liguria Region was informed by the Local Control Room that the local emergency response plan was activated to rescue potentially affected persons. Operators from the civil protection, the Italian Red Cross, Vigili del Fuoco, and Local Police were deployed on site, a helicopter was dispatched as well as two excavators and two ambulances. All resources deployed during the Monesi Landslide can be found at HEIMDALL Deliverable D3.2 Case Studies – Issue 2 [5].

5.2.2.6 Storyboard

Storyboards for the defined story stages using implemented functionalities for release B.

Table 5-4. Legend of LAND-2 of Release B.

Page 30: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 28

User interaction with HEIMDALL performed in Release B

User interaction with HEIMDALL.

Action not performed in the exercise, but relevant information to follow the incident

No user interaction with HEIMDALL and/or informative step

Relevant information to follow the incident

Table 5-5. Storyboard for LAND-2 of Release B.

SKP Time Key event Player Location Id Brief description

1. 24/11/16 15:00

A call received in 112 informs that a landslide has occurred in Monesi di Mendatica (Imperia)

CPO 112 TR_UI_31

TR_DataFR_1

TR_DataFR_3

App receives alert messages sent from the GUI

2. Nomes mmencio

24/11/16 15:03

Landslide warning transmitted to all operators. The Local Control Room (LCR) is activated at Pieve di Teco

CPO RCR TR_Scen_1

TR_Scen_2

TR_Scen_3

TR_Scen_8

3. CPO change scenario parameters and sets mode as “Response”

CPO RCR TR_UI_19

<Changes in GUI visuals to indicate mode of operation - pending >

Scenario parameters:

Scenario name: “Monesi landslide 2016”

Status=”Actual”

Urgency=”Immediate”

Hazard type = “Landslide”

Hazard location? = Monesi di Mendatica:

44.080503270972116

7.754850479642386

4. The CPO sets the area of the scenario in the Monesi Area

CPO RCR TR_UI_5

TR_Scen_33

Set scenario.area=AOI?

5. CRC creates the Response Plan

CRC RCR TR_UI_25

TR_UI_55

TR_Scen_18

Attach a Response Plan Document

Page 31: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 29

TR_Scen_49

6. 24/11/16 15:10

The CRC activates the dispatch plan

CRC LCR

7. Local Police Control Room alerts their local police patrols in the area.

LP LCR Chat message to FR app

(Police):

“Landslide occurred in Monesi

de Mendatica. Please go

there. location will be sent in

another message”

8. 24/11/16 15:10

Check weather data in the AOI

CRC LCR Right click: Get GRID weather

9. 24/11/16 15:10

Update weather data

CRC LCR

10. 24/11/16 15.10

Local police arrive at the incident and confirms the landslide and that Monesi is isolated

LP FIELD TR_DataFR_5

Track and display the location of first responders

11. Police checks road network around Monesi

LP LCR TR_UI_2

12. Police wants to see the buildings in the area

LP LCR TR_UI_2

13. 24/11/16 15:10

The CRC alerts the population of the landslides and informs that the emergency response plan is activated

CRC LCR Alerting service

Select the area

Select the user

CAP message:

“Emergency services

are being deployed in

Monesi area, if you

need assistance,

please call 112.

Further information

will be provided soon”

14. 24/11/16 15:10

IC request an EO product to know the extension of the landslide

IC RCR TR_DataEO_4

TR_DataEO_3

TR_DataEO_4

TR_DataEO_3

TR_DataEx_

Select the EO product associated to the scenario

Page 32: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 30

01

TR_Scen_12

TR_UI_47

15. 24/11/16 15:10

IC request EO based impact products

IC RCR

16. 24/11/16 15:10

IC request a rapid assessment from the field

IC RCR Police send information, text:

“The road between San Bernardo and Monesi is completely covered by the terrain and therefore Monesi will remained isolated from the rest of the area. One house completely destroyed. There are several other houses severely affected. No human casualties”

17. 24/11/16 15:10

CRC associate pictures from the field to the active scenario

CRC RCR TR_Scen_28

TR_UI_47

Police send general pictures of the affected area

Attach image using scenario.geoimage

18. CRC activates the technical expert team. Geological Survey

CRC RCR

19. IC requests information of soil characteristic to Geological expert team

Chat message from Geological team

“Soil humidity is low and soil type is gravel”

Information needed to trigger the simulation

20. 24/11/16 15:10

IC requests a simulation and associates it to the active scenario

IC RCR TR_LS_1

TR_LS_2

TR_LS_3

TR_LS_4

TR_LS_7

TR_Scen_12

TR_UI_47

Trigger simulation

Show simulation results in map

Associate to scenario

Parameters:

Type of landslide: Rotational Landslide

Study area:

Page 33: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 31

Size: Large

Soil humidity: Dry

Soil type: Sand

21. 24/11/16 15:10

IC wants to check the location of all buildings on the map

IC RCR TR_DataFR_5

Display simulation results + buidlings layer

22. 24/11/16 15:10

CRC needs to estimate the expected impact

CRC RCR Simulation based products:

Trigger physical impact assessment

Assessment of physical impact (affected buildings)

Association of impact assessment result to scenario

23. 24/11/16 15:10

IC wants to identify safety areas from the simulation result

IC RCR Association to scenario?

24. 24/11/16 15:10

CRC send the location of safe areas to first responders

CRC RCR TR_DataFR_6

Either send waypoints or draw the areas and send screenshot

25. 24/11/16 15.45

Arrival of the rescue team (firefighters)

CPO, CRI

FIELD FR confirms arrival by sending the positon

26. 24/11/16 15.45

The Helicopter is dispatched

HO FIELD

27. 24/11/16 15.45

IC activates the FCP to Monesi and departs to there.

IC RCR

28. 24/11/16 15.45

IC Identifies safe and unsafe areas, in a manual way, and sets the location of

IC RCR Based on the two layers:

SERTIT LANDSLIDE DELINEATION – MONESI

Simulation result.

Set a point on the map locating the Forward

Page 34: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 32

the FCP. Command Post “FCP”

Associate draws as screenshots to scenario

29. 24/11/16 15.45

IC close the HEIMDALL session

IC RCR TR_UI_57

30. 24/11/16 15:30

IC arrives at the FCP, restores his session and opens the scenario “Monesi landslide”

IC FCP TR_UI_47

TR_UI_4

TR_UI_5

IC search “Monesi landslide”

scenario

IC review all info attached to the scenario:

Simulation

Impact Assessment

Earth observation info

Location of first responders

Location of assets

Pictures associated to scenario

31. 24/11/16 16.00

CRC wants to monitor the movement of terrain.

CPO RCR TR_DataSitu_6

TR_DATASit

uMon_1

TR_DATASituMon_2

GB-SAR layer displayed

32. 24/11/16 16.30

CRC sends the GPS coordinates of excavators to field command staff

CRC LCR TR_DataFR_5

Track and display the location of first responders

The RCR sends the geolocated point (waypoint) to field command mobile app

Associate layer to scenario

33. 24/11/16 16.45

The IC updates the RCR room about the situation

IC FIELD “one house destroyed, several damaged, several persons to be rescued, the road damaged”

34. Response Plan is updated

IC FIELD TR_UI_25 Associate a new version of the Response Plan to the scenario

35. 24/11/16 16.45

Situation Report is produced

CRC LCR TR_Scen_3

TR_SA_5

TR_UI_26

EDXL-SitRep is requested for the active scenario in the GUI (XML-based)

36. 24/11/16 16.45

The CPO updates the weather in the map

CPO LCR TR_DataEx_04

TR_DataEx_05

TR_Scen_30

TR_UI_56

37. 24/11/16 16.50

The CPO notifies and informs the affected

CPO LCR TR_DataFR_3

TR_Com_2

Predefined and established direct messages to citizens

To select the level of “private

Page 35: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 33

population, in particular the vulnerable elements.

TR_Com_3

TR_UI_31

group” were to send the message.

38. 24/11/16 16.55

The helicopter surrounds the area

HO FIELD

39. 24/11/16 16.55

The local police confirms road is blocked.

The LP identifies an alternative road and communicates it to the LCR

LP FIELD TR_UI_52 Open the layer with the blocked points.

Let end-users discuss on the alternative routes.

40. 24/11/16 17.00

CPO filters the information of the road network in the cartography.

CPO LCR TR_UI_4

TR_Scen_34

TR_UI_47

Filter information, map layers, settings

Point are introduced in the GUI.

Screenshot is taken and associated to the active scenario

41. 24/11/16 17.00

CPO edits the emergency response plan

CPO LCR TR_SP_03 Integrate multiple heterogeneous data sources using proprietary interfaces

Information on road network is updated in the Response Plan

42. 24/11/16 17.00

HO sends pictures to the Heimdall system

HO FIELD TR_DataEx_01

TR_Scen_3

TR_UI_47

TR_Scen_28

Present the information as map layers

Georeferenced base layer for the maps

Associate geotagged picture to active scenario (geoimage)

43. 24/11/16 17.00

IC requests information on critical infrastructures

IC FIELD

44. 24/11/16 17.00

CPO activates the critical infrastructure layer

CPO LCR Open layer

45. 24/11/16 17.00

CPO queries the rainfall forecast for different timeframes (1h, 3h, 6h) and stores that data in

CPO LCR TR_UI_56

TR_Scen_31

Right click and get Weather and select the fixed time-frames: +1, +3, +6

Page 36: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 34

the active scenario

46. Reception of EO related products:

EO based Impact products

IC FCP Show EO layers:

47. 24/11/16 17.00

Meeting between the IC and the mayor of Monesi

IC FIELD Meeting preparation:

GOIs layer

Critical infrastructures layer

Impact Summary (ISA) generation?

Photos from HO

Rainfall forecast

48. 24/11/16 17.30

Monesi mayor declares Monesi as “zona rossa”. IC communicates that the houses next to the landslide area will be evacuated

IC FIELD Explanation: “zona rossa”

49. 24/11/16 17.30

IC sets on the GUI the area to evacuate, the evacuation route and the safety zone, and sends the information to the RCR.

IC FIELD TR_Scen_34

TR_UI_47

TR_UI_54

User draw the evacuation route and the area to be evacuated.

Optional to share the draws:

GUI screenshot associated to the active scenario.

Screenshot will contain also the position of FR and the FCP, as reference point.

50. 24/11/16 17:30

CRC identifies the safe area to shelter the population and sends the information to FCP

CRC LCR TR_Com_1

TR_Com_2

TR_Com_3

TR_Com_11

TR_Com_12

Alerting service

CAP message

51. 24/11/16 17:30

IC confirms that they are going to shelter the population in the safe area

IC FIELD TR_Com_1

TR_Com_2

TR_Com_3

TR_Com_11

TR_Com_12

Alerting service:

Waypoint of shelter area

Message: “Crocce Rossa has set a shelter area near the XX, please go there by your own means or wait the rescue team”

CAP message

Page 37: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 35

52. 24/11/16 17.30

CRC sends the helicopter with rescue team and medical resources

CRC

LCR

53. 24/11/16 18.00

Local police reports that two persons have been rescued from their houses

LP

CRI

FIELD TR_DataEx_01

TR_Scen_3

Present the information as map layers

Georeferenced base layer for the maps

54. 24/11/16 18.00

CRI confirms that two persons are being carried to the hospital

CRI FIELD Present the information as map layers

Georeferenced base layer for the maps

55. 24/11/16 18.00

IC Communicates that it is necessary to evacuate all other houses

IC FIELD TR_DataFR_3

TR_Com_3

56. 24/11/16 18.00

CRI sends pictures of houses to the system

CRI FIELD

57. 24/11/16 18.30

CPO confirms that all houses have been evacuated

Three injured persons have been evacuated to the Hospital

CPO FIELD TR_DataEx_01

Present the information as map layers

Georeferenced base layer for the maps

58. 24/11/16 18.45

CPO updates information with real feedback from field on safe and unsafe areas

CPO RCR TR_DataEx_01

resent the information as map layers

Georeferenced base layer for the maps

59. 24/11/16 19.00

CRC informs the population that all houses have been evacuated

CRC LCR Alert information to population

60. 24/11/16 19.00

CRC asks for an assessment of actual and potential

CRC RCR TR_Risk_24

TR_SA_1

TR_SA_3

Physical and human exposure

Impact summary/ ISA information:

Total number of damaged

Page 38: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 36

damages and of strategic infrastructures that might be affected

TR_SA_6

TR_UI_26

TR_SA_17

TR_UI_49

buildings in AOI

Maximum hazard level in AOI

Associate impact summary/ISA information to scenario

61. 24/11/16 19.30

The IC confirms that the rescue actions are over

IC FIELD

62. CPO request a rainfall simulation

Associate Landslide Rainfall Analysis

Date set on: 24/11/2016

Climate: Cool Mediterranean Climate

Location: set a point on Monesi

63. CPO creates a lesson learnt in the “Monesi landslide” scenario and associates a lesson learnt document

CPO RCR TR_Scen_17

TR_Scen_48

Creates a “Rapid Lessons learnt” (not attaching a document)

Table 5-6. Vulnerable elements created for story LAND-2

id X coord. Y coord. Type of bulding

1 44.080498336752385 7.752780276763616 Church

2 44.08421981574625 7.757280743491265 Water supply facility

Table 5-7. Messages and coordinates for damaged buildings for story LAND-2

id X coord. Y coord. Message

3 44.0797809673673 7.755455635589101 Severely damaged, building to be evacuated

4 44.08046392689505 7.75488973663812 Building destroyed

5 44.080641202249865 7.754626383263485 Severely damaged, building to be evacuated

New system functionalities 5.2.3See 5.1.3 New system functionalities.

Page 39: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 37

5.3 Execution phase The execution phase for the demonstration in the End-Users Workshop 3 is composed by 2 dry runs and the execution of the Exercises LAND-1 and LAND-2.

Two dry runs were organised during the month before the End-Users Workshop 3.

Dry Runs 1 & 2 5.3.1Only the technical partners attended the Dry Runs in order to avoid providing end-users with extra information about the exercise organisation and solutions before the exercise run, because it was considered this could cause unwanted disturbance in the results.

5.3.1.1 Dry Runs

The outcomes of the Dry Run 1 in preparation for the EUW3 can be found at Annex I. Outcomes of the Dry Run 1.

The outcomes of the meeting Dry Run 2 in preparation for the EUW3 can be found at Annex II. Outcomes of the Dry Run 2 (EUW3).

Exercise Runs 5.3.2The final run of two exercises LAND-1 and LAND-2, was held within the frame of the End-Users Workshop 3, hosted by the CIMA, in their headquarter premises in Savona, on 17th of April, 2019.

The agenda of the meeting can be found at Annex VII. Agenda of End-Users Workshop 3.

The list of attendees can be found at Annex IX. List of attendees of End-Users Workshop 3.

o HEIMDALL Partners attendees: 36

HEIMDALL Technical partners: 18

HEIMDALL End-users: 18

o HEIMDALL Advisory Board members: 4

o Other: 5

Photos of the End-Users Workshop 3 can be seen in the following table

Page 40: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 38

Table 5-8. Photos of End-User Workshop 3.

Schedule 5.3.3The schedule is as follows:

Page 41: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 39

Presentation of the story and study questions (15 min).

Each run of the story shall take approximately 30-45 minutes of simulated time, representing from 3 to 4 hours of operational time.

Debriefing questionnaire and other selected data collection approaches (30 min).

5.4 Evaluation phase This chapter comprises the actions to collect and analyse the feedback from end-users and the Member of the Advisory Board after the demonstration, as well as the information and data collected by technical partners along the exercise sessions.

Data collection 5.4.1Two data collection techniques were employed in order to gather participants’ feedback on the platform features and functionalities:

- Note taking: through the ongoing exercise there was a dedicated note taker to collect all the system’s shortcomings, and key missing capabilities pointed by the participants and the member of the AB as well as other feedback.

- Questionnaire: a questionnaire addressed to the participants of the End-users Workshop was prepared by EKUT in order to assess the fulfilment of user requirements. The questionnaire was divided into two main parts: one dedicated on the preparedness phase, and another focused on the response phase. A sample of this questionnaire can be seen in Annex XI. Questionnaire for End-Users Workshop 3.

The feedback gather by means of both techniques was further analysed and arranged to prepare the D2.2 [2] and D2.3 [3].

Data analysis 5.4.2A total number of 17 experts (HEIMDALL end-users and Advisory Board members) answered the questionnaire.

5.4.2.1 Questionnaire outcomes

Two questionnaires were prepared in advance so as to collect participants’ feedback from system Release B, one relevant to exercise LAND-1 (preparedness phase), and another to LAND-2 (response phase).

The main outcomes of the two questionnaires, which were collected by EKUT, are presented below along with some comments provided by the responders:

Please note that each questionnaires includes two open questions (highlighted with a star *). Responses to those questions can be consulted in Table 5-10 and Table 5-12.

Table 5-9. Questionnaire outcomes of exercise LAND-1 (preparedness phase).

Fulfilment

Questions Yes Partially No Not applicable Open

anwers

Page 42: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 40

1 Were you able to log in with the profile/role assigned? 16 1

2 Did you get/find the information/data you needed? 5 12

3 Was there any information you could not find/get? 7 2 4 2

4 Which one(s)?*

See Table 5-10

5 Did the user profile/role assigned to you fit your working procedures? 10 6 1

6 Did you recognise the symbology used in the platform and on the map? 8 8 1

7 What did you not recognise?*

See Table 5-10

8 Were you able to set the operation mode as ‘training’? 16 1

9 Was it indicated that you were working in ‘training’ mode? 13 1 3

10 Were you able to create a scenario? 15 1 1

11 Were you able to observe crack sensor data for different time periods and locations? 13 2 2

12 Were you able to access the buildings’ layer? 15 2

13 Did you receive a notification informing that the threshold for triggering a response due to a landslide event was exceeded? 9 3 4

14 Were you able to observe GB-SAR data? 11 2

15 Were you able to create a screenshot? 16 1

16 Were you able to associate the screenshot to a scenario? 13 2 1

17 Were you able to send an alert to other members of your organisation? 11 2 2 1

18 Were you able to attach a screenshot to the alert sent to members of your organisation? 10 2 4 1

19 Were you able to use the chat with first responders and/or members of the geological expert team in the field? 9 4 3 1

20 Were you able to use the chat to send/receive pictures from the field? 10 1 5 1

21 Were you able to see the position of first responders and/or geological team in the field? 7 5 3

22 Were you able to delete a scenario? 15 1

23 Were you able to change from ‘training’ mode to ‘preparedness’ phase? 16 1

24 Did you notice the change from ‘training’ mode to ‘preparedness’ phase? 12 4 1

25 Were you able to set the area of interest (AOI) as Liguria? 12 2 2

26 Were you able to access weather data? 12 4

27 Were you able to create a scenario based on weather data? 4 2 2 7

28 Were you able to associate a lesson learnt document to the scenario? 14 1 2

29 Were you able to associate the population awareness plan and the hydrological risk management file to the scenario? 2 3 2 9

30 Were you able to select different types of landslides and/or other hazards? 9 2 5

Page 43: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 41

31 In a scale from 1 to 5 (1 is bad and 5 is excellent), how do you evaluate the interaction with the platform in terms of…? 1 2 3 4 5

- Organisation of menus/information 1 8 6 2

- Data structure of forms 2 7 6 1

Table 5-10. Open questions from questionnaire outcomes of exercise LAND-1 (preparedness phase).

Question 5: Was there any information you could not find/get? Which one(s)?

Question 7: Did you recognise the symbology used in the platform and on the map? What did you not recognise?

- Legend of symbols.

- Descriptions of notifications.

- More thematic layers (e.g. the CRACK) (mentioned 3x).

- Different languages.

- Unit in the legend (GB-SAR).

- Notifications are not show if we press the button.

- The notification couldn't be read.

- More training needed.

- Blank file created to prove system worked.

- Occupancy data from building layers was hid because position in the pop up out of the screen.

- Building layer drop down box.

- Drop down boxes were problematic because of the screen resolution.

- When the building "layer" was activated it did not allow the "legend" for the crack sensors to be shown.

- Dots indicating the type of the terrain" (without legend is difficult to understand) (mentioned x2).

- Symbols on maps.

- The meaning of the colours.

- Text characters in the alert message (accents).

- Some layers do not appear in the legend when various layers were selected.

- Icons symbology do not allow to recognise univocally the deletion of elements edited in the scenario, causing the erasure of whole scenario.

- Not everything was intuitive

- Only with more use and familiarity it will become easily recognisable.

Table 5-11. Questionnaire outcomes of exercise LAND-2 (response phase).

Fulfilment

Questions Yes Partially No

Not applicable

Open answers

1 Were you able to log in with the profile/role assigned? 17

2 Did you get/find the information/data you needed? 10 7

3 Was there any information you could not find/get? 6 1 9

4 Which one(s)?*

See Table 5-12

5 Did the user profile/role assigned to you fit your working procedures? 9 6

Page 44: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 42

6 Did you recognise the symbology used in the platform and on the map? 8 7 2

7 What did you not recognise?*

See Table 5-12

8 Was it indicated that you were working in ‘preparedness’ mode? 12 2 2

9 Were you able to change from ‘preparedness’ mode to ‘response’ mode? 16

10 Did you notice the change from ‘preparedness’ mode to ‘response’ mode? 14 2

11 Were you able to upload and attach a response plan? 14 2

12 Were you able to use the chat to communicate with local police and/or first responders and/or the geological expert team in the field? 12 4

13 Were you able to access weather data in the area of interest? 16

14 Were you able to access the road network’s layer? 15 1

15 Were you able to access the buildings’ layer? 15 1

16 Were you able to access EO products related to landslide’s extension? 12 2

17 Were you able to use the chat to send/receive pictures from local police and/or first responders in the field? 10 5 1

18 Were you able to associate pictures from the field to the active scenario? 10 3 2

19 Were you able to request and obtain a simulation? 14 2

20 Were you able to trigger and obtain an impact assessment? 10 2 2 1

21 Was the information from the impact assessment, simulation and buildings layer useful for identifying safe areas? 11 2 1

22 Were you able to draw on the layer the safe areas? 11 2 2

23 Were you able to see the position of first responders and local police in the field? 10 1 4 1

24 Were you able to access GB-SAR data? 12 1 1

25 Were you able to modify the response plan and save it? 11 2 2

26 Were you able to obtain a situation report? 8 3 4 1

27 Were you able to upload the roads blocked by police as a layer? 14 1 1

28 Were you able to access the critical infrastructure’s layer? 14 2

29 Were you able to query meteorological data specifying time frames? 15 1

30 Were you able to access EO-based impact products? 13 1

31 Was it useful to draw the evacuation route in the map? 11 3 1

32 Were you able to run a rainfall simulation? 16

33 Was it useful to run the rainfall simulation? 14 2

34 Were you able to create a screenshot? 12 4

35 Were you able to associate the screenshot to a scenario? 10 4

36 Were you able to create a lesson learnt? 9 1 3

37 In a scale from 1 to 5 (1 is bad and 5 is excellent), how do 1 2 3 4 5

Page 45: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 43

you evaluate the interaction with the platform in terms of…?

- Organisation of menus/information 1 3 7 3

- Data structure of forms 1 5 3 5

Table 5-12. Open questions from questionnaire outcomes of exercise LAND-2 (response phase).

Question 5: Was there any information you could not find/get? Which one(s)?

Question 7: Did you recognise the symbology used in the platform and on the map? What did you not recognise?

- The catalogue of the landslides existing in national/regional/local public database.

- There are challenges with the drop down box for map tools and layers, this seemed to be because of resolution.

- Unable to upload and send photos (mentioned x3).

- Information about layers (legends).

- Road interruptions should be considered as critical structures (legend is needed).

- Some of the symbology and names are unfamiliar.

- Colours of command buttons sometimes are red, sometimes blue.

- Warning points and critical infrastructure is confusing.

5.4.2.2 Analysis of key findings

- Questions 3 and 4: Is there any information/data you could not get/find? Which one? Preparedness:

Response:

Legends and units

Notifications

More thematic layers (e.g. the crack)

Drop down menus difficult to read due to screen resolution

Text searching in map

Legends

Catalogue of landslides

Drop down menus difficult to read due to screen resolution

Inability to upload and send photos

Text searching in map

Page 46: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 44

- Questions 6 and 7: Did you recognise the symbology used in the platform and on the map? What did you not recognise?

Preparedness:

Response:

Finally, the questionnaire included a couple of open questions whose main responses are showed below:

1. What did you like? (What work well?) Preparedness:

Intuitive and simple menus – organisation of information

Documents, photos, information and data centralisation

Information sharing

Two-way communication – Phone app

o Location of resources

Availability of layers

Response:

Landslide simulation

Weather forecast

2. What did you not like? What did you miss? Preparedness:

GUI designed for a larger screen

Dots

Icons symbology

Colours are confusing

Legends and symbology

Road interruptions are critical structures

Colours are confusing

Page 47: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 45

Messages weren’t sent to all users of the platform

Weather forecast

Notifications and alarms require buttons and pop-ups

Localisation of the incident in the map – text box searching

Training

Printing messages

Response:

Outputs/Products in editable format: operator/IC might need to modify inputs (simulation and impact assessment)

Situation report not useable without software that reads EDXL – PDF is better

Refreshing = losing data

Rainfall simulation not part of snapshot

Timestamp logs

Population numbers and likely locations

Commands/labels need to be in clear language

GUI: personalisation (buttons’ positions, colours, info’s position) + pop-ups for confirmation

General remarks

Results of preparedness and response exercises corresponding to Release B are only partially comparable.

Moreover, participants concluded that for future releases a training session prior to the main demo exercise is necessary. This should include a general explanation before starting the exercise

Group work has advantages and disadvantages: different points of view enrich the experience, but not everyone can test the system.

Page 48: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 46

6 Preparation phase of exercise FLOOD-1 (Release C)

This chapter describes the preparation phase of Exercise FLOOD-1, based ona training session as well as on the Preparedness and Response phases of DRM.

6.1 Training session This chapter contains the prepared materials for the training session conducted prior to the exercise FLOOD-1.

Objectives 6.1.1

The main objective of the training session is to guarantee sufficient understanding of, and familiarity with, the system by the users prior to the demonstration exercise. The instructions that are presented here are a simplified version of the story board that will be used for the demonstration exercise with the only difference that the sequence of actions is split according to the different HEIMDALL modules. During the training session each module will be presented by a technical partner, and the set of actions relevant to that module will be performed in the main screen so that the users can do the same in parallel.

Specific objectives are outlined as follows:

Explain the general appearance of the GUI. Outline the main functionalities of the different HEIMDALL modules. Provide step-by-step examples of their operation. Attend to any queries coming from end-users. Identify new end-user requirements and modify existing ones. Provide all the information required to carry out a successful performance during the

demonstration exercise.

Story 6.1.2

6.1.2.1 Players

PD: Local Police personnel:

o PD – CRO: Police Control Room Operator

o PD – F: Police Units in the Field

FRS: Fire and Rescue Service personnel:

o FRS – CRO: Fire and Rescue Service Control Room Operator

o FRS – F: Firefighting Units in the Field

6.1.2.2 Locations

FRS – NCR: Fire and Rescue Service National Control Room

FRS – RCR: Fire and Rescue Service Regional Control Room

PD – RCR: Police Regional Control Room

CP – NCC: Civil Protection National Coordination Centre

FCP: Forward Control Post

F: Field

Page 49: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 47

6.1.2.3 Story board

Overall presentation about the GUI (AVA) (15’)

HEIMDALL GUI appearance: where to find the right information?

Set Operation Mode.

Notification system.

Creation of waypoints.

Screenshots.

User settings (SPH) (5’)

Explanation of user and roles.

Explanation of Admin role.

Table 6-1. Training session story board – User settings.

SKP Time Key event Location Module Settings and associated documents

Observations

1. 9/11/2014 9:00

All players log into the platform

FRS – NCR

FRS – RCR

PD – RCR

CP – NCC

Service Platform

2. 9/11/2014 9:30

Check user rights and roles

FRS - NCR

User and Role Management

The user checks the current roles and rights assigned.

3. 9/11/2014 9:30

Check user settings FRS - NCR

User and Role Management

User checks the current user settings of the platform.

4. 9/11/2014 10:00

Set to HEIMDALL mode to “Training”

FRS – NCR & PD – CRC

GUI

Scenario Management (DLR-DFD + UNISTRA) (20’)

Creation of Scenario: what is the meaning of each parameter?

Connection to external services.

EO visualisation functionality.

Manage Layers.

Page 50: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 48

Table 6-2. Training session story board – Scenario management.

SKP Time Key event Location Module Settings and associated documents

Observations

5. 9/11/2014 10:00

Create a Scenario based on the final stretch of the Entella river basin, with weather data and basic parameters

FRS - NCR

Scenario Management

Create scenario:

- Hazard location = select any point within the Scenario area (approx. coordinates: 44.348182, 9.347889).

- Scenario area = Last stretch of the Entella river basin See here.https://goo.gl/maps/eNR1ivtXHVUHeMqn7

- Name: Entella River floods 2014

- Creation Time: Now

- Hazard Type: Flash Flooding

- Status: Actual

- Urgency: Historic

Weather conditions:

Any

6. 9/11/2014 10:00

Get weather data. FRS - NCR

External systems

Weather grid.

7. 9/11/2014 10:00

The user checks the buildings in the area of risk

FRS - NCR

GUI / Exposure

Layers to visualize:

- Entella buildings

8. 9/11/2014 10:00

View EO products. FRS - NCR

Earth Observation

EO layers to visualise:

- EO based flood extent.

- EO based building impact

The EO images were acquired on the 19th November 2014, a week after the flood event took

Page 51: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 49

assessment place.

Alerts (DLR-KN) (10’)

Send alerts among HEIMDALL instances.

Communicate and send/receive photos and location with other field units through the APP.

Creation of alerts addressed to other first responders or public.

Table 6-3. Training session story board – Alerts.

SKP Time Key event Locatio

n Module

Settings and associated documents

Observations

9. 9/11/2014 10:00

CP - NCC sends an alert to C&C centres: PD and FRS.

FRS – NCR & PD – CRC

Information Gateway

Set the following parameters:

Alert creation:

- Area: select municipality: Genova, IT.

- Audience: Private

- Address: Select “Local Police” or “Fire Fighters” depending on your profile in the platform.

- Hazard: Flood

- Certainty: Likely

- Severity: Severe

- On Set time: Now

- Expiration time: not mandatory

- Response: Monitor

- Urgency: Expected

- Translation: not required

- Resources: not required

- Sender: not required

National Civil Protection authority is alerting about the hazardous situation of floods forecasted for the upcoming hours.

Page 52: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 50

Simulation module (TSYL + CIMA) (10’)

Trigger a simulation.

Show a sample of simulation results.

Table 6-4. Training session story board – Simulation mode.

SKP Time Key event Location Module

Settings and associated documents

Observations

10. 9/11/2014 23:30

Trigger a flood simulation.

FRS - NCR

Flood simulator

Simulation parameters:

- AOI: area around the town of Carasco.

- Maximum discharge values (T200 - 200 years return period:

- Entella river: 800 m3/s

- Lavagna: 1400 m3/s

- Duration: 6h

- Interval: 5min (default value)

Impact Assessment and Summary (DLR-DFD) (10’)

Trigger impact assessment

Request impact summary

Table 6-5. Training session story board – Impact Assessment and Summary.

SKP Time Key event Locatio

n Module

Settings and associated documents

Observations

11. 10/11/2014 00:45

Request an impact assessment from the simulation results.

FRS - NCR

Risk and impact assessment products

Show physical, economic and human Impact Assessment.

12. 10/11/2014 6:10

Generate impact summary.

FRS - NCR

Impact summary

Display of impact summary results associated with the scenario.

Response Plan (DLR-DFD) (10’)

Page 53: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 51

Create a Response Plan

Table 6-6. Training session story board – Response Plan.

SKP Time Key event Location Module

Settings and associated documents

Observations

13. 9/11/2014 23:45

Create a Response Plan (RP).

FRS – RCR

Decision Support

Users select the RP parameters they consider most appropriate according to their own criteria:

- Hazard type (automatic from scenario)

- Start time (automatic from scenario)

- Challenge (automatic from scenario)

- Strategy

- Objective (min. one)

- Situation Assessment section

- Agency-specific actions

Decision Support (DLR-DFD) (10’)

Check Common Capability Challenges (CCCs)

Identify evacuation areas (EVAs)

Table 6-7. Training session story board – Decision Support.

SKP Time Key event Location Module

Settings and associated documents

Observations

14. 10/11/2014 12:00

Incident Commander examines the Common Capability Challenges (CCCs) related to the scenario

PD - RCR

Decision Support

Decision support information (DSS):

- Result from CCC Matrix displayed in the respective section in the scenario.

Page 54: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 52

displayed to him.

15. 10/11/2014 12:00

IC determines the evacuation of all the houses affected in specific EVAs (Evacuation Areas) and informs the PD - CRC about that.

FRS - RCR

Decision Support

Users to perform the following actions: Go to “Simulations and other associated data”, unfold your simulation and select “Get safe GOI”; then click on “select EVAs”; select all the EVAs (click on “Select all”) and click on Done.

To view the EVA select the layer “EVA” from the layers menu.

Location of EVAs that require evacuation depending on the simulation results.

Scenario matching (DLR-DFD) (10’)

Brief description of the scenario matching.

Define matching parameters.

Define weights.

Results explanation.

Table 6-8. Training session story board – Scenario matching.

SKP Time Key event Location Module

Settings and associated documents

Observations

16. 10/11/2014 10:00

Incident Commander requests a comparison analysis of the selected potential scenario against former incidents with similar characteristics.

FCP Scenario matching

Scenario matching based on the following filters:

- Hazard type: Flood: Flash flooding

- Status: Actual

- Urgency: Fictional, Expected, Historic

SitRep (DLR-KN) (5’)

Create of SitRep.

Send SitRep through the APP.

Mention about EDXL.

Page 55: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 53

Table 6-9. Training session story board – SitRep.

SKP Time Key event Location Module

Settings and associated documents

Observations

17. 10/11/2014 10:00

Communication meeting with the mayor.

FCP Generate situation report document to be delivered to the user:

- Impact assessment

- Population at risk

- Economic impact assessment

- Evolution (what-if analysis)

Catalogue (DLR-KN) (10’)

Publish in the catalogue.

Check information published by other users.

Table 6-10. Training session story board – Catalogue.

SKP Time Key event Location Module

Settings and associated documents

Observations

18. 9/11/2014 10:30

Subscribe to the Catalogue.

FRS – NCR

FRS – RCR

PD – RCR

CP - NCC

Catalogue

Set the following parameters:

- Product: Scenario

- Area

- Country: Italy

- State: Liguria

- Region: not mandatory

- Hazard type: Flash flood

The rest of the parameters are not mandatory.

By subscribing to the catalogue users will receive notifications and access the data published by other users.

19. 13/11/2014 20:00

Publish in the catalogue.

FRS – NCR

FRS –

Catalogue

Users share in the catalogue incident data generated during the

Page 56: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 54

RCR

PD – RCR

CP - NCC

exercise.

6.2 Preparedness and Response phases This chapter contains the prepared materials for exercise FLOOD-1.

Exercise Setup 6.2.1The functionalities implemented for Release C will be presented and evaluated in an interactive exercise by use of the HEIMDALL system modules.

6.2.1.1 Context

Who: HEIMDALL consortium, AB members and end-users organisation invited to participate in the demonstration exercise.

What: Demonstration 3 of the HEIMDALL project.

Purpose: Testing and evaluation of Release C functionalities by the end-user partners and members of the AB.

Host: FBBR, at the University College Copenhagen, in Copenhagen (Denmark).

6.2.1.2 Exercise type

The exercise will be conducted as a functional exercise allowing participants to perform their duties in a simulated operational environment. Activities for a functional exercise are scenario-driven, such as the failure of a critical business function or a specific hazard scenario. Functional exercises are designed to exercise specific team members, procedures and resources (e.g. communications, warning, notifications and equipment set-up).

6.2.1.3 Exercise roles

Exercise roles are assigned as follows to the members of the Consortium so as to ensure appropriate performance of the exercise:

EXERCISE OWNER (DLR-KN): Benjamin Barth. Tasks: Overall coordination, presentation of the EUW4, introduction of the Advisory Board members, formalities, etc.

SOLUTION COORDINATOR (DLR-KN): Benjamin Barth. Tasks: Lead the rehearsal on DAY 1, supervise all the technical aspects of the system, provide extra technical information if required, etc.

SCENARIO COORDINATOR (PCF): David Martin. Tasks: Introduce the overall framework of the case study, explain the rationale behind the steps in the story board, and supervise the overall performance of the demonstration exercise.

END-USER COORDINATOR (PCF): David Martin. Tasks: Inform the end-users about the objectives set for the exercise: what type of tasks will be performed and what is expected from them; assure their attendance and commitment throughout the exercise, and assure that their feedback is collected at the end of the exercise.

Page 57: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 55

DISSEMINATION LEADER (PCF): David Martin. Tasks: Take pictures during the ongoing exercise, publish in the media, etc.

ETHICAL AND HUMAN FACTOR ISSUES (EKUT): Solange Martinez. Tasks: Prepare and deliver the EUW4 questionnaire at the end of the exercise.

EXERCISE GUIDE (SPH, AVA, DLR-DFD, CIMA, UNISTRA): Tasks: Provide occasional assistance to the end-users, only if they find themselves stuck in some of the steps of the story.

NOTE TAKER (SPH, AVA, DLR-DFD, CIMA, UNISTRA): Tasks: Observe carefully and take general notes about the performance of the end-users throughout the exercise.

HEIMDALL partners (ALL): Tasks: Provide appropriate guiding and assistance to all the attendees that are external to the project.

Figure 6-1. Roles in the exercise organisation for EUW4

6.2.1.4 Exercise Organization

Figure 6-2 depicts the expected configuration of the organisation for FLOOD-1 exercise. The different locations of each Stage Key Point (SKP) in the storyboard are classified in “On-Field” or “Control Room”. End-users will need to read carefully through each SKP to understand the actions that they need to undertake. Then, participants will performed each SKP in the corresponding station on the HEIMDALL system (On-Field, or Command & Control). Further clarification on the SKP will be provided by the End-User coordinator at the request of the participants, whereas technical assistance will be provided, when required, by the technical partners, who will supervise the overall execution of the exercise.

In this Exercise FLOOD-1, SKP were classified as follows:

FRS – NCR: Fire and Rescue Service National Control Room

FRS – RCR: Fire and Rescue Service Regional Control Room

PD – RCR: Police Regional Control Room

CP – NCC: Civil Protection National Coordination Centre

FCP: Forward Control Post

F: Field

Page 58: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 56

Figure 6-2. Exercise organisation for EUW4

Story 6.2.2The story FLOOD-1 will be developed for the Flood case study 1 (CRI). The preparedness phase will be simulated.

Story is based on:

The context of the end-users and the environment in which they operate

The objective of the exercise

Physical drivers – i.e., natural hazards

Incorporation of damage and losses in a possibly realistic way

Flow of response planning / preparedness activities in the end-users reference workflow

6.2.2.1 Story type

Preparedness and response phase to a flood (FLOOD-1).

6.2.2.2 Environment

Final stretch of Entella river, Italy; based on the flood case study 1 (CRI). Environment will be obtained from the event report released by ARPAL and the case scenario described in D3.3.

Page 59: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 57

6.2.2.3 Players and roles

The users will be logged in to the HEIMDALL system, as well as to the mobile phone app, with either the profile of Police officer personnel or with the profile of Fire and Rescue Service personnel. Even though all users will be prompted to perform all the actions throughout the exercise, effective communication and exchange of information will only be possible between members with the same profile. Police officers and Fire and Rescue Services will have to combine the role of a Control Room Operator with the role of local units working in the field:

PD: Local Police personnel:

o PD – CRO: Police Control Room Operator

o PD – F: Police Units in the Field

FRS: Fire and Rescue Service personnel:

o FRS – CRO: Fire and Rescue Service Control Room Operator

o FRS – F: Firefighting Units in the Field

6.2.2.4 Locations

Furthermore, the sequence of events and actions defined in the story board will take place in one of the following locations:

FRS – NCR: Fire and Rescue Service National Control Room

FRS – RCR: Fire and Rescue Service Regional Control Room

PD – RCR: Police Regional Control Room

CP – NCC: Civil Protection National Coordination Centre

FCP: Forward Control Post

F: Field

6.2.2.5 Incident description

The flood event that affected the Italian region of Liguria from the evening of the 9th November until the morning of the 13th of November of 2014 was due to the passage of a deep trough coming from the West that brought large quantities of humidity from Africa. A wet advection caused intense and widespread rainfall across the region of Liguria, these being favourable to thunderstorm activity. The Environmental Protection Agency of Liguria (ARPAL) recorded maximum rainfalls of 242.4 mm in 24 hours, on the 12th of November, in the locality of Piampaludo (Figure 6-3), and of 340.2 mm in 96 hours, between the 9th and the 13th of November in Monte Penello (Figure 6-4).

Page 60: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 58

The long rainfall activity culminated in the overflow of the Entella river basin giving rise to a dramatic flood event that collapsed the region in the evening of the 10th of November and caused considerable damage in a number of towns along the Entella river basin (Figure 6-6); namely, San Colombano, Leivi, Borzonasca and Carasco. Furthermore, the rainfalls also triggered numerous landslides that caused damages to homes and infrastructures resulting in the death of two people (Figure 6-5).

6.2.2.6 Story Description

The nature of the demonstration is a table-top exercise in which the participants will be confronted with a simulated flood incident based upon the Entella River floods. There is a story board that has been prepared to guide the participants through a series of actions (steps) to be taken during the course of the exercise. As part of it, participants will have to review, discuss and perform these actions by using the HEIMDALL system. This will serve to test and validate the array of features and functionalities implemented in the system.

The set of actions defined in the story board will take place around the locality of Carasco, where the Entella river forms a tight meander that embraces the entire town (Figure 6-7). This was one of the worst affected areas by the flood event as a result of an increase in the water level of the river from 2.5 m, at 12:00h, to 8.3 m, at 22:00h (ARPAL).

Figure 6-4. Accumulated rainfall from the 9th

of November at 00h UTC to the 13th of

November at 00h UTC (96h).

Figure 6-6. Flooded areas

Figure 6-3. Accumulated rainfall from the 11

th of November at 00h UTC to the 12

th

of November at 00h UTC (24h).

Figure 6-5. Landslides

Figure 6-7. Town of Carasco

Page 61: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 59

The demonstration exercise will encompass both the preparedness and the response phases of the flood incident. The objective within the “preparedness” phase is to get preparation actions underway in anticipation of the impending flood hazard. E.g. “112 alerts about possible overflows in Carasco in Torrente Entella”. By doing that, reactive responses are avoided in favour of pro-active decisions based on advance analyses of the potential impacts. The objective within the “response” phase is to mitigate the negative impacts of the flood hazard during the ongoing incident. E.g. “The user queries an impact assessment based on the flood simulation results”.

6.2.2.7 Story board

The storyboard for the defined story stages uses implemented functionalities for Release C. Each step in the storyboard is indexed by Stage Key Points (SKP).

Table 6-11. Legend of the Storyboard for FLOOD-1 of Release C.

Colour Mode Meaning

Training

User interaction with HEIMDALL Preparedness

Response

None

No user interaction with HEIMDALL and/or informative step

(This step contain relevant information to follow the incident)

Table 6-12. Storyboard for FLOOD-1 of Release C.

SKP Time Key event Location Module Settings and associated documents

Observations

1. 9/11/2014 7:00

Log into the platform.

FRS – NCR

FRS – RCR

PD – RCR

CP - NCC

GUI

These will be associated with either the profile of Police officer personnel (PD) or the profile of Fire and Rescue Services personnel (FRS).

2. 9/11/2014 10:10

Set the mode to “Preparedness’”.

FRS – NCR & PD – CRC

3. 9/11/2014 10:20

Create a Scenario based on the final stretch of the

FRS - NCR

Scenario management

Create a new scenario and set scenario

Page 62: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 60

SKP Time Key event Location Module Settings and associated documents

Observations

Entella river basin, with weather data and basic parameters.

parameters as follows:

Scenario

- Scenario area: Last stretch of the Entella river basin. Get the following documents from the “Demo 3 Material” folder: “Scenario area (Entella basin)”.https://goo.gl/maps/eNR1ivtXHVUHeMqn7

- Hazard location: Select any point within the Scenario area (approx. coordinates: 44.348182, 9.347889).

- Name: Entella River floods 2014 (username)

- Creation Time: Now

- Hazard Type: Flash Flooding

- Incident start time: 09/11/2014 07:00

- Incident end time: Not known yet.

- Risk Level: High

- Casualties: unknown

- Injured: unknown

- Status: Actual

- Urgency: Historic

Weather Conditions

Page 63: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 61

SKP Time Key event Location Module Settings and associated documents

Observations

(Verified: yes)

- Data/Time: 09/11/2014 07:00

- Forecast hours: 24h

- Dew Point: 12ºC

- Wind speed: 4m/s

- Wind direction: 135 degrees

- Forecasted rainfall: 200 mm

- Wind gust: 135 degrees

- Temperature: 18ºC

- Humidity: 70%

- Rainfall intensity: 12 mm/h

- Accumulated rainfall: 34.8 mm

- Save everything

4. 9/11/2014 10:00

CP - NCC sends an alert to C&C centres: PD and FRS.

FRS – NCR & PD – CRC

Information Gateway

Set the following parameters:

Alert creation:

- Area: select municipality: Genova, IT.

- Audience: Private

- Address: Select “Local Police” if you are Fire Fighters or select “Fire Fighters” if you are police

- Hazard: Flood

- Certainty: Likely

- Severity: Severe

- On Set time: Now

- Expiration time: not mandatory

National Civil Protection authority is alerting about the hazardous situation of floods forecasted for the upcoming hours.

"Following the intense episodes of heavy rains and storms we had between the 3rd and the 6th of November across the region of Liguria, new precipitations are expected to become

Page 64: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 62

SKP Time Key event Location Module Settings and associated documents

Observations

- Response: Monitor

- Urgency: Expected

- Translation: not required

- Resources: not required

Sender and website: not required

widespread from the evening of the 9th of November, and strong thunderstorms are expected to start in the early hours of the night of the 10th of November.”

The frontal system may be aggravated by the passage of northern winds as they would bring a mass of cold air that would collide with the intense wet advection.”

5. 9/11/2014 10:30

Subscribe to the Catalogue.

FRS – NCR

FRS – RCR

PD – RCR

CP - NCC

Catalogue Set the following parameters:

- Product: Scenario

- Area

- Country: Italy

- State: Liguria

- Region: not mandatory

- Hazard type: Flash flood

The rest of the parameters are not mandatory.

By subscribing to the catalogue users will receive notifications and access the data published by other users.

6. 9/11/2014 10:45

The National Civil Protection Authority uploads the hydrogeological risk management and population awareness plan.

FRS – NCR & PD – CRC

Scenario management

Upload the following two plans from the scenario tab “Documents”:

As description use the document name.

Both the hydrogeological risk management and the population awareness plan are associated documents to the scenario.

Page 65: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 63

SKP Time Key event Location Module Settings and associated documents

Observations

From CRI: “These are intended to be external documents (as they are the reference documents for any emergency response / preparedness operation)”.

7. 9/11/2014 11:10

PD identifies the Vulnerable Elements within the region

PD – RCR

GUI Layers to visualize:

Filter for the name

- “Vulnerable Elements”.

8. 9/11/2014 11:15

PD checks Vulnerable Elements (VE) and sends instructions to the local police in the field.

FIELD Crowdsourced and First Responders Data (App)

Each end-user team perform the following actions:

- Select one VE

- Click on the VE to create a waypoint.

- Add the instruction addressed to the field units:

Message:

“Monitor the evolution of the water level, identify the vulnerable elements and report any overflows that occur along the river basin.”

- Send the location to the app.

Local units identify Vulnerable Elements and report their status. Locations of these Vulnerable Elements are sent from the field with information.

Flood risk update:

As a result of heavy rains throughout the area of Carasco the water level of Torrente Entella continues to rise, thereby raising the concern over potential flooding.

Based on the weather forecast by ARPAL

Page 66: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 64

SKP Time Key event Location Module Settings and associated documents

Observations

heavy rain is expected to persist through the day. Local Units are required to look out the populated area as flooding may occur later on the day.

9. 9/11/2014 11:30

View available elements along the Entella river.

FRS - NCR

GUI / Exposure

Layers to visualize:

- “Entella buildings”

- “Entella transportation”

- “Entella LULC”

- “Entella municipalities”

Hint: you can filter for “Entella” to see only those layers.

10. 9/11/2014 12:00

Connect to a weather service to acquire weather data.

FRS - NCR

External systems

Right click on the map to get weather data from the Weather Grid.

11. 9/11/2014 14:00

The National Civil Protection Authority activates the yellow alert phase (fase di attenzione) for the Liguria Region.

FRS – NCR & PD – CRC

N/A This step is just informative. No actions to be performed by the users.

Check the following documents from the “Demo 3 Material” folder: WFD “Bollettino meteo” from ARPAL.

This is the way the civil protection communicates to the population that an area is on alert.

12. 9/11/2014 22:00

Local Police Units in the field inform about the possible overflow in SP225 bridge in Carasco.

FIELD

Crowdsourced and First Responders Data (App)

LP send a text message with information about the waypoint from the app:

Message:

“High water levels

- Approx. coordinates:

Long (X): 9.348378

Lat (Y): 44.345995

Page 67: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 65

SKP Time Key event Location Module Settings and associated documents

Observations

have already caused Torrente Entella to overwhelm its bank in the south of Carasco.”

Coordinates location. Long-9.348378. Lat-44.345995”.

13. 9/11/2014 23:00

Alert from 112:

Possible overflow of Torrente Entella in its way through the town of Carasco.

FRS - NCR

N/A This step is just informative. No actions to be performed by the users.

14. 9/11/2014 23:10

Set mode to “Response”.

FRS – NCR & PD – CRC

N/A

15. 10/11/2014 6:00

Flood analyst queries weather forecast for +3 +6 +9 hours.

FRS - NCR

Service Platform

Weather forecast for 0/+3/+6/+9h.

Right click on the map to get weather data from the Weather Grid and select the time intervals +3/+6/+9h to get the weather data.

Note, historical conditions were:

- Dew Point: 15/14/14/12 ºC

- Wind speed: 6/6/7/11 m/s

- Wind direction: 145/145/180/190 degrees

- Forecasted rainfall: 190/180/170/145 mm

- Wind gust: 145/150/170/175 degrees

- Temperature: 12/14/17/21 ºC

- Humidity: 83/82/80/74%

- Rainfall intensity: 50/40/40/35

Page 68: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 66

SKP Time Key event Location Module Settings and associated documents

Observations

mm/h

Accumulated rainfall: 0/120/160/195 mm

16. 9/11/2014 23:10

Update of scenario. FRS - NCR

Scenario management

Set scenario parameters as follows:

- Change scenario area: Check the exact location in the “Demo 3 Material” folder: “Scenario area (Carasco)”.

- Change Hazard location: Carasco, whose coordinates are:

Long (X): 9.348329

Lat (Y): 44.346200

- Status=”Actual”

- Urgency=”Immediate”

- Challenge: Low frequency, high impact

- Save modifications

-

17. 9/11/2014 23:30

Trigger flood simulation.

FRS - NCR

Flood simulator

Simulation parameters:

- Name: flood (username)

- AOI: area around the town of Carasco. Check the exact location in the “Demo 3 Material” folder: “Scenario area (Carasco)”.

- Maximum discharge values. Set the streams

The simulation run takes about 10 minutes until the results are generated.

In the meantime, users can move to the next step.

Page 69: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 67

SKP Time Key event Location Module Settings and associated documents

Observations

according to file “Streams” (T200 - 200 years return period):

- Entella river: 520 m3/s

- Lavagna: 1062 m3/s

- Resolution: 5 m

- Speed: 5 m/s

- Duration: 3h

- Interval: 300s

18. 10/11/2014 23:35

View of EO products.

FRS - NCR

Earth observation

EO layers to visualise:

- EO based flood extent.

- EO based landslide extent

- EO based building impact assessment

- EO based road impact assessment

- EO based population impact assessment

- EO based Land Use / Land Cover impact assessment

Users display the EO layers on the map and discuss about the information they provide.

19. 9/11/2014 23:40

Create a screenshot showing the simulation results.

FRS - NCR

GUI Right click on the map and select “Save screenshot to file”

Screenshot associated to an active scenario.

20. 9/11/2014 23:45

Create a Response Plan and attach the screenshot.

FRS – RCR

Scenario management

Users select the RP parameters they consider more appropriate according to their own criteria, at least:

- Hazard type (automatic from scenario)

- Start time

Page 70: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 68

SKP Time Key event Location Module Settings and associated documents

Observations

(09.11.2014 23:10)

- Incident Challenge Level

- Strategy

- Objective (min. one)

21. 9/11/2014 23:45

New alert creation and activation of Local Police or Fire Fighter units in the field.

FIELD Crowdsourced and First Responders Data (App)

Create an alert:

- Area: select municipality: Genova, IT.

- Audience: Private

- Address: Select “Local Police” if you are Police or select “Fire Fighters” if you are fire fighter

- Hazard: Flash flood

- Certainty: Observed

- Severity: Severe

- On Set time : Now

- Expiration time: not mandatory

- Response: open to the users

- Urgency: Immediate

- Additional instructions: “The southern access road to the town through the SP225 bridge (via Montanara Disma) is completely overflooded, while high-volume discharges are spreading rapidly toward the centre of the town.”

Page 71: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 69

SKP Time Key event Location Module Settings and associated documents

Observations

- Translation: not required

- Resources: upload the screenshot of the simulation results.

- Sender: not required

22. 10/11/2014 00:45

Request and view the impact assessment from the simulation results.

FRS - NCR

Risk and impact assessment products

Select building to check the physical, economic and human impacts.

Wait for about 3 minutes. In the meantime users can move to the next step.

23. 10/11/2014 00:30

Update Response Plan.

PD - RCR Scenario Management

Update response plan with further Situation Assessment information (add Situation Assessment):

- Weather conditions

Users to update the parameters in the Response Plan.

24. 10/11/2014 01:00

Local Police units in the field send photos to C&C centres that show the impacts of the floods at different locations.

FIELD Crowdsourced and First Responders Data (App)

Send a photo using the app:

- Users take one picture with their mobile phones and send it through the app.

This step is just for testing purposes as users cannot obviously send real pictures from the field.

Real pictures from the field are available for view in the folder “Scenario photos from the field” inside “Demo 3 Material”.

25. 10/11/2014 6:10

Generate impact summary.

FRS - NCR

Impact summary

Click on “Show Impact assessment” through the “simulation and other associated data” tab.

Display of impact summary results associated with the scenario.

26. 10/11/2014 Create and send the Situation report for

FRS - Crowdsourced and First

Create “New Situation report” in

The situational report is

Page 72: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 70

SKP Time Key event Location Module Settings and associated documents

Observations

6:10 first responders in the field.

NCR Responders Data (App)

the alert menu.

Situation report parameters are open to the users.

immediately received on the mobile phone by the field units, who will check it.

27. 10/11/2014 6:30

Incident Commander selects a location for the FCP.

FRS - RCR

Decision Support

Check and select the most suitable location to place the FCP.

To view the FCP select the layer “FPC Points” from the layers menu.

This step is optional.

28. 10/11/2014 8:00

Forward Command Post deployed.

FIELD N/A This step is just informative. No actions to be performed by the users.

User monitors resources on the field.

FCP deployed.

29. 10/11/2014 10:00

Coordination meeting at FCP.

FCP N/A This step is just informative. No actions to be performed by the users.

IC and LP discuss about the new simulation results.

30. 10/11/2014 10:00

Incident Commander requests a comparison analysis of the selected potential scenario against former incidents with similar characteristics.

FCP Scenario matching

Scenario matching based on the following filters:

- Hazard type: Flood: Flash flooding

- Status: Actual

- Urgency: Fictional, Expected, Historic

There is a fake scenario called “Polcevera river floods”.

31. 10/11/2014 10:00

Communication meeting with the mayor.

FCP Crowdsourced and First Responders Data (App)

Generate a situation report document by clicking on “Generate SitRep PDF” in the scenario menu.

32. 10/11/2014 12:00

Incident Commander examines the Common Capability Challenges (CCCs)

PD - RCR Decision Support

Decision support information (DSS):

- The resulting CCC is

This step is just for visualisation purposes.

Page 73: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 71

SKP Time Key event Location Module Settings and associated documents

Observations

related to the scenario displayed to him.

displayed in the respective section in the scenario.

33. 10/11/2014 12:00

IC determines the evacuation of all the houses affected in specific EVAs (Evacuation Areas) and informs the PD - CRC about that.

FRS - RCR

Decision Support

Users to perform the following actions: Go to “Simulations and other associated data”, unfold your simulation and select “Get safe GOI”; then click on “select EVAs”; select all the EVAs (click on “Select all”) and click on Done.

To view the EVA select the layer “EVA” from the layers menu.

Location of EVAs that require evacuation according on the simulation results.

34. 10/11/2014 12:30

Police Local units are activated to manage the evacuation tasks.

PD - RCR N/A This step is just informative. No actions to be performed by the users.

35. 12/11/2014 10:00

Incident Commander starts the Lessons Learnt compilation process.

PD - RCR Prepare the lessons learned of the incident accounting for the following parameters:

- Level of Command

- Lessons Learned Capability

- Lesson evaluation

Creation of Lessons Learnt.

36. 13/11/2014 20:00

Publish in the catalogue.

FRS – NCR

FRS – RCR

PD – RCR

CP - NCC

Catalogue Click on the “Sharing” bottom in the scenario, do not select any access rights, and click on “Publish”.

Users share in the catalogue incident data generated during the exercise.

Page 74: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 72

Solutions 6.2.3HEIMDALL integrated system Release C. See D2.3 [3].

Table 6-13: Detailed specification for story FLOOD-1.

Stage key point

(SKP)

Technical components User interactions

1 UI, UeRM Log into the platform.

3 UI, SP, Scenario management Use HEIMDALL UI to create a new scenario for the flood hazard event.

4 UI, Information Gateway Create an alert message that is notified to other users who are logged in with other Local Units.

5 and 36 UI, UeRM, Catalogue Subscribe to the catalogue and publish data that will be notified and accessed by other users.

6 UI, SP, Scenario management Upload external documents.

7 and 18 UI, SP, External systems Visualise external layers.

8 UI, Crowdsourced and First Responders Data (App)

Create waypoint, add a message and a location, and send it to the app.

10 UI, SP, External systems Get weather map and forecast information.

12 and 24 Crowdsourced and First Responders Data (App)

Send messages and photos from the app to the platform.

15 UI, SP Get weather data.

16 UI, SP, Scenario Management Update the scenario by setting new parameters.

17 UI, SP, Flood simulation Run flood simulations.

19 UI, Scenario Management, Flood simulation

Associate flood simulation screenshots displayed on the GUI to a scenario.

20 and 23 UI, Scenario Management, Response Plan

Create/edit/delete/modify response plans.

21 Crowdsourced and First Responders Data (App)

Create and alert from the app.

22 Risk and impact assessment products Request an Impact Assessment from the simulation results.

25 UI, Impact Summary Generate an Impact Summary.

26 and 31 UI, SP, Situation Report, Create a Situation Report and send

Page 75: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 73

Crowdsourced and First Responders Data (App)

it to the app.

30 UI, SP, Scenario matching Make scenario matching criteria.

32 and 33 UI, SP, Decision Support Create and display decision support (DS) information.

35 UI, SP, UeRM, Scenario Management Create lessons learnt and assign them to scenarios.

6.3 Execution phase The execution phase for the demonstration in the End-Users Workshop 4 is composed by 4 dry runs and the execution of the Exercise FLOOD-1 and training session.

Hence, a total of four dry runs were organised during the month before the End-Users Workshop 4.

Dry Runs 1, 2, 3 and 4 6.3.1The dry runs involved technical partners and PCF. End-users were not expected to attend it in order to avoid providing them with extra information about the exercise organisation and solutions before the exercise run, because it was considered this could cause unwanted disturbance in the results.

6.3.1.1 Dry Runs

The outcomes of the Dry Run 1 in preparation for the EUW4 can be found at Annex I. Outcomes of the Dry Run 1 (EUW3).

The outcomes of the meeting Dry Run 2 in preparation for the EUW4 can be found at Annex II. Outcomes of the Dry Run 2 (EUW3).

The outcomes of the meeting Dry Run 3 in preparation for the EUW4 can be found at Annex V. Outcomes of the Dry Run 3 (EUW4).

The outcomes of the meeting Dry Run 4 in preparation for the EUW4 can be found at Annex VI. Outcomes of the Dry Run 4 (EUW4).

Exercise Runs 6.3.2The final run of two exercise FLOOD-1 and the training session, was held within the frame of the End-Users Workshop 4, hosted by FBBR, at University College Copenhagen, on the 23rd of October, 2019.

The agenda of the meeting can be found at Annex VIII. Agenda of End-Users Workshop 4.

The list of attendees can be found at Annex X. List of attendees of End-Users Workshop 4.

o HEIMDALL Partners attendees: 36

HEIMDALL Technical partners: 17

HEIMDALL End-users: 19

Page 76: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 74

o HEIMDALL Advisory Board members: 6

o Other: 5 (Firefighters from the Flood Operations Group of the CFRS)

Photos of the End-Users Workshop 4 can be seen in the following table:

Table 6-14 Photos of End-User Workshop 4

Page 77: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 75

6.4 Evaluation phase This chapter comprises the actions to collect and analyse the feedback from end-users after the demonstration, as well as the information and data collected by technical partners along the exercise sessions.

Data collection 6.4.1Two data collection techniques were employed in order to gather participants’ feedback on the platform features and functionalities:

- Note taking: through the ongoing exercise there was a dedicated note taker to collect all the system’s shortcomings, and key missing capabilities pointed by the participants and the member of the AB as well as other feedback.

- Questionnaire: a questionnaire prepared by EKUT and specifically addressed to the project end-users was prepared in order to assess the fulfilment of user requirements. A sample of this questionnaire can be seen in the Annex XIII. Questionnaire for End-Users Workshop 4.

Page 78: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 76

The feedback gather by means of both techniques was further analysed and arranged to prepare the D2.3 [3].

Data analysis 6.4.2A final number of 21 experts (HEIMDALL end-users and Advisory Board members) answered the questionnaire.

6.4.2.1 Questionnaire outcomes

The main outcomes of the questionnaires, which were collected by EKUT, are presented below along with some comments provided by the responders:

Note: If questions which are highlighted and have a star (*) have been answered, the answer should be written in the open answer column.

Table 6-15. Questionnaire outcomes of system Release C.

Questions Yes Partially No Not applicable

Open answer

1 Did you get/find the information/data you needed? 11 10 0 0

2 Was there any information you could not find/get? 10 2 6 0

3

Which one(s)?* water parameters (quantity, speed, velocity, capacity) (2x); water speed per pixel; types of damages to the buildings; sending waypoint information as message failed; documents were missing; step 23 (2 times); value of outcome simulation (not just legend); calculation of impact assessment

4 Did you recognise the symbology used in the platform and on the map?

9 11 1 0

5

What did you not recognise?* support texts when "mouse over text" desired (4x); screen tips desired (3x); pull-downs in the menu to explain buttons desired; some confusing symbology (e.g. vulerable elements same as FCPs) (3x)

6 Were you able to enter all scenario parameters mentioned in the story?

12 8 1 0

Page 79: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 77

7

If not, where did you experience difficulties?* help by technical partner required (2x); unable to trigger simulation (4x), e.g. problems with velocity; problems with decision support; app functionality difficult or not working (3x); unable to view EVAs, problems with Situation Report, problems with area selection (municipality)

8 Were you able to send an alert message to other workstations?

20 1 0 0

9 Did you receive the alert from other workstations 17 2 2 0

10 Were you able to subscribe to a topic using the Catalogue? 18 2 1 0

11

Were you able to associate the population awareness plan and the hydrological risk management files to the scenario?

16 5 0 0

12 Were you able to use the mobile app to send information about vulnerable elements´ locations?

14 6 1 0

13 Were you able to use the mobile app to send/receive pictures and the associated coordinates from the field?

12 4 5 0

14 Were you able to visualise the Entella-buildings layer to identify the ones exposed to risk?

19 2 0 0

15 Were you able to visualise the Entella-land-use-land-cover (LULC) layer?

19 2 0 0

16 Were you able to visualise the Entella-transportation layer?

20 1 0 0

17 Were you able to trigger a flood simulation? 17 4 0 0

18 Does the flood simulator provide the necessary parameters?

10 6 3 0

Page 80: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 78

19

What is currently missing in the flood simulator that you would like to see (including potential parameters)?*

height of waves (2x)/height of water on the ground/water stream level; water velocity (2x)/water speed (2x); street names/addresses of affected buildings (5x) to prioritise actions (scroll-in desired); rainfall area; time of simulation and real time; human exposure to compare it with building impact in order to prioritise

20 Were you able to check the EO flood and landslide extent layers?

17 3 0 1

21 Were you able to visualize the EO building impact assessment layer?

15 5 0 1

22 Were you able to visualize the EO road impact assessment layer?

16 4 0 1

23 Were you able to visualize the EO population impact assessment layer?

15 3 0 1

24 Were the EO impact assessment products useful to evaluate the current situation?

15 5 0 0

25

If no, why?* some functionalities still need to be implemented across different layers; it is a source that probably won´t be available at the right moment; issues with layers disappearing continuously; date and hour of collecting EO data required; EO information is partially useful during information because they do not show ongoing information

26 Were you able to create a response plan? 20 1 0 0

27 Were you able to associate a screenshot to the Response Plan?

19 2 0 0

28 Were you able to update the Response Plan? 19 2 0 0

29

Is the design of the Response Plan useful (provide added value) in assisting in the operational management of disaster situations?

12 7 2 0

Page 81: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 79

30

Why?* it´s not operational; missing parameters/lack of information (2x); the ability to edit the Response Plan would be useful; because the operational team needs executive information; because it proposes a lot of important parameters (2x), possibility to share information across more actors; countdown times linked to simulation period would be nice; Response Plan too early in the Story

31 Were you able to trigger an Impact Assessment based on the simulation results?

17 2 0 0

32 Were you able to visualize the impact assessment (physical, human and economic) in the map?

15 4 1 0

33 Were you able to generate an Impact Summary? 16 1 0 0

34 Was it easy for you to generate an Impact Summary? 12 4 4 0

35

If no, why?* required several attempts/help from guides to work (3x); too complex; data not important; information on data source and parameters used during cost damage calculation required

36 Is the summarised information useful? 13 4 2 0

37 If no, why?* too much information (2x), selection of certain parameters

required (2x)

38 Were you able to create a Situation Report? 18 1 1 0

39 Were you able to visualize the Situation Report in the mobile app?

10 2 7 1

40 Did you like the visualization of the Forward Command Posts (FCPs) in the map?

7 5 4 2

41

If no, why?* the coloring was confusing (e.g. all buildings red) (2x); some end users would not rely on this information; parameters lacking to choose points (2x); pop-up over FCP desired; different icon rather than another dot desired; option to add new FCPs manually desired

Page 82: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 80

42 Were you able to request a Scenario Matching? 16 4 1 0

43 Was it easy to request a Scenario Matching for the active scenario?

12 6 3 0

44

If no, why?* not very user friendly/difficult to use (4x); concepts of certain terms unclear/must be adapted accounting for the different actors and hazards (e.g. term "duration"); new tab for matching scenario preferred over having to select it as the active scenario; problems opening the scenario matching; problems due to differing data; possibility to check one item of the list and see related information desired

45 Are the possibilities for configuration (parameters/weights) useful?

11 6 0 0

46

If no, why?* the meaning of some concepts must be clarified in order to configure the weights of each parameter (e.g. duration) (3x); possibility to change the parameters desired; don´t know, haven´t used it

47 Would you need other matching parameters? 5 3 8 2

48

If yes, which ones?* parameters might vary according to different countries or incident types; to be discussed; open ones for the end user to adapt to their needs; concrete ones: vulnerability of people, quantity of people, kind of building, geology, slope inclination, aspect

49 Do the Scenario Matching results provide the information you expect?

9 6 1 0

50

If no, why?* more information required; platform needs to be fed to provide more precise results; don´t know, never opened a file to check it (2x); it would be useful to have information related to the scenario and to check one item of the list and see related information

Page 83: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 81

51 Do you understand the results? 14 3 1 0

52 If no, why?* because we never opened it to look at it

53 Are the Scenario Matching results presented in a useful way?

9 6 4 0

54

If no, why?* problems opening the Scenario Matching; disliked the colouring; desired to have scenario matching open in new tab tp use alongside active scenario; preview of selected information desired (3x), it would be useful to have information related to the scenario and to check one item of the list and see related information

55

Were you able to request Decision Support information regarding Common Capability Challanges (CCC) which are relevant for the ongoing situation?

6 4 5 3

56 Was the presentation of the CCCs useful for you to identify the relevant ones?

5 6 3 3

57 If no, how can the CCCs be better presented?* didn´t get there; additional support form guides required (3x);

more information is required

58

Was the Decision Support (DSS) functionality "select EVAs" useful in order to identify which at-risk areas are the least safe and may require assissted evacuation to rescue people affected by the floods?

6 6 3 3

59

If no, why?* parameters missing (e.g. velocity, human exposure in comparison to building impact); implementation of some functionalities lacking; has not worked (4x); more information required (not just location)

60 Did you like the vicualization of safe EVAs in the map? 7 5 2 4

61

If no, why?* clarification of the term "temporarily safe areas" required; has not worked (3x); different symbols for different sets of EVAs desired

Page 84: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 82

62

The selection of maximum ETA (estimated Time of Arrival) for the "select EVAs" functionality is displayed but not activated in the current version. Would such a filter be useful?

8 2 0 7

63

Why?* it´s a key information to adjust strategy and prioritise actions (2x); optimise response; important to know operational capacity; estimate "reaction" time for teams in the field; depends on what it means and what it takes into account (e.g. whether it takes into account real flood values, simulated values, etc...)

64

Would you need more properties to be customized in the "select EVAs" section besides the maximum ETA, e.g. other types of locations to be assessed?

5 1 5 6

65 Which one(s)?* parameters to get the larger scope of decisions; chemistry

industries, gas stations; alternative access roads

66 Would you need further results, e.g. textual summary with list of potentially safe locations?

5 1 6 4

67

Which ones?* clarification of the term "temporarily safe areas" required; safe locations, meeting points of the population; a list of affected elements with location/address and level of impact to help prioritise

68 Were you able to create a Lesson Learnt? 15 1 2 2

69 Were you able to publish in the Catalogue? 17 1 1 1

70 Was the access rights selection for the Catalogue satisfying and clear?

7 2 2 4

71 If no, why?* didn´t do it; use of acronyms confusing; can´t find it; was

difficult to figure out where to publish; can´t remember

72

On a scale from 1 to 5 (1 is bad and 5 is excellent), how do you evaluate the interavtion with the platform in terms of…?

1 2 3 4 5

Page 85: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 83

Organisation of menus/information 0 1 5 7 2

Data structure of forms 0 2 6 6 1

Page 86: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 84

7 Conclusion

The document provides detailed information on the preparation of the EUW3 and EUW4, which follow the EUW2 described in the HEIMDALL Deliverable D3.5 Demonstrations – Issue 2 [8]. Two stories with two storyboards were prepared by ICGC and PCF to frame the execution and text of HEIMDALL functionalities for Release B; whereas one storyboard and one training session were prepared by PCF to frame the execution and text of HEIMDALL functionalities for Release C. During the course of both EUW3 and EUW4 feedback on the execution of the exercise as well as on the design, features and functionalities of the HEIMDALL platform was collected from the end-users (internal and external to the consortium), the members of the Advisory Board and other participants. This feedback has been taken into consideration in preparation for the final release corresponding with the project Final Demo (March 2020).

Furthermore, the outcomes of the questionnaire that was handed out to the participants at the end of the demo exercise are likewise being used to add new User Requirements that will be fulfilled for the Final Demo. By the end of Release C, participants generally stated that platform functionalities had remarkably improved since the previous releases. Nevertheless, they also highlighted pertinent new requirements to move towards a successful Final Demo.

Page 87: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689] D3.6

12/03/2020 85

8 References

[1] HEIMDALL Deliverable D2.1 System Engineering Report – Issue 1. [2] HEIMDALL Deliverable D2.2 System Engineering Report – Issue 2. [3] HEIMDALL Deliverable D2.3 System Engineering Report – Issue 3. [4] HEIMDALL Deliverable D3.1 Case Studies – Issue 1 [5] HEIMDALL Deliverable D3.2 Case Studies – Issue 2 [6] HEIMDALL Deliverable D3.3 Case Studies – Issue 3 [7] HEIMDALL Deliverable D3.4 Demonstrations – Issue 1 [8] HEIMDALL Deliverable D3.5 Demonstrations – Issue 2 [9] Dubost, L., Giroud, F., Boisnon, J-M., Clémenceau, A., Quéré, B. (2017). Trialing a

Common Operational Picture in simulated environment. In: Proceedings of International Conference on Information and Communication Technologies for Disaster Management, December 2017, available at: http://www.driver-project.eu/wp-content/uploads/2018/01/DRIVER_2017-ICT-DM-paper-on-Expe41.pdf [last accessed in July 2018]

[10] DRIVER (2017). D23.21 - Performance and Effectiveness Metrics in Crisis Management Experiments. Available at: http://driver-project.eu/wp-content/uploads/2017/11/Performance-and-Effectiveness-Metrics-in-Crisis-Management-Experiments.pdf [last accessed in July 2018]

[11] Parmenter, D. (2010). Key Performance Indicators (KPI): Developing, Implementing, and Using Winning KPIs. Hoboken: Wiley & Sons

Page 88: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

9 Annex I. Outcomes of the Dry Run 1 (EUW3)

Scenario creation o The necessary input values for creating a scenario needs to be defined and

added to the document. Was performed online. o In scenario a “-1” shall correspond to a “unknown” at the GUI. Issue on

AVA. o The columns in the scenario browser needs to be adapted to the latest version

(status and urgency). Issue on AVA o If a scenario is newly created it should be set as active automatically. If there

is already an scenario active, the user should select. Issue on AVA

Landslide sensor data o Alert thresholds need to be defined ( AI-329 on ICGC ) and will stored at the

SP of the API is ready by next week Issue on SPH.

Alert messages o For private alerting messages the address field needs to have some

predefined values and it should be possible to add multiple ones. Issue on DLR-KN

o The alert receiver is not done yet. Issue on AVA o The predefined alerting areas are needed for the Liguria region for demo B.

Areas already have been selected but need to be implemented in the system, first feedback from end users is needed on the areas. AI-331 on DLR-KN

o Terrain Movement needs to be added as hazard type in the alert message issue on DLR-KN

o A now button for the onset time is needed. issue on AVA o The sender and webpage should be part of the general user preferences and

automatically set by the GUI if an alert message is created. Issue on SPH and AVA

o Screenshots from the GUI need to be associated to the Scenario Issue on GUI

o in a next step the screenshot should be attached to an alert message. A method is needed at the IG that fetches a file from the SM by a URL provided by the GUI. Issue on DLR-KN

Pictures from the app o the geo image field was discussed and if it can be used to store pictures send

from the field by the app. o Metadata should include the location, time and the user Issue on CIMA

Scenario II + Weather o It was agreed that the current lessons learnt structure should be kept and

enhanced with the possibility to attach a file. Issue on CIMA o The possibility and principle of copying and deleting scenarios needs to be

clarified. Are subfields also copied or deleted? What happens to data that is not assigned to a scenario then anymore? After clarification this needs to trigger an issue for the GUI. AI-333 on DLR-DFD

o The scenario area/ hazard area and possibilities of adding the weather per area at the GUI has been discussed

o It was agreed that major discussion on this will be shifted towards the landscape scenario discussion ongoing

o For demo B the weather conditions of the area of interest will be shown only at the GUI and not connected to a scenario. For the scenario an incident point will be selected where then also the current conditions should be loaded into the scenario by the click of a button. Issue on AVA

o For the weather shown on a grid in the AOI the SP can provide a method. Issue on SPH

General

Page 89: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

o It should be possible in the user preferences to select the AOI, it will be part of story #1. Issue on SPH

o It should be possible to see who is online, mobile and GUI user. Low priority. Issue on AVA

o Response plan document is needed for the next run AI-334 on PCF o PCF and DLR-KN will have a session next week to check for open points in

story #2. AI-335 on PCF and DLR-KN o Story #1 needs to be reviewed with the updates and lessons learnt today.

AI-336 on PCF

Page 90: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

10 Annex II. Outcomes of the Dry Run 2 (EUW3)

General points:

Coordinates could be shown for select hazard location Search for incident area based on coordinates for C

Rainfall simulation missing in the story. Not integrated yet. Will be checked if possible. Issue on SPH and AVA

Provide a folder with all necessary docs that are stored on the workstation machines. AI on PCF

Apk will be provided by AVA to DLR-KN for testing. Issue on DLR-KN

Story Specific:

most points below have an impact and the story and needs to be considered AI on PCF

3 – one mode is missing, colours have been defined

4 – this is automatically set as active

5 - not possible

6 - remove, (more usefeull for lanscpare scenario)

7 - will be removed since it is shown in story 1, by using the hazard location

8 - response plan to be checked by angel if possible Issue on AVA

10 – use the chat function for this instead of alert

11- no private weather data – weather per area, bounding box which be calculated based on the AOI at the GUI Issue on AVA

14 – road network data is there “transportation Monesi” rename and change colour SPH

15 – 3d Building model Monesi layer should be shown

16 – decide in the short term if can be shown (optionally)

17- Sertit landslide delineation what do we do with the associated products? Drop down list for layers, product filter type. Clone layers? Drop down list. SPH Legend needed which explains the layer UNISTRA Workflow for how to request EO data? AI on DLR-KN

19 – upload picture from app -> notification to GUI -> associate to scenario, members of groups needs to be checked SPH

20 - use geoimage until updated with image from field AI DLR-KN

21 - refer to landslide simulator case study #1 or insert parameters in the story, how to do with area?

22- layer was shown before (3d buildings)

23- move before simulation, but how to then provide the info? AI PCF

24 - remove

25 - moved to next week

26 - safety areas EO based what was agreed? Ready for next release DLR-KN

32- not tracked by system, location layer at the teamsite, needs to be forwarded to Spyros PCF

33 and 34 - feature missing AVA

35 - layer to be shown, text adapted layer must be shown SPH

36 – keep but informative

37 – different coloring since will be provided in the next release

Page 91: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

39 – only situation report is produced , sharing button AVA

40 - show area grid and remove association to scenario

43 – where to store drawings? Should be in the scenario? AI on DLR-KN

47- 48 use different symbols for critical infrastructure. to be checked with Christan DLR-KN, to provde symbols AI on PCF

49- button for conditions in scenario and for show in the GUI AVA Weather timings as drop down

50 – next release

52 –move show positions of first responder step before, include text as drawing AVA

67 - document is at teamsite, add doc is there but GUI needs to be updated AVA

Page 92: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

11 Annex III. Outcomes of the Dry Run 1 (EUW4)

Step 2: remove, will be part of presentation

Step 3: user settings, AOI can be modified. Input parameters

Step 4: to be done either alert or instant messaging. AI on DLR-KN to clarify and provide

Step 6: input parameters to be provided

Incident start time incident end time not mandatory issue on AVA

Use working area as basis for area selection Issue on AVA

Step 7: attachment not working Issue on AVA

Step 8: input (message) needed, user + roles for the recipients needed

Step 9: no login possible Issue on AVA

Step 10: position and text from mobile to vulnerable elements as area or a point as input needed

Combination of text and position would be good, way point feature to be used. Send

point from GUI to App, add text to the point and send it back Issue on AVA

Step 11: landscape might be there, need to be moved to step 6. Scenario

management state and way forward unclear AI DLR-DFD, CIMA, DLR-KN

Step 12: auto assign weather data on button request, incident scenario a point, landscape an area

Hazard location must be created fist Issue on AVA

Step 13: Point must be reformulated since we cannot activate.

VOST are integrated but not sure how to show them

Spyros to send the info that we can receive from VOST before a dedicated telco.

Organize a dedicated telco to clarify the integration and which info to show AI on DLR-KN

Step 14: open issue IG, especially area related issue on DLR-KN, input parameters needed

Step 16: informative

17: input parameters

18: 2nd provider for final, will be prioritized after release C. The provider Info and API

must be send to Spyros, the sooner the better AI on PCF

22: info should be loaded from the system. Contact CIMA for the update DLR-KN

23, depending on the timing can be skipped

24: response plan update missing issue on CIMA, DLR-DFD

25: simulation missing, human impact and flood based, unclear if something needs to

be done at the GUI Issue on DLR-KN

26 - 28: repetition

33 remove since matching is performed in step 40

End users have until the end of the week to update the scenarios in the system. Afterwards, DLR-KN will review and update if necessary.

34 DES missing issue on DLR-KN

35 remove not addressed by HEIMDALL

36 button for fake request Issue on AVA

EO integration missing Issue on SPH

40 Matching buggy Issue on AVA

41 template needed, still ongoing AI on end users

44 informative

45 input parameters needed

46 Load documents lessons learnt bug Issue on AVA

Page 93: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

12 Annex IV. Outcomes of the Dry Run 2 (EUW4)

Roles have been clarified and will be modified SPH

Step 2 needs to be removed PCF

Step 3 receiver part missing moved to next dry run DLR-KN, Text message needs to be replaces by defined selectable values PCF/DLR-KN

Step 5 modify the story: add a screenshot of the area to the story so that the testers can better select the boundaries, Incident end time moved to later step since we don’t now the end time at the moment, Credibility remove PCF Bug: end time still mandatory CIMA Credibility meaning could be presented during training session

Step 6 subscription not working moved to the next dry run Input parameters to be included in the story: Scenario, hazard type flood and country

Step 7 documents to be provided PCF Bug when uploading but second try worked AVA

Step 8 highlight in story that it is an alert, adapt values to IG process PCF

Step 9 waypoints not available yet, the process has been disussed: assign at the scenario as relationship type. The geojson or waypoints api from SP can be used. For sending SP posts it to a dedicated chat file, for return the API of the SP is used AVA

Step 10 to provide the data in geojson PCF

Step 11 adapt story external weather service is not used. Weather grid will be used here Bug: weather is not displayed AVA

Step 12 to be checked offline what to do in this step

Step 13 this functionality can only be tested on a real phone, hence offline test to be performed by AVA

Step 16 update the fields with the historical “fake” weather data To be checked if weather underground can provide the missing inputs, like humidity and dew point SPH Provide SPH with historical weather data PCF

Step 18 flood simulator: real time bugs available CIMA offline version will be provided, how will be discussed by Mirko and Spyros CIMA An additional test will be performed on Friday and a Chat meeting shall be arrangedso that it results can be discussed directly Screenshot to be provided for the area selection in the story so that the user can select properly the area CIMA The input fields definition needs to be checked: two times resolution AVA

Step 20 bug in SM for response plan, issue already there CIMA

Step 21 input parameters needs to be reviewed PCF Bug: IG free text cannot be introduced AVA Bug: Resources was not added DLR-KN

Step 22: Add description to image field to image in order to identify CIMA Response plan end time should not be mandatory, empty string maybe problem CIMA Rename snapshot to screenshot AVA

Step 23 Spyros misses the exposure data, but was provided by Christian, has been clarified in the meantime Simulator data missing

Step 25 fake position will be hard coded in the app AVA

Step 26 impact assessment needed CIMA

Step 27 app update missing moved to the next dry run

Step 28 needs to be performed at response plan creation step 22 CIMA

Page 94: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

Step 29 DSS missing DLR-DFD

Step 30 rephrase point, show the EO products, no fake data is used. Add the filenames to the story Include in the training the explanation that it was a week after the hazard

Step 32 What if not there CIMA

Step 34 Matching working, default weights by one AVA

inputs still missing, some will be added by Angel AVA, PCF

Steps 35, 36, 37, 38 missing and were not tested

Step 40 level of command needs need to be filed DLR-DFD

Not covered yet but needs to be included in the story: CCC matrix, decisions, and

snapshots PCF

Page 95: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

13 Annex V. Outcomes of the Dry Run 3 (EUW4)

Step 3: alert to other LU worked. There is an open issue with posting the JSON in order to store the received alert (https://redmine.space.gr/issues/1695)

6 subscription will be tested offline DLR-KN, SPH

Steps 9 and 10: merged and chat will be used PCF

10 waypoints to be implemented AVA

Vulnerable elements layer name missing SPH

Step 12: weather grid worked

Step 13: will be informative PCF

Step 14: alerting images test worked, adding to scenario worked but preview of the

screenshots was broken AVA Provide a method to fetch previous sitrep from IG

Step 19: flood simulation:

Check if results are realistic (e.g. 350m flood) CIMA Offline: 50 layers, select some meaningful for the story that also can be consumed by

the DES so 3 prominetn steps in time CIMA and PCF

10 minute simulation what to do during this time, maybe EO products PCF

Add a screenshot of the area to the story PCF Name property to be used for the simulation results to show more information to the

user to enable a proper selection SPH

Legend info missing SPH It has been agreed that the time for sandbags is not enough and needs to be moved to the final demo

Step 21: screenshot cannot be created the thumbnail issue already there CIMA

Mapping of the strategy was wrong AVA Notification empty, not sure what needs to be included, but very low prio

Check for specific actions and notifications step DLR-KN

Step 22: Sitrep a multi path problem occurred ath the SP SPH

Step 24: impact assessment worked properly Mapping of return values, one api for displaying, one for feeding other

module AVA

Step 27: worked properly

Step 28: Sitrep hard coded atm, chain is there but needs to be integrated

One XMPP chat room needed SPH

Step 33: what if moved to final, flood use different simulations with different input

parameters PCF

Step 35: matching TODO: results like list of scenarios, fake scenario, two weights to

be added AVA

Steps 38, 39: DES next dry run DLR-DFD

Step 41: lessons learnt, for alisases per instance the SM needs to be enabled for

different instance which is possible but to close to the demo moved to next run

Step 42: publish next dry run DLR-KN

Page 96: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

14 Annex VI. Outcomes of the Dry Run 4 (EUW4)

Waypoints: o have been implemented now at the App what is missing is the possibility to

add and description and to return the waypoint with feedback from the field. o Target user selection missing, it was mentioned that it would be good to have

it separated by LU but if not possible in a simple way, will be shifted to final

demo SPH to check

o Description fielded for wait points needed again SPH

o Missing part the feature to send back AVA o Notification at the app is missing if something is received, solution is

there AVA and SPH, but story could be used as work around

Flood simulation

o The DEM needs to be adapted for better realistic results CIMA

o Legend to be provided by SPH

impact assessment o Description of the parameters needs to be improved and units need to be

added CIMA

o Results needs to be scrollable AVA o The colour of the layers should indicate the level of impact, we focus on the

physical impact here during this demo with the illustration, four zones (25% each, in yellow, orange, red and violet) according to the physical impact.

o Human impact depending on zone of hazard for the final release

sitrep app chain

o Adapt the address field so that the LUs of the story can be selected DLR-KN

o XML mapping some values missing have been clarified, the mapping will be enhanced for the final release and will include more parameters

o Area missing DLR-KN

matching o results like list of scenarios moved to final

o fake scenario was lost, to be reintroduced by PCF and then inform DLR,

finally to be tested offline DLR-KN, DLR-DFD o filtering for LUs are in place, but will be removed just for the demo so that

database is larger SPH, legal issues with this for the final o two weights to be added moved to final

DES o Styling is missing of results and numbers to be displayed, how to deviated

FCP and EVA, legend proposal from DFD

lessons learnt

o Aliases in Italy to be checked with CRI PCF

Catalogue

o GUI functionality missing to publish scenarios, backend ready AVA o Test using the URL was successful o Illustration for the subscription results need to be presented in a better way at

the moment it is only showing the response JSON AVA

Layer

o Layers provided by DLR-DFD are missing in the story PCF but style needs

to be included DLR-DFD

Page 97: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

15 Annex VII. Agenda of End-Users Workshop 3

HEIMDALL

3rd End Users Workshop (EUW3)

Centro Internazionale Monitoraggio Ambientale (CIMA)

Via Armando Magliotto, 2

17100 Savona, Italy

17th April 2019

AGENDA

WEDNESDAY 17TH

08:30 Welcome (DLR-KN) and Introduction of Advisory Board

09:00 Overall presentation of use cases and methodology(PCF)

09:15 System intro and modules usage

09:30 Coffee break

Workshop Part I:

LAND-1 Exercise (preparedness phase)

09:45 Introduction, rules, and story explanation

10:00 Usage of the system (AB+EUs)

11:00 Open Discussion

11:30 Debriefing questionnaire

12:00 Lunch

Workshop Part II:

LAND-2 Exercise (response phase)

13:00 Introduction, rules, and story explanation

13:15 Usage of the system (AB+EUs)

15:00 Open Discussion

15:30 Debriefing questionnaire

16:00 Coffee break

Preview of Products out of Release B demo

16:30 Product 1: HEIMDALL Catalogue: module for information sharing and collaboration

17:00 Product 2: Scenario Matching

17:30 Product 3: Area Monitoring for Wildfire Hotspot Detection with a Swarm of

Autonomous Drones - First Experimental Results

18:00 Final wrap-up

18:15 End of meeting

Page 98: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

16 Annex VIII. Agenda of End-Users Workshop 4

HEIMDALL

4th End Users Workshop (EUW4)

University College Copenhagen

Sigurdsgade 26, 2200 Copenhagen

23rd

October 2019

AGENDA

WEDNESDAY 23RD

08:30 Welcome (FBBR + DLR-KN) and Introduction of Advisory Board

09:00 Overall presentation of the EUW4: training session and use case (PCF)

09:15 System intro and modules usage

09:30 Coffee break

Workshop Part I:

Training Session of EUW4

09:45 Introduction to training session

10:00 Training live session

12:00 General questions

12:15 Lunch

Workshop Part II:

FLOOD-1 Exercise (preparedness and response phase)

13:15 Introduction, rules, story explanation, handing off questionnaires

13:45 Usage of the system (AB+EUs)

15:45 Coffee break

Workshop Part III:

Discussion and debriefing questionnaire

16:15 Vulnerability Assessment under Cascading Effects (DLR-DFD)

16:30 Debriefing questionnaire

17:15 Discussion

18:00 Final wrap-up

18:15 End of meeting

Page 99: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

17 Annex IX. List of attendees of End-Users Workshop 3

HEIMDALL Partners

DLR-KN Mani Swaminathan Benjamin Barth Alberto Viseras

DLR-DFD Monika Friedemann Christian Knopp (guide)

Christian Boehnke

SPH Spyros Pantazis Alexandros Bartzas

PCF Celia Conde Jordi Vendrell

TSYL Miguel Mendes

AVA Diana Mathew (guide) Angel Grablev

EKUT Andreas Baur

Solange Martinez Demarco

UNISTRA Stephanie Battiston Julien Briant

CTTC

ICGC Clàudia Abancó

CIMA

INT Daniel Milla Edgar Nebot Jordi Pagès Claudi Gallardo

Laia Estivill

FBBR Kim Lintrup Rasmus Lillemose

SFRS Bruce Farquharson Alex McKinley Keith Langley Ewan Baird

CRI Lorenzo Stefano Massucchielli

Nedim Jasic Silvia Venier Traverso Danilo

Cerminara Matteo

Costache Stefania

Cavo Sabrina

Other

CNR-IRPI Aleksandra Wrzesniak Davide Notti Daniele Giordan

Page 100: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

Advisory Board and End Users

Geological Survey of Austria

Sandra Melzner

Corpo Nazionale

dei Vigili del Fuoco

Gianmario Gnecchi

BRGM (Bureau de Recherches Géologiques et Minières) Christian Iasio

Regione Emilia

Romagna Agenzia per la Sicurezza Territoriale e Protezione

Civile

Giovanni Bartolini

Consejería de Medio

Ambiente y Ordenación del Territorio

Junta de Andalucía

Antonio Santiago Gahete

Page 101: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

18 Annex X. List of attendees of End-Users Workshop 4

HEIMDALL Partners

DLR-KN Benjamin Barth Alberto Viseras Govinda Kabbinahithilu

DLR-DFD Christian Knopp Monika Friedemann

Sandro Martinis Peter Folie

SPH Spiros Pantazis Alex Bartzas

PCF David Martin

TSYL Miguel Mendes

AVA Angel Grablev Diana Mathew

EKUT Solange Martinez Demarco

Lena Schlegel Andreas Baur

UNISTRA Stéphanie Battiston Julien Briant

CTTC Guido Luzi

ICGC Pere Buxó

CIMA Flavio Pignone Mirko D'Andrea

INT Daniel Milla Claudi Gallardo Carles Garcia Laia Estivill Edgar Nebot

5 firefighters from the Flood Operation Group

FBBR Kim Lintrup Sefik Muhic Jesper Marcussen Rasmus Lillemose

SFRS Bruce Farquharson Ewan Baird Keith Langley Alex McKinley

CRI Nedim Jasic SimonPietro Mondini

Advisory Board and End Users

GEOCONSULT ZT GmbH / GEOCONSULT

Sandra Melzner (TBC)

BRGM (Bureau de Recherches Géologiques et Minières) Christian Iasio

Page 102: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

Regione Emilia Romagna Agenzia per la Sicurezza Territoriale e Protezione Civile

Giovanni Bartolini

Consejería de Medio Ambiente y Ordenación del Territorio Junta de Andalucía

Antonio Santiago Gahete

JAVNA VATROGASNA POSTROJBA GRADA KARLOVCA

Miroslav Rade

Page 103: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

Annex XI. Questionnaire for End-Users Workshop 3

Questionnaire – Release B

Questionnaire on exercise I – Preparedness

Questions

Answers

Fulfilment

Yes Partially No Not

applicable

1 Were you able to log in with the profile/role assigned? ⃝ ⃝ ⃝ ⃝

2 Did you get/find the information/data you needed? ⃝ ⃝ ⃝ ⃝

3 Was there any information you could not find/get? ⃝ ⃝ ⃝ ⃝

4

Which one(s)?

5 Did the user profile/role assigned to you fit your working procedures? ⃝ ⃝ ⃝ ⃝

6 Did you recognise the symbology used in the platform and on the map? ⃝ ⃝ ⃝ ⃝

7 What did you not recognise?

Page 104: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

8 Were you able to set the operation mode as ‘training’? ⃝ ⃝ ⃝ ⃝

9 Was it indicated that you were working in ‘training’ mode? ⃝ ⃝ ⃝ ⃝

10 Were you able to create a scenario? ⃝ ⃝ ⃝ ⃝

11 Were you able to observe crack sensor data for different time periods and locations? ⃝ ⃝ ⃝ ⃝

12 Were you able to access the buildings’ layer? ⃝ ⃝ ⃝ ⃝

13 Did you receive a notification informing that the threshold for triggering a response due to a landslide event was exceeded? ⃝ ⃝ ⃝ ⃝

14 Were you able to observe GB-SAR data? ⃝ ⃝ ⃝ ⃝

15 Were you able to create a screenshot? ⃝ ⃝ ⃝ ⃝

16 Were you able to associate the screenshot to a scenario? ⃝ ⃝ ⃝ ⃝

17 Were you able to send an alert to other members of your organisation? ⃝ ⃝ ⃝ ⃝

18 Were you able to attach a screenshot to the alert sent to members of your organisation? ⃝ ⃝ ⃝ ⃝

Page 105: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

19 Were you able to use the chat with first responders and/or members of the geological expert team in the field? ⃝ ⃝ ⃝ ⃝

20 Were you able to use the chat to send/receive pictures from the field? ⃝ ⃝ ⃝ ⃝

21 Were you able to see the position of first responders and/or geological team in the field? ⃝ ⃝ ⃝ ⃝

22 Were you able to delete a scenario? ⃝ ⃝ ⃝ ⃝

23 Were you able to change from ‘training’ mode to ‘preparedness’ phase? ⃝ ⃝ ⃝ ⃝

24 Did you notice the change from ‘training’ mode to ‘preparedness’ phase? ⃝ ⃝ ⃝ ⃝

25 Were you able to set the area of interest (AOI) as Liguria? ⃝ ⃝ ⃝ ⃝

26 Were you able to access weather data? ⃝ ⃝ ⃝ ⃝

27 Were you able to create a scenario based on weather data? ⃝ ⃝ ⃝ ⃝

28 Were you able to associate a lesson learnt document to the scenario? ⃝ ⃝ ⃝ ⃝

29 Were you able to associate the population awareness plan and the hydrological risk management file to the scenario? ⃝ ⃝ ⃝ ⃝

30 Were you able to select different types of landslides and/or other hazards? ⃝ ⃝ ⃝ ⃝

Page 106: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

31 In a scale from 1 to 5 (1 is bad and 5 is excellent), how do you evaluate the interaction with the platform in terms of…?

Organisation of menus/information

Data structure of forms

Page 107: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

What did you like? What worked well?

What did you not like?

What did you miss?

Page 108: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

Questionnaire – Release B

Questionnaire on exercise II – Response

Questions

Answers

Fulfilment

Yes Partially No Not

applicable

1 Were you able to log in with the profile/role assigned? ⃝ ⃝ ⃝ ⃝

2 Did you get/find the information/data you needed? ⃝ ⃝ ⃝ ⃝

3 Was there any information you could not find/get? ⃝ ⃝ ⃝ ⃝

4

Which one(s)?

5 Did the user profile/role assigned to you fit your working procedures? ⃝ ⃝ ⃝ ⃝

6 Did you recognise the symbology used in the platform and on the map? ⃝ ⃝ ⃝ ⃝

7 What did you not recognise?

Page 109: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

8 Was it indicated that you were working in ‘preparedness’ mode? ⃝ ⃝ ⃝ ⃝

9 Were you able to change from ‘preparedness’ mode to ‘response’ mode? ⃝ ⃝ ⃝ ⃝

10 Did you notice the change from ‘preparedness’ mode to ‘response’ mode? ⃝ ⃝ ⃝ ⃝

11 Were you able to upload and attach a response plan? ⃝ ⃝ ⃝ ⃝

12 Were you able to use the chat to communicate with local police and/or first responders and/or the geological expert team in the field? ⃝ ⃝ ⃝ ⃝

13 Were you able to access weather data in the area of interest? ⃝ ⃝ ⃝ ⃝

14 Were you able to access the road network’s layer? ⃝ ⃝ ⃝ ⃝

15 Were you able to access the buildings’ layer? ⃝ ⃝ ⃝ ⃝

16 Were you able to access EO products related to landslide’s extension? ⃝ ⃝ ⃝ ⃝

17 Were you able to use the chat to send/receive pictures from local police and/or first responders in the field? ⃝ ⃝ ⃝ ⃝

18 Were you able to associate pictures from the field to the active scenario? ⃝ ⃝ ⃝ ⃝

Page 110: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

19 Were you able to request and obtain a simulation? ⃝ ⃝ ⃝ ⃝

20 Were you able to trigger and obtain an impact assessment? ⃝ ⃝ ⃝ ⃝

21 Was the information from the impact assessment, simulation and buildings layer useful for identifying safe areas? ⃝ ⃝ ⃝ ⃝

22 Were you able to draw on the layer the safe areas? ⃝ ⃝ ⃝ ⃝

23 Were you able to see the position of first responders and local police in the field? ⃝ ⃝ ⃝ ⃝

24 Were you able to access GB-SAR data? ⃝ ⃝ ⃝ ⃝

25 Were you able to modify the response plan and save it? ⃝ ⃝ ⃝ ⃝

26 Were you able to obtain a situation report? ⃝ ⃝ ⃝ ⃝

27 Were you able to upload the roads blocked by police as a layer? ⃝ ⃝ ⃝ ⃝

28 Were you able to access the critical infrastructure’s layer? ⃝ ⃝ ⃝ ⃝

29 Were you able to query meteorological data specifying time frames? ⃝ ⃝ ⃝ ⃝

30 Were you able to access EO-based impact products? ⃝ ⃝ ⃝ ⃝

Page 111: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

31 Was it useful to draw the evacuation route in the map? ⃝ ⃝ ⃝ ⃝

32 Were you able to run a rainfall simulation? ⃝ ⃝ ⃝ ⃝

33 Was it useful to run the rainfall simulation? ⃝ ⃝ ⃝ ⃝

34 Were you able to create a screenshot? ⃝ ⃝ ⃝ ⃝

35 Were you able to associate the screenshot to a scenario? ⃝ ⃝ ⃝ ⃝

36 Were you able to create a lesson learnt? ⃝ ⃝ ⃝ ⃝

37 In a scale from 1 to 5 (1 is bad and 5 is excellent), how do you evaluate the interaction with the platform in terms of…?

Organisation of menus/information

Data structure of forms

Page 112: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

What did you like? What worked well?

What did you not like?

What did you miss?

Page 113: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

19 Annex XII. Template for Observations during Release B Exercises

Observations Release B Exercises

Methodology for observations

Characteristics of situation assessment/scenario building/alerting:

Duration (is it fast(er)?)

The information displayed (it is relevant and complete?)

Usability of UI (is it intuitive and complete?)

Misunderstandings and errors (is it understandable, clear?).

Page 114: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

FIRE-1 & FIRE-2

Research questions:

How do the Fire Simulator and related UI functionalities facilitate the assessment of potential affected area and conditions (flame length, intensity...) at morning meetings?

How do Release B SP and UI improve the availability of information from additional external data sources and systems to anticipate future scenarios?

How do the Release B Scenario Management solution and related UI functionalities facilitate the building of different possible future scenarios to a potential situation?

How does the Information Gateway solution improve the creation of public awareness and communication with field staff?

Observations:

Information (is it relevant and complete?)

Scenario/Incident Management/Simulations

Risk Assessment:

Usability of UI (is it intuitive and complete?)

First Responders:

Tools (Fire Simulation/Scenario Management/Information Gateway)

Simulation:

Page 115: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

Scenario Management:

Scenario matching:

Misunderstandings and Errors

Other

Page 116: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

20 Annex XIII. Questionnaire for End-Users Workshop 4

Questionnaire – Release C

Questions

Answers

Fulfilment

Yes Partiall

y No

Not applicabl

e

1 Did you get/find the information/data you needed? ⃝ ⃝ ⃝ ⃝

2 Was there any information you could not find/get? ⃝ ⃝ ⃝ ⃝

3

Which one(s)?

4 Did you recognise the symbology used in the platform and on the map? ⃝ ⃝ ⃝ ⃝

5 What did you not recognise?

Page 117: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

6 Were you able to enter all scenario parameters mentioned in the story? ⃝ ⃝ ⃝ ⃝

7

If not, where did you experience difficulties?

8 Were you able to send an alert message to the other workstations? ⃝ ⃝ ⃝ ⃝

9 Did you receive the alert from the other workstations? ⃝ ⃝ ⃝ ⃝

10 Were you able to subscribe to a topic using the Catalogue? ⃝ ⃝ ⃝ ⃝

11 Were you able to associate the population awareness plan and the hydrological risk management files to the scenario? ⃝ ⃝ ⃝ ⃝

12 Were you able to use the mobile app to send information about vulnerable elements´ locations? ⃝ ⃝ ⃝ ⃝

Page 118: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

13 Were you able to use the mobile app to send/receive pictures and the associated coordinates from the field? ⃝ ⃝ ⃝ ⃝

14 Were you able to visualise the Entella-buildings layer to identify the ones exposed to risk? ⃝ ⃝ ⃝ ⃝

15 Were you able to visualise the Entella-land-use-land-cover (LULC) layer? ⃝ ⃝ ⃝ ⃝

16 Were you able to visualise the Entella-transportation layer? ⃝ ⃝ ⃝ ⃝

17 Were you able to trigger a flood simulation? ⃝ ⃝ ⃝ ⃝

18 Does the flood simulator provide the necessary parameters? ⃝ ⃝ ⃝ ⃝

19

What is currently missing in the flood simulator that you would like to see (including potential parameters)?

20 Were you able to check the EO flood and landslide extent layers? ⃝ ⃝ ⃝ ⃝

21 Were you able to visualise the EO building impact assessment layer? ⃝ ⃝ ⃝ ⃝

22 Were you able to visualise the EO road impact assessment layer? ⃝ ⃝ ⃝ ⃝

Page 119: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

23 Were you able to visualise the EO population impact assessment layer? ⃝ ⃝ ⃝ ⃝

24 Were the EO impact assessment products useful to evaluate the current situation? ⃝ ⃝ ⃝ ⃝

25

If no, why?

26 Were you able to create a Response Plan? ⃝ ⃝ ⃝ ⃝

27 Were you able to associate a screenshot to the Response Plan? ⃝ ⃝ ⃝ ⃝

28 Were you able to update the Response Plan? ⃝ ⃝ ⃝ ⃝

29 Is the design of the Response Plan useful (provide added value) in assisting in the operational management of disaster situations? ⃝ ⃝ ⃝ ⃝

30

Why?

Page 120: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

31 Were you able to trigger an Impact Assessment based on the simulation results? ⃝ ⃝ ⃝ ⃝

32 Were you able to visualize the impact assessment (physical, human and economic) in the map? ⃝ ⃝ ⃝ ⃝

33 Were you able to generate an Impact Summary?

34 Was it easy for you to generate an Impact Summary? ⃝ ⃝ ⃝ ⃝

35

If no, why?

36 Is the summarised information useful? ⃝ ⃝ ⃝ ⃝

37

If no, why?

Page 121: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

38 Were you able to create a Situation Report? ⃝ ⃝ ⃝ ⃝

39 Were you able to visualise the Situation Report in the mobile app? ⃝ ⃝ ⃝ ⃝

40 Did you like the visualization of the Forward Command Posts (FCPs) in the map? ⃝ ⃝ ⃝ ⃝

41

If no, why?

42 Were you able to request a Scenario Matching? ⃝ ⃝ ⃝ ⃝

43 Was it easy to request a Scenario Matching for the active scenario? ⃝ ⃝ ⃝ ⃝

44

If no, why?

Page 122: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

45 Are the possibilities for configuration (parameters/weights) useful? ⃝ ⃝ ⃝ ⃝

46

If no, why?

47 Would you need other matching parameters? ⃝ ⃝ ⃝ ⃝

48

If yes, which ones?

Page 123: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

49 Do the scenario matching results provide the information you expect? ⃝ ⃝ ⃝ ⃝

50

If no, why?

51 Do you understand the results? ⃝ ⃝ ⃝ ⃝

52

If no, why?

53 Are the Scenario Matching results presented in a useful way? ⃝ ⃝ ⃝ ⃝

54

If no, why?

Page 124: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

55 Were you able to request Decision Support information regarding Common Capability Challenges (CCC) which are relevant for the ongoing situation? ⃝ ⃝ ⃝ ⃝

56 Was the presentation of the CCCs useful for you to identify the relevant ones? ⃝ ⃝ ⃝ ⃝

57

If no, how can CCCs be better presented?

58

Was the Decision Support (DSS) functionality “select EVAs” useful in order to identify which at-risk areas are the least safe and may require assisted evacuation to rescue people affected by the floods?

⃝ ⃝ ⃝ ⃝

59

If no, why?

Page 125: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

60 Did you like the visualization of safe EVAs in the map? ⃝ ⃝ ⃝ ⃝

61

If no, why?

62 The selection of a maximum ETA (Estimated Time of Arrival) for the “select EVAs” functionality is displayed but not activated in the current version. Would such a filter be useful? ⃝ ⃝ ⃝ ⃝

63

Why?

64 Would you need more properties to be customized in the “select EVAs” section besides the maximum ETA, e.g. other types of locations to be assessed? ⃝ ⃝ ⃝ ⃝

Page 126: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

65

Which ones?

66 Would you need further results, e.g. textual summary with list of potentially safe locations? ⃝ ⃝ ⃝ ⃝

67

Which ones?

68 Were you able to create a Lesson Learnt? ⃝ ⃝ ⃝ ⃝

69 Were you able to publish in the Catalogue? ⃝ ⃝ ⃝ ⃝

70 Was the access rights selection for the Catalogue satisfying and clear? ⃝ ⃝ ⃝ ⃝

71 If no, why?

Page 127: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

72 6

On a scale from 1 to 5 (1 is bad and 5 is excellent), how do you evaluate the interaction with the platform in terms of…?

Organisation of menus/information

Data structure of forms

Page 128: D3.6 HEIMDALL Demonstrations – Issue 3

HEIMDALL [740689]

End of document